Search NASA⌕ Search

SEARCH · Search NASA

Results for “MONITOR PROGRAM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,279 records · Page 71

MO-D-213-01: Workflow Monitoring for a High Volume Radiation Oncology Center

Purpose: Implement a center wide communication system that increases interdepartmental transparency and accountability while decreasing redundant work and treatment delays by actively monitoring treatment planning workflow. Methods: Intake Management System (IMS), a program developed by ProCure Treatment Centers Inc., is a multi-function database that stores treatment planning process information. It was devised to work with the oncology information system (Mosaiq) to streamline interdepartmental workflow.Each step in the treatment planning process is visually represented and timelines for completion of individual tasks are established within the software. The currently active step of each patient’s planning process is highlighted either red or green according to whether the initially allocated amount of time has passed for the given process. This information is displayed as a Treatment Planning Process Monitor (TPPM), which is shown on screens in the relevant departments throughout the center. This display also includes the individuals who are responsible for each task.IMS is driven by Mosaiq’s quality checklist (QCL) functionality. Each step in the workflow is initiated by a Mosaiq user sending the responsible party a QCL assignment. IMS is connected to Mosaiq and the sending or completing of a QCL updates the associated field in the TPPM to the appropriate status. Results: Approximately one patient a week is identified during the workflow process as needing to have his/her treatment start date modified or resources re-allocated to address the most urgent cases. Being able to identify a realistic timeline for planning each patient and having multiple departments communicate their limitations and time constraints allows for quality plans to be developed and implemented without overburdening any one department. Conclusion: Monitoring the progression of the treatment planning process has increased transparency between departments, which enables efficient communication. Having built-in timelines allows easy prioritization of tasks and resources and facilitates effective time management.

60 APPLIED LIFE SCIENCES↗

UV/Near-IR Aerosol Absorption Monitor

In this DOE SBIR Phase I study, we have designed and constructed two prototypes demonstrating proof of concept for a new aerosol measurement instrument: a UV/near-IR aerosol absorption monitor. One prototype operates at 360nm and the other at 1064nm. From the laboratory testing and evaluation, we obtained the following technical specifications for the two prototypes: (A) Photoacoustic measurements of aerosol light absorption at 360nm and 1064 nm; (B) Detection limit of 1.0 Mm-1 in 10s-averaging and 0.36 Mm-1 in 100s at 1064nm; (C) Detection limit of 9 Mm-1 in 10s at 360nm; (D) Time response of 4.3 ± 0.6 s, using the 90% criteria; (E) Linear dynamic range from 0.36 Mm to 250 Mm-1 at 1064nm; (F) Sample flow rate of 0.5-2.0 liter per minute; (G) Continuous measurement at 1s sampling rate; (H) An aerosol-based calibration approach; (I) Dimension of 56cm×43cm×25cm and 25kg for the near-IR prototype; while 66cm×43cm×38cm and 30kg for the UV prototype. In this Phase I study, we changed the modulation approach applied to the UV prototype to improve its detection sensitivity. Using an optical chopper to chop the laser beam instead of the electronic modulation on its power supply, we were able to increase the effective laser power and thereby improve the sensitivity by a factor of 2.1. However there is a tradeoff of utilizing a chopper. This approach can only produce a single modulation frequency, presenting an obstacle to combining the UV and near-IR aerosol absorption monitors into a single two-wavelength measurement instrument. Given that the near-IR prototype meets all the desired technical specifications from the DoE SBIR program, this instrument will be ready to be commercialized in the Phase II program. On the other hand, in addition to a different modulation scheme from the near-IR model, the UV aerosol absorption monitor needs some improvements to achieve the desired technical objective in measurement sensitivity. Thus the future Phase II program would primarily focus on improving the UV model and developing both the UV and near-IR aerosol absorption monitors into standalone commercial products.

54 ENVIRONMENTAL SCIENCES↗

Online Monitoring of Concrete Structures in Nuclear Power Plants: Interim Report

The existing fleet of nuclear power plants in the United States have initial operating licenses of 40 years, and many of these plants have applied for and received license extensions. As plant structures, systems, and components age, their useful life—considering both structural integrity and performance—is reduced as a result of deterioration of the materials. Assessment and management of aging concrete structures in nuclear plants require a more systematic approach than simple reliance on existing code-based design margins of safety. Structural health monitoring is required to produce actionable information regarding structural integrity that supports operational and maintenance decisions. The online monitoring of concrete structures project conducted under the Advanced Instrumentation, Information, and Control Technologies Pathway of the Light Water Reactor Sustainability program at Idaho National Laboratory is seeking to develop and demonstrate capabilities for concrete structures health monitoring. Through this research project, several national laboratories and Vanderbilt University propose to develop a framework of research activities for the health monitoring of nuclear power plant concrete structures that includes the integration of four elements—damage modeling, monitoring, data analytics, and uncertainty quantification. This report briefly discusses activities in this project during October-December, 2014. The most significant activity during this period was the organizing of a two-day workshop on research needs in online monitoring of concrete structures, hosted by Vanderbilt University in November 2014. Thirty invitees from academia, industry and government participated in the workshop. The presentations and discussions at the workshop surveyed current activities related to concrete structures deterioration modeling and monitoring, and identified the challenges, knowledge gaps, and opportunities for advancing the state of the art; these discussions are summarized in this report

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Nuclear Physics and Hadron Therapy

Hadron therapy uses light charged particles beams (mainly proton and {sup 12}C ions) to irradiate tumors. These beams present a ballistic advantage with a maximum energy deposition at the end of the path. A large dose can be delivered inside a deep tumor while the surrounding healthy tissues are preserved. There is an obvious advantage in using these beams but the beam control has to be achieved and all the physical processes leading to the energy deposition have to be fully under control. This treatment protocol requires accurate control devices and a good knowledge of the physical processes occurring all along the path of the projectile in human tissues. In this report, we will present one example of a beam monitor for the proton therapy. We will also present the experimental program which has been initiated to obtain fundamental data on the nuclear fragmentation process.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

The Enhanced Sealing Project, Monitoring a Full-Scale Shaft Seal at Canada's Underground Research Laboratory (2009-2015) - 16070

A full-scale shaft seal was designed and installed in the 5-m-diameter main shaft at Canada's Underground Research Laboratory (URL) in 2009. Located where the main shaft intersects a water-bearing fracture zone at a depth of approximately 273 m, a 6-m-thick clay component was sandwiched between two 3-m-thick concrete components. The clay component was 40:60 mixture of bentonite and quartz/feldspar sand and spans approximately 1 m beyond the maximum identified vertical extent of the fracture zone. Its purpose is to limit the mixing of saline groundwater from the deeper region with the fresher, near-surface groundwater. Its construction was part of Canada's Nuclear Legacy Liabilities Program (NLLP). The 1. phase of the Enhanced Sealing Project (ESP), a jointly-funded Research, Development and Demonstration (RD and D) project was started in 2009 to monitor the saturation of the shaft seal until the end of 2013. The 2. phase, extended monitoring of the ESP is supported by Posiva (Finland), Andra (France) and CNL (Canada) and this will run until the end of 2016. The slow evolution of the seal and its surroundings and complete removal of the surface facilities at the URL site in 2014, has meant that the ESP monitoring has evolved to a stand-alone, lower frequency data collection program. Information gained from the ESP monitoring is applicable to support the development of sealing technology to safely close a deep geological repository for the permanent disposal of radioactive wastes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sentinel Devices LLC (CRADA Final Report)

Industrial equipment is a critical component of virtually all at-scale manufacturing and infrastructure. Broadly speaking, modern equipment is predominantly controlled using hardened digital controllers – computers designed to be able to operate continuously for sometimes extremely long periods of time, with little to no maintenance. Due to the nature of how these digital controllers have evolved, they are solely optimized to execute a single task, and do not have the capabilities or resources to monitor or analyze their internal state beyond simple execution of their program. As a result, for many “common sense” situations where individual data points can be easily determined to be out-of-normal, the controllers are unable to identify these incorrect operational modes unless a human has explicitly programmed in detection of this degradation. This project seeks to develop an AI/ML system which can identify incorrect or anomalous trends in industrial data streams, of exactly the kind that would be produced and seen by these digital controllers, with a minimal amount of computing resources. The benefits produced by developing this system would ultimately be self-monitoring and self-reporting infrastructure, capable of identifying and alerting humans to issues as soon as they happen, potentially long before they have the chance to impact the industrial process.

42 ENGINEERING↗

Instrumented Pipeline Initiative

This report summarizes technical progress achieved during the cooperative agreement between Concurrent Technologies Corporation (CTC) and U.S. Department of Energy to address the need for a for low-cost monitoring and inspection sensor system as identified in the Department of Energy (DOE) National Gas Infrastructure Research & Development (R&D) Delivery Reliability Program Roadmap.. The Instrumented Pipeline Initiative (IPI) achieved the objective by researching technologies for the monitoring of pipeline delivery integrity, through a ubiquitous network of sensors and controllers to detect and diagnose incipient defects, leaks, and failures. This report is organized by tasks as detailed in the Statement of Project Objectives (SOPO). The sections all state the objective and approach before detailing results of work.

03 NATURAL GAS↗

Successful Implementation of a Natural Resource Restoration Plan at the Fernald Preserve - 19568

The Fernald Preserve, Ohio, Site is a former uranium-processing plant that underwent extensive remediation pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). It is situated on a 425-hectare (ha) (1050-acre) tract of land, approximately 29 kilometers (km) (18 miles) northwest of Cincinnati, Ohio. The US Department of Energy (DOE) Office of Legacy Management is responsible for management of the site. Site remediation and subsequent ecological restoration have converted the site from an industrial production facility to an undeveloped park, encompassing a series of wetlands, prairies, and forested communities. The remediation of buildings and contaminated soil was completed in 2006, but aquifer remediation is ongoing. Portions of the site are open to the public, including approximately 11 km (7 miles) of walking trails that are open year-round and a Fernald Preserve Visitors Center open four days a week. Stakeholders were instrumental in providing recommendations for final land use of the site as an undeveloped park with an emphasis on wildlife. Final land use decisions were also instrumental in the resolution of a CERCLA natural resource damage claim. The State of Ohio sued DOE in 1986 for damages to state natural resources under Section 107 of CERCLA. The suit was stayed until completion of all Records of Decision (RODs) for the site. The last ROD was signed in 1996. DOE, which was both a Natural Resource Trustee (NRT) and a potentially responsible party (PRP) under CERCLA, initiated consultation with other site NRTs in 1993. A Trustee Council was formed that included DOE, Ohio Environmental Protection Agency (representing the State of Ohio), and the US Fish and Wildlife Service (representing the US Department of the Interior). The NRTs agreed collectively to conduct sitewide ecological restoration, consistent with the stakeholder vision of final land use. A conceptual restoration plan was drafted in 1998. This Natural Resource Restoration Plan (NRRP) developed goals for site restoration, as well as provisions for monitoring and maintenance of restored areas. The NRTs signed a Memorandum of Understanding in 2001, and DOE integrated ecological restoration design and construction into remediation and closure activities for the site. The NRT relationship became contentious in the following years as a result of a disagreement over monitoring commitments and compensation for groundwater injury. Final settlement was reached in 2008. As part of the settlement, DOE paid $13.75 million into the NRT fund as compensation for natural resource damages. In addition, the NRRP was finalized, and long-term commitments for monitoring and maintenance of ecologically restored areas were put in place. An Environmental Covenant was established and recorded with Hamilton and Butler Counties that ensures site activity and use limitations remain in place. The NRTs used a portion of the settlement funds to initiate the Paddys Run Conservation Project. This effort is a means to secure development rights and conservation easements within the Paddys Run watershed. Paddys Run is a third-order stream located on the western side of the Fernald Preserve. The NRTs partnered with Three Valley Conservation Trust to obtain assistance with land acquisition and conservation easement management, and since the program's inception in the Fall of 2012, more than 1820 ha (4500 acres) have been permanently protected via easement or purchase. Future decisions by the NRTs regarding monitoring and maintenance of restored areas will be negotiated in 2020. The site Restored Area Maintenance Plan (RAMP) was developed in 2010. The RAMP is a requirement within the NRRP and is scheduled for review following 10 years of implementation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

MINIMUM REQUIREMENTS FOR DETECTING A STOCHASTIC GRAVITATIONAL WAVE BACKGROUND USING PULSARS

We assess the detectability of a nanohertz gravitational wave (GW) background in a pulsar timing array (PTA) program by considering the shape and amplitude of the cross-correlation function summed over pulsar pairs. The distribution of correlation amplitudes is found to be non-Gaussian and highly skewed, which significantly influences detection and false-alarm probabilities. When only white noise combines with GWs in timing data, our detection results are consistent with those found by others. Contamination by red noise from spin variations and from any uncorrected interstellar plasma effects significantly increases the false-alarm probability. The number of arrival times (and thus the observing cadence) is important only as long as the residuals are dominated by white noise. When red noise and GWs dominate, the statistical significance of the correlation estimate can be improved only by increasing the number of pulsars. We characterize plausible detection regimes by evaluating the number of millisecond pulsars (MSPs) that must be monitored in a high-cadence, five-year timing program to detect a GW background spectrum h{sub c} (f) = A(f/f{sub 0}){sup -2/3} with f{sub 0} = 1 yr{sup -1} and A = 10{sup -15}. Our results indicate that a sample of 20 super-stable MSPs-those with rms timing residuals {sigma}{sub r} {approx}< 20 ns(A/10{sup -15}) from red-noise contributions over a five-year span-will allow detection of the GW background and study of its spectrum. However, a timing program on {approx}> 50-100 MSPs is likely needed for a complete PTA program, particularly if red noise is generally present in MSPs.

79 ASTRONOMY AND ASTROPHYSICS↗

The LTS timing analysis program :

The LTS Timing Analysis program described in this report uses signals from the Tempest Lasers, Pulse Forming Lines, and Laser Spark Detectors to carry out calculations to quantify and monitor the performance of the the Z-Accelerator s laser triggered SF6 switches. The program analyzes Z-shots beginning with Z2457, when Laser Spark Detector data became available for all lines.

Armstrong, Darrell Jewell↗

Final Technical Report Wireless Microsensors System for Monitoring Deep Subsurface Operations

This final technical report describes the main findings of the project Wireless Microsensors System for Monitoring Deep Subsurface Operations (FE0031850). The project was part of the U.S. Department of Energy National Energy Technology Laboratory FOA 1998 program to develop new sensor systems for direct observation of parameters associated with CO2 injection and to provide data collection without being disruptive to operations. The overall DOE program was aimed at developing and validating innovative transformational sensor systems, amenable for integration with autonomous intelligent monitoring systems, that are capable of being deployed within the casing annulus and do not have casing perforation or wires/cables in the annulus for installation, power supply, or data transmission needs. Project accomplishments included 1) design and fabrication of a wireless downhole sensor system to monitor parameters for CO2 storage, 2) field testing of the sensor system in two legacy oil & gas wells, and 3) development of an analysis approach that validates the measurements and demonstrates the application of the technology to depict CO2 movement in the subsurface. The project leveraged new sensor technologies along with specialized wellbore telemetry, deployment, and analysis methods designed to address the challenges and risks related to CO2 storage in the subsurface. Results from field testing were a mixture of successes and challenges. The temperature sensor rings, installation procedures in legacy oil & gas wells, wireless powering demonstration, automated data collection, and material compatibility were successful. The wireless data transfer through cement to the wellhead via the sensor relays was not functional beyond the first relay. Consequently, work in the last year of the project included some additional testing of data transmission through different materials along with modeling and analysis of field data for CO2 monitoring applications. This work suggested there are options like polymer cements and open hole annuli that may allow point-to-point transmission along the borehole. The techno-economic analysis suggests that the sensor system is ~40% less expensive than fiber optic distributed temperature system. Modeling of CO2 storage applications suggests temperature can provide an indicator of CO2 saturation but would be best combined with pressure sensors.

47 OTHER INSTRUMENTATION↗

SU-E-T-258: Development of a New Patient Set-Up Monitoring System Using Force Sensing Resistor (FSR) Sensor for the Radiation Therapy

Purpose: The purpose of this work is to develop a new patient set-up monitoring system using force sensing resistor (FSR) sensors that can confirm pressure of contact surface and evaluate its feasibility. Methods: In this study, we focused on develop the patient set-up monitoring system to compensate for the limitation of existing optical based monitoring system, so the developed system can inform motion in the radiation therapy. The set-up monitoring system was designed consisting of sensor units (FSR sensor), signal conditioning devices (USB cable/interface electronics), a control PC, and a developed analysis software. The sensor unit was made by attaching FSR sensor and dispersing pressure sponge to prevent error which is caused by concentrating specific point. Measured signal from the FSR sensor was sampled to arduino mega 2560 microcontroller, transferred to control PC by using serial communication. The measured data went through normalization process. The normalized data was displayed through the developed graphic user interface (GUI) software. The software was designed to display a single sensor unit intensity (maximum 16 sensors) and display 2D pressure distribution (using 16 sensors) according to the purpose. Results: Changes of pressure value according to motion was confirmed by the developed set-up monitoring system. Very small movement such as little physical change in appearance can be confirmed using a single unit and using 2D pressure distribution. Also, the set-up monitoring system can observe in real time. Conclusion: In this study, we developed the new set-up monitoring system using FSR sensor. Especially, we expect that the new set-up monitoring system is suitable for motion monitoring of blind area that is hard to confirm existing optical system and compensate existing optical based monitoring system. As a further study, an integrated system will be constructed through correlation of existing optical monitoring system. This work was supported by the Industrial R&D program of MOTIE/KEIT. [10048997, Development of the core technology for integrated therapy devices based on real-time MRI guided tumor tracking] and the Mid-career Researcher Program (2014R1A2A1A10050270) through the National Research Foundation of Korea funded by the Ministry of Science, ICT&Future Planning.

60 APPLIED LIFE SCIENCES↗

The Monitoring Network of the Vancouver 2010 Olympics

Abstract—An innovative monitoring network was implemented to support the operational and science programs for the Vancouver 2010 Winter Olympics. It consisted of in situ weather stations on custom-designed platforms. The sensors included an HMP45C for temperature, humidity and pressure, a tipping bucket rain gauge, an acoustic snow depth sensor, a Pluvio 1 precipitation gauge and an anemometer placed at gauge height and at 10 m height. Modifications to commercial automated precipitation gauges were necessary for the heavy snowfall conditions. Advanced or emerging technologies were deployed to support scientific and nowcasting studies into precipitation intensity, typing, visibility and wind. The sensors included an FD12P visibility and precipitation sensor, a precipitation occurrence sensing system (POSS) present weather sensor, a Hotplate precipitation sensor and a Parsivel disdrometer. Data were collected at 1 min sampling intervals. A Doppler weather radar was deployed in a valley location and provided critical detailed low-level data. An X-band dual-polarized radar was deployed by the National Oceanic and Atmospheric Administration to monitor Vancouver and Cypress Mountain. Three remote sensing stations for vertical profiling were established. At the base of Whistler Mountain, a micro-rain radar, a 22-channel radiometer, a ceilometer, a Parsivel and a POSS were installed. At the base of Cypress Mountain, a micro-rain radar, a ceilometer, a low cost rain sensor (LCR by ATTEX) and a POSS were installed. At Squamish, a wind profiler and a POSS were installed. Weather sensors were mounted on the Whistler Village Gondola and on the Peak to Peak gondola. Sites were established along the Whistler Mountain slope and at other key locations. The combination of sites and instruments formed a comprehensive network to provide observations appropriate for nowcasting in winter complex terrain and investigate precipitation, visibility and wind processes. The contribution provides a detailed description of the network, their sensors, the innovations and some examples.

Joe, Paul↗

Defense Threat Reduction Agency Radiochemical Needs

The United States Government (USG) first developed nuclear forensics-related capabilities to analyze radiological and nuclear materials, including underground nuclear test debris and interdicted materials. Nuclear forensics is not a new mission for Department of Defense (DoD). The department's existing nuclear forensics capability is the result of programs that span six (6) decades and includes activities to assess foreign nuclear weapons testing activities, monitor and verify nuclear arms control treaties, and to support intelligence and law enforcement activities. Today, nuclear forensics must support not only weapons programs and nuclear smuggling incidents, but also the scientific analysis and subsequent attribution of terrorists' use of radiological or nuclear materials/devices. Nuclear forensics can help divulge the source of origin of nuclear materials, the type of design for an interdicted or detonated device, as well as the pathway of the materials or device to the incident. To accomplish this mission, the USG will need trained radiochemists and nuclear scientists to fill new positions and replace the retiring staff.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

2009 DOE-EM LONG-TERM MONITORING TECHNICAL FORUM SUMMARY REPORT

The U. S. Department of Energy's (DOE) Office of Environmental Management (EM) has the responsibility for cleaning up 60 sites in 22 states that were associated with the legacy of the nation's nuclear weapons program and other research and development activities. These sites are unique and many of the technologies needed to successfully disposition the associated wastes have yet to be developed or would require significant re-engineering to be adapted for future EM cleanup efforts. In 2008, the DOE-EM Engineering and Technology Program (EM-22) released the Engineering and Technology Roadmap in response to Congressional direction and the need to focus on longer term activities required for the completion of the aforementioned cleanup program. One of the strategic initiatives included in the Roadmap was to enhance long term performance monitoring as defined by 'Develop and deploy cost effective long-term strategies and technologies to monitor closure sites (including soil, groundwater, and surface water) with multiple contaminants (organics, metals and radionuclides) to verify integrated long-term cleanup performance'. To support this long-term monitoring (LTM) strategic initiative, EM 22 and the Savannah River National Laboratory (SRNL) organized and held an interactive symposia, known as the 2009 DOE-EM Long-Term Monitoring Technical Forum, to define and prioritize LTM improvement strategies and products that could be realized within a 3 to 5 year investment time frame. This near-term focus on fundamental research would then be used as a foundation for development of applied programs to improve the closure and long-term performance of EM's legacy waste sites. The Technical Forum was held in Atlanta, GA on February 11-12, 2009, and attended by 57 professionals with a focus on identifying those areas of opportunity that would most effectively advance the transition of the current practices to a more effective strategy for the LTM paradigm. The meeting format encompassed three break-out sessions, which focused on needs and opportunities associated with the following LTM technical areas: (1) Performance Monitoring Tools, (2) Systems, and (3) Information Management. The specific objectives of the Technical Forum were to identify: (1) technical targets for reducing EM costs for life-cycle monitoring; (2) cost-effective approaches and tools to support the transition from active to passive remedies at EM waste sites; and (3) specific goals and objectives associated with the lifecycle monitoring initiatives outlined within the Roadmap. The first Breakout Session on LTM performance measurement tools focused on the integration and improvement of LTM performance measurement and monitoring tools that deal with parameters such as ecosystems, boundary conditions, geophysics, remote sensing, biomarkers, ecological indicators and other types of data used in LTM configurations. Although specific tools were discussed, it was recognized that the Breakout Session could not comprehensively discuss all monitoring technologies in the time provided. Attendees provided key references where other organizations have assessed monitoring tools. Three investment sectors were developed in this Breakout Session. The second Breakout Session was on LTM systems. The focus of this session was to identify new and inventive LTM systems addressing the framework for interactive parameters such as infrastructure, sensors, diagnostic features, field screening tools, state of the art characterization monitoring systems/concepts, and ecosystem approaches to site conditions and evolution. LTM systems consist of the combination of data acquisition and management efforts, data processing and analysis efforts and reporting tools. The objective of the LTM systems workgroup was to provide a vision and path towards novel and innovative LTM systems, which should be able to provide relevant, actionable information on system performance in a cost-effective manner. Two investment sectors were developed in this Breakout Session. The last Breakout Session of the Technical Forum was on LTM information management. The session focus was on the development and implementation of novel information management systems for LTM including techniques to address data issues such as: efficient management of large and diverse datasets; consistency and comparability in data management and incorporation of accurate historical information; data interpretation and information synthesis including statistical methods, modeling, and visualization; and linage of data to site management objectives and leveraging information to forge consensus among stakeholders. One investment sector was developed in this Breakout Session.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Detecting control system misbehavior by fingerprinting programmable logic controller functionality

In recent years, attacks such as the Stuxnet malware have demonstrated that cyberattacks against control systems cause extensive damage. These attacks can result in physical damage to the networked systems under their control. In this paper, we discuss our approach for detecting such attacks by distinguishing between programs running on a programmable logic controller (PLC) without having to monitor communications. Using power signatures generated by an attached, high-frequency power measurement device, we can identify what a PLC is doing and when an attack may have altered what the PLC should be doing. To accomplish this, we generated labeled data for testing our methods and applied feature engineering techniques and machine learning models. The results of this research demonstrate that Random Forests and Convolutional Neural Networks classify programs with up to 98% accuracy for major program differences and 84% accuracy for minor differences. Our results can be used for both online and offline applications.

97 MATHEMATICS AND COMPUTING↗

Status Update of Permanent Magnet Radiation Resiliency Studies at CEBAF

The proposed energy upgrade of the Continuous Electron Beam Accelerator Facility (CEBAF) incorporates Fixed-Field Alternating-gradient (FFA) arcs utilizing permanent magnet technology. Given the radiation environment within the CEBAF tunnel enclosure, validating the long-term magnetic stability of these materials is a critical step for the project's technical feasibility. This contribution presents an overview of the ongoing permanent magnet radiation resiliency program at Jefferson Lab. We briefly review the experimental methodology used to monitor demagnetization in situ and summarize the operational experience from the initial data-taking campaign. Furthermore, we discuss the upgrades implemented for the second exposure campaign, currently underway, which aims to refine dose correlation and reduce systematic uncertainties. We report on the general status of the program and the roadmap for certifying permanent magnet optics for the proposed upgrade energies.

Bodenstein, R. [Thomas Jefferson National Accelera↗

SU-F-J-44: Development of a Room Laser Based Real-Time Alignment Monitoring System Using An Array of Photodiodes

Purpose: To develop a real-time alignment monitoring system (RAMS) to compensate for the limitations of the conventional room laser based alignment system, and to verify the feasibility of the RAMS. Methods: The RAMS was composed of a room laser sensing array (RLSA), an analog-todigital converter, and a control PC. In the RLSA, seven photodiodes (each in 1 mm width) are arranged in a pattern that the RAMS provides alignment in 1 mm resolution. It works based on detecting laser light aligned on one of photodiodes. When misaligned, the laser would match with different photodiode(s) giving signal at unexpected location. Thus, how much displaced can be determined. To verify the reproducibility of the system with respect to time as well as repeated set-ups, temporal reproducibility and repeatability test was conducted. The accuracy of the system was tested by obtaining detection signals with varying laser-match positions. Results: The signal of the RAMS was found to be stable with respect to time. The repeatability test resulted in a maximum coefficient of variance of 1.14%, suggesting that the signal of the RAMS was stable over repeated set-ups. In the accuracy test, signals between when the laser was aligned and notaligned with any of sensors could be distinguished by signal intensity. The signals of not-aligned sensors were always below 75% of the signal of the aligned sensor. It was confirmed that the system could detect 1 mm of movement by monitoring the pattern of signals, and could observe the movement of the system in real-time. Conclusion: We developed a room laser based alignment monitoring system. The feasibility test verified that the system is capable of quantitative alignment monitoring in real time. The system is relatively simple, not expensive, and considered to be easily incorporated into conventional room laser systems for real-time alignment monitoring. This research was supported by the Mid-career Researcher Program through NRF funded by the Ministry of Science, ICT & Future Planning of Korea (NRF-2014R1A2A1A10050270) and by the Radiation Technology R&D program through the National Research Foundation of Korea funded by the Ministry of Science, ICT & Future Planning (No. 2013M2A2A7038291)

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗