Search NASA⌕ Search

SEARCH · Search NASA

Results for “Resource allocation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,279 records · Page 71

20% Wind by 2030: Overcoming the Challenges (Final Technical Report)

The funds allocated through the Wind Powering America (WPA) grant were utilized by the State of Montana to support broad outreach activities communicating the benefits and opportunities of increased wind energy and transmission development. The challenges to increased wind development were also clearly communicated with the understanding that a clearer comprehension of the challenges would be beneficial in overcoming the obstacles to further development. The ultimate purpose of these activities was to foster the increased development of Montana's rich wind resources through increased public acceptance and wider dissemination of technical resources.

17 WIND ENERGY↗

NASA LCLUC Program: An Integrated Forest Monitoring System for Central Africa

Central Africa has the second largest unfragmented block of tropical rain forest in the world; it is also one of the largest carbon and biodiversity reservoirs. With nearly one-third of the forest currently allocated for logging, the region is poised to undergo extensive land-use change. Through the mapping of the forests, our Integrated Forest Monitoring System for Central Africa (INFORMS) project aims to monitor habitat alteration, support biodiversity conservation, and promote better land-use planning and forest management. Designed as an interdisciplinary project, its goal is to integrate data acquired from satellites with field observations from forest inventories, wildlife surveys, and socio-economic studies to map and monitor forest resources. This project also emphasizes on collaboration and coordination with international, regional, national, and local partners-including non-profit, governmental, and commercial sectors. This project has been focused on developing remote sensing products for the needs of forest conservation and management, insuring that research findings are incorporated in forest management plans at the national level. The societal impact of INFORMS can be also appreciated through the development of a regional remote sensing network in central Africa. With a regional office in Kinshasa, (www.OSFAC.org), the contribution to the development of forest management plans for 1.5 million hectares of forests in northern Republic of Congo (www.tt-timber.com), and the monitoring of park encroachments in the Albertine region (Uganda and DRC) (www.albertinerift.org).

Laporte, Nadine↗

Low-Cost, Class D Testing of Spacecraft Photovoltaic Systems Can Reduce Risk

The end-to-end verification of a spacecraft photovoltaic power generation system requires light! Specifically, the standard practice for doing so is the Large Area Pulsed Solar Simulation (LAPSS). A LAPSS test can characterize a photovoltaic system's efficiency via its response to rapidly applied impulses of simulated sunlight. However, a Class D program on a constrained budget and schedule may not have the resources to ship an entire satellite for a LAPSS test alone. Such was the case with the Lunar Atmospheric and Dust Environment Explorer (LADEE) program, which was also averse to the risk of hardware damage during shipment. When the Electrical Power System (EPS) team was denied a spacecraft-level LAPSS test, the lack of an end-to-end power generation test elevated to a project-level technical risk. The team pulled together very limited resources to not only eliminate the risk, but build a process to monitor the health of the system through mission operations. We discuss a process for performing a low-cost, end-to-end test of the LADEE photovoltaic system. The approach combines system-level functional test, panel-level performance results, and periodic inspection (and repair) up until launch. Following launch, mission operations tools are utilized to assess system performance based on a scant amount of data. The process starts in manufacturing at the subcontractor. The panel manufacturer provides functional test and LAPSS data on each individual panel. We apply an initial assumption that the per-panel performance is sufficient to meet the power generation requirements. The manufacturer's data is also carried as the performance allocation for each panel during EPS system modeling and initial mission operations. During integration and test, a high-power, professional theater lamp system provides simulated sunlight to each panel on the spacecraft, thereby permitting a true end-to-end system test. A passing test results in a step response to nearly full-rated current at the appropriate solar array switch in the power system. A metal-halide bulb, infrared imagers, and onboard spacecraft measurements are utilized to minimize risk of thermal damage during test. Data is provided to support test results for both passing and marginal panels. Prior to encapsulation in the launch vehicle, each panel is inspected for damage by the panel manufacturer. Cracked cells or other damage is amended on-site. Because the photovoltaic test system is inexpensive and portable, each repaired panel can be re-verified immediately. Post-launch, the photovoltaic system is again characterized for per-panel deviations from the manufacturer's performance test. This proved especially tricky as the LADEE spacecraft performs only one current measurement on the entire array. The algorithm for Matlab tools to assess panel performance based on spacecraft attitude is discussed. While not as precise and comprehensive as LAPSS, the LADEE approach leverages minimal resources into an ongoing assessment program that can be applied through numerous stages of the mission. The project takes a true Class D approach in assessing the technical value of a spacecraft level performance test versus the programmatic risk of shipping the spacecraft to another facility. The resources required are a fraction of that for a LAPSS test, and is easy to repeat. Further, the test equipment can be handed down to future projects without building an on-site facility.

photovoltaic↗

GridTool: A surface modeling and grid generation tool

GridTool is designed around the concept that the surface grids are generated on a set of bi-linear patches. This type of grid generation is quite easy to implement, and it avoids the problems associated with complex CAD surface representations and associated surface parameterizations. However, the resulting surface grids are close to but not on the original CAD surfaces. This problem can be alleviated by projecting the resulting surface grids onto the original CAD surfaces. GridTool is designed primary for unstructured grid generation systems. Currently, GridTool supports VGRID and FELISA systems, and it can be easily extended to support other unstructured grid generation systems. The data in GridTool is stored parametrically so that once the problem is set up, one can modify the surfaces and the entire set of points, curves and patches will be updated automatically. This is very useful in a multidisciplinary design and optimization process. GridTool is written entirely in ANSI 'C', the interface is based on the FORMS library, and the graphics is based on the GL library. The code has been tested successfully on IRIS workstations running IRIX4.0 and above. The memory is allocated dynamically, therefore, memory size will depend on the complexity of geometry/grid. GridTool data structure is based on a link-list structure which allows the required memory to expand and contract dynamically according to the user's data size and action. Data structure contains several types of objects such as points, curves, patches, sources and surfaces. At any given time, there is always an active object which is drawn in magenta, or in their highlighted colors as defined by the resource file which will be discussed later.

Samareh-Abolhassani, Jamshid↗

Design, implementation and migration of security systems as an extreme project.

Decision Trees, algorithms, software code, risk management, reports, plans, drawings, change control, presentations, and analysis - all useful tools and efforts but time consuming, resource intensive, and potentially costly for projects that have absolute schedule and budget constraints. What are necessary and prudent efforts when a customer calls with a major security problem that needs to be fixed with a proven, off-the-approval-list, multi-layered integrated system with high visibility and limited funding and expires at the end of the Fiscal Year? Whether driven by budget cycles, safety, or by management decree, many such projects begin with generic scopes and funding allocated based on a rapid management 'guestimate.' Then a Project Manager (PM) is assigned a project with a predefined and potentially limited scope, compressed schedule, and potentially insufficient funding. The PM is tasked to rapidly and cost effectively coordinate a requirements-based design, implementation, test, and turnover of a fully operational system to the customer, all while the customer is operating and maintaining an existing security system. Many project management manuals call this an impossible project that should not be attempted. However, security is serious business and the reality is that rapid deployment of proven systems via an 'Extreme Project' is sometimes necessary. Extreme Projects can be wildly successful but require a dedicated team of security professionals lead by an experienced project manager using a highly-tailored and agile project management process with management support at all levels, all combined with significant interface with the customer. This paper does not advocate such projects or condone eliminating the valuable analysis and project management techniques. Indeed, having worked on a well-planned project provides the basis for experienced team members to complete Extreme Projects. This paper does, however, provide insight into what it takes for projects to be successfully implemented and accepted when completed under extreme conditions.

99 GENERAL AND MISCELLANEOUS↗

Design implementation and migration of security systems as an extreme project.

Decision Trees, algorithms, software code, risk management, reports, plans, drawings, change control, presentations, and analysis - all useful tools and efforts but time consuming, resource intensive, and potentially costly for projects that have absolute schedule and budget constraints. What are necessary and prudent efforts when a customer calls with a major security problem that needs to be fixed with a proven, off-the-approval-list, multi-layered integrated system with high visibility and limited funding and expires at the end of the Fiscal Year? Whether driven by budget cycles, safety, or by management decree, many such projects begin with generic scopes and funding allocated based on a rapid management 'guestimate.' Then a Project Manager (PM) is assigned a project with a predefined and potentially limited scope, compressed schedule, and potentially insufficient funding. The PM is tasked to rapidly and cost effectively coordinate a requirements-based design, implementation, test, and turnover of a fully operational system to the customer, all while the customer is operating and maintaining an existing security system. Many project management manuals call this an impossible project that should not be attempted. However, security is serious business and the reality is that rapid deployment of proven systems via an 'Extreme Project' is sometimes necessary. Extreme Projects can be wildly successful but require a dedicated team of security professionals lead by an experienced project manager using a highly-tailored and agile project management process with management support at all levels, all combined with significant interface with the customer. This paper does not advocate such projects or condone eliminating the valuable analysis and project management techniques. Indeed, having worked on a well-planned project provides the basis for experienced team members to complete Extreme Projects. This paper does, however, provide insight into what it takes for projects to be successfully implemented and accepted when completed under extreme conditions.

99 GENERAL AND MISCELLANEOUS↗

A Workflow for Accelerating Multimodal Data Collection for Electrodeposited Films

Abstract Future machine learning strategies for materials process optimization will likely replace human capital-intensive artisan research with autonomous and/or accelerated approaches. Such automation enables accelerated multimodal characterization that simultaneously minimizes human errors, lowers costs, enhances statistical sampling, and allows scientists to allocate their time to critical thinking instead of repetitive manual tasks. Previous acceleration efforts to synthesize and evaluate materials have often employed elaborate robotic self-driving laboratories or used specialized strategies that are difficult to generalize. Herein we describe an implemented workflow for accelerating the multimodal characterization of a combinatorial set of 915 electroplated Ni and Ni–Fe thin films resulting in a data cube with over 160,000 individual data files. Our acceleration strategies do not require manufacturing-scale resources and are thus amenable to typical materials research facilities in academic, government, or commercial laboratories. The workflow demonstrated the acceleration of six characterization modalities: optical microscopy, laser profilometry, X-ray diffraction, X-ray fluorescence, nanoindentation, and tribological (friction and wear) testing, each with speedup factors ranging from 13–46x. In addition, automated data upload to a repository using FAIR data principles was accelerated by 64x.

36 MATERIALS SCIENCE↗

A Review and Comparison of Different Sensitivity Analysis Techniques in Practice

There exist many methods for sensitivity analysis readily available to the practitioner. While each seeks to help the modeler answer the same general question – How do sources of uncertainty or changes in the model inputs relate to uncertainty in the output? – different methods are associated with different assumptions, constraints, and required resources, leading to conclusions that may vary in interpretability and level of detail. Thus, it is crucial that the practitioner selects the desired sensitivity analysis method judiciously, making sure to match the selected approach to the specifics of their problem and to their desired objectives. In this chapter, we provide a practical overview of a collection of widely used, widely available sensitivity analysis methods. We focus on global sensitivity approaches, which seek to characterize how uncertainty in the model output may be allocated to sources of uncertainty in model inputs across the entire input space. Generally, this will require the practitioner to specify a probability distribution over the input space. On the other hand, methods for local sensitivity analysis do not require this specification but they have more limited utility, providing insight into sources of uncertainty associated only with a particular, specified location in the input space. Our hope is that this chapter may serve as a decision-making tool for practitioners, helping to guide the selection of a sensitivity analysis approach that will best fit their needs. To support this goal, we have selected a suite of approaches to cover, which, while not exhaustive, we believe provides a flexible and robust sensitivity analysis toolkit. All methods included are widely used and available in standard software packages.

97 MATHEMATICS AND COMPUTING↗

Physical Layer Security at a Point-to-Point MIMO System With 1-Bit DACs and ADCs

Low-resolution converters reduce the power consumption of wireless devices and help enable large energy-efficient arrays. In this letter, we evaluate the secrecy rate for the extreme case of 1-bit single-user multiple-input multiple-output systems following two signaling approaches. In the first method, the system uses discrete signaling. In the second, the system combines Gaussian signaling with artificial noise alongside power allocation. In the first case, we give a closed-form expression of the secrecy rate and propose an algorithm that provides near-optimal results for low signal-to-noise ratios (SNRs). Further, in the second scenario, depending on the channel state information, we suggest different precoding plans and derive a secrecy rate lower bound. At low SNR, power is allocated to the main signal. Only at high SNR is optimal power allocation effective. Moreover, knowing the eavesdropper channel greatly improves the system’s secrecy.

1-bit digital-to-analog (DAC) and analog-to-digita↗

FOX: A Fault Oblivious Extreme-Scale Execution Environment

The FOX project, funded under the ASCR X-stack I program, developed systems software and runtime libraries for a new approach to the data and work distribution for massively parallel, fault oblivious application execution. Our work was motivated by the premise that exascale computing systems will provide a thousand-fold increase in parallelism and a proportional increase in failure rate relative to today’s machines. To deliver the capability of exascale hardware, the systems software must provide the infrastructure to support existing applications while simultaneously enabling efficient execution of new programming models that naturally express dynamic, adaptive, irregular computation; coupled simulations; and massive data analysis in a highly unreliable hardware environment with billions of threads of execution. Our OS research has prototyped new methods to provide efficient resource sharing, synchronization, and protection in a many-core compute node. We have experimented with alternative task/dataflow programming models and shown scalability in some cases to hundreds of thousands of cores. Much of our software is in active development through open source projects. Concepts from FOX are being pursued in next generation exascale operating systems. Our OS work focused on adaptive, application tailored OS services optimized for multi → many core processors. We developed a new operating system NIX that supports role-based allocation of cores to processes which was released to open source. We contributed to the IBM FusedOS project, which promoted the concept of latency-optimized and throughput-optimized cores. We built a task queue library based on distributed, fault tolerant key-value store and identified scaling issues. A second fault tolerant task parallel library was developed, based on the Linda tuple space model, that used low level interconnect primitives for optimized communication. We designed fault tolerance mechanisms for task parallel computations employing work stealing for load balancing that scaled to the largest existing supercomputers. Finally, we implemented the Elastic Building Blocks runtime, a library to manage object-oriented distributed software components. To support the research, we won two INCITE awards for time on Intrepid (BG/P) and Mira (BG/Q). Much of our work has had impact in the OS and runtime community through the ASCR Exascale OS/R workshop and report, leading to the research agenda of the Exascale OS/R program. Our project was, however, also affected by attrition of multiple PIs. While the PIs continued to participate and offer guidance as time permitted, losing these key individuals was unfortunate both for the project and for the DOE HPC community.

97 MATHEMATICS AND COMPUTING↗

Library Services Funding Assessment

The Glenn Technical Library is a science and engineering library that primarily supports research activities at the Glenn Research Center, and provides selected services to researchers at all of the NASA research centers. Resources available in the library include books, journals, CD-ROMs, and access to various online sources, as well as live reference and inter-library loan services. The collection contains over 77,000 books, 800,000 research reports, and print or online access to over 1,400 journals. Currently the library operates within the Logistics and Technical Information Division, and is funded as an open-access resource within the GRC. Some of the research units at the GRC have recently requested that the library convert to a "pay-for-services" model, in which individual research units could fund only those journal subscriptions for which they have a specific need. Under this model, the library would always maintain a certain minimum level of pooled-expense services, including the ready reference and book collections, and inter-library loan services. Theoretically the "pay-for-services" model would encourage efficient financial allocation, and minimize the extent to which paid journal subscriptions go unused. However, this model also could potentially negate the benefits of group purchases for journal subscriptions and access. All of the major journal publishers offer package subscriptions that compare favorably in cost with the sum of individual subscription costs for a similar selection of titles. Furthermore, some of these subscription packages are "consortium" purchases that are funded collectively by the libraries at multiple NASA research centers; such consortia1 memberships would be difficult for the library to pay, if enough GRC research units were to withdraw their pooled contributions. cost of collectively-funded journal access with the cost of individual subscriptions. My primary task this summer is to create the cost dataset framework, and collect as much of the relevant data as possible. Hopefully this dataset will permit the research units at the GRC, and library administration as well, to make informed decisions about future library funding. Prior to the creation of the actual dataset, I established a comprehensive list of the library s print and online journal subscriptions. This list will be useful outside the context of the cost analysis project, as an addition to the library website. The cost analysis dataset s primary fields are: journal name, vendor, publisher, ISSN (International Standard Serial Number, to uniquely identify the titles), stand-alone price, and indication as to the presence of the journal in current GRC Technical Library consortium membership subscriptions. The dataset will hopefully facilitate comparisons between the stand-alone journal prices and the cost of shared journal subscriptions for groups of titles.

Lorig, Jonathan A.↗

Data and Multistage Optimization for the New Grid

Three essential capabilities for using exascale computing resources on next generation power grid applications are: generating large renewable energy datasets, modeling damage and operations during and after extreme events, and employing multi-stage optimization for infrastructure planning. Powerscenarios, developed as part of the ExaSGD project, addresses these capabilities by enabling users to build synthetic wind farms for large test systems using numerical weather prediction-based data sources. We share examples of using Powerscenarios to build out wind farms on the ACTIVSg2000 test system, to enable simulated operations and emergency asset allocation during a hurricane strike, and to compute multi-stage infrastructure buildouts.

economic dispatch↗

Project report: a survey of operating reserve markets in U.S. ISO/RTO-managed electric energy regions

This survey was undertaken as part of the initial phase of a larger market design project. The goal of the project is to design a wholesale electric power market such that electric energy storage (EES) resources are permitted to participate and receive compensation that is commensurate with the benefits they provide to the grid. This survey compares and contrasts operating reserve markets in the seven U.S. ISO/RTO-managed electric energy regions. The reserve market categories employed in each energy region are placed into a common frame work. The terminology used for reserve markets in each region, as well as the characteristics of these markets, is discussed. Finally, the market procedures currently in place in the seven energy regions for the procurement, settlement, and allocation of costs for reserves are examined.

Ellison, James F.↗

Transmission Interconnection Roadmap: Transforming Bulk Transmission Interconnection by 2035

The U.S. electricity system is amid a rapidly occurring and widespread energy transition. Regional, Tribal, state, and customer demand for new energy resources, combined with favorable policies, is driving a rapid rise of interconnection requests. Interconnection processes will need to evolve to handle this larger number of requests today and into the future, as policy and economic drivers continue to motivate significant resource development. This roadmap identifies and organizes nearer- and longer-term solutions to enable transmission interconnection processes to meet this expected demand, and it is intended for a diverse audience of stakeholders participating within transmission interconnection processes. The roadmap is a result of the Interconnection Innovation e-Xchange (i2X) program launched by the U.S. Department of Energy (DOE) in June 2022 to convene stakeholders and address interconnection challenges. The roadmap is organized into four primary goal areas, each important to the overall i2X mission to enable a simpler, faster, and fairer interconnection of clean energy resources while enhancing the reliability, resiliency, and security of our electric grid. The first goal aims to improve interconnection data transparency, to aid interconnection customers’ ability to screen and site potential projects, better enable third-party modeling, facilitate more process automation, enhance competition while ensuring equitable outcomes, and enable benchmarking, tracking, and auditing of interconnection processes and reforms. The second goal covers solutions to improve queue management practices, affected system studies, fair processes, and workforce development. The third goal incorporates solutions that aim to improve cost allocation, reduce costs to electricity consumers, enhance the coordination between transmission planning and the interconnection process, and optimize the rightsizing of transmission investment through improvements in interconnection studies. The fourth and final goal aims to reduce the performance issues not identified during interconnection studies by updating technical requirements within interconnection studies, models, and tools while also improving industry interconnection standards.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integrating Water Supply Constraints into Irrigated Agricultural Simulations of California

Simulations of irrigated croplands generally lack key interactions between water demand from plants and water supply from irrigation systems. We coupled the Water Evaluation and Planning system (WEAP) and Decision Support System for Agrotechnology Transfer (DSSAT) to link regional water supplies and management with field-level water demand and crop growth. WEAP-DSSAT was deployed and evaluated over Yolo County in California for corn, rice, and wheat. WEAP-DSSAT is able to reproduce the results of DSSAT under well-watered conditions and reasonably simulate observed mean yields, but has difficulty capturing yield interannual variability. Constraining irrigation supply to surface water alone reduces yields for all three crops during the 1987-1992 drought. Corn yields are reduced proportionally with water allocation, rice yield reductions are more binary based on sufficient water for flooding, and wheat yields are least sensitive to irrigation constraints as winter wheat is grown during the wet season.

Agriculture; Irrigation; Water Resources Managemen↗

Quota management in dCache or making a perfectly normal file system normal

dCache (https://dcache.org) is a highly scalable storage system providing location-independent access to data. The data are stored across multiple data servers as complete files presented to the end-user via a single-rooted namespace. From its inception, dCache has been designed as a caching disk buffer to a tertiary tape storage system with the assumption that the latter has virtually unlimited capacity. dCache can also be configured as a disk-only storage system with no tape backend. Owing to the idea that a tape resource is infinite, or purely physically limited by budget considerations, the system has never provided for any restrictions on how much data can be stored on tape. Likewise, in the disk-only configuration, the capacity of the system is only limited by the aggregate disk capacity of the data servers. In a multi-user environment, however, this has become problematic. This presentation will describe the design and implementation of a user- and group-based quota system, that allows to manage tape and disk space allocations, as part of dCache namespace.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Transforming E-Waste Into Strategic Resources: Techno-Economic Analysis of Gallium and By-products Recovery from LEDs via Bioleaching

The growing demand for gallium in optoelectronics and renewable energy applications raises concerns about supply security and production sustainability. This study evaluates the techno-economic feasibility of recovering gallium and by-products (copper and nickel) from waste GaN-based LEDs via bioleaching. A process flowsheet encompassing transportation, robotic disassembly, ball milling, bioleaching, solvent extraction/electrowinning, and refining was modeled. Based on mass balance analysis, more than 53 tons of LED waste are required annually to yield 1 kg of gallium alongside substantial copper and nickel co-products. Preliminary techno-economic analysis (TEA) shows an average total cost (ATC) of 6.84 USD/kg metal when costs are allocated by mass-weighted economic value (market price) fraction, corresponding to 6.75 USD/kg for copper, 15.91 USD/kg for nickel, and 470.95 USD/kg for gallium. For gallium, direct operational costs account for more than 70% of the cost. Monte Carlo simulations further quantify cost uncertainties under market price fluctuations. This work represents the first TEA of gallium recovery from GaN-based LEDs and highlights potential pathways for future cost reduction.

36 MATERIALS SCIENCE↗

Utilization of common pressurized modules on the Space Station Freedom

During the preliminary design review of Space Station Freedom elements and subsystems, it was shown that reductions of cost, weight, and on-orbit integration and verification would be necessary in order to meet program constraints, particularly nominal Orbiter payload launch capability. At that time, the Baseline station consisted of four resource nodes and two 44 ft modules. In this study, the viability of a common module which maintains crew and payload accommodation is assessed. The size, transportation, and orientation of modules and the accommodation of system racks and user experiments are considered and compared to baseline. Based on available weight estimates, a module pattern consisting of six 28 ft. common elements with three radial and two end ports is shown to be nearly optimal. Advantageous characteristics include a reduction in assembly flights, dual egress from all elements, logical functional allocation, no adverse impacts to international partners, favorable airlock, cupola, ACRV (Assured Crew Return Vehicle), and logistics module accommodation, and desirable flight attitude and control characteristics.

Gould, Marston J.↗