Search NASA⌕ Search

SEARCH · Search NASA

Results for “test facility”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,261 records · Page 70

Erosion rate diagnostics in ion thrusters using laser-induced fluorescence

We have used laser-induced fluorescence (LIF) to monitor the charge-exchange ion erosion of the molybdenum accelerator electrode in ion thrusters. This real-time, nonintrusive method was implemented by operating a 30cm-diam ring-cusp thruster using xenon propellant. With the thruster operating at a total power of 5 kW, laser radiation at a wavelength of 390 nm (corresponding to a ground state atomic transition of molybdenum) was directed through the extracted ion beam adjacent to the downstream surface of the molybdenum accelerator electrode. Molybdenum atoms, sputtered from this surface as a result of charge-exchange ion erosion, were excited by the laser radiation. The intensity of the laser-induced fluorescence radiation, which is proportional to the sputter rate of the molybdenum atoms, was measured and correlated with variations in thruster operating conditions such as accelerator electrode voltage, accelerator electrode current, and test facility background pressure. We also demonstrated that the LIF technique has sufficient sensitivity and spatial resolution to evaluate accelerator electrode lifetime in ground-based test facilities.

Gaeta, C. J.↗

Upgrade of the Fermilab Spoke Test Cryostat for Testing of PIP-II 650 MHz 5-Cell Elliptical Cavities

Design of the high beta 650 MHz prototype cryomodule for PIP-II is currently undergoing at Fermilab. The cryomodule includes six 5-cell elliptical SRF cavities with accelerating voltage up to 20 MV and low heat dissipation (Q₀ > 3·10^{z}EhNZeHn). Characterization of performance of fully integrated jacketed cavities with high power coupler and tuner is crucial for the project. Such a characterization of jacketed cavity requires a horizontal test cryostat. Existing horizontal testing facilities at Fermilab, Horizontal Test Stand (HTS) and Spoke Test Cryostat (STC), are not large enough to accommodate jacketed 650 MHz 5-cell cavity. An upgrade of the STC is proposed to install extension to the cryostat and modify cryogenic connections and RF infrastructure to provide testing of 650 MHz cavities. In this paper we describe STC upgrade and commissioning of the upgraded facility. We discuss mitigation of issues and problems specific for testing of high Q₀ 650 MHz cavities, which require low residual magnetic field and low acoustic and mechanical vibrations environment.

43 PARTICLE ACCELERATORS↗

End-effector for robotic assembly of welded truss structures in space

In June 1987, work was initiated at LaRC on end-effectors and preloaded joints for robotic truss assembly. This is part of an on-going research effort centered on a test facility that assembles 1 inch x 2 m identical struts into an 8 m diameter x 1.5 m deep platform truss. A detailed description of the test facility was published. The end-effector being used for the LaRC assembly demonstration is quite suitable for the Precision Segmented Reflector or other precision applications. These require high stiffness provided by mechanical joint preloads. Stiffness obtained in this manner is only required and provided over a load range far less than the ultimate strength of the strut tubes. Beyond this useful range, truss behavior is somewhat unpredictable. Mechanically preloaded joints of this type are less suitable for applications such as the Aero Brake where predictable strength and stiffness are required over a greater fraction of the load bearing capacity of component parts. Preliminary studies of the Aerobrake support truss indicate that struts of at least 3 different diameters and various lengths would improve performance. The double-ended end-effector currently in service is designed for only one diameter and length. Anticipated single-ended versions can accommodate varying lengths but not multiple diameters. Tradeoff considerations for welded joints relative to their mechanically preloaded counterparts are presented. Conclusions from this research are as follows: (1) repair by cut and re-weld on the original weld site should be research; (2) welded joints, though repairable, should not be used where high repair frequencies are anticipated; and (3) welded joints should be considered for an Aero Brake truss.

Brewer, William V.↗

Development work for a superconducting linear collider

For future linear e(+)e(-) colliders in the TeV range several alternatives are under discussion. The TESLA approach is based on the advantages of superconductivity. High Q values of the accelerator structures give high efficiency for converting RF power into beam power. A low resonance frequency for the RF structures can be chosen to obtain a large number of electrons (positrons) per bunch. For a given luminosity the beam dimensions can be chosen conservatively which leads to relaxed beam emittance and tolerances at the final focus. Each individual superconducting accelerator component (resonator cavity) of this linear collider has to deliver an energy gain of 25 MeV/m to the beam. Today s.c. resonators are in use at CEBAF/USA, at DESY/Germany, Darmstadt/Germany KEK/Japan and CERN/Geneva. They show acceleration gradients between 5 MV/m and 10 MV/m. Encouraging experiments at CEA Saclay and Cornell University showed acceleration gradients of 20 MV/m and 25 MV/m in single and multicell structures. In an activity centered at DESY in Hamburg/Germany the TESLA collaboration is constructing a 500 MeV superconducting accelerator test facility (TTF) to demonstrate that a linear collider based on this technique can be built in a cost effective manner and that the necessary acceleration gradients of more than 15 MeV/m can be reached reproducibly. The test facility built at DESY covers an area of 3.000 m2 and is divided into 3 major activity areas: (1) The testlinac, where the performance ofthe modular components with an electron beam passing the 40 m long acceleration section can be demonstrated. (2) The test area, where all individual resonators are tested before installation into a module. (3) The preparation and assembly area, where assembly of cavities and modules take place. We report here on the design work to reach a reduction of costs compared to actual existing superconducting accelerator structures and on the facility set up to reach high acceleration gradients in a reproducible way.

Matheisen, Axel↗

The design concept of the 6-degree-of-freedom hydraulic shaker at ESTEC

The European Space Agency (ESA) has decided to extend its test facilities at the European Space and Technology Center (ESTEC) at Noordwijk, The Netherlands, by implementing a 6-degree-of-freedom hydraulic shaker. This shaker will permit vibration testing of large payloads in the frequency range from 0.1 Hz to 100 Hz. Conventional single axis sine and random vibration modes can be applied without the need for a configuration change of the test set-up for vertical and lateral excitations. Transients occurring during launch and/or landing of space vehicles can be accurately simulated in 6-degrees-of-freedom. The performance requirements of the shaker are outlined and the results of the various trade-offs, which are investigated during the initial phase of the design and engineering program are provided. Finally, the resulting baseline concept and the anticipated implementation plan of the new test facility are presented.

Brinkman, P. W.↗

Test Results of the CERN HL-LHC low- Quadrupole Short Models MQXFS3c and MQXFS4

For the High Luminosity Upgrade of the CERN Large Hadron Collider, lower * quadrupole magnets based on advanced Nb3Sn conductors will be installed on each side of the ATLAS and CMS experiment insertion zones. As part of the technological developments needed to achieve the required field gradient of 132.6 T/m within a 150-mm aperture, short length model magnets, named MQXFS, are tested both at the CERN SM18 and FERMI Lab test facilities. The model magnets rely on two types of Nb3Sn conductors (RRP and PIT) and on an innovative bladders and keys design to provide mechanical support against the Lorentz forces. In 2016 and 2017, the powering tests of the first two models MQXFS3 (RRP) and MQXFS5 (PIT) proved that nominal performance (16.5 kA) could be reached with excellent memory of the quench current after thermal cycle. However both magnets showed a slow training behavior with clear observations of voltage disturbances before the quench. Besides MQXFS5 only could reach ultimate current (17.9 kA) whereas erratic behavior was observed on MQXFS3 due to conductor local degradation at the head of one of the coil. In 2018, this limiting coil was changed and the applied azimuthal pre-stress increased. If ultimate current could then be reached, no stable current could be maintained due to identified defect on the outer layer of the new coil. Finally the outcome of the test of the new model MQXFS4, featuring the final RRP conductors that will be used for the series production and variation on the inner layer quench heater designs are here reported in details.

43 PARTICLE ACCELERATORS↗

The Acoustic Environment of the NASA Glenn 9- by 15-foot Low-Speed Wind Tunnel

The 9- by 15-Foot Low Speed Wind Tunnel is an acoustic testing facility with a long history of aircraft propulsion noise research. Due to interest in renovating the facility to support future testing of advanced quiet engine designs, a study was conducted to document the background noise level in the facility and investigate the sources of contaminating noise. The anechoic quality of the facility was also investigated using an interrupted noise method. The present report discusses these aspects of the noise environment in this facility.

Background Noise↗

Popping a Hole in High-Speed Pursuits

NASA s Plum Brook Station, a 6,400-acre, remote test installation site for Glenn Research Center, houses unique, world-class test facilities, including the world s largest space environment simulation chamber and the world s only laboratory capable of full-scale rocket engine firings and launch vehicle system level tests at high-altitude conditions. Plum Brook Station performs complex and innovative ground tests for the U.S. Government (civilian and military), the international aerospace community, as well as the private sector. Popping a Hole in High-Speed Pursuits Recently, Plum Brook Station s test facilities and NASA s engineering experience were combined to improve a family of tire deflating devices (TDDs) that helps law enforcement agents safely, simply, and successfully stop fleeing vehicles in high-speed pursuit

Source record↗

Overview of NASA Electrified Aircraft Propulsion Research for Large Subsonic Transports

NASA is investing in Electrified Aircraft Propulsion (EAP) research as part of the portfolio to improve the fuel efficiency, emissions, and noise levels in commercial transport aircraft. Turboelectric, partially turboelectric, and hybrid electric propulsion systems are the primary EAP configurations being evaluated for regional jet and larger aircraft. The goal is to show that one or more viable EAP concepts exist for narrow body aircraft and mature tall-pole technologies related to those concepts. A summary of the aircraft system studies, technology development, and facility development is provided. The leading concept for mid-term (2035) introduction of EAP for a single aisle aircraft is a tube and wing, partially turbo electric configuration (STARC-ABL), however other viable configurations exist. Investments are being made to raise the TRL level of light weight, high efficiency motors, generators, and electrical power distribution systems as well as to define the optimal turbine and boundary layer ingestion systems for a mid-term tube and wing configuration. An electric aircraft power system test facility (NEAT) is under construction at NASA Glenn and an electric aircraft control system test facility (HEIST) is under construction at NASA Armstrong. The correct building blocks are in place to have a viable, large plane EAP configuration tested by 2025 leading to entry into service in 2035 if the community chooses to pursue that goal.

aircraft engines↗

Overview of NASA Electrified Aircraft Propulsion Research for Large Subsonic Transports

NASA is investing in Electrified Aircraft Propulsion (EAP) research as part of the portfolio to improve the fuel efficiency, emissions, and noise levels in commercial transport aircraft. Turboelectric, partially turboelectric, and hybrid electric propulsion systems are the primary EAP configurations being evaluated for regional jet and larger aircraft. The goal is to show that one or more viable EAP concepts exist for narrow body aircraft and mature tall-pole technologies related to those concepts. A summary of the aircraft system studies, technology development, and facility development is provided. The leading concept for mid-term (2035) introduction of EAP for a single aisle aircraft is a tube and wing, partially turbo electric configuration (STARC-ABL), however other viable configurations exist. Investments are being made to raise the TRL level of light weight, high efficiency motors, generators, and electrical power distribution systems as well as to define the optimal turbine and boundary layer ingestion systems for a mid-term tube and wing configuration. An electric aircraft power system test facility (NEAT) is under construction at NASA Glenn and an electric aircraft control system test facility (HEIST) is under construction at NASA Armstrong. The correct building blocks are in place to have a viable, large plane EAP configuration tested by 2025 leading to entry into service in 2035 if the community chooses to pursue that goal.

Jansen, Ralph H.↗

Overview of NASA Electrified Aircraft Propulsion Research for Large Subsonic Transports

NASA is investing in Electrified Aircraft Propulsion (EAP) research as part of the portfolio to improve the fuel efficiency, emissions, and noise levels in commercial transport aircraft. Turboelectric, partially turboelectric, and hybrid electric propulsion systems are the primary EAP configurations being evaluated for regional jet and larger aircraft. The goal is to show that one or more viable EAP concepts exist for narrow body aircraft and mature tall-pole technologies related to those concepts. A summary of the aircraft system studies, technology development, and facility development is provided. The leading concept for mid-term (2035) introduction of EAP for a single aisle aircraft is a tube and wing, partially turbo electric configuration (STARC-ABL), however other viable configurations exist. Investments are being made to raise the TRL level of light weight, high efficiency motors, generators, and electrical power distribution systems as well as to define the optimal turbine and boundary layer ingestion systems for a mid-term tube and wing configuration. An electric aircraft power system test facility (NEAT) is under construction at NASA Glenn and an electric aircraft control system test facility (HEIST) is under construction at NASA Armstrong. The correct building blocks are in place to have a viable, large plane EAP configuration tested by 2025 leading to entry into service in 2035 if the community chooses to pursue that goal.

aircraft engines↗

Report on Year-2 of Water NSTF Matrix Testing

Under support from the Department of Energy (DOE) and the Office of Advanced Reactor Technologies (ART), a large scale test facility has been constructed at Argonne National Laboratory to generate NQA-1 qualified validation data for passive decay heat removal systems of advanced reactors. The Natural convection Shutdown heat removal Test Facility (NSTF) reflects key features of a ½ scale, water-based, Reactor Cavity Cooling System (RCCS) and is intended to study the behavior, bound performance, and ultimately guide design decisions for passive decay heat removal systems for advanced reactors. Since the facility also retains all aspects common to a fundamental boiling water thermosiphon, the generated experimental data sets are well poised to advance the understanding of fundamental natural circulation boiling and two-phase flow phenomena.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Study of hypersonic propulsion/airframe integration technology

An assessment is done of current and potential ground facilities, and analysis and flight test techniques for establishing a hypersonic propulsion/airframe integration technology base. A mach 6 cruise prototype aircraft incorporating integrated Scramjet engines was considered the baseline configuration, and the assessment focused on the aerodynamic and configuration aspects of the integration technology. The study describes the key technology milestones that must be met to permit a decision on development of a prototype vehicle, and defines risk levels for these milestones. Capabilities and limitations of analysis techniques, current and potential ground test facilities, and flight test techniques are described in terms of the milestones and risk levels.

Hartill, W. R.↗

Rockwell Automation PLC-5 Lands Stennis Space Center with a Reliable, Flexible Control System

Ever since the first rocket was launched, people have been infatuated with the vast and unchartered frontier of space. Whether it's visiting a space center or watching a shuttle launch, people are waiting to see what will be discovered next. And even though orbiting the Earth or taking soil samples form the Moon now seems effortless, decades worth of behind-the-scenes work have helped the U.S. space program get to this point. Even today, NASA must take every precaution to ensure equipment is up to the endeavor of setting foot on the moon. As part of the initial push to put the first man on the moon, NASA established the John C. Stennis Space Center, Hancock County, Mississippi in 1961 for space engine propulsion system development. Today, Stennis has three major test complexes where engine and component testing is carried out and integrated into full motion systems for space shuttles and vehicles as well as secondary testing facilities. With different products being tested throughout the facilities, Stennis was in need of an automation system that could link the operations. By integrating a control system based on a Rockwell Automation's flexible and reliable PLC-5 controller, Stennis was able to implement projects more efficiently and focus its efforts on getting the next generation of products ready for space.

Epperson, Dave↗

Design, Activation, and Operation of the J2-X Subscale Simulator (JSS)

The purpose of this paper is to give a detailed description of the design, activation, and operation of the J2-X Subscale Simulator (JSS) installed in Cell 1 of the E3 test facility at Stennis Space Center, MS (SSC). The primary purpose of the JSS is to simulate the installation of the J2-X engine in the A3 Subscale Rocket Altitude Test Facility at SSC. The JSS is designed to give aerodynamically and thermodynamically similar plume properties as the J2-X engine currently under development for use as the upper stage engine on the ARES I and ARES V spacecraft. The JSS is a scale pressure fed, LOX/GH fueled rocket that is geometrically similar to the J2-X from the throat to the nozzle exit plane (NEP) and is operated at the same oxidizer to fuel ratios and chamber pressures. This paper describes the heritage hardware used as the basis of the JSS design, the newly designed rocket hardware, igniter systems used, and the activation and operation of the JSS.

Saunders, Grady P.↗

Capability Improvements at Marshall Space Flight Center's X-Ray and Cryogenic Facility

The X-Ray & Cryogenic Facility (XRCF) at Marshall Space Flight Center is the world’s largest x-ray optic calibration facility and NASA’s premier cryogenic optical test facility. Built specifically to calibrate the Chandra telescope, the facility contributed to several other x-ray missions until 2005 when it became dedicated to normal incidence optical testing at cryogenic temperatures. Recently the facility’s x-ray test capability has been returned to service and updated. New beam monitors, focal plane detectors, and test article and instrument positioning systems have been added. The x-ray data acquisition system has been updated. A real-time position monitoring metrology system is being developed that will enable calibration of large diameter optics via partial illumination in a diverging beam. The newly expanded x-ray test capabilities of the facility will be discussed.

XRCF↗

Nonseeded linewise temperature measurements by resonantly ionized photoemission thermometry in a Mach 4 Ludwieg tube

A one-dimensional (1D) thermometry using oxygen-tagging resonantly ionized photoelectron thermometry (O 2 RIPT) was employed to investigate thermal gradients within a Mach 4 Ludwieg tube. The Ludwieg tube is pulsed with a test duration of approximately 100 ms, providing a cold supersonic flow at Mach 4 ideal for studying aerothermal effects. This study focused on measuring freestream temperatures, capturing shock-induced heating behind a detached bow shock from a blunt cylinder, and resolving sharp temperature variations across a bow shock generated by a cylinder. The O 2 RIPT technique produced strong emission signals extending approximately 4 cm long, demonstrating its capability for precise temperature measurements in high-speed wind tunnel environments. The results confirm that O 2 RIPT is well-suited for applications in large-scale aerodynamic testing facilities, particularly in regions with strong compression effects, enabling the resolution of sharp thermal gradients. This method presents a promising solution for thermometry in dynamic flow conditions relevant to various experimental ground-test facilities.

McCord, Walker (ORCID:0000000179747550)↗