Search NASA⌕ Search

SEARCH · Search NASA

Results for “COST PROGRAM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,279 records · Page 71

Mild Biomass Liquefaction Process for Economic Production of Stabilized Refinery-Ready Bio-oil

Southern Research (SR) in cooperation with U.S. Department of Energy (DOE), Bioenergy Technology Office (BETO), investigated a biomass liquefaction process for economic production of stabilized refinery-ready bio-oil. The project was awarded by DOE under a Funding Opportunity Announcement (DE-FOA-0000686) for Bio-oil Stabilization and Commoditization that intended to evaluate the feasibility of using bio-oil as a potential feedstock in an existing petroleum refinery. SR investigated Topic Area 1 of the FOA at Technology Readiness Level 2-3 to develop thermochemical liquefaction technologies for producing a bio-oil feedstock from high-impact biomass that can be utilized within a petroleum refinery. Bio-oil obtained from fast pyrolysis of biomass is a green intermediate that can be further upgraded into a biofuel for blending in a petroleum refinery using a hydro-deoxygenation (HDO) route. Co-processing pyrolysis bio-oil in a petroleum refinery is an attractive approach to leverage the refinery’s existing capital. However, the petroleum industry is reluctant to accept pyrolysis bio-oil because of a lack of a standard definition for an acceptable bio-oil feedstock in existing refinery processes. Also per BETO’s multiyear program plan, fast pyrolysis-based bio-fuel is presently not cost competitive with petroleum-based transportation fuels. SR aims to develop and demonstrate a cost-effective low-severity thermal liquefaction and hydrodeoxygenation (HDO) process to convert woody biomass to stabilized bio-oils that can be directly blended with hydrotreater input streams in a petroleum refinery for production of gasoline and/or diesel range hydrocarbons. The specific project objectives are to demonstrate the processes at laboratory scale, characterize the bio-oil product and develop a plan in partnership with a refinery company to move the technology towards commercialization.

09 BIOMASS FUELS↗

Terry Turbopump Expanded Operating Band Full-Scale Component and Basic Science Detailed Test Plan - Final.

This document details the milestone approach to define the true operating limitations (margins) of the Terry turbopump systems used in the nuclear industry for Milestone 3 (full-scale component experiments) and Milestone 4 (Terry turbopump basic science experiments) efforts. The overall multinational-sponsored program creates the technical basis to: (1) reduce and defer additional utility costs, (2) simplify plant operations, and (3) provide a better understanding of the true margin which could reduce overall risk of operations.

42 ENGINEERING↗

Terry Turbopump Expanded Operating Band Full-Scale Component and Basic Science Detailed Test Plan-Revision 2

This document details the milestone approach to define the true operating limitations (margins) of the Terry turbopump systems used in the nuclear industry for Milestone 3 (full-scale component experiments) and Milestone 4 (Terry turbopump basic science experiments) efforts. The overall multinational-sponsored program creates the technical basis to: (1) reduce and defer additional utility costs, (2) simplify plant operations, and (3) provide a better understanding of the true margin which could reduce overall risk of operations.

47 OTHER INSTRUMENTATION↗

Terry Turbopump Analytical Modeling Efforts in Fiscal Year 2016 - Progress Report

This document details the Fiscal Year 2016 modeling efforts to define the true operating limitations (margins) of the Terry turbopump systems used in the nuclear industry for Milestone 3 (full-scale component experiments) and Milestone 4 (Terry turbopump basic science experiments) experiments. The overall multinational-sponsored program creates the technical basis to: (1) reduce and defer additional utility costs, (2) simplify plant operations, and (3) provide a better understanding of the true margin which could reduce overall risk of operations.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Terry Turbopump Expanded Operating Band Full-Scale Integral Long-Term Low-Pressure Experiments — Preliminary Test Plan

This document details the milestone approach to define the true operating limitations (margins) of the Terry turbopump systems used in the nuclear industry for Milestone 5 (full-scale integral long-term low-pressure operations) efforts. The overall multinational-sponsored program creates the technical basis to: (1) reduce and defer additional utility costs, (2) simplify plant operations, and (3) provide a better understanding of the true margin which could reduce overall risk of operations.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Aniak Energy Action Plan

In 2017, the Native Village of Aniak received a grant for the Aniak Energy Efficiency Project from the United States Department of Energy Office of Indian Energy policy and programs. The objective of the project was to reduce and stabilize energy costs in tribal buildings by setting energy efficiency improvement goals to provide direction for a future retrofit project. This final report begins with information about the community of Aniak and the project procedure. Chapters follow on each component of the project. The project team began by recording information about the seven project buildings as well as the Aniak Traditional Council’s goals for each building. Tribal staff also gathered baseline data on each building, including their energy use and general condition. An energy professional surveyed each building, prepared an energy model using AkWarm-C energy modeling software to determine energy-saving retrofits, and completed energy audits, summarized within this report. Each energy audit lists energy efficiency measures and energy conservation measures to pursue to improve the building and decrease its energy use. This report also contains three resources to help with the next steps in an energy retrofit project: a data monitoring plan to track the building condition and energy use through a retrofit project, a maintenance plan to facilitate energy conservation, and a list of funding and training opportunities that could provide resources for a retrofit or training for maintenance staff. Finally, readers can find materials from the outreach component of the project which demonstrated sustainable practices to the community. This Energy Action Plan marks the conclusion of the Aniak Energy Efficiency Project, but is meant to lead to the next step towards safe, comfortable, and energy efficient tribal buildings that will continue to benefit the community of Aniak for many years to come.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Development of a Pre-Combustion CO 2 Capture Process Using High-Temperature PBI Hollow-Fiber Membranes

The overall objective of this project was to evaluate the advantages of transformational polybenzimidazole (PBI) polymer hollow-fiber membrane (HFM)-based, carbon dioxide (CO 2 ) capture and purification technology at bench-scale using an actual coal-derived syngas stream from a coal gasification facility. The project was carried out over two budget periods. The technical objectives in Budget Period 1 (BP1) included preparing HFs and modules and upgrading the available skid for field testing. The technical objectives for BP2 were to field-test the skid unit with actual coal-derived syngas from an oxygen-blown gasifier to obtain performance data, update the Techno-Economic Analysis (TEA) that would assist with future process scale-up, and provide information on the design of a small pilot-scale test unit. The goal was to advance the PBI-HFM CO 2 capture and gas separation system for pre-combustion applications beyond second-generation economic performance predictions and make progress toward meeting overall fossil energy performance goals of CO 2 capture with 95% CO 2 purity at a cost of electricity (COE) 30% less than baseline capture approaches. The research program was designed with progressive technical tasks leading to both dynamic and steady-state testing of the PBI-HFM skid with actual coal-derived syngas. The work plan was to: (1) fabricate sufficient Generation-2 (GEN-2) fibers for module fabrication; (2) upgrade the fiber skid to accommodate large fiber modules for bench-scale field testing; (3) conduct dynamic and steady-state testing with coal-derived syngas from an oxygen-blown gasifier and obtain system performance data; (4) perform a TEA and environmental, health, and safety (EH&S) assessment; (5) update the State-Point Data Table, Technology Gap Analysis (TGA), and Technology Maturation Plan (TMP); (6) uninstall and return the test skid to the Recipient’s facilities; and (7) submit a Final Report that describes the results and analysis of the project research effort.

03 NATURAL GAS↗

Investigation of a Hybrid Carbon Capture System at a NGCC Power Plant That Performs Direct Air Capture During Off-Peak Hours

The goal of this project was to investigate the feasibility of coupling NGCC power plants with membrane and solid sorbent carbon capture to achieve net negative carbon emissions. This novel hybrid system has a couple of potential benefits: 1) the carbon capture systems could help the NGCC plant by minimizing its carbon footprint and giving it a new revenue stream from direct air capture, and 2) the NGCC plant could help direct air capture scale up quickly and costeffectively by providing it with electricity, steam and compressed air streams. In order to investigate this hybrid design, we developed a complex, integrated system model consisting of: 1) a NGCC power plant model developed by Dr. Bhattacharyya’s team at WVU, 2) a membrane carbon capture model developed by Dr. Lipscomb’s team at U Toledo, and 3) a solid sorbent carbon capture model developed by Dr. Hornbostel’s team at U Pittsburgh. Mr. Matuszewski’s team at AristoSys LLC integrated these three models into a single, integrated model using FOQUS, an optimization tool developed by the NETL CCSI 2 program. Optimizations were then performed on this integrated model to determine the cost and carbon capture rates under a range of electricity and carbon price scenarios.

20 FOSSIL-FUELED POWER PLANTS↗

Optimal Membrane Cascade Design for Critical Mineral Recovery through Logic-based Superstructure Optimization

In this work, we extend the superstructure model proposed by Wamble et al. (2022) that considers feed input locations, recycling strategies, split fractions, stage numbers, and membrane area. We include the total number of stages as a decision variable, which might be particularly useful when there is cost as- sociated with adding additional stages. We propose a Generalized Disjunctive Programming (GDP) superstructure model that integrates all the design variables of the system. We also investigate the scalability of the model by varying the number of stages and the number of finite elements per stage to determine the impact on recovery and solution time.

Tran, Norman↗

Batteries (2021 Annual Progress Report)

This document summarizes the progress of VTO battery R&D projects supported during the fiscal year 2021 (FY 2021). In FY 2021, the DOE VTO battery R&D funding was approximately $\$$115 million. Its R&D focus was on the development of high-energy batteries for EVs as well as very high-power devices for hybrid vehicles. The electrochemical energy storage roadmap (which can be found at the EERE Roadmap web page2) describes ongoing and planned efforts to develop electrochemical storage technologies for EVs. To advance battery technology, which can in turn improve market penetration of PEVs, the program investigates various battery chemistries to overcome specific technical barriers, e.g., battery cost, performance, life (both the calendar life and the cycle life), its tolerance to abusive conditions, and its recyclability/sustainability. VTO R&D has had considerable success, lowering the cost of EV battery packs to $\$$185/kWh in 2019 (representing more than 80% reduction since 2008) yet even further cost reduction is necessary for EVs to achieve head-to-head cost competitiveness with ICEs (without Federal subsidies). In addition, today’s batteries also need improvements in such areas as their ability to accept charging at a high rate, referred to as extreme fast charging (XFC) (15 minute charge) – to provide a “refueling” convenience similar to ICEs, and the ability to operate adequately at low temperatures. Research into “next-gen lithium-ion” batteries which would provide such functionalities is one of the R&D focus areas. VTO is funding research on both “next gen” chemistries (which employ an alloy anode and/or a high voltage cathode) and beyond lithium-ion (BLI) chemistries (which can, for example, employ a lithium metal anode).

25 ENERGY STORAGE↗

Bridging the Gap on Data and Analysis for Distribution System Planning: Information That Utilities Can Provide Regulators, State Energy Offices and Other Stakeholders

Electric utilities conduct planning annually to ensure their distribution system meets technical standards, policies, and regulations; addresses forecasted grid conditions; satisfies customer needs; and advances utility priorities. The plan identifies grid deficiencies, analyzes potential solutions, and prioritizes capital investments and other expenditures. About 20 U.S. states and jurisdictions require regulated utilities to file some type of distribution system plan with the public utility commission for review. Requirements for sharing distribution system data and analyses vary widely, from few specific requirements to a detailed list of information that must be provided. While utilities conduct extensive analysis to develop distribution system plans, in most jurisdictions regulators and stakeholders do not know what data are available and how the utility uses the data in planning and investing. This report aims to bridge the gap by increasing understanding of the types of data and analyses utilities employ to develop distribution system plans and how the information affects their decision-making. The report describes information that states and stakeholders can ask for related to 11 data categories: -Forecasting loads and distributed energy resources (DERs) -Scenario analysis -Worst-performing circuits -Asset management strategy -Hosting capacity analysis -Value of DERs -Grid needs assessment -Cost-effectiveness framework for investments -Distribution system investment strategy and implementation -Geotargeted programs -Non-wires alternatives procurements.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Batteries 2022 Annual Progress Report

This document summarizes the progress of VTO battery R&D projects supported during the fiscal year 2022. Its R&D focus was on the development of high-energy batteries for PEVs. The electrochemical energy storage roadmap describes ongoing and planned efforts to develop electrochemical storage technologies for EVs. To advance battery technology, which can in turn improve market penetration of PEVs, the program investigates various battery chemistries to overcome specific technical barriers, e.g., battery cost, performance, life (both the calendar life and the cycle life), its tolerance to abusive conditions, and its recyclability/sustainability.

25 ENERGY STORAGE↗

Batteries (2023 Annual Progress Report)

This document summarizes the progress of VTO battery R&D projects supported during the fiscal year 2023. Its R&D focus was on the development of high-energy batteries for PEVs. The electrochemical energy storage roadmap describes ongoing and planned efforts to develop electrochemical storage technologies for EVs. To advance battery technology, which can in turn improve market penetration of PEVs, the program investigates various battery chemistries to overcome specific technical barriers, e.g., battery cost, performance, life (both the calendar life and the cycle life), its tolerance to abusive conditions, and its recyclability/sustainability.

25 ENERGY STORAGE↗

Scaleable Clean Aluminum Melting Systems

The project entitled 'Scaleable Clean Aluminum Melting Systems' was a Cooperative Research and Development Agreements (CRADAs) between Oak Ridge National Laboratory (ORNL) and Secat Inc. The three-year project was initially funded for the first year and was then canceled due to funding cuts at the DOE headquarters. The limited funds allowed the research team to visit industrial sites and investigate the status of using immersion heaters for aluminum melting applications. Primary concepts were proposed on the design of furnaces using immersion heaters for melting. The proposed project can continue if the funding agency resumes the funds to this research. The objective of this project was to develop and demonstrate integrated, retrofitable technologies for clean melting systems for aluminum in both the Metal Casting and integrated aluminum processing industries. The scope focused on immersion heating coupled with metal circulation systems that provide significant opportunity for energy savings as well as reduction of melt loss in the form of dross. The project aimed at the development and integration of technologies that would enable significant reduction in the energy consumption and environmental impacts of melting aluminum through substitution of immersion heating for the conventional radiant burner methods used in reverberatory furnaces. Specifically, the program would couple heater improvements with furnace modeling that would enable cost-effective retrofits to a range of existing furnace sizes, reducing the economic barrier to application.

36 MATERIALS SCIENCE↗

Simulation of ion beam induced current in radiation detectors and microelectronic devices.

Ionizing radiation is known to cause Single Event Effects (SEE) in a variety of electronic devices. The mechanism that leads to these SEEs is current induced by the radiation in these devices. While this phenomenon is detrimental in ICs, this is the basic mechanism behind the operation of semiconductor radiation detectors. To be able to predict SEEs in ICs and detector responses we need to be able to simulate the radiation induced current as the function of time. There are analytical models, which work for very simple detector configurations, but fail for anything more complex. On the other end, TCAD programs can simulate this process in microelectronic devices, but these TCAD codes costs hundreds of thousands of dollars and they require huge computing resources. In addition, in certain cases they fail to predict the correct behavior. A simulation model based on the Gunn theorem was developed and used with the COMSOL Multiphysics framework.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗