Search NASA⌕ Search

SEARCH · Search NASA

Results for “Resource scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,261 records · Page 70

Recent Results from the Lunar Reconnaissance Orbiter Mission and Plans for the Extended Science Phase

The Lunar Reconnaissance Orbiter spacecraft (LRO), launched on June 18, 2009, began with the goal of seeking safe landing sites for future robotic missions or the return of humans to the Moon as part of NASA's Exploration Systems Mission Directorate (ESMD). In addition, LRO's objectives included the search for surface resources and to investigate the Lunar radiation environment. After spacecraft commissioning, the ESMD phase of the mission began on September 15, 2009 and completed on September 15, 2010 when operational responsibility for LRO was transferred to NASA's Science Mission Directorate (SMD). The SMD mission was scheduled for 2 years and completed in September, 2012. The LRO mission has been extended for two years under SMD. The extended mission focuses on a new set of goals related to understanding the geologic history of the Moon, its current state, and what it can tell us about the evolution Of the Solar System. Here we will review the major results from the LRO mission for both exploration and science and discuss plans and objectives going forward including plans for the extended science phase out to 2014. Results from the LRO mission include but are not limited to the development of comprehensive high resolution maps and digital terrain models of the lunar surface; discoveries on the nature of hydrogen distribution, and by extension water, at the lunar poles; measurement of the day and night time temperature of the lunar surface including temperature down below 30 K in permanently shadowed regions (PSRs); direct measurement of Hg, H2, and CO deposits in the PSRs, evidence for recent tectonic activity on the Moon, and high resolution maps of the illumination conditions as the poles. The objectives for the second and extended science phases of the mission under SMD include: 1) understanding the bombardment history of the Moon, 2) interpreting Lunar geologic processes, 3) mapping the global Lunar regolith, 4) identifying volatiles on the Moon, and 5) measuring the Lunar atmosphere and radiation environment.

Vondrak, Richard↗

Transmission Scheduling and Routing Algorithms for Delay Tolerant Networks

The challenges of data processing, transmission scheduling and routing within a space network present a multi-criteria optimization problem. Long delays, intermittent connectivity, asymmetric data rates and potentially high error rates make traditional networking approaches unsuitable. The delay tolerant networking architecture and protocols attempt to mitigate many of these issues, yet transmission scheduling is largely manually configured and routes are determined by a static contact routing graph. A high level of variability exists among the requirements and environmental characteristics of different missions, some of which may allow for the use of more opportunistic routing methods. In all cases, resource allocation and constraints must be balanced with the optimization of data throughput and quality of service. Much work has been done researching routing techniques for terrestrial-based challenged networks in an attempt to optimize contact opportunities and resource usage. This paper examines several popular methods to determine their potential applicability to space networks.

Space Networking↗

Combining model-based and model-free methods for stochastic control of distributed energy resources

Modern distribution systems are experiencing a fast transformation with the growing penetration of distributed energy resources (DERs). Along with the economic and environmental benefits of DERs, challenges arise to address the uncertainties caused by their inherent volatility. If properly coordinated, however, DERs have the potential to provide the controllability that grid operators need. Here, we propose a hierarchical control framework that combines the model-based and model-free methods for stochastic DER control in distribution systems. The upper-level scheduler considers a chance-constrained optimal power flow problem (model-based) that schedules DER setpoints to minimize the operational cost and maintain the operating reserve. The lower-level distributed DER controllers absorb real-time disturbances and uncertainties using the extremum seeking control (model-free) to achieve grid objectives. The combination of model-based and model-free methods allows us to take the advantages of both methods to effectively manage the uncertainty in distribution systems. The proposed work is demonstrated on the IEEE 13-node feeder.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Orbital Express Mission Operations Planning and Resource Management using ASPEN

As satellite equipment and mission operations become more costly, the drive to keep working equipment running with less man-power rises.Demonstrating the feasibility of autonomous satellite servicing was the main goal behind the Orbital Express (OE) mission. Planning the satellite mission operations for OE required the ability to create a plan which could be executed autonomously over variable conditions. The Automated-Scheduling and Planning Environment (ASPEN)tool, developed at the Jet Propulsion Laboratory, was used to create the schedule of events in each daily plan for the two satellites of the OE mission. This paper presents an introduction to the ASPEN tool, the constraints of the OE domain, the variable conditions that were presented within the mission, and the solution to operations that ASPEN provided. ASPEN has been used in several other domains, including research rovers, Deep Space Network scheduling research, and in flight operations for the ASE project's EO1 satellite. Related work is discussed, as are the future of ASPEN and the future of autonomous satellite servicing.

Automated Scheduling and Planning Environment (ASP↗

Stochastic Methods Applied to Power System Operations with Renewable Energy: A Review

Renewable energy resources have been rapidly integrated into power systems in many parts of the world, contributing to a cleaner and more sustainable supply of electricity. Wind and solar resources also introduce new challenges for system operations and planning in terms of economics and reliability because of their variability and uncertainty. Operational strategies based on stochastic optimization have been developed recently to address these challenges. In general terms, these stochastic strategies either embed uncertainties into the scheduling formulations (e.g., the unit commitment [UC] problem) in probabilistic forms or develop more appropriate operating reserve strategies to take advantage of advanced forecasting techniques. Other approaches to address uncertainty are also proposed, where operational feasibility is ensured within an uncertainty set of forecasting intervals. In this report, a comprehensive review is conducted to present the state of the art through Spring 2015 in the area of stochastic methods applied to power system operations with high penetration of renewable energy. Chapters 1 and 2 give a brief introduction and overview of power system and electricity market operations, as well as the impact of renewable energy and how this impact is typically considered in modeling tools. Chapter 3 reviews relevant literature on operating reserves and specifically probabilistic methods to estimate the need for system reserve requirements. Chapter 4 looks at stochastic programming formulations of the UC and economic dispatch (ED) problems, highlighting benefits reported in the literature as well as recent industry developments. Chapter 5 briefly introduces alternative formulations of UC under uncertainty, such as robust, chance-constrained, and interval programming. Finally, in Chapter 6, we conclude with the main observations from our review and important directions for future work.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Introductory Review of the Maritime Nuclear Regulatory Landscape

The successful deployment of nuclear technology for maritime applications, including the ability to provide energy to land-based projects at ports, has the potential to assist the International Maritime Organization’s pursuit of 2050 targets while simultaneously bringing low-cost nuclear power closer to where it is needed. The benefits of low-cost nuclear power include, but are not limited to, effective resource extraction and processing, more efficient and productive industrial applications through electrification, and increased energy abundance. In addition, the maritime sector presents unique opportunities for nuclear. For example, by leveraging the maritime sector’s experience with modular shipyard manufacturing, the nuclear industry can achieve significant cost and schedule reductions, increased productivity, and improved quality control.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Applications of Optimal Building Energy System Selection and Operation

Berkeley Lab has been developing the Distributed Energy Resources Customer Adoption Model (DER-CAM) for several years. Given load curves for energy services requirements in a building microgrid (u grid), fuel costs and other economic inputs, and a menu of available technologies, DER-CAM finds the optimum equipment fleet and its optimum operating schedule using a mixed integer linear programming approach. This capability is being applied using a software as a service (SaaS) model. Optimisation problems are set up on a Berkeley Lab server and clients can execute their jobs as needed, typically daily. The evolution of this approach is demonstrated by description of three ongoing projects. The first is a public access web site focused on solar photovoltaic generation and battery viability at large commercial and industrial customer sites. The second is a building CO2 emissions reduction operations problem for a University of California, Davis student dining hall for which potential investments are also considered. And the third, is both a battery selection problem and a rolling operating schedule problem for a large County Jail. Together these examples show that optimization of building u grid design and operation can be effectively achieved using SaaS.

25 ENERGY STORAGE↗

Automatic Identification of Application I/O Signatures from Noisy Server-Side Traces

Competing workloads on a shared storage system cause I/O resource contention and application performance vagaries. This problem is already evident in today s HPC storage systems and is likely to become acute at exascale. We need more interaction between application I/O requirements and system software tools to help alleviate the I/O bottleneck, moving towards I/O-aware job scheduling. However, this requires rich techniques to capture application I/O characteristics, which remain evasive in production systems. Traditionally, I/O characteristics have been obtained using client-side tracing tools, with drawbacks such as non-trivial instrumentation/development costs, large trace traffic, and inconsistent adoption. We present a novel approach, I/O Signature Identifier (IOSI), to characterize the I/O behavior of data-intensive applications. IOSI extracts signatures from noisy, zero-overhead server-side I/O throughput logs that are already collected on today s supercomputers, without interfering with the compiling/execution of applications. We evaluated IOSI using the Spider storage system at Oak Ridge National Laboratory, the S3D turbulence application (running on 18,000 Titan nodes), and benchmark-based pseudo-applications. Through our ex- periments we confirmed that IOSI effectively extracts an application s I/O signature despite significant server-side noise. Compared to client-side tracing tools, IOSI is transparent, interface-agnostic, and incurs no overhead. Compared to alternative data alignment techniques (e.g., dynamic time warping), it offers higher signature accuracy and shorter processing time.

Liu, Yang↗

TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT TO SAFELY AND EFFECTIVELY COMPLETE NUCLEAR CONSTRUCTION WORK

Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Guest Editorial: Planning and operation of resilient distribution system for integrated multi-energy

Resilience is the ability of power systems to prepare for and adapt to low-probability, high-impact incidents and withstand and recover rapidly from disruptions. With the ageing of electricity distribution infrastructure and increasing threats of weather-related incidents and natural disasters, the need to effectively enhance the resilience of the electricity distribution system has become urgent and has attracted worldwide attention. Although there are an increasing number of publications related to enhancing resilience strategies, resilience is an emerging concept in power systems. Existing practices are mostly focused on deploying distributed energy resources (DERs) and microgrids, hardening the existing infrastructures and building redundant capacities. However, from a broader perspective, resilience enhancement of power distribution system is a systematic engineering, involving long-term system planning and upgrading (e.g., deployment of smart grid technologies and intelligent switches), short-term proactive scheduling, real-time robust and resilient control of DERs, and post-event restoration and recovery strategies. Based on this point, this Special Issue in IET Energy System Integration focuses on soliciting the most recent and original technologies, scheduling and control strategies for improving the resilience of power distribution system. Eight papers are presented in this Special Issue, covering various aspects related to resilience enhancement of power distribution system, including fault-tolerant frequency measurement, robust scheduling of integrated electricity and district heating systems, robust control of DERs, efficient methods for safety verification as well as novel graph theory-based approach to restore the distribution systems after multiple simultaneous faults. A brief introduction of these 8 papers is provided below.

24 POWER TRANSMISSION AND DISTRIBUTION↗

AC Power Flow Based DLMP Calculation and Decomposition Method to Smooth Power Fluctuation of Distributed Renewable Energy Sources

As the penetration of renewable energy sources increases, the growing renewable power variability brings ramping issues to power systems. Meanwhile, the development of distributed energy resources (DERs) makes the distribution systems to provide both energy and ancillary services. To incentivise individual resources and customers to alleviate ramping issues on the demand side, a two-stage distribution locational marginal price (DLMP) calculation and decomposition method is developed to formulate the marginal power ramping price for DERs. In the first stage of the proposed method, a distribution system operator market scheduling model based on AC optimal power flow is designed to estimate the optimal operating point of the distribution system. Subsequently, the voltage and power flow constraints are linearised in stage two to calculate DLMP. Finally, based on the Lagrange function and sensitivity factors, DLMP is decomposed to the marginal costs for active/reactive power, voltage management, power loss and power variability. Case studies demonstrate that the proposed model can effectively smooth the power fluctuation and reduce the ramping flexibility requirements of distribution systems.

AC optimal power flow↗

Light Water Reactor Sustainability Program Plant Modernization Technical Program Plan for FY 2019

This report presents the Technical Program Plan for FY 2019 for the Department of Energy Light Water Reactor Sustainability Program – Plant Modernization research pathway. A summary of the vision and strategy is provided to explain how this program addresses key issues and barriers for modernizing instrumentation and control technologies and infrastructure in domestic nuclear power plants. The report describes the pilot projects that have been formulated to develop and validate enabling technologies over the next several years that will result in digital alternatives to the legacy analog II&C systems in place today. This will allow much needed modernization of these systems to address reliability and obsolescence problems, as well as serve as a platform for substantial operational improvement. The report further describes key project resources and cooperative relationships, including the Electric Power Research Institute, the Nuclear Energy Institute )NEI), the Institute of Nuclear Power Operations (INPO), the IFE Halden Reactor Project, the Nuclear Regulatory Commission, and industry suppliers, that are instrumental to the success of the program. The report also lists the schedule for all program products, including the titles and report numbers for all published reports under this program.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Summer Workshop on Near-Earth Resources

The possible large scale use of extraterrestrial resources was addressed, either to construct structures in space or to return to Earth as supplements for terrestrial resources. To that end, various specific recommendations were made by the participants in the summer study on near-Earth resources, held at La Jolla, California, 6 to 13 August, 1977. The Moon and Earth-approaching asteroids were considered. Summaries are included of what is known about their compositions and what needs to be learned, along with recommendations for missions designed to provide the needed data. Tentative schedules for these projects are also offered.

Arnold, J. R.↗

Geographic Information Systems and Web Page Development

The Facilities Engineering and Architectural Branch is responsible for the design and maintenance of buildings, laboratories, and civil structures. In order to improve efficiency and quality, the FEAB has dedicated itself to establishing a data infrastructure based on Geographic Information Systems, GIS. The value of GIS was explained in an article dating back to 1980 entitled "Need for a Multipurpose Cadastre" which stated, "There is a critical need for a better land-information system in the United States to improve land-conveyance procedures, furnish a basis for equitable taxation, and provide much-needed information for resource management and environmental planning." Scientists and engineers both point to GIS as the solution. What is GIS? According to most text books, Geographic Information Systems is a class of software that stores, manages, and analyzes mapable features on, above, or below the surface of the earth. GIS software is basically database management software to the management of spatial data and information. Simply put, Geographic Information Systems manage, analyze, chart, graph, and map spatial information. GIS can be broken down into two main categories, urban GIS and natural resource GIS. Further still, natural resource GIS can be broken down into six sub-categories, agriculture, forestry, wildlife, catchment management, archaeology, and geology/mining. Agriculture GIS has several applications, such as agricultural capability analysis, land conservation, market analysis, or whole farming planning. Forestry GIs can be used for timber assessment and management, harvest scheduling and planning, environmental impact assessment, and pest management. GIS when used in wildlife applications enables the user to assess and manage habitats, identify and track endangered and rare species, and monitor impact assessment.

Reynolds, Justin↗

Results from the Lunar Reconnaissance Orbiter Mission and Plans for the Extended Science Mission

The Lunar Reconnaissance Orbiter spacecraft (LRO), launched on June 18,2009, began with the goal of seeking safe landing sites for future robotic missions or the return of humans to the Moon as part of NASA's Exploration Systems Mission Directorate (ESMD). In addition, LRO's objectives included the search for surface resources and the measurement of the lunar radiation environment. After spacecraft commissioning, the ESMD phase of the mission began on September 15, 2009 and was completed on September 15, 2010 when operational responsibility for LRO was transferred to NASA's Science Mission Directorate (SMD). The SMD mission was scheduled for 2 years and completed in September of 2012. Under SMD, the Science Mission focused on a new set of goals related to understanding the history of the Moon, its current state, and what it can tell us about the evolution of the Solar System. Having recently marked the completion of the two-year Science Mission, we will review here the major results from the LRO for both exploration and science and discuss plans and objectives for the Extended Science that will last until September, 2014. Some results from the LRO mission are: the development of comprehensive high resolution maps and digital terrain models of the lunar surface; discoveries on the nature of hydrogen distribution, and by extension water, at the lunar poles; measurement of the daytime and nighttime temperature of the lunar surface including temperature down below 30 K in permanently shadowed regions (PSRs); direct measurement of Hg, H2, and CO deposits in the PSRs; evidence for recent tectonic activity on the Moon; and high resolution maps of the illumination conditions at the poles.

Vondrak, Richard R.↗

Method and system for providing flexible reserve power for power grid

An optimization-based method and system is disclosed to enable heterogeneous loads and distributed energy resources (DERs) to participate in grid ancillary services, such as spinning and non-spinning reserves, and ramping reserves. The method includes receiving inputs for decision parameters for optimizing an objective for obtaining flexible reserve power, solving the objective for obtaining flexible reserve power, determining a reserve power schedule for a prediction horizon for providing flexible reserve power based on the objective, generating a service bid based on the reserve power schedule for the power grid; and when the service bid is accepted, providing flexible reserve power to the power grid based on the service bid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Light Water Reactor Sustainability Program Plant Modernization Technical Program Plan for FY 2021

This report presents the Technical Program Plan for FY 2019 for the Department of Energy Light Water Reactor Sustainability Program – Plant Modernization research pathway. A summary of the vision and strategy is provided to explain how this program addresses key issues and barriers for modernizing instrumentation and control technologies and infrastructure in domestic nuclear power plants. The report describes the pilot projects that have been formulated to develop and validate enabling technologies over the next several years that will result in digital alternatives to the legacy analog II&C systems in place today. This will allow much needed modernization of these systems to address reliability and obsolescence problems, as well as serve as a platform for substantial operational improvement. The report further describes key project resources and cooperative relationships, including the Electric Power Research Institute, the Nuclear Energy Institute )NEI), the Institute of Nuclear Power Operations (INPO), the IFE Halden Reactor Project, the Nuclear Regulatory Commission, and industry suppliers, that are instrumental to the success of the program. The report also lists the schedule for all program products, including the titles and report numbers for all published reports under this program.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Light Water Reactor Sustainability Program Plant Modernization Technical Program Plan for FY 2021

This report presents the Technical Program Plan for FY 2019 for the Department of Energy Light Water Reactor Sustainability Program – Plant Modernization research pathway. A summary of the vision and strategy is provided to explain how this program addresses key issues and barriers for modernizing instrumentation and control technologies and infrastructure in domestic nuclear power plants. The report describes the pilot projects that have been formulated to develop and validate enabling technologies over the next several years that will result in digital alternatives to the legacy analog II&C systems in place today. This will allow much needed modernization of these systems to address reliability and obsolescence problems, as well as serve as a platform for substantial operational improvement. The report further describes key project resources and cooperative relationships, including the Electric Power Research Institute, the Nuclear Energy Institute )NEI), the Institute of Nuclear Power Operations (INPO), the IFE Halden Reactor Project, the Nuclear Regulatory Commission, and industry suppliers, that are instrumental to the success of the program. The report also lists the schedule for all program products, including the titles and report numbers for all published reports under this program.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗