Search NASA⌕ Search

SEARCH · Search NASA

Results for “certification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,261 records · Page 70

ESBWR - Robust design for natural circulation and stability performance effectiveness

ESBWR is a 4500 MWt Generation III+ natural circulation reactor with an array of robust design features and passive safety systems to deliver highly effective plant performance during normal operation and to keep the reactor safe during postulated transients and accidents. With the submittal of the latest revision of the Design Control Document (DCD) to US Nuclear Regulatory Commission, ESBWR is nearing the completion of the US design certification process. This paper focuses on the natural circulation-driven plant performance aspects during normal operation, and stability evaluation of the robust ESBWR design. The TRACG computer code is used for the analysis of ESBWR plant performance, safety analysis, and stability margins. The paper describes the evaluation of ESBWR stability performance during normal power operation including operation in the Core Power-Feed Water Temperature Operating Domain. For ESBWR the normal power operation condition has the highest power/flow ratio and is limiting from the perspective of stability. The paper includes results from detailed evaluation of the most limiting decay ratio for out-of-phase regional oscillations calculated by perturbing the core inlet flow rate in this out-of-phase mode about the line of symmetry for the azimuthal harmonic mode. The paper also summarizes the ESBWR regional mode stability evaluations during a limiting transient (Loss of Feedwater Heating), and during ATWS (Anticipated Transient without Scram). Nominal decay ratios of limiting Channel oscillation, Core wide oscillation and Regional oscillation are within the maximum acceptance criterion of 0.8, at 95% content and 95% confidence. These stability evaluation results indicate decay ratio is within design limits. The paper also describes the evaluation of ESBWR stability performance during plant startup, and summarizes the defense-in-depth stability solution for ESBWR. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Benefits of creating a cross-country data framework for energy efficiency

As manufacturers now sell a similar range of consumer electronics and home appliances to major markets around the world, the task of identifying a product’s energy efficiency rating has usually been the responsibility of each country and its respective government agency. This has led to a multitude of energy efficiency testing procedures, ratings, and certifications, resulting in disparate data being captured on identical products. Furthermore, lack of consistent product identification criteria means product energy performance is not easily connected to relevant information about the product such as market availability, price or real world energy consumption. This paper presents a new data standard for reporting energy performance and related product information that can be adopted internationally. To inform the development of this standard, we explore the existing energy efficiency market data for the two example products of TVs and Room Air Conditioners. This paper discusses current/future use cases of appliance level energy efficiency data across all stakeholders, including consumers, retailers/manufacturers, global standards organizations, third party service providers, and regulatory agencies. It also explains the key benefits of moving to a common international data framework for energy efficiency, such as: 1) a centralized product information repository for comparing energy use, ratings/certifications, and pricing data 2) improved access to relevant consumer electronics and appliance data to facilitate new policy development and harmonization across markets 3) enablement of retailers and other third parties to embed actionable energy efficiency information as part of the consumer experience.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Land Use Manager Application Ensures Protectiveness Following Remediation on the Oak Ridge Reservation - 13355

Long-term stewardship is the set of activities necessary to return contaminated land to safe and beneficial use. The activities include physical and legal controls to prevent inappropriate exposure to contamination left in place at a site. It is the longest phase of the Department of Energy's Environmental Management Program and ensures the protection of human health and the environment for varied end uses. At the Department of Energy's Oak Ridge Reservation an automated program has been developed and implemented that tracks the multitude of long-term stewardship activities. The Oak Ridge Reservation is a large site that currently has over 50 actions requiring long-term stewardship activities. The Oak Ridge Reservation consists primarily of three plant sites, and long-term stewardship will enable these sites to be leased to private entities (East Tennessee Technology Park), modernized for an evolving national security mission (Y-12 National Security Complex), and revitalized to continue multi-disciplinary research (Oak Ridge National Laboratory). The varied site end uses of the individual plant sites coupled with the multitude of controls required by leaving waste in place presents challenges. A single remedial action may include surveillance and maintenance activities, media monitoring, property record notices as well as physical controls such as fences and signs. Thus, the array of long-term stewardship activities is complex and intermingled (over 200 inspections each year at various frequencies are required currently) and requires an effective tracking program, termed the Land Use Manager. The Land Use Manager is a web-based data management application for use by personnel responsible for implementing, maintaining, and verifying engineering and land use controls on the Oak Ridge Reservation. The program is a data entry and tracking tool, as well as a notification tool. The status and performance of engineering and land use controls are checked annually for evaluation in the required Remediation Effectiveness Report, and the automated Land Use Manager collects, maintains, tracks, notifies, monitors, and manages the information necessary to perform this evaluation. Land Use Manager tracks site information including type of contamination, regulatory requirements, locates land use controls; provides information on inspections, certification, and reporting; and provides reports. Most data access features, e.g., view, print, query, and download, are available to all users; however, data input, updating, and editing are restricted to the personnel directly responsible for monitoring and inspection. The Land Use Manager application was developed for the Department of Energy Oak Ridge Office by URS - CH2M Oak Ridge LLC, Restoration Services Incorporated, and MIJARA Corporation to meet the specific needs of long-term stewardship tracking on the Oak Ridge Reservation. The successful implementation of long-term stewardship enables the future government and private activities being planned on the Oak Ridge Reservation to proceed. (authors)

54 ENVIRONMENTAL SCIENCES↗

Testing of a Transport Cask for Research Reactor Spent Fuel - 13003

Since the beginning of the last decade three Latin American countries that operate research reactors - Argentina, Brazil and Chile - have been joining efforts to improve the regional capability in the management of spent fuel elements from the TRIGA and MTR reactors operated in the region. A main drive in this initiative, sponsored by the International Atomic Energy Agency, is the fact that no definite solution regarding the back end of the research reactor fuel cycle has been taken by any of the participating country. However, any long-term solution - either disposition in a repository or storage away from reactor - will involve at some stage the transportation of the spent fuel through public roads. Therefore, a licensed cask that provides adequate shielding, assurance of subcriticality, and conformance to internationally accepted safety, security and safeguards regimes is considered a strategic part of any future solution to be adopted at a regional level. As a step in this direction, a packaging for the transport of irradiated fuel for MTR and TRIGA research reactors was designed by the tri-national team and a half-scale model equipped with the MTR version of the internal basket was constructed in Argentina and Brazil and tested in Brazil. Three test campaigns have been carried out so far, covering both normal conditions of transportation and hypothetical accident conditions. After failing the tests in the first two test series, the specimen successfully underwent the last test sequence. A second specimen, incorporating the structural improvements in view of the previous tests results, will be tested in the near future. Numerical simulations of the free drop and thermal tests are being carried out in parallel, in order to validate the computational modeling that is going to be used as a support for the package certification. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessing and improving regulatory communication processes: the case of the WIPP CRA - 15151

This paper will focus on how and why effective communication is useful and meaningful for a multi-organizational project team and the concrete practices through which this team assessed and intervened in its communication. First, the effort generated five recommendations that may be useful in other similar projects. The five primary areas of improvement include the use of an electronic platform for collaboration and document sharing, the continued use of an in-house technical editor, improved direction for authors and technical editors, improved comment resolution process (development of Communication Guidelines) and improved management of the project schedule. These areas for improvement were translated into process changes that were identified and agreed upon by the team. Specific actions were assigned to members of the team with the intent to streamline the complex regulatory process. Second, and more importantly, we demonstrate how the assessment of communication, thinking about our communication practices together (reflexive engagement), and the implementation of insights about communication fit into a larger continuous improvement framework. Third, the experience of the interdisciplinary team provided preliminary evidence about the efficacy of the approach and the need for continuous engagement with communication. The intensified participation in the second assessment encouraged greater ownership and satisfaction with corrective actions. The substance of the recommendations was made more robust as well, focusing on improving communication within the project team. Early anecdotal evidence suggests that improvements in communications continue to enhance the project team's efficiency and efficacy of the planning phase through submittal of the Compliance Re-certification Application. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Impacts of an additional exhaust shaft on WIPP performance - 15170

The Waste Isolation Pilot Plant (WIPP), located in southeastern New Mexico, has been developed by the U.S. Department of Energy (DOE) for the geologic (deep underground) disposal of transuranic (TRU) waste. WIPP performance assessment (PA) demonstrates repository performance from facility closure to 10,000 years after closure. The recent radiological release event at the WIPP site has temporarily halted waste emplacement activities at the facility. A modified ventilation system is envisioned that will provide sufficient airflow necessary for the resumption of full-rate disposal operations in the future. A primary component of the modified ventilation system is an additional exhaust shaft in the north end of the repository. There are four shafts currently in the repository north end, namely a salt handling shaft, an exhaust shaft, a waste shaft, and an air intake shaft. These shafts are combined into a single composite shaft in WIPP PA that captures the combined impacts of all of them. The proposed additional exhaust shaft is combined with the four existing shafts in the repository model to determine its impacts on long-term repository performance. Moreover, mined volume in the repository north end is modified in the repository representation so as to include additional drifts created to access the new shaft. Computed gas and brine flow behaviors corresponding to the repository with the additional exhaust shaft are compared to those obtained in the PA executed for the 2014 Compliance Re-certification Application (the CRA-2014 PA). Results show that the repository with an additional exhaust shaft and drifts yields brine and gas flow behaviors similar to the current repository configuration. It is concluded that WIPP continues to satisfy regulatory compliance limits with the addition of an exhaust shaft and its access drifts, with compliance curves like those found in the CRA-2014 PA for total normalized releases. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Risk considerations for WIPP passive institutional controls - 15173

The regulatory assurance measures for the Waste Isolation Pilot Plant (WIPP) include such things as active and passive institutional controls, monitoring, waste retrieval/removal capabilities and engineered barriers. Passive Institutional Controls (PICs) are an assurance measure intended to reduce the likelihood of humans unintentionally intruding the WIPP geologic radioactive waste disposal system for thousands of years after it is closed. The waste repository is designed such that it should not pose a significant risk to future populations if it is left undisturbed. The design has also been demonstrated through a performance assessment (PA) analysis to not pose a significant risk to future generations even if it is intruded upon by an inadvertent drilling intrusion [1, Appendix PA]. Through PA, it has been determined that the overall risk of the disposal system to people and the environment is small. The intent of the regulatory Assurance Requirements and PICs is to provide additional confidence that the repository will perform as expected after closure. However, the actual implementation of the proposed PICs design may pose a greater risk to the current population than they would potentially reduce for future generations. Specifically, the risks due to industrial accidents, construction and transportation risks incurred during the fabrication and construction of the permanent markers system may be greater than the overall reduction in risk to future generations due to the existence of the permanent markers. If this were true, implementation of the current PICs design may be counter to the intention of the regulatory requirement to include such assurance measures. As such, provisions for assurance measures used in geologic radioactive waste disposal facilities, such as PICs, should consider risk impacts. A provision of any disposal program's Regulatory Assurance Requirements should address the impacts of the known risks from all the components of the assurance-related systems. The initial WIPP PICs design was developed as part of the regulatory certification process in 1996 with the intent of being revised when the WIPP closes several decades from now [2, Appendix PIC]. The revised design that will be developed at closure should address the design's potential reduction to long-term risks from the repository and the risks due to the implementation of the final design. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Influencing future exploratory drilling rates-a potential approach for the waste isolation pilot plant - 15307

The Department of Energy/Carlsbad Field Office (DOE/CBFO) is responsible for managing activities related to the disposal of TRU and TRU-mixed waste in the geologic repository at the Waste Isolation Pilot Plant (WIPP), near Carlsbad, New Mexico. The WIPP Compliance Certification Application had a reference concerning natural resources at the site of the Waste Isolation Pilot Plant. This reference suggested that resources could be withdrawn from under the repository area from a distance and not affect the integrity of the repository. This would not eliminate, but would certainly diminish, the rate of exploratory drilling in the distant future. Currently the only scenarios that result in releases from the repository are human intrusion scenarios, without human intrusion radioactive releases to the accessible environment are essentially zero for the very long term future. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Laboratory testing options for FUSRAP projects - 15462

Remediation projects within the Formerly Used Sites Remedial Action Program (FUSRAP) have many options to consider when evaluating their analytical testing needs. Factors that should be considered in determination of a project's analytical testing needs include which parameter results are considered time-critical, the potential savings in reduction of construction-related delays when time-critical samples are analyzed onsite (including screening) instead of offsite, control of data quality for onsite versus offsite data, and the value of additional knowledge gained by programs such as FUSRAP by employing onsite laboratories. The most important factor turned out to be reduction in construction-related delays. We considered development of an optimum combination of onsite lab/offsite lab capability. This depends on: i. Time critical parameters and the methods required; ii. Estimated Cost for onsite lab construction or facility rental, maintenance, labor, chemicals (reagents and standards), and certification (if desired and deemed necessary) iii. Ability, flexibility, and cost of offsite lab sample testing using project-desired TATs and methods that will meet project action levels iv. Willingness of stakeholders, in particular regulators, in accepting some combination of onsite and offsite testing (for example, onsite screening followed by offsite confirmatory testing for certain parameters) Due to the significant costs in construction of an onsite lab and development of sample testing capability and all which that entails, the recommendations made in this paper will aid other FUSRAP projects in finding an acceptable combination of onsite and offsite testing that is acceptable to all stakeholders. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Managing TRU waste processing and storage issues/challenges - 15487

Operational events at the Waste Isolation Pilot Plant (WIPP) facility resulted in suspension of disposal operations and waste shipments to WIPP creating significant challenges for the Department of Energy (DOE) complex. The Oak Ridge Transuranic (TRU) Waste Program which was poised to re-start shipping after a 2.5 year suspension of the Carlsbad Field Office (CBFO) certification activities which resulted in on-site accumulation of the highest activity contact handled (CH) TRU waste containers. As a result, Transuranic Waste Processing Center (TWPC) is nearing its physical storage capacity for CH waste and has already reached storage capacity limits for remote handled (RH) TRU waste. The TWPC storage capacity for RH-TRU waste is very limited and dependent on real time shipping support to continue RH waste processing activities in the facilities Hot Cell. Additionally, changes in dispersion modeling (i.e., dry deposition factor changes) used in the TWPC Documented Safety Analysis (DSA) present Material at Risk (MAR) management challenges to effectively manage off-site dose consequences. These facts necessitated the identification of alternative waste storage options for both CH and RH waste to continue waste processing operations at TWPC. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Achievements and process improvements in processing transuranic waste at the TRU Waste Processing Center - 15488

Wastren Advantage, Inc., (WAI) is the DOE Prime contractor for the TRU Waste Processing Center (TWPC) located in Oak Ridge, TN. This paper highlights the TWPCs specific achievements and process improvements associated with both Contact (CH) and Remote Handled (RH), Transuranic (TRU) waste receipt processing and repackaging for disposal. The five key improvement areas and achievements include: - The TWPC installed, tested and operated successfully the Drum Venting System (DVS) to vent over-packed CH-TRU waste drums in several configurations including 55-gallon drums over-packed in 79 or 85-gallon drums. - A new Remote Drum Opener (RDO) system was designed, tested and placed in service to vent drums discovered in overpack boxes in the Box Breakdown Area and to vent overpack configurations that could not be handled in the standard DVS (e.g., 110 gallon overpacks and multiple drum configurations). - The Cask Processing Enclosure (CPE) approach to repackaging RH-TRU waste contained in concrete casks was developed and implemented - Hot Cell outage to incorporate planned equipment modifications and improvements to maintain processing rates. - To improve certification and segregation of CH-TRU from drums that meet Low Level Waste criteria for disposal at Nevada the TWPC added additional equipment/facilities for Non-Destructive Assay (NDA) and Real Time Radiography (RTR). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental cleanup of the East Tennessee Technology Park - Year three - A status report - 15522

On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began its five-year, $1.4 billion cleanup of the East Tennessee Technology Park (ETTP), the former Oak Ridge Gaseous Diffusion Plant, located on the U.S. Department of Energy's (DOE) Oak Ridge Reservation (Reservation) in Tennessee. Under the contract, the base period scope of work to be completed by 2016 includes demolition of both the K-25 and K-31 gaseous diffusion buildings and all demolition waste dispositioned, initiation of demolition on the remaining K-27 gaseous diffusion building, safe storage of transuranic (TRU) waste for eventual transfer to the Transuranic Waste Processing Center, previously designated -No-Path-To-Disposition Waste- dispositioned to the extent possible, and completion of design and engineering of a mercury treatment system to be installed at the Y-12 National Security Complex (Y-12). UCOR will have also managed DOE Oak Ridge Office of Environmental Management (OREM)-owned facilities at ETTP, Oak Ridge National Laboratory (ORNL), and Y-12 in a safe and cost-effective manner. Since assuming responsibilities as the ETTP and Oak Ridge Reservation cleanup contractor, UCOR has completed its life-cycle Performance Measurement Baseline; received its Earned Value Management System (EVMS) certification; completed the deactivation and demolition (D and D) of the 44-acre K-25 gaseous diffusion building; removed and disposed of a contaminated underground storage tank (Tank W-1A) at ORNL; dispositioned mercury-contaminated storage tanks at Y-12; completed closure of the Toxic Substances Control Act Incinerator; disposed of more than 158,000 cubic yards of cleanup waste while managing the on-site Environmental Management Waste Management Facility (EMWMF); and conducted operations, surveillance, and maintenance activities at 180 DOE EM facilities at ETTP, ORNL, and Y-12 in a safe and cost-effective manner. In 2014, UCOR completed the removal and disposal of all of the K-25 demolition debris; completed the removal of asbestos-laden transite siding on the K-31 gaseous diffusion building and began demolition of that 17-acre building; advanced the characterization and deactivation of the K-27 gaseous diffusion building, readying the building for the start of demolition in 2015; advanced the design and engineering of a Mercury Treatment Facility to be located at Y-12; continued the cost-effective and safe disposition of all cleanup wastes; and readied ETTP for Voluntary Protection Program Star Status Assessment in 2015. Project performance as of December 31, 2014, continued to be excellent: - Cost Performance Index - 1.12 - Schedule Performance Index - 1.02 At the same time, since safety is the foundation of all cleanup work, UCOR's safety record goes hand-in-hand with its excellent project performance. Through calendar year 2014, UCOR's recordable injury rate was 1.04 occurrences per 200,000 work hours, and the lost workday case rate was 0.52. This performance continues to be due, in large part, to the people and processes URS and CH2M HILL, the parent companies of UCOR, brought to the project. Key enablers included: - Selected and deployed experienced staff in key leadership positions throughout the organization, continually re-energizing the organization with new leaders - Implemented previously successful safety programs and initiatives from other DOE sites, such as DOE's Voluntary Protection Program - Brought fresh thinking and innovation to tackling tough project issues, such as the deactivation of the Technetium-99-contaminated areas of K-27, applying lessons learned from the D and D of K-25; and implementing a -waste factory- approach to cleanup - Maintained continuing alignment between UCOR's contract with DOE and its Performance Measurement Baseline - rapidly addressing contract changes when they arose - Maintained a readiness both from a process as well as experienced personnel perspective to support DOE OREM in performing other significant Oak Ridge Reservation cleanup activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An underground laboratory in the context of salt disposal research - 15549

Evaluating the basis of need for an underground research laboratory for salt science and engineering is imperative because of the significant commitment of time and money involved. Decades of salt repository studies, numerous experiments, and sophisticated modeling capabilities underpin the scientific database that supports safe disposal of nuclear waste in salt. The safety case for disposal of non-heat-generating waste such as transuranic waste interred at the Waste Isolation Pilot Plant is robust, with the only long-term releases to the environment projected to be by way of human intrusion. The scientific evidence also favors safe disposal of heat-generating waste. Technical evaluations for disposal of heat-generating waste in salt experienced a rather long hiatus in the United States subsequent to certification of the Waste Isolation Pilot Plant and issuance of the Nuclear Waste Policy Act Amendment that ended salt disposal research for the civilian program. Similar salt repository research in Germany was delayed by a ten-year moratorium that ended in 2010. In collaboration with German peers, the United States Department of Energy has reviewed and evaluated thermally driven processes in salt disposal and identified key technical areas in which to prioritize resources. The goal for disposal research in salt is to provide sufficient technical information to license a repository successfully. The necessity or utility of a salt underground laboratory is to be evaluated in the context of an overall research agenda that supports a license application. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Support of SRS salt-stone regulatory compliance - 15586

The SRS salt-stone Facility is designed and permitted to immobilize and dispose of low-level radioactive and hazardous liquid waste (salt solution) remaining from the processing of radioactive material at the Savannah River Site. The salt-stone Processing Facility (SPF) is permitted as a wastewater treatment facility per the South Carolina Department of Health and Environmental Control Regulations (SCDHEC) South Carolina Hazardous Waste Management Regulations (SCHWMR) R.61-67. The salt-stone Disposal Facility is permitted as a solid waste landfill site, as defined by SCDHEC Regulations R61-107.19. The salt-stone Sampling and Analysis Plan provides the SCDHEC with the chemical and physical characterization strategy for the salt solution and salt-stone waste form. During operation, samples are collected from Tank 50H on a quarterly basis and are analyzed by the Savannah River National Laboratory (SRNL) for over chemical and radioactive components. The analytical results are compared to the salt-stone waste acceptance criteria in a technical report. SRNL also prepares salt-stone samples from the quarterly sample and premix binder materials provided by the SPF to determine the non-hazardous nature of the grout to meet the requirements of the SCDHEC regulation for the 'Characteristic of Toxicity', R.61-79.261.24(b) and the 'Universal Treatment Standards', R.61-79.268.48.4. salt-stone samples are collected, size reduced, packaged, and shipped to an independent United States EPA certified laboratory, or a laboratory that holds an equivalent certification such as one from the National Environmental Laboratory Accreditation Program to perform the EPA Toxicity Characteristic Leaching Procedure (TCLP) extraction of the salt-stone sample. SRNL reviews the results of the TCLP analysis and prepares a report detailing the sample preparation and analysis that is used by the salt-stone Facility to demonstrate the nonhazardous nature of the salt-stone waste form. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Shortage of Type B LLRW Casks in the US to Serve Nuclear Plants and National Labs - 15663

In early 2012, the industry experienced sudden shortage of Type B Low Level Radioactive Waste (LLRW) transport casks available for transportation of nuclear waste and sealed sources within the United States (US) of America. Some of the events which created this situation include, but not limited to, opening of a new LLRW Disposal facility (Andrews County, TX) managed by Waste Control Specialists (WCS) for Class A, B and C LLRW, retirement of vast majority of previously certified Type B LLRW transport packages, more stringent regulatory certification requirements and increased demand for LLRW transportation casks to support decommissioning of nuclear power plant and transportation of sealed sources. Cask designers are still in the process of responding to the emerging needs of the industry. This paper will provide a detailed background and discuss the events that have occurred in recent years that have led to a shortage of Type B LLRW transport casks available to service the industry with transportation of resins, used filters, irradiated hardware and sealed sources. In addition, this paper will provide an overview of currently available, being fabricated Type B packages as well as information about the tentative designs of Type B LLRW transport casks to be designed and certified in the US by cask design/manufacturing firms in the near future. In conclusion section, this paper will summarize whether the LLRW Type B transport cask supply market for discussed payloads will be able to adequately respond to the industry demand. Potential ways for long term resolution of this issue will be discussed. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nuclear waste management approach for new build nuclear power plants in the people's republic of China - 15687

EnergySolutions continues to provide waste treatment solutions in the People's Republic of China (PRC). Currently two projects are in the installation phase at different sites (Haiyang, an AP-1000TM site and Yangjiang, a CPR-1000 site). EnergySolutions is also working closely with PRC nuclear regulatory officials for certification of High Integrity Containers (HIC). This paper discusses progress on these two projects, and new information regarding current and future PRC waste management plans. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Importance Ranking of Software Dependability Attributes in the Nuclear Industry

With the current transition from analog to digital instrumentation and control systems in nuclear power plants, the number and variety of software-based systems has significantly increased. Due to the sophisticated nature and the increasing complexity of software, a significant challenge faced by the nuclear industry is the trust one can place in software-based systems once they have been developed. The trust placed in software is typically termed software dependability, a qualifier which encompasses different attributes such as software reliability, safety, security, availability and maintainability. It is recognized that these attributes relate to each other in different ways under various scenarios. The detailed dependencies between software dependability attributes can be found in a previous study. With limited time and budget resources, which dependability attribute should be given the highest priority when certifying software-based systems in the nuclear industry is a fundamental question that needs to be answered. This paper addresses this problem using stakeholders' opinion elicitation. A comprehensive questionnaire was designed to elicit the goals that should be fulfilled by the nuclear industry and to collect the relative importance of the various dependability attributes for each goal. We then used the Analytical Hierarchy Process (AHP) to analyze the data and obtained the relative importance ranking of software dependability attributes in the context of a reactor protection system. The results will provide guidance to resource allocation for the certification of software dependability in the nuclear industry. (authors)

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Future Transition of WIPP from EM to Another DOE Office - 19256

The U. S. Department of Energy (DOE) Carlsbad Field Office (CBFO) has a primary mission to assist federal government entities disposition transuranic (TRU) radioactive waste. The main resource for disposition is the deep geologic repository known as the Waste Isolation Pilot Plant (WIPP). Other resources include a complete transportation system and a program that assists in the certification and shipment of TRU waste to WIPP known as the National TRU Program (NTP). All of these resources are managed by CBFO, which currently is part of the DOE Environmental Management (EM) program. EM's primary mission for DOE is to clean up the legacy remaining from many years of nuclear weapons research and production. But, CBFO estimates the need for WIPP and NTP will continue beyond the mission of EM and will assist other entities such as the National Nuclear Security Administration (NNSA), the Office of Science (OS) and the Navy. As the inventory of legacy TRU waste is reduced, the inventory of new TRU waste will continue from ongoing missions. So, over the life span of WIPP the primary customers of CBFO will shift from legacy EM sites to newly-generated TRU waste sites. And, somewhere along the way CBFO estimates that it will transition, primarily from an EM support (legacy waste) entity to a primarily a NNSA support (newly-generated waste) entity to facilitate ongoing DOE missions. This paper will address the need for that change at a programmatic level and will include some ideas for conceptual planning for such a transition. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗