Search NASA⌕ Search

SEARCH · Search NASA

Results for “Performance Indicators”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,279 records · Page 71

Mountain-Top-to-Mountain-Top Optical Link Demonstration

A mountain-top-to-mountain-top optical communications demonstration was conducted between the JPL Table Mountain Facility (TMF), Wrightwood, California, and Strawberry Peak (SP), Lake Arrowhead, California, during the months of August and September of 2000. The link was nearly horizontal at an altitude of 2 km and spanned a range of 46.8 km. A 780-nm multibeam beacon broadcast from TMF was received by the JPL Optical Communications Demonstrator (OCD) located at SP. The received beacon was utilized as a pointing reference to retransmit an 852-nm communications laser beam, modulated at 400 Mb/s by a PN7 pseudo-random bit stream (PRBS) sequence. The long atmospheric path resulted in atmospheric-turbulence-induced angle-of-arrival fluctuations of the beacon at the OCD aperture. A .ne-steering control loop was used to track the resulting beacon centroid motion and update the pointing of the communications laser beam transmitted from SP to TMF. Fried parameters, or r0, inferred from focal spot sizes received at SP were 4 to 5 cm whereas, using the spot sizes received at TMF, they were 2 to 3 cm. In both cases, theory predicts larger r0 values. The predicted angle-of-arrival fluctuations compare well with measured rms displacements exhibited by the focal spots at either end of the link. An uncompensated error of ~1.1 rad in the x-axis and ~2 rad in the y-axis was obtained using centroid data logged by the OCD. Average bit-error rates of 10-5 were recorded for extended periods of time. An atmospheric coherence length r0 of 3 to 5 cm was inferred using the focal-plane spot size measured on the CCD tracking sensor and compared to a predicted value of 5 to 7 cm using reasonable atmospheric models. The irradiance bounds required for the CCD tracking sensor to perform centroiding was found to range from 2000 to 3000 integrated pixel counts, although a more reliable range was 600 to 3000, indicating a dynamic range of 6 to 11 dB. The motion of the spot on the focal plane was also recorded and yielded rms angle-of-arrival-induced focal-plane displacement of 9 to 11 m, compared to a predicted value of 7.8 to 11 m. The irradiance measurements made with the OCD clearly indicate that best tracking performance is obtained when the mean received signal is 2000 to 2200 counts. The best tracking performance resulted in an rms uncompensated error of 1.1 rad. The uncompensated error appeared to increase with either an increase or decrease in mean beacon-signal level. The rms uncompensated error determined by deriving the beacon displacement power spectral density from the beacon centroid-versustime data and the rejection function of the control loop yielded a higher value of 3.4 rad.

Biswas, A.↗

Diagnosis of helicopter gearboxes using structure-based networks

A connectionist network is introduced for fault diagnosis of helicopter gearboxes that incorporates knowledge of the gearbox structure and characteristics of the vibration features as its fuzzy weights. Diagnosis is performed by propagating the abnormal features of vibration measurements through this Structure-Based Connectionist Network (SBCN), the outputs of which represent the fault possibility values for individual components of the gearbox. The performance of this network is evaluated by applying it to experimental vibration data from an OH-58A helicopter gearbox. The diagnostic results indicate that the network performance is comparable to those obtained from supervised pattern classification.

Jammu, Vinay B.↗

Two-well injector direct-phonon terahertz quantum cascade lasers

We present an experimental study on a terahertz quantum cascade laser (THz QCL) design that combines both two-well injector and direct-phonon scattering schemes, i.e., a so-called two-well injector direct-phonon design. As a result of the two-well injector direct-phonon scheme presented here, the lasers benefit from both a direct phonon scattering scheme for the lower laser level depopulation and a setback for the doping profile that reduces the overlap of the doped region with active laser states. Additionally, our design also has efficient isolation of the active laser levels from excited and continuum states as indicated by negative differential resistance behavior all the way up to room temperature. This scheme serves as a good platform for improving the temperature performance of THz QCLs as indicated by the encouraging temperature performance results of the device with a relatively high doping level of 7.56 × 10 10 cm −2 and T max ∼ 167 K. With the right optimization of the molecular beam epitaxy growth and interface quality, the injection coupling strength, and the doping density and its profile, the device could potentially reach higher temperatures than the latest records reached for the maximum operating temperature (T max ) of THz QCLs.

47 OTHER INSTRUMENTATION↗

Vehicle performance impact on space shuttle design and concept evaluation

The continuing examination of widely varied space shuttle concepts makes an understanding of concept interaction with vehicle performance imperative. The estimation of vehicle performance is highly appurtenant to all aspects of shuttle design and hence performance has classically been a key indicator of overall concept desirability and potential. Vehicle performance assumes the added role of defining interactions between specific design characteristics, the sum total of which define a specific concept. Special attention is given to external tank effects.

Craig, M. K.↗

Wetlife Study of Nickel Hydrogen Cells

A study was undertaken to determine the residual Nickel Precharge, and to understand the Performance and Cycle Life of Aged Nickel Hydrogen cells that were in cold storage up to thirteen (13) years. Comsat Technical Services, Aerospace Corporation, and NSWC/Crane test data to date indicate a nominal electrical performance with a small second plateau and the presence of Nickel Precharge in the cells: Cell Teardown, Plate (active Nickel Precharge determination), and Electrolyte Analyses are in progress. Preliminary Thermal Imaging data indicates that older the cell greater the heat generation, but cell over charge (capacity) could dominate heat generation. U.S. Govt. cells has completed 1150 nominal 60% LEO cycles. The completion date for this study is January 31, 2008.

Source record↗

Testing of an Integrated Iodine Scrubber and Polishing Bed System

In 2016 an initial engineering evaluation and design of the off-gas abatement systems required for a hypothetical 1000 t/yr used nuclear fuel (UNF) reprocessing facility treating 5 yr–cooled, 60 GWd/tIHM UNF was completed. In this study two types of silver-based iodine sorbents were considered. The first was a silver-exchanged mordenite (AgZ), and the second was a silver-functionalized silica aerogel. In the initial design of the dissolver off-gas (DOG) iodine capture beds, the sorbent capacity was assumed to be 40 mg I/g sorbent. The total iodine released from the fuel, used as input for the design of the DOG system, was 1.635 kg/day. Tramp halogens increased this to ~5.1 kg/day on an iodine equivalent basis. The daily consumption of iodine sorbent was ~166 kg (including the mass transfer zones that have lower iodine loading). The iodine capture system was designed to utilize five beds in parallel. In this design each bed was ~1 m in diameter and 1.5 m long. This design allowed the beds to remain on line for 20 days, but at that point all five beds would need to be replaced, resulting in considerable material handling. It was proposed that the bed life could be extended and the number of parallel beds reduced if an aqueous iodine scrubber preceded the solid sorbent iodine capture beds. The testing described in this report was intended to provide an evaluation of an integrated system in which bulk iodine would first be removed by an aqueous NaOH scrubber with a target iodine decontamination factor (DF) of 10 to 50. This would reduce the sorbent usage by 90 to 95% and significantly reduce the associated frequent remote handling of the iodine filter beds. The effluent from the scrubber would then be passed through an AgZ sorbent bed to remove residual iodine. The integration of these unit operations was intended to demonstrate an iodine DF of >1000, which would facilitate regulatory compliance with regards to total volatile radionuclide emission from a reprocessing facility. Initial baseline performance testing of the scrubber system includes the characterization of CO 2 removal by the aqueous NaOH scrubber as a function of temperature, caustic concentration, packing length, liquid-to-gas mass ratio, and liquid flow rate. It was found that when the column was well wetted, very high CO 2 DFs were achieved (>650 and potentially as high as 15,000), preventing the ability to elucidate the effects of each specific variable tested. The L/G ratio in this system was not representative of typical L/G ratios found in industrial-scale scrubber systems. By significantly lowering the liquid recirculation rate to the point that column wetting was marginal, some significant variations in the CO 2 DF or CO 2 effluent concentrations could be observed. The additional tests conducted under these more adverse conditions still showed CO 2 DFs >100. The only operational parameter with significant effects was determined to be column length, with increased column length resulting in higher CO 2 DFs. Following these CO 2 tests, a single iodine scrubber test was performed deliberately at a condition indicated by the CO 2 demonstration to result in poor column performance. This was intended to establish a lower performance bound for iodine removal by the aqueous scrubber. The result showed that even under the adverse operating conditions, an iodine DF of >100 could be achieved. Finally, the aqueous scrubber and a AgZ polishing bed were integrated. This simple caustic scrubber system achieved an iodine DF of >12,000 for just the scrubber portion. Using this iodine DF, the iodine loading on the polishing bed was reduced by 99.993%. The performance of that integrated system was compared to a system including only a AgZ sorbent bed. The system without the scrubber also showed iodine DFs >3000 until breakthrough was observed. The loading on the saturated portion of the bed averaged 87.2 mg I 2 /gm AgZ. Comparing the penetration of iodine into the sorbent beds for these two systems showed a marked difference; the penetration with the scrubber was only 0.65 cm at a maximum loading of 0.11 mg I 2 /gm AgZ, whereas for the case without the caustic scrubber, the bed was saturated for the first 7 cm and breakthrough of the 13.3 cm bed occurred.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Advanced helium regulator for a fluorine propellant system

The space storable propulsion module is an advanced high performance (375 seconds Isp minimum) planetary spacecraft propulsion system with a mission life of 5-10 years. The propellants used are liquid fluorine and amine fuel. This application requires high pressure regulator accuracy to optimize propellant depletion characteristics. An advanced regulator concept was prepared which is compatible with both fuel and oxidizer and which features design concepts such as redundant bellows, all-metallic/ceramic construction, friction-free guidance of moving parts and gas damping. Computer simulation of the propulsion module performance over two mission profiles indicated satisfactory minimization of those propellant residual requirements imposed by regulator performance variables.

Wichmann, H.↗

Spacecraft battery reconditioning cost considerations

Cost considerations for spacecraft battery reconditioning are studied. Results indicate that the cost of performing reconditioning is minuscule compared with spacecraft system investment. Results also indicate that spacecraft life extension of a few days justifies incorporation of reconditioning circuitry.

Vanommering, G.↗

Internal performance characteristics of thrust-vectored axisymmetric ejector nozzles

A series of thrust-vectored axisymmetric ejector nozzles were designed and experimentally tested for internal performance and pumping characteristics at the Langley research center. This study indicated that discontinuities in the performance occurred at low primary nozzle pressure ratios and that these discontinuities were mitigated by decreasing expansion area ratio. The addition of secondary flow increased the performance of the nozzles. The mid-to-high range of secondary flow provided the most overall improvements, and the greatest improvements were seen for the largest ejector area ratio. Thrust vectoring the ejector nozzles caused a reduction in performance and discharge coefficient. With or without secondary flow, the vectored ejector nozzles produced thrust vector angles that were equivalent to or greater than the geometric turning angle. With or without secondary flow, spacing ratio (ejector passage symmetry) had little effect on performance (gross thrust ratio), discharge coefficient, or thrust vector angle. For the unvectored ejectors, a small amount of secondary flow was sufficient to reduce the pressure levels on the shroud to provide cooling, but for the vectored ejector nozzles, a larger amount of secondary air was required to reduce the pressure levels to provide cooling.

Lamb, Milton↗

Evaluation of the Performance and Exhaust Emissions of a 4 Cylinder CI Engine Operating With Dimethyl Ether (DME) and Propane Blends

In response to stringent emissions regulations and the need for higher efficiency engines, the utilization of DME and propane fuel blends in compression ignition (CI) engines has gained interest in the automotive industry. In this study, a range of DME-propane blends are explored in a CI combustion strategy at high injection pressures. A GT-Power model of a 2.2 L Hyundai CI engine was developed to facilitate evaluation of the impacts of variations of DME and propane blends at a light and medium engine speed-torque-load operating condition; specifically at 1500 rpm, 50 Nm and 2.84 bar brake mean effective pressure (BMEP); and 2000 rpm, 150 Nm, 8.53 bar BMEP speed-torque-load combination. Here, the GT-Power model was validated using Computational Fluid Dynamics (CFD) simulations. The results indicate that high diesel-like efficiencies can be achieved with a 100% DME mass substitution and up to 50% propane-DME blends could be implemented without a significant penalty on engine performance indicators. Significant brake specific nitrogen oxides (BSNOx) reductions were also observed along with reductions in carbon dioxide (CO2) and soot when leveraging these fuel blends.

computational fluid dynamics↗

Baseline [ 18 F]GTP1 tau PET imaging is associated with subsequent cognitive decline in Alzheimer’s disease

Background: The role and implementation of tau PET imaging for predicting subsequent cognitive decline in Alzheimer’s disease (AD) remains uncertain. This study was designed to evaluate the relationship between baseline [ 18 F]GTP1 tau PET and subsequent longitudinal change across multiple cognitive measures over 18 months. Methods: Our analyses incorporated data from 67 participants, including cognitively normal controls (n = 10) and β-amyloid (Aβ)-positive individuals ([ 18 F] florbetapir Aβ PET) with prodromal (n = 26), mild (n = 16), or moderate (n = 15) AD. Baseline measurements included cortical volume (MRI), tau burden ([ 18 F]GTP1 tau PET), and cognitive assessments [Mini-Mental State Examination (MMSE), Clinical Dementia Rating (CDR), 13-item version of the Alzheimer’s Disease Assessment Scale-Cognitive Subscale (ADAS-Cog13), and Repeatable Battery for the Assessment of Neuropsychological Status (RBANS)]. Cognitive assessments were repeated at 6-month intervals over an 18-month period. Associations between baseline [ 18 F]GTP1 tau PET indices and longitudinal cognitive performance were assessed via univariate (Spearman correlations) and multivariate (linear mixed effects models) approaches. The utility of potential prognostic tau PET cut points was assessed with ROC curves. Results: Univariate analyses indicated that greater baseline [ 18 F]GTP1 tau PET signal was associated with faster rates of subsequent decline on the MMSE, CDR, and ADAS-Cog13 across regions of interest (ROIs). In multivariate analyses adjusted for baseline age, cognitive performance, cortical volume, and Aβ PET SUVR, the prognostic performance of [ 18 F]GTP1 SUVR was most robust in the whole cortical gray ROI. When AD participants were dichotomized into low versus high tau subgroups based on baseline [ 18 F]GTP1 PET standardized uptake value ratios (SUVR) in the temporal (cutoff = 1.325) or whole cortical gray (cutoff = 1.245) ROIs, high tau subgroups demonstrated significantly more decline on the MMSE, CDR, and ADAS-Cog13. Conclusions: Our results suggest that [ 18 F]GTP1 tau PET represents a prognostic biomarker in AD and are consistent with data from other tau PET tracers. Tau PET imaging may have utility for identifying AD patients at risk for more rapid cognitive decline and for stratification and/or enrichment of participant selection in AD clinical trials.

60 APPLIED LIFE SCIENCES↗

WEC-Sim Modeling of Laminar Scientific's Patented Seesaw Wave Energy Converter: Preprint

Laminar Scientific's patented seesaw wave energy converter was modeled in WEC-Sim to predict performance. The device operates by utilizing ocean surface waves to rotate a truss in pitch about a pivot. The pivot is located at the top of two pylons, which are embedded in the seafloor. The seesaw has a float on either end, and the buoyancy forces from each float cause the system to rise or fall with passing waves. Device performance relies upon seesaw length and ocean wavelength creating an antiphase effect. The seesaw truss has an adjustable length intended to achieve this effect. The operation method enforces a narrow band of wavelengths which induce the largest rotational motion from the device. The hydrodynamic analysis of the device was performed using Capytaine, and the results confirmed that the device operates best in a narrow frequency band. Four float-to-float spacing cases and three pylon radii were examined. The hydrodynamic results indicate a match between the model and the physical expectations for the device, and that varying the pylon radii by 0.1-m increments for three instances creates minimal changes in hydrodynamic properties. Power matrices for three float spacing cases of the device were simulated with Joint North Sea Wave Project spectra waves and optimal power take-off damping in WEC-Sim. The maximum average power production for the 15-m spacing case was 14.1 kW with a 5.0-s peak wave period and 4-m significant wave heights. Plots of capture-width ratios indicated that the device performance was linear and confirmed that the device is optimal in a narrow frequency band. The maximum percentage of the available wave power produced by the 15-m device was approximately 16%. Simulations of the device in regular waves were used to produce plots of average power compared to a ratio of float spacing to wavelength. These plots indicate that the power production is maximized at a ratio of 0.5, and further confirm that the device has a narrow frequency response. The device was simulated at an example field location, where the device produced an annual average power rating of 1.6 kW given an average omnidirectional wave climate of 10.3 kW m-1 and an optimal, linearized power take-off model. While the maximum predicted device performance is reliant upon a narrow band of wave frequencies, the conducted analysis provides an opportunity to improve device design prior to prototyping and testing. Modifying the design to respond to a broader frequency range would improve device performance.

numerical modeling↗

On the Evaluation of the GEOSAT Follow On (GFO) Altimeter

The NAVY GFO satellite was launched on February 10, 1998. The spacecraft system and the GPS instrument have experienced a number of problems that have prevented the mission from entering normal operations. However the GFO radar altimeter has been turned on a number of times and does appear to be performing well. We have been approved to help monitor the long term trends in the altimeter similar to the functions we have been performing for the Ocean Topography Experiment POSEIDON (TOPEX) radar altimeter. We will present some analysis of the pre-launch test data from the GFO altimeter to indicate the characteristics of the instrument. We will also present analysis of in-flight data indicating that the altimeter performance appears to be nominal. The current in-flight trends based on the calibration mode will be discussed.

Hancock, D. W., III↗

Summary of FUTURIX-FTA Non-destructive Examination

A summary of results from the non-destructive examination of the FUTURIX-FTA irradiation are presented. This irradiation was conducted under true fast spectrum conditions in the Phenix reactor. Baseline non-destructive examinations of these tests have been completed at this time. Results from visual examination, neutron radiography, gamma spectrometry, and dimensional inspection have been collected. The data collected from this irradiation will be compared to sister irradiations performed in pseudo-fast spectrum conditions at the INL Advanced Test Reactor helping to confirm fuel performance behavior observed in Advanced Test Reactor irradiations is representative of fast reactor conditions. All indications from the non-destructive examinations performed on the FUTURIX-FTA elements indicate a successful irradiation with fuel performance in line with expectations. The intact state of the nitride fuel is especially notable as these pellets were fragile after fabrication, but they appear to have survived the irradiation and extensive shipping well. These rodlets will undergo further examination to include gamma tomography to investigate the radial fission product distribution, fission gas release analysis, optical metallography, microhardness testing, and chemical burnup analysis. If possible, cross sections from optical metallography may also be examined by more advanced techniques such as scanning electron microscopy and transmission electron microscopy of specific sites through the use of focused ion beam lift outs. The results of all these examinations will be compared with the results from the AFC-1B, AFC-I1D, AFC-IF, AFC-1G, AFC-1H and AFC-LAE irradiations. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2024

Energy Savings Performance Contracts (ESPCs)are a contractual mechanism that allow a federal agency to procure energy savings and facility improvements without upfront capital costs to reduce costs and resiliency. ESPCs are covered under FAR Part 23.2, and 42 USC § 8287. Section 8287(a)(2)(A) of Title 42 of the U.S. Code requires that each energy savings performance contract (ESPC) undergo an annual energy audit, resulting in a separate audit report for every project. The objective of the present report is to compile and analyze all annual ESPC audit reports issued between October 1, 2023, and September 30, 2024, for projects awarded under Generations 1, 2, and 3 of DOE’s ESPC IDIQ contracts. During this period, 205 measurement and verification (M&V) reports were produced for 200 projects; the total number of reports exceeds the number of projects because some projects generated more than one report(for example, a few projects measure savings twice per year and produce two audit reports annually, each covering a different six-month period). By aggregating the results from these individual audits, the report determines the portfolio-wide realization rate of energy and cost savings for all active ESPC projects awarded under DOE’s IDIQ program. For all 205audit reports, sufficient information was available to compare project-level estimated, reported, and guaranteed cost savings. Reported cost savings accounted for ESCO verified savings per each project’s M&V plan. The total reported cost savings for the period addressed were $\$$647.8million,compared with the total guaranteed cost savings of $\$$601.6million. On average across the reported projects: •ESPC contractors guaranteed 92.8% of the estimated cost savings• projects reported achieving 100.0% of the estimated cost savings• projects reported achieving 107.7% of the guaranteed cost savings. The M&V performed for the period indicated adjustments for government operations and maintenance impacts to savings amount to$\$$43.9millionandcould be restored with the original operational parameters for impacted projects. Accounting for this potential cost savings impact, these projects still realized 100.4% of the guaranteed cost savings. The information on estimated and reported energy savings was collected and compared for all 205of the reports examined. Based on site energy, estimated savings totaled 14.88million MMBtu, and reported savings were 15.33million MMBtu; 3.1% greater than the estimated energy savings. All of the reports examined contained sufficient information to calculate source energy savings. Based on site-adjusted source energy, total estimated energy savings were 20.90 million MMBtu, and reported savings were 21.22million MMBtu, 101.5% of the estimated energy savings. For water savings, the estimated savings were 11,539,055 kGal and the reported savings were 13,315,930 kGal. This means 1,776,875 kGal more water was saved than estimated, which is about 15% higher than the estimate. These results indicate that, overall, the reported energy savings slightly exceeded the estimated values, while estimated water savings significantly exceeded estimated values, suggesting that the projects achieved greater cost savings than originally projected. The total annual expense for the ESCOs to perform annual M&V audits and reporting was $\$$10.02million. Through this effort, $\$$647.8 million in annual cost savings was verified. The M&V results indicated that $\$$43.9 million of these verified savings reflected adjustments due to government operations A-6and maintenance impacts, which could be restored under the original operational parameters for the affected projects. These findings show the value of M&V that only costs 1.7%of the guaranteed cost savings to ensure guarantees are met.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Skylab S-193 altimeter experiment performance, results and applications

A description of the Skylab altimeter instrument system along with the appropriate system error model is presented. The data processing flow, orbit computation, and topographic recovery techniques are discussed. Some data analysis results are presented which indicate excellent correlation with underwater topographic features. In addition, results are shown which indicate that the instrument performance was as expected.

Mcgoogan, J. T.↗

Systems and methods for circuit lifetime evaluation

Systems and methods for estimating the lifetime of an electrical system in accordance with embodiments of the invention are disclosed. One embodiment of the invention includes iteratively performing Worst Case Analysis (WCA) on a system design with respect to different system lifetimes using a computer to determine the lifetime at which the worst case performance of the system indicates the system will pass with zero margin or fail within a predetermined margin for error given the environment experienced by the system during its lifetime. In addition, performing WCA on a system with respect to a specific system lifetime includes identifying subcircuits within the system, performing Extreme Value Analysis (EVA) with respect to each subcircuit to determine whether the subcircuit fails EVA for the specific system lifetime, when the subcircuit passes EVA, determining that the subcircuit does not fail WCA for the specified system lifetime, when a subcircuit fails EVA performing at least one additional WCA process that provides a tighter bound on the WCA than EVA to determine whether the subcircuit fails WCA for the specified system lifetime, determining that the system passes WCA with respect to the specific system lifetime when all subcircuits pass WCA, and determining that the system fails WCA when at least one subcircuit fails WCA.

Heaps, Timothy L.↗

Delay-Throughput Performance of the Deep-Space Ka-band Link

In this paper, performance of a first-in, first-out (FIFO), selective retransmission scheme for the deep-space Ka-band link is presented and compared to the performance of a comparable X-band link. In this analysis, 16 months of water vapor radiometer (WVR) and advanced water vapor radiometer (AWVR) data from the three Deep Space Network (DSN) Communication Complexes (DSCC) were used to emulate weather effects on X-band and Ka-band links from Mars. Mars Reconnaissance Orbiter (MRO) X-band and Ka-band telecommunications parameters were used for spacecraft telecommunications capabilities. One pass per week per complex was selected from MRO's Deep Space Network (DSN) schedule from April 1, 2006 to August 31, 2007 for a total of 207 passes (69 passes per complex) for this analysis. For each pass both X-band and Ka-band links were designed using at most two data rates so that the expected pass capacity would be maximized subject to a minimum availability requirement (MAR). In conjunction with the WVR/AWVR data, elevation profiles of the selected passes and models for the performance of the antennas in the DSN were used to emulate the performance of both links. It was assumed that the retransmission of the data takes place not on the same pass as the original transmission but during subsequent passes. The data collected before a pass was assumed to be a fraction of the expected capacity of the pass as calculated through the link design process. Infinite spacecraft storage was assumed to obtain an upper bound on the spacecraft storage requirement. The independent parameters of this analysis were MAR and the ratio of data collected before a pass to the expected pass capacity. Since the selected passes did not occur at regular intervals, the delay in this analysis was measured in terms of number of passes. The throughput was measured in terms of number of bits received successfully on the ground. The results indicate that reasonable delay performance could be achieved with very high throughput for relatively low MAR values for data collection to expected pass capacity ratio of around 97% for Ka-band. The results indicate that, except for very low average delay requirements, the Ka-band link provides more than twice the throughput of the X-band link for the same amount of power consumed by the spacecraft. In addition, the results indicate that the required storage onboard the spacecraft is not prohibitive and good performance could be achieved by using a buffer size less than three times the maximum amount of data collected before a pass.

Shambayati, Shervin↗