Search NASA⌕ Search

SEARCH · Search NASA

Results for “procurement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,261 records · Page 70

Optimal purchasing of raw materials: A data-driven approach

An approach to the optimal purchasing of raw materials that will achieve a desired product quality at a minimum cost is presented. A PLS (Partial Least Squares) approach to formulation modeling is used to combine databases on raw material properties and on past process operations and to relate these to final product quality. These PLS latent variable models are then used in a sequential quadratic programming (SQP) or mixed integer nonlinear programming (MINLP) optimization to select those raw-materials, among all those available on the market, the ratios in which to combine them and the process conditions under which they should be processed. The approach is illustrated for the optimal purchasing of metallurgical coals for coke making in the steel industry.

01 COAL, LIGNITE, AND PEAT↗

Policy choices and outcomes for offshore wind auctions globally

Offshore wind energy is rapidly expanding, facilitated largely through auctions run by governments. We provide a detailed quantified overview of utilised auction schemes, including geographical spread, volumes, results, and design specifications. Our comprehensive global dataset reveals heterogeneous designs. Although most auction designs provide some form of revenue stabilisation, their specific instrument choices vary and include feed-in tariffs, one-sided and two-sided contracts for difference, mandated power purchase agreements, and mandated renewable energy certificates. We review the schemes used in all eight major offshore wind jurisdictions across Europe, Asia, and North America and evaluate bids in their jurisdictional context. We analyse cost competitiveness, likelihood of timely construction, occurrence of strategic bidding, and identify jurisdictional aspects that might have influenced auction results. We find that auctions are embedded within their respective regulatory and market design context, and are remarkably diverse, though with regional similarities. Auctions in each jurisdiction have evolved and tend to become more exposed to market price risks over time. Less mature markets are more prone to make use of lower-risk designs. Still, some form of revenue stabilisation is employed for all auctioned offshore wind energy farms analysed here, regardless of the specific policy choices. Our data confirm a coincidence of declining costs and growing diffusion of auction regimes.

17 WIND ENERGY↗

Tanks 18 and 19-F equipment grout fill material evaluation and recommendations

The United States Department of Energy (US DOE) intends to remove Tanks 18-F and 19-F at the Savannah River Site (SRS) from service. The high-level waste (HLW) tanks have been isolated from the F-area Tank Farm (FTF) facilities and will be filled with cementitious grout for the purpose of: (1) physically stabilizing the empty volumes in the tanks, (2) limiting/eliminating vertical pathways from the surface to residual waste on the bottom of the tanks, (3) providing an intruder barrier, and (4) providing an alkaline, chemical reducing environment within the closure boundary to limit solubility of residual radionuclides.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Finite-element analysis of the deformation of thin Mylar films due to measurement forces

Significant deformation of thin films occurs when measuring thickness by mechanical means. This source of measurement error can lead to underestimating film thickness if proper corrections are not made. Analytical solutions exist for Hertzian contact deformation, but these solutions assume relatively large geometries. If the film being measured is thin, the analytical Hertzian assumptions are not appropriate. ANSYS is used to model the contact deformation of a 48 gauge Mylar film under bearing load, supported by a stiffer material. Simulation results are presented and compared to other correction estimates. Ideal, semi-infinite, and constrained properties of the film and the measurement tools are considered.

36 MATERIALS SCIENCE↗

Recovery Act. Demonstration of a Pilot Integrated Biorefinery for the Efficient, Direct Conversion of Biomass to Diesel Fuel

The Renewable Energy Institute International, in collaboration with Greyrock Energy and Red Lion Bio-Energy (RLB) has successfully demonstrated operation of a 25 ton per day (tpd) nameplate capacity, pilot, pre-commercial-scale integrated biorefinery (IBR) plant for the direct production of premium, “drop-in”, synthetic fuels from agriculture and forest waste feedstocks using next-generation thermochemical and catalytic conversion technologies. The IBR plant was built and tested at the Energy Center, which is located in the University of Toledo Medical Campus in Toledo, Ohio.

03 NATURAL GAS↗

Decarbonization Considerations: Grid-Interactive Efficient Buildings [Slides]

The Federal Energy Management Program (FEMP) is helping federal agencies understand how to meet decarbonization goals with grid interactive efficient buildings (GEB). This training will provide attendees with an introduction to GEB, how to work with utilities, and opportunities for federal sites.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Antigua and Barbuda Distributed Energy Resources Deployment Guidelines

This document is designed to provide comprehensive considerations, best practices and guidance for deployment of Distributed Energy Resources (DERs) in Antigua and Barbuda. The document provides lists of various technology selection guidance including technical specifications, requirements and applicable key standards and code associated with key DERs and balance of plant equipment. The document also presents the key microgrid design considerations to integrate the DERs to achieve the economic, decarbonization and resiliency goals. Taking into account sensitive grid for such islands, for grid readiness and screening the potential DER interconnection, general approach is highlighted along with the potential technical interconnection requirements. Furthermore, this document shows the key stakeholders involved in such DER integration and/or microgrid project and how key responsible project team can be qualified. Finally, this document refers to key information about warranties and consumer rights and maintenance of the systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Customizable Technical Specifications for Lithium-Ion Battery Storage Projects

Learn how to navigate the FEMP Lithium-ion Battery Storage Technical Specifications, a key resource for federal agencies developing onsite energy storage projects. This webinar, led by technical experts, will provide a step-by-step walkthrough of the specifications, supplemented with a real-world case study. Gain practical insights to support successful battery storage project development and implementation.

25 ENERGY STORAGE↗

Renewable Energy Contracting Options and Renewable Energy Certificates

Virtual Trainings are the online version of the multi-day workshops known as In-Plants (INPLTs) offered by the DOE Better Plants program. ORNL has a 6-session weekly training on Renewable Energy Contracting Options and RECs starting August 5th 2025 (10 am ET) focused on options and resources for the manufacturing sector. This session is earmarked for Tuesday, August 26th, 10 AM ET.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

ACRF Instrumentation Status and Information September 2009

The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement Climate Research Facility instrumentation status. The report is divided into the following five sections: (1) new instrumentation in the process of being acquired and deployed, (2) field campaigns, (3) existing instrumentation and progress on improvements or upgrades, (4) proposed future instrumentation, and (5) Small Business Innovation Research instrument development.

47 OTHER INSTRUMENTATION↗

Production of Ra225 precursor for Ac225/Bi213 generators. Final CRADA Report.

Russian subcontractors shipped two small deliveries of Ra225 to PNNL for evaluation. The activity was close to the requisite amount in the subcontract. The first labeled properly; the second did not. This showed that the Russians could supply Ra225 to the US; however they proved unable to meet future demands for larger amounts of activity. The US DOE attempts to get Ra225 from Russian should be terminated; the Russians, under Rosatom, are not interested in this business.

07 ISOTOPE AND RADIATION SOURCES↗