Search NASA⌕ Search

SEARCH · Search NASA

Results for “probabilistic analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,261 records · Page 70

Mechanical system reliability for long life space systems

The creation of a compendium of mechanical limit states was undertaken in order to provide a reference base for the application of first-order reliability methods to mechanical systems in the context of the development of a system level design methodology. The compendium was conceived as a reference source specific to the problem of developing the noted design methodology, and not an exhaustive or exclusive compilation of mechanical limit states. The compendium is not intended to be a handbook of mechanical limit states for general use. The compendium provides a diverse set of limit-state relationships for use in demonstrating the application of probabilistic reliability methods to mechanical systems. The compendium is to be used in the reliability analysis of moderately complex mechanical systems.

Kowal, Michael T.↗

Europa Planetary Protection for Juno Jupiter Orbiter

NASA's Juno mission launched in 2011 and will explore the Jupiter system starting in 2016. Juno's suite of instruments is designed to investigate the atmosphere, gravitational fields, magnetic fields, and auroral regions. Its low perijove polar orbit will allow it to explore portions of the Jovian environment never before visited. While the Juno mission is not orbiting or flying close to Europa or the other Galilean satellites, planetary protection requirements for avoiding the contamination of Europa have been taken into account in the Juno mission design.The science mission is designed to conclude with a deorbit burn that disposes of the spacecraft in Jupiter's atmosphere. Compliance with planetary protection requirements is verified through a set of analyses including analysis of initial bioburden, analysis of the effect of bioburden reduction due to the space and Jovian radiation environments, probabilistic risk assessment of successful deorbit, Monte-Carlo orbit propagation, and bioburden reduction in the event of impact with an icy body.

Juno↗

Bayesian Framework For Bioburden Density Calculations To Perform Planetary Protection Probabilistic Risk Assessment

The planetary protection discipline aims to minimize the microbial contamination on spacecraft to prevent the inadvertent contamination of other planetary bodies, known as forward planetary protection (PP). Planetary protection probabilistic risk assessment (PRA) relies on two core methodologies-the contamination probability event tree analysis and statistical parameter estimation. Planetary protection engineers combine several techniques to estimate the bioburden present on spacecraft components. A direct assay to enumerate CFU (colony forming units) is the preferred methodology, but given a similar processing environment the bioburden present on certain components is inferred using: (1) a NASA defined bioburden estimate based upon the biological cleanliness of the manufacturing/assembly environment or (2) sampled data from a similar spacecraft component. The paper presents an empirical Bayesian framework to systematically treat bioburden estimation and its uncertainties on different levels starting with measurement procedures to combining different components to subsystems and whole spacecraft. It is shown that the Bayesian approach can effectively handle estimations and their uncertainties at different levels and produce a reliable estimate for bioburden to be used to evaluate the probability of contamination.

Seuylemezian, Arman↗

Risk Estimation Methodology for Launch Accidents.

As compact and light weight power sources with reliable, long lives, Radioisotope Power Systems (RPSs) have made space missions to explore the solar system possible. Due to the hazardous material that can be released during a launch accident, the potential health risk of an accident must be quantified, so that appropriate launch approval decisions can be made. One part of the risk estimation involves modeling the response of the RPS to potential accident environments. Due to the complexity of modeling the full RPS response deterministically on dynamic variables, the evaluation is performed in a stochastic manner with a Monte Carlo simulation. The potential consequences can be determined by modeling the transport of the hazardous material in the environment and in human biological pathways. The consequence analysis results are summed and weighted by appropriate likelihood values to give a collection of probabilistic results for the estimation of the potential health risk. This information is used to guide RPS designs, spacecraft designs, mission architecture, or launch procedures to potentially reduce the risk, as well as to inform decision makers of the potential health risks resulting from the use of RPSs for space missions.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Integrated Cost and Schedule using Monte Carlo Simulation of a CPM Model - 12419

This discussion of the recommended practice (RP) 57R-09 of AACE International defines the integrated analysis of schedule and cost risk to estimate the appropriate level of cost and schedule contingency reserve on projects. The main contribution of this RP is to include the impact of schedule risk on cost risk and hence on the need for cost contingency reserves. Additional benefits include the prioritizing of the risks to cost, some of which are risks to schedule, so that risk mitigation may be conducted in a cost-effective way, scatter diagrams of time-cost pairs for developing joint targets of time and cost, and probabilistic cash flow which shows cash flow at different levels of certainty. Integrating cost and schedule risk into one analysis based on the project schedule loaded with costed resources from the cost estimate provides both: (1) more accurate cost estimates than if the schedule risk were ignored or incorporated only partially, and (2) illustrates the importance of schedule risk to cost risk when the durations of activities using labor-type (time-dependent) resources are risky. Many activities such as detailed engineering, construction or software development are mainly conducted by people who need to be paid even if their work takes longer than scheduled. Level-of-effort resources, such as the project management team, are extreme examples of time-dependent resources, since if the project duration exceeds its planned duration the cost of these resources will increase over their budgeted amount. The integrated cost-schedule risk analysis is based on: - A high quality CPM schedule with logic tight enough so that it will provide the correct dates and critical paths during simulation automatically without manual intervention. - A contingency-free estimate of project costs that is loaded on the activities of the schedule. - Resolves inconsistencies between cost estimate and schedule that often creep into those documents as project execution proceeds. - Good-quality risk data that are usually collected in risk interviews of the project team, management and others knowledgeable in the risk of the project. The risks from the risk register are used as the basis of the risk data in the risk driver method. The risk driver method is based in the fundamental principle that identifiable risks drive overall cost and schedule risk. - A Monte Carlo simulation software program that can simulate schedule risk, burn WM2012 rate risk and time-independent resource risk. The results include the standard histograms and cumulative distributions of possible cost and time results for the project. However, by simulating both cost and time simultaneously we can collect the cost-time pairs of results and hence show the scatter diagram ('football chart') that indicates the joint probability of finishing on time and on budget. Also, we can derive the probabilistic cash flow for comparison with the time-phased project budget. Finally the risks to schedule completion and to cost can be prioritized, say at the P-80 level of confidence, to help focus the risk mitigation efforts. If the cost and schedule estimates including contingency reserves are not acceptable to the project stakeholders the project team should conduct risk mitigation workshops and studies, deciding which risk mitigation actions to take, and re-run the Monte Carlo simulation to determine the possible improvement to the project's objectives. Finally, it is recommended that the contingency reserves of cost and of time, calculated at a level that represents an acceptable degree of certainty and uncertainty for the project stakeholders, be added as a resource-loaded activity to the project schedule for strategic planning purposes. The risk analysis described in this paper is correct only for the current plan, represented by the schedule. The project contingency reserve of time and cost that are the main results of this analysis apply if that plan is to be followed. Of course project managers have the option of re-planning and re-scheduling in the face of new facts, in part by mitigating risk. This analysis identifies the high-priority risks to cost and to schedule, which assist the project manager in planning further risk mitigation. Some project managers reject the results and argue that they cannot possibly be so late or so overrun. Those project managers may be wasting an opportunity to mitigate risk and get a more favorable outcome. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Exploring the physics of cesium lead halide perovskite quantum dots via Bayesian inference of the photoluminescence spectra in automated experiment

The unique optoelectronic properties of metal halide perovskite quantum dots (QDs) make them promising candidates for applications in light-emitting diodes (LEDs), scintillators, and other photonic devices. The automated micropipetting synthesis platform equipped with an optical reader enables the opportunity for high throughput synthesis and photoluminescent (PL) characterization of metal halide perovskite QDs for the first time. Here, we explore the compositional dependence of the PL behavior and stability of the combinatorial library of cesium lead halide (CsPbX 3 ) perovskites QDs via the automated platform. To study the stability of synthesized QDs in the binary and ternary configurations, we study the time-dependent PL properties using previously developed machine learning analysis. Additionally, to systematically explore the PL behavior in the ternary CsPbX 3 QDs system, we introduce the Bayesian inference framework that allows the probabilistic fit of multiple models to the PL data and establishes both optimal model and model parameter robustly. Furthermore, these behaviors can be used as a control parameter for the navigation of the multidimensional compositional spaces in automated synthesis. Furthermore, this analysis shows the nonuniformity of the PL peak behavior in the ternary CsPbX 3 QDs system. Further, the analysis confirms narrow size distribution and good quality of CsPbBr 3 QDs alloyed with low concentrations of iodide and chloride. We note that Bayesian Inference fit parameters can be further used as a control signal for navigation of the chemical spaces in automated synthesis.

36 MATERIALS SCIENCE↗

How Many Performance Shaping Factors are Necessary for Human Reliability Analysis?

It has been argued that human reliability analysis (HRA) has expended considerable energy on creating detailed representations of human performance through an increasingly long list of performance shaping factors (PSFs). It is not clear, however, to what extent this refinement and expansion of PSFs has enhanced the quality of HRA. Indeed, there is considerable range in the number of PSFs provided by individual HRA methods, ranging from single factor models such as time-reliability curves, up to 50 or more PSFs in some current HRA models. The US Nuclear Regulatory Commission advocates 15 PSFs in its HRA Good Practices (NUREG-1792), while its SPAR-H method (NUREG/CR-6883) espouses the use of eight PSFs and its ATHEANA method (NUREG-1624) features an open-ended number of PSFs. The apparent differences in the optimal number of PSFs can be explained in terms of the diverse functions of PSFs in HRA. The purpose of this paper is to explore the role of PSFs across different stages of HRA, including identification of potential human errors, modeling of these errors into an overall probabilistic risk assessment, quantifying errors, and preventing errors.

99 GENERAL AND MISCELLANEOUS↗

Markov Decision Processes for Intelligent, Risk-Informed Asset-Management Decision-Making

Advanced nuclear reactors are a promising option for aiding the world in achieving its net-zero carbon emission goals, however, there are significant challenges to attaining and maintaining economic competitiveness with other sources of electricity. To improve the economic competitiveness of advanced reactor designs, a project was initiated to explore the use of Markov Decision Processes (MDPs) to guide asset-management decision-making during advanced reactor operation. MDPs are a powerful tool for optimizing decision-making in complex environments and their application to advanced reactors can aid in planning maintenance and repair activities to minimize downtime and maximize generation. The described approach expands on previous work regarding the use of MDPs for operational decision-making through the direct incorporation of real-time plant information. The integral MDP analysis includes information from online component diagnostic tools and the plant’s real-time generation risk assessment (GRA) and probabilistic risk assessment (PRA), which evaluate plant risk from both an economic and safety perspective. The result is an asset-management optimization framework that is based on real-time data regarding plant component status and the current best-estimate of plant risk. The paper presents an overview of the theoretical framework to incorporate the different information pathways into an integral MDP analysis, along with example analyses.

Grabaskas, David↗

Inference of Unresolved Point Sources at High Galactic Latitudes Using Probabilistic Catalogs

The detection of point sources in images is a fundamental operation in astrophysics, and is crucial for constraining population models of the underlying point sources or characterizing the background emission. Standard techniques fall short in the crowded-field limit, losing sensitivity to faint sources and failing to track their covariance with close neighbors. We construct a Bayesian framework to perform inference of faint or overlapping point sources. The method involves probabilistic cataloging, where samples are taken from the posterior probability distribution of catalogs consistent with an observed photon count map. In order to validate our method, we sample random catalogs of the gamma-ray sky in the direction of the North Galactic Pole (NGP) by binning the data in energy and point-spread function classes. Using three energy bins spanning 0.3–1, 1–3, and 3–10 GeV, we identify 270{sub −10}{sup +30} point sources inside a 40{sup ∘}×40{sup ∘} region around the NGP above our point-source inclusion limit of 3×10{sup −11} cm{sup −2} s{sup −1} sr{sup −1} GeV{sup −1} at the 1–3 GeV energy bin. Modeling the flux distribution as a power law, we infer the slope to be −1.92{sub −0.05}{sup +0.07} and estimate the contribution of point sources to the total emission as 18{sub −2}{sup +2}%. These uncertainties in the flux distribution are fully marginalized over the number as well as the spatial and spectral properties of the unresolved point sources. This marginalization allows a robust test of whether the apparently isotropic emission in an image is due to unresolved point sources or of truly diffuse origin.

79 ASTRONOMY AND ASTROPHYSICS↗

Ion Engine Service Life Validation by Analysis and Testing

Assessment of the NSTAR ion engine service life is being accomplished through a combination of long duration testing and probabilistic analyses of the credible failure modes. A literature review that examined 65 ion engine endurance tests perfromed over the past 35 years was conducted to compile a list of possible ion engine failure modes.

Ion Engine↗

Ion Engine Service Life Validation by Analysis and Testing

Assessment of the NSTAR ion engine service life is being accomplished through a combination of long duration testing and probabilistic analyses of the credible failure modes. A literature review that examined 65 ion engine endurance tests perfromed over the past 35 years was conducted to compile a list of possible ion engine failure modes.

Ion Engine↗

External Events Analysis for LWRS/RISMC Project: Methodology Development and Early Demonstration

The ultimate scope of Industrial Application no.2 (IA) of the LWRS/RISMC project is a realistic simulation of natural external hazards that impose threat to a NPP. This scope requires the development of a methodology and of a qualified set of tools able to perform advanced risk-informed safety analysis. In particular the methodology should be able to combine results from seismic, flooding and thermal-hydraulic (TH) deterministic calculations with dynamic PRA. A so-called Risk Informed Margin Management (RIMM) approach is being used to represent meaningful (i.e., realistic facility representation and simulation) event scenarios and consequences by linking probabilistic simulations to external events physics. Calculations performed so far demonstrated the capabilities of the proposed methodology in analyzing multi-hazards generated by External Events. The sample application described in this paper allowed identifying the main issues (code interfaces, computational and human resources needed, simplifications) connected to such kind of advanced analysis. The next steps will be the risk-informed earthquakes and flooding analysis of a system of a generic PWR.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Cost-Effectiveness Analysis of Single Fraction of Stereotactic Body Radiation Therapy Compared With Single Fraction of External Beam Radiation Therapy for Palliation of Vertebral Bone Metastases

Purpose: Stereotactic body radiation therapy (SBRT) has been proposed for the palliation of painful vertebral bone metastases because higher radiation doses may result in superior and more durable pain control. A phase III clinical trial (Radiation Therapy Oncology Group 0631) comparing single fraction SBRT with single fraction external beam radiation therapy (EBRT) in palliative treatment of painful vertebral bone metastases is now ongoing. We performed a cost-effectiveness analysis to compare these strategies. Methods and Materials: A Markov model, using a 1-month cycle over a lifetime horizon, was developed to compare the cost-effectiveness of SBRT (16 or 18 Gy in 1 fraction) with that of 8 Gy in 1 fraction of EBRT. Transition probabilities, quality of life utilities, and costs associated with SBRT and EBRT were captured in the model. Costs were based on Medicare reimbursement in 2014. Strategies were compared using the incremental cost-effectiveness ratio (ICER), and effectiveness was measured in quality-adjusted life years (QALYs). To account for uncertainty, 1-way, 2-way and probabilistic sensitivity analyses were performed. Strategies were evaluated with a willingness-to-pay (WTP) threshold of $100,000 per QALY gained. Results: Base case pain relief after the treatment was assumed as 20% higher in SBRT. Base case treatment costs for SBRT and EBRT were $9000 and $1087, respectively. In the base case analysis, SBRT resulted in an ICER of $124,552 per QALY gained. In 1-way sensitivity analyses, results were most sensitive to variation of the utility of unrelieved pain; the utility of relieved pain after initial treatment and median survival were also sensitive to variation. If median survival is ≥11 months, SBRT cost <$100,000 per QALY gained. Conclusion: SBRT for palliation of vertebral bone metastases is not cost-effective compared with EBRT at a $100,000 per QALY gained WTP threshold. However, if median survival is ≥11 months, SBRT costs ≤$100,000 per QALY gained, suggesting that selective SBRT use in patients with longer expected survival may be the most cost-effective approach.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Fossil Signatures Using Elemental Abundance Distributions and Bayesian Probabilistic Classification

Elemental abundances (C6, N7, O8, Na11, Mg12, Al3, P15, S16, Cl17, K19, Ca20, Ti22, Mn25, Fe26, and Ni28) were obtained for a set of terrestrial fossils and the rock matrix surrounding them. Principal Component Analysis extracted five factors accounting for the 92.5% of the data variance, i.e. information content, of the elemental abundance data. Hierarchical Cluster Analysis provided unsupervised sample classification distinguishing fossil from matrix samples on the basis of either raw abundances or PCA input that agreed strongly with visual classification. A stochastic, non-linear Artificial Neural Network produced a Bayesian probability of correct sample classification. The results provide a quantitative probabilistic methodology for discriminating terrestrial fossils from the surrounding rock matrix using chemical information. To demonstrate the applicability of these techniques to the assessment of meteoritic samples or in situ extraterrestrial exploration, we present preliminary data on samples of the Orgueil meteorite. In both systems an elemental signature produces target classification decisions remarkably consistent with morphological classification by a human expert using only structural (visual) information. We discuss the possibility of implementing a complexity analysis metric capable of automating certain image analysis and pattern recognition abilities of the human eye using low magnification optical microscopy images and discuss the extension of this technique across multiple scales.

Hoover, Richard B.↗

Probabilistic Communication and I/O Tracing with Deterministic Replay at Scale

With today's petascale supercomputers, applications often exhibit low efficiency, such as poor communication and I/O performance, that can be diagnosed by analysis tools. However, these tools either produce extremely large trace files that complicate performance analysis, or sacrifice accuracy to collect high-level statistical information using crude averaging. This work contributes Scala-H-Trace, which features more aggressive trace compression than any previous approach, particularly for applications that do not show strict regularity in SPMD behavior. Scala-H-Trace uses histograms expressing the probabilistic distribution of arbitrary communication and I/O parameters to capture variations. Yet, where other tools fail to scale, Scala-H-Trace guarantees trace files of near constant size, even for variable communication and I/O patterns, producing trace files orders of magnitudes smaller than using prior approaches. We demonstrate the ability to collect traces of applications running on thousands of processors with the potential to scale well beyond this level. We further present the first approach to deterministically replay such probabilistic traces (a) without deadlocks and (b) in a manner closely resembling the original applications. Our results show either near constant sized traces or only sub-linear increases in trace file sizes irrespective of the number of nodes utilized. Even with the aggressively compressed histogram-based traces, our replay times are within 12% to 15% of the runtime of original codes. Such concise traces resembling the behavior of production-style codes closely and our approach of deterministic replay of probabilistic traces are without precedence.

99 GENERAL AND MISCELLANEOUS↗

CONSTRUCTING A FLEXIBLE LIKELIHOOD FUNCTION FOR SPECTROSCOPIC INFERENCE

We present a modular, extensible likelihood framework for spectroscopic inference based on synthetic model spectra. The subtraction of an imperfect model from a continuously sampled spectrum introduces covariance between adjacent datapoints (pixels) into the residual spectrum. For the high signal-to-noise data with large spectral range that is commonly employed in stellar astrophysics, that covariant structure can lead to dramatically underestimated parameter uncertainties (and, in some cases, biases). We construct a likelihood function that accounts for the structure of the covariance matrix, utilizing the machinery of Gaussian process kernels. This framework specifically addresses the common problem of mismatches in model spectral line strengths (with respect to data) due to intrinsic model imperfections (e.g., in the atomic/molecular databases or opacity prescriptions) by developing a novel local covariance kernel formalism that identifies and self-consistently downweights pathological spectral line “outliers.” By fitting many spectra in a hierarchical manner, these local kernels provide a mechanism to learn about and build data-driven corrections to synthetic spectral libraries. An open-source software implementation of this approach is available at http://iancze.github.io/Starfish, including a sophisticated probabilistic scheme for spectral interpolation when using model libraries that are sparsely sampled in the stellar parameters. We demonstrate some salient features of the framework by fitting the high-resolution V-band spectrum of WASP-14, an F5 dwarf with a transiting exoplanet, and the moderate-resolution K-band spectrum of Gliese 51, an M5 field dwarf.

79 ASTRONOMY AND ASTROPHYSICS↗

The WRF-Solar Ensemble Prediction System to Provide Solar Irradiance Probabilistic Forecasts

In this study, we introduce the recently developed WRF-solar ensemble prediction system and a calibration method. The performances of forecast models are evaluated using the National Solar Radiation Database observational analysis for day-ahead solar irradiance predictions. The results demonstrate that the ensemble forecast improves the quality of the forecasts by considering the uncertainty of each ensemble member. The analog ensemble calibration contributed to the reduction of positive bias and an overall improvement in the probabilistic attributes, such as reliability and statistical consistency.

14 SOLAR ENERGY↗

Probabilistic Vulnerability Assessment Based on Power Flow and Voltage Distribution

Risk assessment of large scale power systems has been an important problem in power system reliability study. Probabilistic technique provides a powerful tool to solve the task. In this paper, we present the results of a study on probabilistic vulnerability assessment on WECC system. Cumulant based expansion method is applied to obtain the probabilistic distribution function (PDF) and cumulative distribution function (CDF) of power flows on transmission lines and voltage. Overall risk index based on the system vulnerability analysis is calculated using the WECC system. The simulation results based on WECC system is used to demonstrate the effectiveness of the method. The methodology can be applied to the risk analysis on large scale power systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗