Search NASA⌕ Search

SEARCH · Search NASA

Results for “Staging Building”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,261 records · Page 70

Life cycle assessment of construction and demolition waste management

Highlights: • LCA of C&DW utilisation in road vs. C&DW landfilling. • C&DW utilisation in road better than landfilling for most categories. • Transportation is the most important process in non-toxic impact categories. • Leaching of oxyanions is the critical process in toxic impact categories. • Modelling of Cr fate in the subsoil is highly influential to the results. - Abstract: Life cycle assessment (LCA) modelling of construction and demolition waste (C&DW) management was carried out. The functional unit was management of 1 Mg mineral, source separated C&DW, which is either utilised in road construction as a substitute for natural aggregates, or landfilled. The assessed environmental impacts included both non-toxic and toxic impact categories. The scenarios comprised all stages of the end-of-life management of C&DW, until final disposal of all residues. Leaching of inorganic contaminants was included, as was the production of natural aggregates, which was avoided because of the use of C&DW. Typical uncertainties related to contaminant leaching were addressed. For most impact categories, utilisation of C&DW in road construction was preferable to landfilling; however, for most categories, utilisation resulted in net environmental burdens. Transportation represented the most important contribution for most nontoxic impacts, accounting for 60–95 per cent of these impacts. Capital goods contributed with negligible impacts. Leaching played a critical role for the toxic categories, where landfilling had lower impacts than utilisation because of the lower levels of leachate per ton of C&DW reaching the groundwater over a 100-year perspective. Leaching of oxyanions (As, V and Sb) was critical with respect to leaching. Typical experimental uncertainties in leaching data did not have a pivotal influence on the results; however, accounting for Cr immobilisation in soils as part of the impact assessment was critical for modelling the leaching impacts. Compared with the overall life cycle of building and construction materials, leaching emissions were shown to be potentially significant for toxicity impacts, compared with contributions from production of the same materials, showing that end-of-life impacts and leaching should not be disregarded when assessing environmental impacts from construction products and materials. CO{sub 2} uptake in the C&DW corresponding to 15 per cent carbonation could out-balance global warming impacts from transportation; however, carbonation would also likely result in increased toxicity impacts due to higher leaching of oxyanions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A robust gene expression-based prognostic risk score predicts overall survival of lung adenocarcinoma patients

Identification of reliable predictive biomarkers and new therapeutic targets is a critical step for significant improvement in patient outcomes. Here, we developed a multi-step bioinformatics analytic strategy to mine large omics and clinical data to build a prognostic scoring system for predicting the overall survival (OS) of lung adenocarcinoma (LuADC) patients. In latter we first identified 1327 significantly and robustly deregulated genes, 600 of which were significantly associated with the OS of LuADC patients. Gene co-expression network analysis revealed the biological functions of these 600 genes in normal lung and LuADCs, which were found to be enriched for cell cycle-related processes, blood vessel development, cell-matrix adhesion and metabolic processes. Finally, we implemented a multiple resampling method combined with Cox regression analysis to identify a 27-gene signature associated with OS, and then created a prognostic scoring system based on this signature. This scoring system robustly predicted OS of LuADC patients in 100 sampling test sets and was further validated in four independent LuADC cohorts. In addition, in comparison to other existing prognostic gene signatures published in the literature, our signature was significantly superior in predicting OS of LuADC patients. In summary, our multiomics and clinical data integration study created a 27-gene prognostic risk score that can predict OS of LuADC patients independent of age, gender and clinical stage. This score could guide therapeutic selection and allow stratification in clinical trials.

59 BASIC BIOLOGICAL SCIENCES↗

Of the final end state for decommissioning of reactors at SRS: collaboration between stakeholders, regulators, and the Federal Government - 15279

The Savannah River Site (SRS) is an 802 square-kilometer (310 square-miles) United States Department of Energy (US DOE) nuclear facility located along the Savannah River near Aiken, South Carolina. Nuclear weapons material production began in the early 1950's, utilizing five (5) production reactors. In the early 1990's all SRS production reactor operations were terminated. The first reactor closure end-state declaration was documented in a Comprehensive Environmental Response and Compensation and Liability Act (CERCLA) Early Action Record of Decision. The decision for the final closure of the 29,543 square-meter (318,000 square-feet) 105-P Reactor was determined to be in situ decommissioning (ISD). ISD is an acceptable and cost-effective alternative to off-site disposal for the reactor building, which will allow for consolidation of remedial action wastes generated from other cleanup activities within the P Area. ISD is considered protective by the regulators, U.S. Environmental Protection Agency (USEPA) and the South Carolina Department of Health and Environmental Control (SCDHEC), public and stakeholders as waste materials are stabilized / immobilized, and radioactivity is allowed to naturally decay, thus preventing future exposure to the environment. Stakeholder buy-in was critical in the up-front planning in order to achieve this monumental final decision. Numerous public meetings and workshops were held in two different states (covering a 321 kilometer (200-mile) radius) with stakeholder and SRS Citizens Advisory Board (CAB) participation. These meetings were conducted over an eight- month period as the end-state decision making progressed. Information provided to the public evolved from workshop to workshop as data became available and public input from the public meetings were gathered. ISD is being considered for the balance of the four (4) SRS reactors and other hardened facilities such as the chemical Separation Facilities (canyons). Closure of the SRS P Reactor Area was precedent setting and sets the stage for closure of other reactors and hardened facilities. The DOE, USEPA, and SCDHEC engaged in active, up-front, and timely involvement with the SRS. The SRS CAB, elected officials, and citizens of South Carolina and Georgia met to discuss the P reactor area closure and associated risks. Early public involvement gave SRS and the regulators assurance that the selected decision was valid and would not be overturned. Public input improved the process and ensured that the important decision on the final end-state of the reactor facilities was not made in isolation. ISD of P Reactor will provide adequate protection of human health and the environment and the lowest cost since short-term risk is minimized to remedial workers from exposure to contaminated equipment and facilities by leaving the reactor vessel in place allowing for radiological decay over time. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

dCache - Joining the noWORM Storage Club

For over a decade, dCache.ORG has provided robust software, called dCache, that is used at more than 80 universities and research institutes around the world, allowing these sites to provide reliable storage services for the WLCG experiments and many other scientific communities. The flexible architecture of dCache allows running it in a wide variety of configurations and platforms - from all-in-one Raspberry-Pi up to hundreds of nodes in multi-petabyte infrastructures. The life cycle of scientific data is well defined - collected, processed, archived and finally deleted, when it’s not needed anymore. Moreover, during all those stages the data is never modified: either the original data is used, or new derived data is produced. With this knowledge, dCache was designed to handle immutable files as efficiently as possible. Data replication, HSM connectivity and data-server independent operations are only possible due to the immutable nature of stored data. Nowadays many commercial vendors provide such write-once-read-many or WORM storage systems, as they become more and more demanded with grown demand of audio, photo and video content in the web. On the other hand by providing standard NFSv4.1 interface dCache is often used as a general-purpose file-system, especially by new communities, like photon scientists or microbiologists. Although many users are aware of data immutability, some applications and use cases still require in-place updates of stored files. To satisfy new requirements some fundamental changes have to be applied to dCache’s core design. However, new developments must not compromise any aspect of existing functionality. In this presentation we will show new developments in dCache to turn it into a regular file system. We will discuss the challenges to build a distributed storage system, ‘life’ with POSIX compliance, handling of multiple replicas and backward compatibility by providing WORM and noWORM capabilities within the same storage system.

Mkrtchyan, Tigran↗

Modelling chemical degradation of concrete during leaching with rain and soil water types

Percolation of external water through concrete results in the degradation of cement and changes the concrete pore water and solid phase composition. The assessment of long-term degradation of concrete is possible by means of model simulation. This paper describes simulations of chemical degradation of cement for different types of rain and soil water at an ambient earth surface temperature (10 {sup o}C). Rain and soil water types were derived using generic equations and measurement of atmospheric boundary conditions representative for North-Belgium. An up-to-date and consistent thermodynamic model is used to calculate the geochemical changes during chemical degradation of the concrete. A general pattern of four degradation stages was simulated with the third stage being the geochemically most complex stage involving reactions with calcium-silicate hydrates, AFm and AFt phases. Whereas the sequence of the dissolution reactions was relatively insensitive to the composition of the percolating water, the duration of the different reactions depends strongly on the percolating water composition. Major identified factors influencing the velocity of cement degradation are the effect of dry deposition and biological activity increasing the partial pressure of CO{sub 2(g)} in the soil air phase (and thus increasing the inorganic carbon content in the percolating water). Soil weathering processes have only a minor impact, at least for the relatively inert sandy material considered in this study.

36 MATERIALS SCIENCE↗

Observations and Lessons Learned From Installing Residential Roofing-Integrated Photovoltaics

Building-sited solar photovoltaics (PV) could play a key role in decarbonizing the building sector either through racked and mounted PV or through Building-integrated PV (BIPV). BIPV is installed into the building envelope itself, with solar cells and/or modules forming the outer layer of a building structure, thus transforming a single-purpose structure into one that serves the dual purposes of the building envelope and electricity. BIPV can be applied to building roofs, facades, awnings, pergolas, windows, skylights, balustrades, and other external surfaces. Given BIPV products vary widely, the focus of this research is residential roofing integrated PV (RIPV), where solar is incorporated into or otherwise replaces the roofing material. Previous research suggests that residential RIPV could reduce customer acquisition, labor, supply chain, and equipment costs. These products have yet to realize these cost savings and deployment remains significantly less than conventional rooftop PV as a relative share of the addressable market in the US. One potential barrier to broader residential roofing integrated PV deployment may be higher costs relative to conventional rooftop PV, primarily because the design and installation of these products is still evolving. Here, we explore residential RIPV cost-reduction opportunities by analyzing installation processes. Our study documents residential RIPV installations at 2 reroofing sites and the equivalent of 9 new construction sites in California through a methodology known as time and motion study. We also conducted interviews with subject-matter experts to identify barriers and solutions to maximize these products' market penetration. Our time and motion study breaks the RIPV installation process into four steps: 1) staging, unloading, and roof preparation; 2) fire resistant underlayment(s) (synthetic material laid between roof shingles and roof deck); 3) flashings and PV installation; and 4) wiring and monitoring. We measure the time required for each step in terms of worker-hours, representing an hour of labor from a single worker. We further normalize process time by dividing worker-hours by kilowatt (kW) of system capacity. The most time-intensive step was flashings and PV installation, taking around 2.4 worker-hours per kW on average and accounting for around 60% of the process time for an average installation. The total installation process took on average about 6.4 and 3.5 worker-hours per kW at the reroofing sites and new construction sites, respectively. For comparison, a previous time and motion study documented a time of 6.9 worker-hours per kW for conventional rooftop PV. The shorter RIPV installation times are consistent with previous studies suggesting that RIPV could be installed faster than conventional rooftop PV. The time and motion results and feedback from interviewees provide insights into potential residential RIPV cost reduction opportunities. Several interviewees suggested that these products would be more efficient if PV installation was more fully integrated into the roofing/construction industries, which currently use separate supply chains and skillsets. Further integration could reduce supply chain delays and labor force redundancies. Future research could explore specific ways to integrate these industries to help realize the cost savings potential of RIPV.

14 SOLAR ENERGY↗

Preventing Ice Before it Forms

In the late 1990s, a team of engineers at Ames Research Center invented an anti-icing fluid to keep ice from building up on airplane wings. Ice on wings can be a serious safety hazard, especially during takeoff, when a sheet of ice the thickness of a compact disc can reduce lift by 25 percent or more. The typical approach to clearing off the ice is to use a deicing solution once the ice has built up. The fluid created by the Ames team, though, when applied to a dry surface, prevents the ice from even forming a surface bond, which saves deicing time and money, while also preventing excessive use of chemical solvents. If, however, the solution is not applied before ice forms, it also serves as a traditional deicing formula. The formula contains propylene glycol, which has a very low freezing point, and a thickener, which helps the fluid adhere to the surface. Ice gathers on top of the formula, and then it can be wiped off with little effort. This thickening agent, a pseudo-plastic, sprays on as a liquid, like lemonade, gels like a lemon sherbet, turns back to a liquid when wiped, and then gels again into its sherbet consistency when left to solidify. The sherbet-gel stage is especially important when the formula is sprayed onto a vertical or steeped surface, as it clings better than a liquid would.

Source record↗

Potential up-scaling of inkjet-printed devices for logical circuits in flexible electronics

Inkjet Technology is often mis-believed to be a deposition/patterning technology which is not meant for high fabrication throughput in the field of printed and flexible electronics. In this work, we report on the 1) printing, 2) fabrication yield and 3) characterization of exemplary simple devices e.g. capacitors, organic transistors etc. which are the basic building blocks for logical circuits. For this purpose, printing is performed first with a Proof of concept Inkjet printing system Dimatix Material Printer 2831 (DMP 2831) using 10 pL small print-heads and then with Dimatix Material Printer 3000 (DMP 3000) using 35 pL industrial print-heads (from Fujifilm Dimatix). Printing at DMP 3000 using industrial print-heads (in Sheet-to-sheet) paves the path towards industrialization which can be defined by printing in Roll-to-Roll format using industrial print-heads. This pavement can be termed as 'Bridging Platform'. This transfer to 'Bridging Platform' from 10 pL small print-heads to 35 pL industrial print-heads help the inkjet-printed devices to evolve on the basis of functionality and also in form of up-scaled quantities. The high printed quantities and yield of inkjet-printed devices justify the deposition reliability and potential to print circuits. This reliability is very much desired when it comes to printing of circuits e.g. inverters, ring oscillator and any other planned complex logical circuits which require devices e.g. organic transistors which needs to get connected in different staged levels. Also, the up-scaled inkjet-printed devices are characterized and they reflect a domain under which they can work to their optimal status. This status is much wanted for predicting the real device functionality and integration of them into a planned circuit.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Cr segregation at the FeCr surface and the origin of corrosion resistance in ferritic steels

Structural materials in Gen-IV nuclear reactors will face severe conditions of high operating temperatures, high neutron flux exposure, and corrosive environment. Radiation effects and corrosion and chemical compatibility issues are factors that will limit the materials lifetime. Low-chromium (9-12 Cr wt.%) ferritic martensitic (F/M) steels are being considered as possible candidates because they offer good swelling resistance and good mechanical properties under extreme conditions of radiation dose and irradiation temperature. The surface chemistry of FeCr alloys, responsible for the corrosion properties, is complex. It exists today a controversy between equilibrium thermodynamic calculations, which suggest Cr depletion at the surface driven by the higher surface energy of Cr, and experimental data which suggest the oxidation process occurs in two stages, first forming a Fe-rich oxide, followed by a duplex oxide layer, and ending with a Cr-rich oxide. Moreover, it has been shown experimentally that corrosion resistance of F/M steels depends significantly on Cr content, increasing with increasing Cr content and with a threshold around 10% Cr, below which, the alloy behaves as pure Fe. In an attempt to rationalize these two contradicting observations and to understand the physical mechanism behind corrosion resistance in these materials we perform atomistic simulations using our FeCr empirical potential and analyze Cr equilibrium distributions at different compositions and temperatures in single and polycrystalline samples. We analyze the controversy in terms of thermodynamic and kinetic considerations.

42 ENGINEERING↗

NASA's Space Launch System: Momentum Builds Towards First Launch

NASA's Space Launch System (SLS) is gaining momentum programmatically and technically toward the first launch of a new exploration-class heavy lift launch vehicle for international exploration and science initiatives. The SLS comprises an architecture that begins with a vehicle capable of launching 70 metric tons (t) into low Earth orbit. Its first mission will be the launch of the Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back. SLS will also launch the first Orion crewed flight in 2021. SLS can evolve to a 130-t lift capability and serve as a baseline for numerous robotic and human missions ranging from a Mars sample return to delivering the first astronauts to explore another planet. Managed by NASA's Marshall Space Flight Center, the SLS Program formally transitioned from the formulation phase to implementation with the successful completion of the rigorous Key Decision Point C review in 2014. At KDP-C, the Agency Planning Management Council determines the readiness of a program to go to the next life-cycle phase and makes technical, cost, and schedule commitments to its external stakeholders. As a result, the Agency authorized the Program to move forward to Critical Design Review, scheduled for 2015, and a launch readiness date of November 2018. Every SLS element is currently in testing or test preparations. The Program shipped its first flight hardware in 2014 in preparation for Orion's Exploration Flight Test-1 (EFT-1) launch on a Delta IV Heavy rocket in December, a significant first step toward human journeys into deep space. Accomplishments during 2014 included manufacture of Core Stage test articles and preparations for qualification testing the Solid Rocket Boosters and the RS-25 Core Stage engines. SLS was conceived with the goals of safety, affordability, and sustainability, while also providing unprecedented capability for human exploration and scientific discovery beyond Earth orbit. In an environment of economic challenges, the nationwide SLS team continues to meet ambitious budget and schedule targets through the studied use of hardware, infrastructure, and workforce investments the United States has already made in the last half century, while selectively using new technologies for design, manufacturing, and testing, as well as streamlined management approaches that have increased decision velocity and reduced associated costs. This paper will summarize recent SLS Program technical accomplishments, as well as the challenges and opportunities ahead for the most powerful and capable launch vehicle in history.

May, Todd↗

Nuclear forensics: Soil content

Nuclear Forensics is a growing field that is concerned with all stages of the process of creating and detonating a nuclear weapon. The main goal is to prevent nuclear attack by locating and securing nuclear material before it can be used in an aggressive manner. This stage of the process is mostly paperwork; laws, regulations, treaties, and declarations made by individual countries or by the UN Security Council. There is some preliminary leg work done in the form of field testing detection equipment and tracking down orphan materials; however, none of these have yielded any spectacular or useful results. In the event of a nuclear attack, the first step is to analyze the post detonation debris to aid in the identification of the responsible party. This aspect of the nuclear forensics process, while reactive in nature, is more scientific. A rock sample taken from the detonation site can be dissolved into liquid form and analyzed to determine its chemical composition. The chemical analysis of spent nuclear material can provide valuable information if properly processed and analyzed. In order to accurately evaluate the results, scientists require information on the natural occurring elements in the detonation zone. From this information, scientists can determine what percentage of the element originated in the bomb itself rather than the environment. To this end, element concentrations in soils from sixty-nine different cities are given, along with activity concentrations for uranium, thorium, potassium, and radium in various building materials. These data are used in the analysis program Python.

54 ENVIRONMENTAL SCIENCES↗

Dismantling of Loop-Type Channel Equipment of MR Reactor in NRC 'Kurchatov Institute' - 13040

In 2009 the project of decommissioning of MR and RTF reactors was developed and approved by the Expert Authority of the Russian Federation (Gosexpertiza). The main objective of the decommissioning works identified in this project: - complete dismantling of reactor equipment and systems; - decontamination of reactor premises and site in accordance with the established sanitary and hygienic standards. At the preparatory stage (2008-2010) of the project the following works were executed: loop-type channels' dismantling in the storage pool; experimental fuel assemblies' removal from spent fuel repositories in the central hall; spent fuel assembly removal from the liquid-metal-cooled loop-type channel of the reactor core and its placement into the SNF repository; and reconstruction of engineering support systems to the extent necessary for reactor decommissioning. The project assumes three main phases of dismantling and decontamination: - dismantling of equipment/pipelines of cooling circuits and loop-type channels, and auxiliary reactor equipment (2011-2012); - dismantling of equipment in underground reactor premises and of both MR and RTF in-vessel devices (2013-2014); - decontamination of reactor premises; rehabilitation of the reactor site; final radiation survey of reactor premises, loop-type channels and site; and issuance of the regulatory authorities' de-registration statement (2015). In 2011 the decommissioning license for the two reactors was received and direct MR decommissioning activities started. MR primary pipelines and loop-type facilities situated in the underground reactor hall were dismantled. Works were also launched to dismantle the loop-type channels' equipment in underground reactor premises; reactor buildings were reconstructed to allow removal of dismantled equipment; and the MR/RTF decommissioning sequence was identified. In autumn 2011 - spring 2012 results of dismantling activities performed are: - equipment from underground rooms (No. 66, 66A, 66B, 72, 64, 63) - as well as from water and gas loop corridors - was dismantled, with the total radwaste weight of 53 tons and the total removed activity of 5,0 x 10{sup 10} Bq; - loop-type channel equipment from underground reactor hall premises was dismantled; - 93 loop-type channels were characterized, chopped and removed, with radwaste of 2.6 x 10{sup 13} Bq ({sup 60}Co) and 1.5 x 10{sup 13} Bq ({sup 137}Cs) total activity removed from the reactor pool, fragmented and packaged. Some of this waste was placed into the high-level waste (HLW) repository of the Center. Dismantling works were executed with application of remotely operated mechanisms, which promoted decrease of radiation impact on the personnel. The average individual dose for the personnel was 1.9 mSv/year in 2011, and the collective dose is estimated as 0.0605 man x Sv/year. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ares V: Shifting the Payload Design Paradigm

NASA's Ares V heavy-lift cargo launch vehicle is being designed send more crew and cargo to more places on the lunar surface than the 1960s-era Apollo program and provide ongoing support to a permanent lunar outpost. In addition to that role, however, its unmatched mass and volume capability represent a global asset for exploration, science, and commerce. The Ares V also is an enabler of a large class of space missions not thought possible by scientists and engineers since the Saturn V program ended over 30 years ago. Compared to current systems, it will offer approximately 5 times the mass and volume to most orbits and locations. This should allow prospective mission planners to build robust payloads with margins that are 3 to 5 times the industry norm. The space inside the planned payload shroud has enough usable volume to launch the volumetric equivalent of approximately 10 Apollo Lunar Excursion Modules or approximately 5 equivalent Hubble Space Telescopes. This mass and volume capability to Low Earth Orbit enables a host of new scientific and observation platforms, such as telescopes, satellites, planetary and solar missions, as well as being able to provide the lift for future large in-space infrastructure missions, such as space based power and mining, Earth asteroid defense, propellant depots, etc. The Ares V team is engaging the potential payload community now, 2-3 years before System Requirements Review, in order to better understand the potential limitations and or additional requirements that could be added to the Ares V from the mission planning community. If a viable mission is determined and added to the Ares V as a design case, tradeoffs will be conducted to determine if other mission design requirements can be included in the system. Multiple shroud options for the Ares V have been analyzed to identify their impact on performance. Ares V is in a conceptual design stage prior to a formal design phase. The initial concept for the cargo launch vehicle (CaLV) that would later be dubbed "Ares V" was produced by the Exploration Systems Architecture Study in 2005. Since then, it has evolved through hundreds of concepts. The current point-of-departure (POD) concept was approved during the Lunar Capabilities Concept Review/Ares V Mission Concept Review in June 2008. This reference concept serves as a starting point for a renewed set of design trades and detailed analysis into its interaction with the other components of the Constellation architecture and existing launch infrastructure. This paper will discuss the Ares V design evolution, the most recent point-of-departure concept, and its capabilities to support future science missions.

Summrall, Phil↗

LED Lighting in a Performing Arts Building at the University of Florida

The U.S. DOE GATEWAY Demonstration Program supports demonstrations of high-performance solid-state lighting (SSL) products in order to develop empirical data and experience with the in-the-field applications of this advanced lighting technology. This report describes the process and results of the 2013 - 2014 GATEWAY demonstration of SSL technology in the Nadine McGuire Theatre and Dance Pavilion at the University of Florida, Gainesville, FL. The LED solutions combined with dimming controls utilized in four interior spaces - the Acting Studio, Dance Studio, Scene Shop, and Dressing Room - received high marks from instructors, students/performers, and reduced energy use in all cases. The report discusses in depth and detail of each project area including specifications, energy savings, and user observations. The report concludes with lessons learned during the demonstration.

Demonstration↗

MOOSE Reactor Module Meshing Enhancements to Support Reactor Physics Analysis

The U.S. Department of Energy Office of Nuclear Energy Advanced Modeling and Simulation (NEAMS) program develops an integrated suite of advanced reactor physics tools built upon the Multiphysics Object-Oriented Simulation Environment (MOOSE) framework. Each code generally requires an input finite element mesh on which the physics solution is calculated, reported, and transferred to other physics codes. The meshing process is often burdensome for the complex geometries present in reactors due to lack of easy-to-use, open-source meshing tools. To address the bottleneck associated with meshing complex geometries found in nuclear reactors, NEAMS initiated the development of the MOOSE Reactor Module starting in FY21. The Reactor Module builds off the existing MOOSE Mesh System to include targeted meshing capabilities such as the ability to generate hexagonal pin cells, assemblies with ducts, rotating control drums, cores, peripheral zones around a core, as well as the automatic labeling (“reporting IDs”) of pin, assembly, and planar zones to simplify post-processing of results. As a Physics Module in MOOSE, the Reactor Module is open-source, available with any MOOSE installation, directly compatible with MOOSE-based tools, and can be invoked from MOOSEbased applications to generate meshes. Functionality from the Reactor Module has been applied to several advanced reactor concepts to demonstrate user workflow improvements and accuracy. The primary objective of the Reactor Module is to improve useability of MOOSEbased tools by streamlining mesh generation and output inspection processes. During FY22, the functionality of the Reactor Module (and accompanying Mesh System) has been expanded based on user needs. First, the Reactor Geometry Mesh Builder capability developed primarily in FY21 has been refactored and merged to the public MOOSE repository. This capability wraps underlying Reactor Module mesh generators into a “Pin – Assembly – Core” workflow appropriate for conventional Cartesian and hexagonal geometries, and notably assigns material IDs during mesh generation stage and generates only the minimal number of blocks needed in order to reduce computational burden. Biasing and boundary layer options have been added to the base mesh generators as required by thermal hydraulics solvers. The reporting ID functionality has been expanded to differentiate ring-wise and azimuthal sectors within a pin for use with depletion algorithms, and VectorPostProcessor and Reporter objects are now available to integrate solution variables across zones based on ID combinations. Functionality to trim hexagonal meshes along the center or periphery has been developed so users may leverage symmetry and reflective boundary conditions to reduce the mesh size. A flexible and powerful tool to fill the space between two sidesets has been introduced to the framework and can be used for transition layers such as stitching two assemblies together with different numbers of pins, or for complex geometries which do not follow conventional Cartesian/hexagonal patterns. Finally, additional verification problems were performed with NEAMS physics tools in complement with existing NEAMS work.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Evolvable Mars Campaign Long Duration Habitation Strategies: Architectural Approaches to Enable Human Exploration Missions

The Evolvable Mars Campaign (EMC) is the current NASA Mars mission planning effort which seeks to establish sustainable, realistic strategies to enable crewed Mars missions in the mid-2030s timeframe. The primary outcome of the Evolvable Mars Campaign is not to produce "The Plan" for sending humans to Mars, but instead its intent is to inform the Human Exploration and Operations Mission Directorate near-term key decisions and investment priorities to prepare for those types of missions. The FY'15 EMC effort focused upon analysis of integrated mission architectures to identify technically appealing transportation strategies, logistics build-up strategies, and vehicle designs for reaching and exploring Mars moons and Mars surface. As part of the development of this campaign, long duration habitats are required which are capable of supporting crew with limited resupply and crew abort during the Mars transit, Mars moons, and Mars surface segments of EMC missions. In particular, the EMC design team sought to design a single, affordable habitation system whose manufactured units could be outfitted uniquely for each of these missions and reused for multiple crewed missions. This habitat system must provide all of the functionality to safely support 4 crew for long durations while meeting mass and volume constraints for each of the mission segments set by the chosen transportation architecture and propulsion technologies. This paper describes several proposed long-duration habitation strategies to enable the Evolvable Mars Campaign through improvements in mass, cost, and reusability, and presents results of analysis to compare the options and identify promising solutions. The concepts investigated include several monolithic concepts: monolithic clean sheet designs, and concepts which leverage the co-manifested payload capability of NASA's Space Launch System (SLS) to deliver habitable elements within the Universal Payload Adaptor between the SLS upper stage and the Orion/Service module on the top of the vehicle. Multiple modular habitat options for Mars surface and in-space missions are also considered with various functionality and volume splits between modules to find the best balance of reducing the single largest mass which must be delivered to a destination and reducing the number of separate elements which must be launched. Analysis results presented for each of these concepts in this paper include mass/volume/power sizing using parametric sizing tools, identification of unique operational constraints, and limited comments on the additional impacts of reusability/dormancy on system design. Finally, recommendations will be made for promising solutions which will be carried forward for consideration in the Evolvable Mars Campaign work.

Simon, Matthew A.↗

Numerical Computations of Hypersonic Boundary-Layer over Surface Irregularities

Surface irregularities such as protuberances inside a hypersonic boundary layer may lead to premature transition on the vehicle surface. Early transition in turn causes large localized surface heating that could damage the thermal protection system. Experimental measurements as well as numerical computations aimed at building a knowledge base for transition Reynolds numbers with respect to different protuberance sizes and locations have been actively pursued in recent years. This paper computationally investigates the unsteady wake development behind large isolated cylindrical roughness elements and the scaled wind-tunnel model of the trip used in a recent flight measurement during the reentry of space shuttle Discovery. An unstructured mesh, compressible flow solver based on the space-time conservation element, solution element (CESE) method is used to perform time-accurate Navier-Stokes calculations for the flow past a roughness element under several wind-tunnel conditions. For a cylindrical roughness element with a height to the boundary-layer thickness ratio from 0.8 to 2.5, the wake flow is characterized by a mushroom-shaped centerline streak and horse-shoe vortices. While time-accurate solutions converged to a steady-state for a ratio of 0.8, strong flow unsteadiness is present for a ratio of 1.3 and 2.5. Instability waves marked by distinct disturbance frequencies were found in the latter two cases. Both the centerline streak and the horse-shoe vortices become unstable downstream. The oscillatory vortices eventually reach an early breakdown stage for the largest roughness element. Spectral analyses in conjunction with the computed root mean square variations suggest that the source of the unsteadiness and instability waves in the wake region may be traced back to possible absolute instability in the front-side separation region.

Chang, Chau-Lyan↗

Realizability-preserving DG-IMEX method for the two-moment model of fermion transport

Building on the framework of Zhang & Shu [1], [2], we develop a realizability-preserving method to simulate the transport of particles (fermions) through a background material using a two-moment model that evolves the angular moments of a phase space distribution function f . The two-moment model is closed using algebraic moment closures; e.g., as proposed by Cernohorsky & Bludman [3] and Banach & Larecki [4]. Variations of this model have recently been used to simulate neutrino transport in nuclear astrophysics applications, including core-collapse supernovae and compact binary mergers. We employ the discontinuous Galerkin (DG) method for spatial discretization (in part to capture the asymptotic diffusion limit of the model) combined with implicit-explicit (IMEX) time integration to stably bypass short timescales induced by frequent interactions between particles and the background. Appropriate care is taken to ensure the method preserves strict algebraic bounds on the evolved moments (particle density and flux) as dictated by Pauli's exclusion principle, which demands a bounded distribution function (i.e., f ϵ [0,1]). This realizability-preserving scheme combines a suitable CFL condition, a realizability-enforcing limiter, a closure procedure based on Fermi-Dirac statistics, and an IMEX scheme whose stages can be written as a convex combination of forward Euler steps combined with a backward Euler step. The IMEX scheme is formally only first-order accurate, but works well in the diffusion limit, and — without interactions with the background — reduces to the optimal second-order strong stability-preserving explicit Runge-Kutta scheme of Shu & Osher [5]. Numerical results demonstrate the realizability-preserving properties of the scheme. As a result, we also demonstrate that the use of algebraic moment closures not based on Fermi-Dirac statistics can lead to unphysical moments in the context of fermion transport.

97 MATHEMATICS AND COMPUTING↗