Search NASA⌕ Search

SEARCH · Search NASA

Results for “Crew Module”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,279 records · Page 71

STS-76 Flight Day 6

On this sixth day of the STS-76 mission, the flight crew, Cmdr. Kevin P. Chilton, Pilot Richard A. Searfoss, and Mission Specialists Shannon W. Lucid, Linda M. Godwin, Michael R. Clifford, and Ronald M. Sega are shown preparing for Godwin and Clifford's extra vehicular activity (EVA). The two astronauts are shown egressing from the Shuttle and performing activities during the EVA with the Earth in the background. Godwin and Clifford spent six hours spacewalking in Atlantis' cargo bay and on the exterior of the Mir's docking module. They are shown completing all of the objectives planned for the spacewalk, the most important of which was to install on the exterior of Mir four experiments to monitor the space environment for the next year and a half. This marks the first time that a spacewalk was conducted from a docked Space Shuttle. A variety of new tools capable of being used on both US and Russian spacecraft were evaluated during the spacewalk.

Source record↗

International Space Station Acoustics - A Status Report

It is important to control acoustic noise aboard the International Space Station (ISS) to provide a satisfactory environment for voice communications, crew productivity, and restful sleep, and to minimize the risk for temporary and permanent hearing loss. Acoustic monitoring is an important part of the noise control process on ISS, providing critical data for trend analysis, noise exposure analysis, validation of acoustic analysis and predictions, and to provide strong evidence for ensuring crew health and safety, thus allowing Flight Certification. To this purpose, sound level meter (SLM) measurements and acoustic noise dosimetry are routinely performed. And since the primary noise sources on ISS include the environmental control and life support system (fans and airflow) and active thermal control system (pumps and water flow), acoustic monitoring will indicate changes in hardware noise emissions that may indicate system degradation or performance issues. This paper provides the current acoustic levels in the ISS modules and sleep stations, and is an update to the status presented in 20031. Many new modules, and sleep stations have been added to the ISS since that time. In addition, noise mitigation efforts have reduced noise levels in some areas. As a result, the acoustic levels on the ISS have improved.

Allen, Christopher S.↗

International Space Station Acoustics - A Status Report

It is important to control acoustic noise aboard the International Space Station (ISS) to provide a satisfactory environment for voice communications, crew productivity, alarm audibility, and restful sleep, and to minimize the risk for temporary and permanent hearing loss. Acoustic monitoring is an important part of the noise control process on ISS, providing critical data for trend analysis, noise exposure analysis, validation of acoustic analyses and predictions, and to provide strong evidence for ensuring crew health and safety, thus allowing Flight Certification. To this purpose, sound level meter (SLM) measurements and acoustic noise dosimetry are routinely performed. And since the primary noise sources on ISS include the environmental control and life support system (fans and airflow) and active thermal control system (pumps and water flow), acoustic monitoring will reveal changes in hardware noise emissions that may indicate system degradation or performance issues. This paper provides the current acoustic levels in the ISS modules and sleep stations and is an update to the status presented in 2011. Since this last status report, many payloads (science experiment hardware) have been added and a significant number of quiet ventilation fans have replaced noisier fans in the Russian Segment. Also, noise mitigation efforts are planned to reduce the noise levels of the T2 treadmill and levels in Node 3, in general. As a result, the acoustic levels on the ISS continue to improve.

Allen, Christopher S.↗

RB-ARD: A proof of concept rule-based abort

The Abort Region Determinator (ARD) is a console program in the space shuttle mission control center. During shuttle ascent, the Flight Dynamics Officer (FDO) uses the ARD to determine the possible abort modes and make abort calls for the crew. The goal of the Rule-based Abort region Determinator (RB/ARD) project was to test the concept of providing an onboard ARD for the shuttle or an automated ARD for the mission control center (MCC). A proof of concept rule-based system was developed on a LMI Lambda computer using PICON, a knowdedge-based system shell. Knowdedge derived from documented flight rules and ARD operation procedures was coded in PICON rules. These rules, in conjunction with modules of conventional code, enable the RB-ARD to carry out key parts of the ARD task. Current capabilities of the RB-ARD include: continuous updating of the available abort mode, recognition of a limited number of main engine faults and recommendation of safing actions. Safing actions recommended by the RB-ARD concern the Space Shuttle Main Engine (SSME) limit shutdown system and powerdown of the SSME Ac buses.

Smith, Richard↗

STS-84 Day 09 Highlights

On this the ninth day of the STS-84 mission, the flight crew, Cmdr. Charles J. Precourt, Pilot Eileen M. Collins, Payload Cmdr, Jean-Francois Clervoy (ESA), Mission Specialists Edward T. Lu, Carlos I. Noriega, Elena V. Kondakova, Jerry M. Linenger (download), and C. Michael Foale (upload) spend the morning testing Atlantis' flight control surfaces and thruster jets to ensure they are ready to support the Shuttle's high speed return to Earth. The astronauts' final day on orbit is devoted to stowing equipment and finishing experiment work in the Spacehab module in the cargo bay. In addition to 2,600 pounds of items being brought back from the Mir Space Station, Atlantis is ferrying home astronaut Jerry Linenger, who is returning to Earth after 122 days on the Mir. If Atlantis lands as planned Saturday, Linenger will have logged 132 days in space on this flight, the second longest single spaceflight by a U.S. astronaut behind the record 188-day stay in orbit by Shannon Lucid last year.

Source record↗

International Space Station (ISS) Payload Autonomous Operations Past, Present and Future

Draper Laboratorys Timeliner is a scripting and automation system that runs onboard computers in the International Space Station (ISS). Timeliner is fully integrated with ISS and can be used to automate ISS operations tasks. Some of the most challenging aspects of operating a payload in low earth orbit are communication delays, ground equipment failures, and human errors. How does a Payload Developer (PD) know their equipment is operating nominally and collecting science in the most efficient way possible or even powered at any given time? During a ground Loss of Signal (LOS) data outage, PDs have no insight into their experiments state, and benefit greatly from Timeliner scripts executing on ISS to perform telemetry monitoring and commanding operations. This paper will discuss current software designs, and new operational uses for Timeliner. Existing Timeliner capabilities discussed will include: autonomous EXPRESS Rack activation and deactivation; autonomous science data downlinks; Minus Eighty Degree Freezer (MELFI) Dewar autonomous safing; JAXA and ESA module autonomous payload facility safing; as well as many others. New operational concepts discussed will include allowing Timeliner on the payload computer to issue core commands (Thermal, Power, Fire Detection), creation of new ground tools that will monitor the current status of Payload Racks as well as all the messaging from autonomous scripts executing, decreasing approval time for Timeliner bundles, and opening up the Payload MDM Enhanced Processor Integrated Communications Card (EPIC) interface. The EPIC interface could provide a new crew interface for PL Timeliner execution. The new interface could operate on either a Payload Computer System (PCS) or a Station Support Computer (SSC) that is plugged into either the Payload LAN or the Operations LAN which will make communicating to the PL MDM more flexible and greatly increase band width for communication.

Space Mission Automation↗

Space robotic experiment in JEM flight demonstration

Japan is collaborating on the multinational space station program. The JEM, Japanese Experiment Module, has both a pressurized module and an Exposed Facility (EF). JEM Remote Manipulator System (JEMRMS) will play a dominant role in handling/servicing payloads and the maintenance of the EF, and consists of two robotic arms, a main arm and a small fine arm. JEM Flight Demonstration (JFD) is a space robotics experiment using the prototype small fine arm to demonstrate its capability, prior to the Space Station operation. The small fine arm will be installed in the Space Shuttle cargo bay and operated by a crew from a dedicated workstation in the Aft Flight Deck of the orbiter.

Nagatomo, Masanori↗

STS-77 Flight Day 8

On this eighth day of the STS-77 mission, the flight crew, Cmdr. John H. Casper, Pilot Curtis L. Brown, Jr., and Mission Specialists Andrew S.W. Thomas, Ph.D., Daniel W. Bursch, Mario Runco, Jr., and Marc Garneau, Ph.D., take time out from their schedule to discuss the progress of the mission with reporters. Casper said the flight has been highly successful so far, having accomplished all of the goals. Mission Specialists Dan Bursch and Andy Thomas described protein crystal growth and plant growth experiments being conducted throughout the flight in the Spacehab module. And Mario Runco discussed testing soft drink samples in the Fluids Generic Bioprocessing Apparatus.

Source record↗

Analysis of debris from Spacelab Space Life Sciences-1

Airborne microbiological and particulate contamination generated aboard Spacelab modules is a potential safety hazard. In order to shed light on the characteristics of these contaminants, microbial and chemical/particulate analyses were performed on debris vacuumed from cabin and avionics air filters in the Space Life Sciences-1 (SLS-1) module of the Space Transportation System 40 (STS-40) mission 1 month after landing. The debris was sorted into categories (e.g., metal, nonmetal, hair/fur, synthetic fibers, food particles, insect fragments, etc.). Elemental analysis of particles was done by energy dispersive analysis of x rays (metals) and Fourier transform infrared spectroscopy (nonmetals). Scanning electron micrographs were done of most particles. Microbiological samples were grown on R2A culture medium and identified. Clothing fibers dominated the debris by volume. Other particles, all attributed to the crew, resulted from abrasions and impacts during missions operations (e.g., paint chips, plastic, electronic scraps and clothing fibers). All bacterial species identified are commonly found in the atmosphere or on the human body. Bacillus sp. was the most frequently seen bacterium. One of the bacterial species, Enterobacter agglomerans, could cause illness in crew members with depressed immune systems.

Caruso, S. V.↗

GeoLab's First Field Trials, 2010 Desert RATS: Evaluating Tools for Early Sample Characterization

As part of an accelerated prototyping project to support science operations tests for future exploration missions, we designed and built a geological laboratory, GeoLab, that was integrated into NASA's first generation Habitat Demonstration Unit-1/Pressurized Excursion Module (HDU1-PEM). GeoLab includes a pressurized glovebox for transferring and handling samples collected on geological traverses, and a suite of instruments for collecting preliminary data to help characterize those samples. The GeoLab and the HDU1-PEM were tested for the first time as part of the 2010 Desert Research and Technology Studies (DRATS), NASA's analog field exercise for testing mission technologies. The HDU1- PEM and GeoLab participated in two weeks of joint operations in northern Arizona with two crewed rovers and the DRATS science team.

Evans, Cindy A.↗

Geology of the Apollo 17 site

The Apollo 17 landing site was unique in several aspects: (1) it was the only site that was not selected from telescopic-based geologic interpretation--interest in the site was generated by the visual observations of Al Worden, Apollo 15 Command Module pilot, who interpreted dark-haloed craters as possible cinder cones; (2) instead of 20-m-resolution photographs, as was the norm for all earlier missions, this site had Apollo 15 panoramic camera photography coverage that had 2-m resolution; and (3) it had a geologist-astronaut aboard who was intimately involved in all stages of planning and mission operation, and was also instrumental in the design of a long-handled sample bag holder that eliminated the need for crew to dismount before collecting a sample, which then permitted sampling between major stations. Details of site geology, sample description, and geologic synthesis of the site as viewed from studies through 1976 are summarized.

Muehlberger, W. R.↗

STS-77 Flight Day 3

On this third day of the STS-77 mission, the flight crew, Cmdr. John H. Casper, Pilot Curtis L. Brown, Jr., and Mission Specialists Andrew S.W. Thomas, Ph.D., Daniel W. Bursch, Mario Runco, Jr., and Marc Garneau, Ph.D., can be seen focusing their attention on retrieving the Spartan satellite and returning it to the Shuttle's payload bay. Commander John Casper, Pilot Curt Brown and Mission Specialist Dan Bursch prepared for the rendezvous while Mission Specialists Andy Thomas, Mario Runco and Marc Garneau continued work on the orbiter's middeck and in the Spacehab module. The Inflatable Antenna Experiment (I.A.E) was jettisoned later in the morning and is expected to enter the Earth's atmosphere. This morning's rendezvous is the first of four planned during the mission. Following a series of jet firings, Endeavour approaches within a distance of about 30 feet from Spartan, where Garneau can be seen extending the ship's robot arm to grapple the satellite for its berthing back on its payload bay platform.

Source record↗

STS-107 Mission after the Mission: Recovery of Data from the Debris of Columbia

STS-107 was a 16-day, dedicated research mission that included over 80 experiments, spanning many disciplines including biology, physics, chemistry, and earth sciences, including many student experiments. The mission was considered a resounding success until February 1, 2003, when tragedy struck the Columbia and her crew as she re-entered the atmosphere over Texas. During the mission, approximately one third of the overall data was obtained but much more was stored in the flight hardware systems. This paper documents a new set of STS-107 experiment objectives, a "mission after the mission," in which several experiment teams attempted, and, in many cases succeeded, to recover data from their flight hardware, now debris. A description of the data recovery efforts is included for these five experiment facilities: Combustion Module-2, Critical Viscosity of Xenon-2, Commercial Instrumentation Technology Associates Biomedical Experiments-2, Biological Research in Canisters-14, and Commercial Protein Crystal Growth.

Over, A. P.↗

STS-96 Crew Interview: Valery Tokarev

Live footage of a preflight interview with the Russian Cosmonaut Valery Ivanovich Tokarev is presented. The interview addresses many different questions including why Tokarev wanted to be a cosmonaut, and the events that led to his interest. Other interesting information that this one-on-one interview discusses is this logistics and supply mission, and why it is important to send equipment to the International Space Station (ISS) before the astronauts. Tokarev compares both the Russian and United States space programs, and space shuttles. He mentions the logistics and supply mission, plans to transfer the supply, his involvement with the installation of mufflers, and the undocking of Discovery. The future automatic docking of the Service Module to the Zarya Module of the ISS, and the role that the ISS will play in future space flight and exploration are also discussed.

Source record↗

STS-101: Crew Interview / Susan J. Helms

Live footage of a preflight interview with Mission Specialist Susan J. Helms is seen. The interview addresses many different questions including why Helms became an astronaut, the individuals who influenced her, and the events that led to her interest. Other interesting information that this one-on-one interview discusses is his reaction to and the reasons for the change of the mission objectives. Susan also mentions the docking with the International Space Station (ISS), the repairs of equipment, the change of the batteries, and the transfer of equipment. Susan explains why she, James S. Voss, and Yuri Vladimirovich Usachev are the perfect choice for this mission because of their experience with the ISS modules. She also discusses what the ISS means to her as well as to the human efforts to explore space.

Source record↗

STS-107 Flight Day 13 Highlights

This video shows the activities of the STS-107 crew on flight day 13 of the Columbia orbiter's final mission. The crew members include: Rick Husband, Commander; William McCool, Pilot; Kalpana Chawla, David Brown, Michael Anderson, Laurel Clark, Mission Specialists; Ilan Ramon, Payload Specialist. The primary activities of flight day 13 are spaceborne experiments, including troubleshooting undertaken by Mission Specialist Chawla on the Water Mist Fire Suppression (MIST) experiment. Chawla performs troubleshooting tasks relayed to her by Mission Control. She shows Mission Control the location of air and water in a transparent hose that is part of the atomizer on the exterior of the combustion module. She also changes the atomizer head. All six Space Technology and Research Students (STARS) experiments are profiled in the video. These experiments are on ants, crystal growth in a chemical garden, fish embryos, carpenter bees, spiders, and silkworms. The video also includes a view of the southeast Texas coast near Houston, and a view of Portugal, Spain, Gibraltar, Morocco, and the Sahara Desert. The video ends with an explanation of roses at Mission Control which commemorate astronauts who have died on missions.

Source record↗

Verification and Implementation of Operations Safety Controls for Flight Missions

Approximately eleven years ago, the International Space Station launched the first module from Russia, the Functional Cargo Block (FGB). Safety and Mission Assurance (S&MA) Operations (Ops) Engineers played an integral part in that endeavor by executing strict flight product verification as well as continued staffing of S&MA's console in the Mission Evaluation Room (MER) for that flight mission. How were these engineers able to conduct such a complicated task? They conducted it based on product verification that consisted of ensuring that safety requirements were adequately contained in all flight products that affected crew safety. S&MA Ops engineers apply both systems engineering and project management principles in order to gain a appropriate level of technical knowledge necessary to perform thorough reviews which cover the subsystem(s) affected. They also ensured that mission priorities were carried out with a great detail and success.

Jones, Cheryl L.↗

Gas Trap Plug Design, Function and Performance

The cooling loops of the Internal Active Thermal Control System (IATCS) on the Node 3, Node 2 and US Laboratory (USL) Modules of the International Space Station (ISS) have been serviced by Gas Traps (GTs) since the onset of operations. These traps serve to protect the pumping function of the cooling loops by eliminating free gas that would otherwise impact the impellers and cause a loop shutdown. Gas Trap Plug Assemblies (GTPAs) have been designed, manufactured and tested, to permit function of the IATCS in the event of a loss of cabin atmosphere and long term decrew event. The GTPA also serve to give the crew additional time to evacuate the United States Operating Segment (USOS) in the unlikely event of an Ammonia breach of an Interface Heat Exchanger (IFHX). These GTPAs have been installed on the ISS IATCS since May 2019. This paper will address purpose, design and testing of the GTPA. The paper will also provide analyses showing residual trapping capability and free gas elimination of the GTs even while tightly plugged, for both the GTs and the Alternate Gas Trap Assemblies (AGTAs) ground spares.

Gas Trap Plugs↗