Hydrothermal liquefaction for biomass

Catalyst composition and parameters for catalytic hydrothermal liquefaction of biomass to bio-oil fuels target municipal solid waste (MSW) rather than lignin rich plant waste typically sought for bio-oil production. An HTL (Hydrothermal Liquefaction) reactor generates bio-fuel from municipal solid waste (MSW), including receiving, in the HTL reactor, non-lignin based waste from a municipal processing stream, and adding a solvent for extracting sugars from green waste components of the municipal processing stream. The reactor extracts a liquid from the received waste, and converts water soluble products in the liquid into oil soluble products via C—C (carbon-to-carbon) coupling reactions. A catalyst added to the resulting aqueous stream recovers a beneficial oil product, and is optimized by tuning acid and base sites on the solid catalyst.

Timko, Michael T.↗

A Conceptual Design and Economic Assessment of a Chitin Biorefinery Based on Shrimp Processing Wastes

Due to the extensive production of shrimp in captivity, waste generation has increased significantly and has become an environmental problem. The recovery of biomolecules can be an important way to mitigate the environmental problems associated with processing in this sector. In this sense, the present work aimed to evaluate a biorefinery approach for valuing shrimp farming waste to obtain astaxanthin, chitin and chitosan. Stoichiometric segmentation was used as a tool to identify the process steps, whose information on process variables (fresh water consumption, flow rate and reaction conditions) was adapted from the literature. A biorefinery coupled to a shrimp processing plant was proposed for the immediate use of highly perishable biomass, to guarantee the quality of the extracted products and reduce storage and transportation costs. In practice, the biomass treatment sequence adopted (demineralization followed by deproteinization) eliminates the depigmentation step, as the chitin obtained has a lighter tone. The proposed route was evaluated for four scenarios based on two indicators: gross economic potential (EGP) and metrics for inspection of sales and reagents (MISR). The results indicate that economic viability is achieved only for the production of chitosan, resulting in a gross revenue of US$832.50/cycle and a MISR value > 1. The sale of astaxanthin promotes an increase of US$3.73/cycle in the EGP, considered too low for the inclusion of another stage in the process.

astaxanthin↗

Niagara Falls Storage Site - Balance of plant investigation results - 15432

The Niagara Falls Storage Site (NFSS) is a 77.3-hectare (ha) (191-acre) property that is owned by the United States Government and located in the township of Lewiston, Niagara County, New York. The NFSS is part of the former Lake Ontario Ordnance Works (LOOW) that was used by the War Department beginning in 1942 for the production of trinitrotoluene (TNT). During the 1940's and 1950's, the Manhattan Engineer District and the Atomic Energy Commission brought various radioactive wastes and uranium processing byproducts (residues) resulting from our nation's atomic energy program to the LOOW for storage. Site operations caused soil, sediment, and groundwater contamination that lead to several remedial actions, which culminated in the construction of the Interim Waste Containment Structure (IWCS) on the NFSS. The U. S. Army Corps of Engineers (USACE)-Buffalo District is the lead Federal agency for Formerly Utilized Sites Remedial Action Program (FUSRAP) remediation of the NFSS. As the lead agency, USACE is conducting a remedial investigation/feasibility study (RI/FS) pursuant to the protocols set forth in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). CERCLA activities at the NFSS have transitioned from the site RI activities to the FS evaluation of potential remediation alternatives. USACE recognizes the need to implement a focused CERCLA FS process and, therefore, has established three separate operable units (OUs) for NFSS: the IWCS OU, the Balance of Plant (BOP) OU [i.e., all on-site areas outside the boundary of the IWCS], and the Groundwater OU. This paper details recent investigations into the underground utilities, groundwater/soil contamination, and past storage of contaminated material on the Balance of Plant Operable Unit of the NFSS. Recent fieldwork activities have investigated areas of elevated groundwater contamination as well as an investigation to determine/eliminate any preferential pathway that historical underground utilities may have provided on-site in these areas. Additional areas of investigation included strategic placement of groundwater wells at locations of historic residue storage piles and intersections of various underground utilities (based on aerial photography and geophysical surveys). Several hundred locations across the site were investigated with a gamma walk-over survey, boring, surveying and sampling of soil-cores to aide in the delineation of soil contamination throughout the Balance of Plant Operable Unit. The series of investigations indicated multiple operational areas still have impacts above background conditions, risk-based concentrations, and promulgated maximum contaminant levels for multiple media in the Balance of Plant Operable Unit. The soil, groundwater, sediment, and utility sampling data show that 1) radionuclide impacts derived from ore-residue handling operations still exist, 2) impacts from other inorganic and organic compound exist in TNT manufacturing and support areas, and 3) contaminant transport from past source areas is minimal. The full compendium of site history and recent sampling data provides a well-defined conceptual site model that provides the necessary input data to prepare volumetric soil estimates for the Balance of Plant Operable Unit Feasibility Study. The scale of the NFSS and complexity of prior operations provide many remedial challenges. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technical Basis of Scaling Relationships for the Pretreatment Engineering Platform

Pacific Northwest National Laboratory has been tasked by Bechtel National Inc. (BNI) on the River Protection Project-Waste Treatment Plant (RPP-WTP) project to perform research and development activities. The Pretreatment Engineering Platform (PEP) is being designed and constructed as part of a plan to respond to an issue raised by the WTP External Flowsheet Review Team (EFRT) entitled “Undemonstrated Leaching Processes” and numbered M12. The PEP replicates the WTP leaching process using prototypic equipment and control strategies. The approach for scaling PEP performance data to predict WTP performance is critical to the successful resolution of the EFRT issue. This report describes the recommended PEP scaling approach, PEP data interpretation and provides recommendations on test conduct and data requirements.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A Review of Flow Analysis Methods for Determination of Radionuclides in Nuclear Wastes and Nuclear Reactor Coolants

The safety and security nuclear power plant operations depends on the application of the most appropriate techniques and methods of chemical analysis, where modern flow analysis methods find increasing applications. Nevetheless, the current status of development of these methods is more limited than might be expected from their authentic advantages. The main aim of this contribution is to review automated flow analysis procedures developed with various detection methods for application in the nuclear energy industry. The flow analysis methods for determination of radionuclides that have been reported to date have been primarily focused mainly on environmental applications. The needs and benefits of the application of flow methods for the monitoring of nuclear wastes and for process analysis of the primary circuit coolants of light water nuclear reactors are discussed. Application of continuous flow methods (CFA) or injection methods (FIA, SIA) of flow analysis with radiometric detection shorterns the time of analysis and improves precision of determinations due to mechanization of time-consuming operations of sample processing. The use of mass spectrometry (MS) detection enables multicomponent analyses and determination of transuranic isotopes with much better limits of detection compared to radiometric detection.

radiochemical analysis, Sequential Injection and F↗

Application of a set of complementary techniques to understand how varying the proportion of two wastes affects humic acids produced by vermicomposting

Highlights: • A set of techniques was used to characterize humic acids content of vermicomposts. • The properties of the humic acids produced from different waste mixtures were similar. • This set of techniques allowed distinguishing the humic acids of each vermicomposts. • Increasing humic acid contents in initial mixtures would produce richer vermicomposts. - Abstract: A better understanding of how varying the proportion of different organic wastes affects humic acid (HA) formation during vermicomposting would be useful in producing vermicomposts enriched in HAs. With the aim of improving the knowledge about this issue, a variety of analytical techniques [UV–visible spectroscopic, Fourier transform infrared, fluorescence spectra, solid-state cross-polarization magic-angle spinning (CPMAS) {sup 13}C nuclear magnetic resonance (NMR) spectra, and thermal analysis] was used in the present study to characterize HAs isolated from two mixtures at two different ratios (2:1 and 1:1) of tomato-plant debris (TD) and paper-mill sludge (PS) before and after vermicomposting. The results suggest that vermicomposting increased the HA content in the TD/PS 2:1 and 1:1 mixtures (15.9% and 16.2%, respectively), but the vermicompost produced from the mixture with a higher amount of TD had a greater proportion (24%) of HAs. Both vermicomposting processes caused equal modifications in the humic precursors contained in the different mixtures of TD and PS, and consequently, the HAs in the vermicomposts produced from different waste mixtures exhibited analogous characteristics. Only the set of analytical techniques used in this research was able to detect differences between the HAs isolated from each type of vermicompost. In conclusion, varying the proportion of different wastes may have a stronger influence on the amount of HAs in vermicomposts than on the properties of HAs.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Advances in Resin Management Using 3R-Scan - 20154

The most important factor underlying optimal waste management is developing a clear picture of the radioactivity content of the waste and its impact on waste disposal cost. For over 35 years since the publishing of 10CFR61, waste characterization has relied on sampling the final waste product after formation. In the days following 10CFR61, the cost of final disposal was marginal with only a small impact on the overall costs. Constraints were added by provisions of the Low Level Waste Policy Act of 1985 leading to increasingly limited access to those disposal sites that remained available. In addition, Nuclear Regulatory Commission (NRC) pressure promoting waste volume reduction led to disposal costs inevitably rising. Despite this, characterization practices in monitoring of waste generation for activity content still center on the same dated processes. This results in a disposal classification on the basis of endpoint sampling without consideration of the homogeneity of the waste mixture. It can also disregard consideration of the representativeness of the single or small sample base. As a minimum effort, a formalized sampling program of a fixed grouping of waste streams can be implemented that could account for more than 95% of all of the activity carried in solid waste products. The sample results for each radionuclide could then be trended as time passes to develop reasonable scaling factors for difficult to measure radionuclides. This process, identified in NRC guidance, has been rigorously followed by a relatively small number of facilities. The trended scaling factors serve to improve accuracy by identifying anomalous results that could otherwise go undetected. Direct monitoring of the accumulation of activity in process streams generating solid radwaste, including demineralizers and filter streams, is a more precise approach. Nearly all of these streams are monitored by plant chemistry on a regular schedule to maintain water quality. This paper discusses viable options for developing the basis for characterization through process monitoring of the accumulation of activity at the point of generation. Special focus is on resin bed tracking and how process knowledge of these streams can be brought together to form a consistent and precise solid waste radioactivity inventory. Some of the specific points covered in this paper include the merger of the fission product release computer program, 3R-STAT, with the radwaste sample analysis computer program, SCAN4 to create 3R-SCAN, the importance of individual waste stream influences on the overall source term, and the use of historic sample data to develop scaling factors using an automated process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Filter 'Cook-Off': Filter Selection via Side-by-Side Testing at Actual Process Conditions - 20040

In 2005, the THOR steam reforming fluidized-bed reactor technology was selected by the U.S. Department of Energy for treatment of sodium-bearing waste at the INL. During the final phase of commissioning prior to radiological operations, regeneration of the high temperature filters in the process gas filter (PGF) vessel became ineffective. After approximately 50 days of testing, the differential pressure across the filters began increasing exponentially and the plant had to be shutdown. Subsequent investigation revealed that the Inconel 625 (I625) sintered metal filter media was corroding in the 550 deg. C reducing environment. A pilot plant run tested four candidate replacement filter media. The top candidate was further tested during a long-term pilot plant run to validate the selection. Data from the testing indicate the selected filters will provide reliable service throughout the life of the project, including after in-situ radiological decontamination. This paper presents the data from this effort and reinforces the value of pilot plant testing. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Chernobyl NPP: Completion of LRW Treatment Plant and LRW Management on Site - 12568

Since a beginning of ChNPP operation, and after a tragedy in 1986, a few thousands m3 of LRW have been collected in a storage tanks. In 2004 ChNPP started the new project on creation of LRW treatment plant (LRWTP) financed from EBRD fund. But it was stopped in 2008 because of financial and contract problems. In 2010 SIA RADON jointly with Ukrainian partners has won a tender on completion of LRWTP, in particular I and C system. The purpose of LRTP is to process liquid rad-wastes from SSE 'Chernobyl NPP' site and those liquids stored in the LRWS and SLRWS tanks as well as the would-be wastes after ChNPP Power Units 1, 2 and 3 decommissioning. The LRTP design lifetime - 20 years. Currently, the LRTP is getting ready to perform the following activities: 1. retrieval of waste from tanks stored at ChNPP LWS using waste retrieval system with existing equipment involved; 2. transfer of retrieved waste into LRTP reception tanks with partial use of existing transfer pipelines; 3. laboratory chemical and radiochemical analysis of reception tanks contest to define the full spectrum of characteristics before processing, to acknowledge the necessity of preliminary processing and to select end product recipe; 4. preliminary processing of the waste to meet the requirements for further stages of the process; 5. shrinkage (concentrating) of preliminary processed waste; 6. solidification of preliminary processed waste with concrete to make a solid-state (end product) and load of concrete compound into 200-l drums; 7. curing of end product drums in LRTP curing hall; 8. radiologic monitoring of end product drums and their loading into special overpacks; 9. overpack radiological monitoring; 10. send for disposal (ICSRM Lot 3); The current technical decisions allow to control and return to ChNPP of process media and supporting systems outputs until they satisfy the following quality norms: salt content: < 100 g/l; pH: 1 - 11; anionic surface-active agent: < 25 mg/l; oil dissipated in the liquid: < 2 mg/l; overall gamma-activity: < 3,7 x10{sup 5} Bq/l. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sustainability of carbon delivery to an algal biorefinery: A techno-economic and life-cycle assessment

Supplementation of carbon is critical for high productivity cultivation of most microalgae. Moreover, using microalgae for atmospheric CO 2 mitigation to combat climate change is promising as waste sources and atmospheric CO 2 can be utilized to produce useful products. The challenge is developing technologies, processes, and strategies that utilize carbon efficiently such that the overall system is sustainable. Through engineering system modeling combined with techno-economic and life-cycle assessments, this study examined the implications of various delivery methods of carbon to a production-scale algal biorefinery. Five primary carbon sources were considered: atmospheric CO 2 ; CO 2 from direct chemical or power plant waste emissions; CO 2 that has been concentrated from waste sources and compressed; inorganic carbon in the form of hydrogen carbonate; and organic carbon in the form of cellulosic sugars derived from corn stover. Each source was evaluated assuming co-location as well as pipeline transportation up to 100 km. Sustainability results indicate that economics are more prohibitive than energy and emissions. Furthermore, of the scenarios evaluated, only two met both the economic and environmental criteria of contributing less than 0.50 US-$ GGE -1 and 20 g CO 2-eq MJ -1 to the overall system, respectively: uncompressed, pure sources of gaseous CO 2 with pipeline transportation of 40 km or less; and compressed, supercritical CO 2 from pure sources for pipeline transportation up to 100 km. A first order scalability assessment of algal biofuels based on these results shows carbon to be a limiting nutrient in an algal biorefinery with a total US production capability of 360 million gallons of fuel per year.

42 ENGINEERING↗

INVESTIGATING SUSPENSION OF MST, CST, AND SIMULATED SLUDGE SLURRIES IN A PILOT-SCALE WASTE TANK

The Small Column Ion Exchange (SCIX) process is being developed to remove cesium, strontium, and actinides from Savannah River Site (SRS) Liquid Waste using an existing waste tank (i.e., Tank 41H) to house the process. Savannah River National Laboratory (SRNL) is conducting pilot-scale mixing tests to determine the pump requirements for suspending and resuspending monosodium titanate (MST), crystalline silicotitanate (CST), and simulated sludge. The purpose of this pilot scale testing is for the pumps to resuspend the MST, CST, and simulated sludge particles so that they can be removed from the tank, and to suspend the MST so it can contact strontium and actinides. The pilot-scale tank is a 1/10.85 linear scaled model of Tank 41H. The tank diameter, tank liquid level, pump nozzle diameter, pump elevation, and cooling coil diameter are all 1/10.85 of their dimensions in Tank 41H. The pump locations correspond to the proposed locations in Tank 41H by the SCIX program (Risers B5, B3, and B1). Previous testing showed that three Submersible Mixer Pumps (SMPs) will provide sufficient power to initially suspend MST in an SRS waste tank, and to resuspend MST that has settled in a waste tank at nominal 45 C for four weeks. The conclusions from this analysis are: (1) Three SMPs will be able to resuspend more than 99.9% of the MST and CST that has settled for four weeks at nominal 45 C. The testing shows the required pump discharge velocity is 84% of the maximum discharge velocity of the pump. (2) Three SMPs will be able to resuspend more than 99.9% of the MST, CST, and simulated sludge that has settled for four weeks at nominal 45 C. The testing shows the required pump discharge velocity is 82% of the maximum discharge velocity of the pump. (3) A contact time of 6-12 hours is needed for strontium sorption by MST in a jet mixed tank with cooling coils, which is consistent with bench-scale testing and actinide removal process (ARP) operation.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Westinghouse Modular Grinding Process - Enhancement of Volume Reduction for Hot Resin Supercompaction - 13491

In nuclear power plants (NPP) ion exchange (IX) resins are used in several systems for water treatment. Spent resins can contain a significant amount of contaminates which makes treatment for disposal of spent resins mandatory. Several treatment processes are available such as direct immobilization with technologies like cementation, bitumisation, polymer solidification or usage of a high integrity container (HIC). These technologies usually come with a significant increase in final waste volume. The Hot Resin Supercompaction (HRSC) is a thermal treatment process which reduces the resin waste volume significantly. For a mixture of powdered and bead resins the HRSC process has demonstrated a volume reduction of up to 75 % [1]. For bead resins only the HRSC process is challenging because the bead resins compaction properties are unfavorable. The bead resin material does not form a solid block after compaction and shows a high spring back effect. The volume reduction of bead resins is not as good as for the mixture described in [1]. The compaction properties of bead resin waste can be significantly improved by grinding the beads to powder. The grinding also eliminates the need for a powder additive.Westinghouse has developed a modular grinding process to grind the bead resin to powder. The developed process requires no circulation of resins and enables a selective adjustment of particle size and distribution to achieve optimal results in the HRSC or in any other following process. A special grinding tool setup is use to minimize maintenance and radiation exposure to personnel. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

LITERATURE REVIEWS TO SUPPORT ION EXCHANGE TECHNOLOGY SELECTION FOR MODULAR SALT PROCESSING

This report summarizes the results of literature reviews conducted to support the selection of a cesium removal technology for application in a small column ion exchange (SCIX) unit supported within a high level waste tank. SCIX is being considered as a technology for the treatment of radioactive salt solutions in order to accelerate closure of waste tanks at the Savannah River Site (SRS) as part of the Modular Salt Processing (MSP) technology development program. Two ion exchange materials, spherical Resorcinol-Formaldehyde (RF) and engineered Crystalline Silicotitanate (CST), are being considered for use within the SCIX unit. Both ion exchange materials have been studied extensively and are known to have high affinities for cesium ions in caustic tank waste supernates. RF is an elutable organic resin and CST is a non-elutable inorganic material. Waste treatment processes developed for the two technologies will differ with regard to solutions processed, secondary waste streams generated, optimum column size, and waste throughput. Pertinent references, anticipated processing sequences for utilization in waste treatment, gaps in the available data, and technical comparisons will be provided for the two ion exchange materials to assist in technology selection for SCIX. The engineered, granular form of CST (UOP IE-911) was the baseline ion exchange material used for the initial development and design of the SRS SCIX process (McCabe, 2005). To date, in-tank SCIX has not been implemented for treatment of radioactive waste solutions at SRS. Since initial development and consideration of SCIX for SRS waste treatment an alternative technology has been developed as part of the River Protection Project Waste Treatment Plant (RPP-WTP) Research and Technology program (Thorson, 2006). Spherical RF resin is the baseline media for cesium removal in the RPP-WTP, which was designed for the treatment of radioactive waste supernates and is currently under construction in Hanford, WA. Application of RF for cesium removal in the Hanford WTP does not involve in-riser columns but does utilize the resin in large scale column configurations in a waste treatment facility. The basic conceptual design for SCIX involves the dissolution of saltcake in SRS Tanks 1-3 to give approximately 6 M sodium solutions and the treatment of these solutions for cesium removal using one or two columns supported within a high level waste tank. Prior to ion exchange treatment, the solutions will be filtered for removal of entrained solids. In addition to Tanks 1-3, solutions in two other tanks (37 and 41) will require treatment for cesium removal in the SCIX unit. The previous SCIX design (McCabe, 2005) utilized CST for cesium removal with downflow supernate processing and included a CST grinder following cesium loading. Grinding of CST was necessary to make the cesium-loaded material suitable for vitrification in the SRS Defense Waste Processing Facility (DWPF). Because RF resin is elutable (and reusable) and processing requires conversion between sodium and hydrogen forms using caustic and acidic solutions more liquid processing steps are involved. The WTP baseline process involves a series of caustic and acidic solutions (downflow processing) with water washes between pH transitions across neutral. In addition, due to resin swelling during conversion from hydrogen to sodium form an upflow caustic regeneration step is required. Presumably, one of these basic processes (or some variation) will be utilized for MSP for the appropriate ion exchange technology selected. CST processing involves two primary waste products: loaded CST and decontaminated salt solution (DSS). RF processing involves three primary waste products: spent RF resin, DSS, and acidic cesium eluate, although the resin is reusable and typically does not require replacement until completion of multiple treatment cycles. CST processing requires grinding of the ion exchange media, handling of solids with high cesium loading, and handling of liquid wash and conditioning solutions. RF processing requires handling and evaporation of cesium eluates, disposal of spent organic resin, and handling of the various liquid wash and regenerate solutions used. In both cases, the DSS will be immobilized in a low activity waste form. It appears that both technologies are mature, well studied, and generally suitable for this application. Technology selection will likely be based on downstream impacts or preferences between the various processing options for the two materials rather than on some unacceptable performance property identified for one material. As a result, the following detailed technical review and summary of the two technologies should be useful to assist in technology selection for SCIX.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Quantity, Quality, and Availability of Waste Heat from United States Thermal Power Generation

Secondary application of unconverted heat produced during electric power generation has the potential to improve the life-cycle fuel efficiency of the electric power industry and the sectors it serves. Here this work quantifies the residual heat (also known as waste heat) generated by U.S. thermal power plants and assesses the intermittency and transport issues that must be considered when planning to utilize this heat. Combining Energy Information Administration plant-level data with literature-reported process efficiency data, we develop estimates of the unconverted heat flux from individual U.S. thermal power plants in 2012. Together these power plants discharged an estimated 18.9 billion GJ th of residual heat in 2012, 4% of which was discharged at temperatures greater than 90 °C. We also characterize the temperature, spatial distribution, and temporal availability of this residual heat at the plant level and model the implications for the technical and economic feasibility of its end use. Increased implementation of flue gas desulfurization technologies at coal-fired facilities and the higher quality heat generated in the exhaust of natural gas fuel cycles are expected to increase the availability of residual heat generated by 10.6% in 2040.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Final Report: Vitrification of Inorganic Ion-Exchange Media, VSL-16R3710-1

One of the primary roles of waste pretreatment at the Hanford Tank Waste Treatment and Immobilization Plant (WTP) is to separate the majority of the radioactive components from the majority of the nonradioactive components in retrieved tank wastes, producing a high level waste (HLW) stream and a low activity waste (LAW) stream. This separation process is a key element in the overall strategy to reduce the volume of HLW that requires vitrification and subsequent disposal in a national deep geological repository for high level nuclear waste. After removal of the radioactive constituents, the LAW stream, which has a much larger volume but smaller fraction of radioactivity than the HLW stream, will be immobilized and disposed of in near surface facilities at the Hanford site.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development and Characterization of Cementitious Waste Forms for Immobilization of Granular Activated Carbon, Silver Mordenite, and HEPA Filter Media Solid Secondary Waste

At the Department of Energy’s Hanford site, over 53 million gallons of chemically complex and radioactive wastes have been stored in 177 underground tanks. The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is under construction and is designed to treat and immobilize these wastes. During operations of WTP, solid secondary wastes (SSWs) will be generated as a result of waste treatment, vitrification, off-gas management, and supporting process activities. SSW treatment processes and resulting disposal pathways for the final disposition form of the SSW are needed to support direct feed low activity waste (DFLAW) operations and facilitate continued operation of WTP. The SSWs produced through WTP operations are expected to include used process equipment, contaminated tools and instruments, decontamination wastes, high-efficiency particulate air (HEPA) filters, carbon absorption beds (granular activated carbon, GAC), silver mordenite (AgM) and spent ion-exchange resins. These waste streams are planned to be immobilized in a cementitious waste form and disposed of either as stabilized/blended (non-debris) or encapsulated (debris) in a cementitious waste form. Accordingly, cementitious waste forms from these streams were included in the 2017 Integrated Disposal Facility (IDF) Performance Assessment (PA). The input data used to represent these SSW forms in the 2017 IDF PA involved many assumptions and associated uncertainties. This data limitation was due to the lack of material- and site-specific data available for representative SSW materials in cementitious matrices. To verify the assumed values used in the IDF PA and fill this limitation in available data, Washington River Protection Solutions, LLC (WRPS), has initiated a program targeted toward gathering site specific data relevant to Hanford SSW disposal. The work within this report is a continuation of this ongoing program.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A practical method of determining water current velocities and diffusion coefficients in coastal waters by remote sensing techniques

A simplified procedure is presented for determining water current velocities and diffusion coefficients. Dye drops which form dye patches in the receiving water are made from an aircraft. The changes in position and size of the patches are recorded from two flights over the area. The simplified data processing procedure requires only that the ground coordinates about the dye patches be determined at the time of each flight. With an automatic recording coordinatograph for measuring coordinates and a computer for processing the data, this technique provides a practical method of determining circulation patterns and mixing characteristics of large aquatic systems. This information is useful in assessing the environmental impact of waste water discharges and for industrial plant siting.

James, W. P.↗

Approaches to lunar base life support

Various approaches to reliable, low maintenance, low resupply regenerative long-term life support for lunar base application are discussed. The first approach utilizes Space Station Freedom physiochemical systems technology which has closed air and water loops with approximately 99 and 90 percent closure respectively, with minor subsystem changes to the SSF baseline improving the level of water resupply for the water loop. A second approach would be a physiochemical system, including a solid waste processing system and improved air and water loop closure, which would require only food and nitrogen for resupply. A hybrid biological/physiochemical life support system constitutes the third alternative, incorporating some level of food production via plant growth into the life support system. The approaches are described in terms of mass, power, and resupply requirements; and the potential evolution of a small, initial outpost to a large, self-sustaining base is discussed.

Brown, M. F.↗