Search NASA⌕ Search

SEARCH · Search NASA

Results for “border”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,279 records · Page 71

Integration of the Kromek D3S Detector and Spot Robot For Secondary Inspections

Inspecting vehicles and containers for the presence of nuclear material is a challenging task for border control and security. When performed manually by inspectors, this task also has an associated risk of exposing the inspectors to unknown radiation. With the advent of agile, easy-to-program, quadruped robots like the Boston Dynamics Spot, automation of secondary inspection can improve the efficiency of the inspection process and alleviates the radiation risks to inspectors. In this project, Brookhaven National Laboratory and the University of Massachussetts at Lowell explored how to automate a simple secondary inspection mission. The Spot robot comes with its own software development kit (SDK) that allows clients/users to write custom code in the Python programming language to control the robot. Spot also has a payload computer called Spot-CORE, which runs the Ubuntu Linux operating system and allows users to integrate external sensors, such as a radiation detector, with Spot. In this study, the Kromek D3S detector has been integrated with Spot via the Spot-CORE, allowing Spot to capture gamma spectra and neutron counts for a specified acquisition period. Two custom routines, search and confirmation, have been developed and executed in this specified order. The search routine directs Spot to go around the nearest obstacle, e.g., vehicle and container, in a preset distance and step to collect gamma and neutron gross counts with the D3S detector. The radiation data and the robot location corresponding to each step are stored and fed to the confirmation routine at the end of the search. The confirmation routine then navigates Spot to the locations of the highest gamma or neutron counts to perform a long, e.g., one minute, measurement, and gives the operators the signature gamma spectra and neutron counts at the hotspots. This paper presents a detailed description of this automated system along with results of the preliminary tests in identifying the location and signature of a 137Cs radiation source in a vehicle.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Contentious narratives and disinformation about nuclear weapons in strategic deterrence and competition: A SOCOM perspective. Part of Section: United States Special Operations Command (USSOCOM) in Emerging Strategic & Geopolitical Challenges: Operational Implications for US Combatant Commands

Russia’s “special military operation” in Ukraine demonstrates the challenge for strategic deterrence and competition of countering contentious narratives and disinformation about weapons of mass destruction (WMD) during conventional regional wars against a nucleararmed adversary. Moscow uses both tailored, contentious narratives and targeted disinformation about WMD in Ukraine to influence and disrupt local and global perceptions in support of its deterrence and competition objectives vis-à-vis the United States and NATO. Since December 2021, Moscow has made a focal point of chemical, biological, radiological, and nuclear weapons in its efforts to establish a permissive environment for its military buildup on the border with Ukraine and then its military intervention. These information tactics also demonstrate an opportunity for US Special Operations Forces (SOF). They are a case study for considering how SOF can contribute to strategic deterrence and competition objectives, specifically countering adversary gray-zone information efforts to alter regional security orders.1 Such a role is in line with the 2022 Special Operations Forces Vision and Strategy, which provides a framework for the evolution of SOF into “a force capable of creating strategic, asymmetric advantages for the nation as a key contributor of integrated deterrence” (United States Special Operations Command, 2022). This paper briefly examines this strategic challenge and SOF opportunity, focusing narrowly on the distinction between contentious narratives and disinformation about nuclear weapons and the role of SOF in countering these gray-zone information tactics. The nuclear dimension of Moscow’s contentious narratives and disinformation in the “special military operation” is of particular interest because it demonstrates the distinction between strategic efforts to influence and disrupt local and global perceptions in Moscow’s favor. This distinction between influence and disruption is less clear with Russia’s contentious narratives and disinformation about chemical and biological weapons in Ukraine, as disinformation about these two types of WMD appears to overwhelm contentious narratives. We believe this distinction is useful for policymakers and warfighters responsible for countering gray-zone information tactics because it provides a framework for crafting tailored responses to contentious narratives and disinformation about nuclear weapons and other WMD. The chapter concludes with a discussion of efforts that could be undertaken by SOF in cooperation with other relevant stakeholders to address this aspect of adversary gray-zone information tactics.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Grid Interconnection and Renewables Deployment Related Air Quality and Human Health Benefits in Southeast Asia

The Association of Southeast Asian Nations (ASEAN) has increasingly focused on multilateral electricity trade, improved grid resiliency and modernization. These opportunities in the power sector have been studied through the ASEAN Interconnection Masterplan Studies, the most recent of which is the ASEAN Interconnection Masterplan Study III (AIMS III). AIMS III assessed four different scenarios of power system in the ASEAN countries that include a base scenario and three additional scenarios (called optimum RE, ASEAN RE, and High RE) considering different levels of deployment of renewable energy (RE) and cross-border generation and trade of electricity for three years (2025, 2030, 2040). In this work, we quantify the potential air quality and public health co-benefits of AIMS III scenarios. For a rapidly expanding, energy hungry region like SE Asia generation is power generation is expected to increase significantly. The AIMS III scenarios' capacity expansion modeling suggest that: 1) Generation nearly doubles from 2025 to 2040 in all four AIMS III scenarios; 2) Most of the increased generation is met by coal in all four AIMS III scenarios; 3) While renewables generation increases in all four AIMS III scenarios, the fraction of total generation (its share) generally decreases because of the much greater increase in non-renewable sources, mostly coal. Only in the High RE Target scenario do renewables represent a higher share in 2040 than in 2025, though even here it is at the expense of natural gas rather than coal; 4) As a result, emissions of gaseous and aerosol pollutants increase significantly in all scenarios. Because emissions increase in 2040 compared to 2025 for all four AIMS III scenarios, so do PM2.5 concentrations. Even for the High RE Target scenario (the scenario with highest share of renewable energy), compared to the Base scenario in 2025, in 2040 PM2.5 concentrations are higher. Compared to the Base scenario in the same years, the Optimum RE and ASEAN RE Target scenarios do not differ very much from the Base in terms of PM2.5 concentration. The High RE Target scenario, on the other hand, yields noticeably lower PM2.5 concentration. For example, in 2040 the population-weighted decrease in annual average PM2.5 concentration in the High RE Target scenario relative to the Base scenario is 0.5 ug m-3. Compared to the Base scenario in 2040, each of the alternative AIMS III scenarios is estimated to result in net reductions in power-sector air quality-related excess mortality in the ASEAN region. Yet there are a few countries for which the Optimum RE and ASEAN RE Target result in increases in PM2.5-related excess mortality (Thailand and Vietnam for the ASEAN RE Target scenario and Thailand for the Optimum RE scenario). However, for the High RE Target scenario, all countries benefit and find reductions in excess mortality resulting from the power sector scenarios modeled in AIMS III with regionwide mortality decreasing by 16,000 compared to the Base scenario in 2040. In summary, our analysis finds that changing power generation emissions is a crucial lever for improving public health in ASEAN member countries and provides a pathway for policymakers to make decision backed by a realistic power sector expansion and air quality analyses.

air quality↗

FINITE ELEMENT MODEL MESH REFINEMENT EFFECTS ON QUALIFICATION OF NUCLEAR GRADE GRAPHITE COMPONENTS

The American Society of Mechanical Engineers (ASME) provides the full and simplified design-by-analysis probabilistic assessments for determining acceptance of nuclear grade graphite core components. The assessments can be characterized by three parts: (1) a component stress distribution, often determined by a finite element (FE) model; (2) a Weibull probability density function (pdf) that characterizes the experimental tensile strength distribution; and (3) the post-processor, which combines the FE model and the Weibull strength distribution in accordance with the full and simplified assessments to determine component acceptance. It is known that the level of mesh refinement in FE models can affect the modeled component’s calculated stress distribution. Depending on the component geometry, the stress distribution may converge with sufficient refinement. It was previously unknown whether the acceptance decision resulting from the full and simplified assessments might change even with sufficient mesh refinement. This study explores that question using experimental strength results for a dog-bone geometry for two graphite grades, IG-110 and PCEA. The simplified assessment has two criteria that must be met, the first limits the combined membrane stress by the allowable stress and the second limits the peak equivalent stress by the allowable stress scaled by the ratio of flexural to tensile strength. In the application of the simplified assessment, convergence of the peak equivalent stress required extreme mesh refinement, however, the acceptance decision was not affected. It is hypothesized that more complex geometries with stress concentrations may present mesh refinement effects on the simplified assessment acceptance decision. Mesh refinement did affect the acceptance decision in the full assessment for the applied pressure loadings in this study. This work suggests component stress distribution convergence is not a sufficient criteria for POF convergence in the full assessment and that mesh refinement should continue until the POF has converged, especially where the resulting POF is bordering the SRC acceptable POF limit.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

RECS student sequestration program

The 2007 Research Experiment in Carbon Sequestration (RECS) met at the Montana State University (MSU) and a variety of field sites over the 10-day period of July 29 - Aug 10. This year's group consisted of 17 students from graduate and doctoral programs in the United States and Canada, as well as early career professionals in fields related to carbon mitigation. Appropriately, because greenhouse gas reduction and storage is a global problem, the group included seven international students, from France, Iran, Paraguay, Turkey, Russia and India. Classroom talks featured experts from academia, government, national laboratories, and the private sector, who discussed carbon capture and storage technologies and related policy issues. Then, students traveled to Colstrip, Montana to visit PPL Montana's coal-fired power plant and view the local geology along the Montana/Wyoming border. Finally, students spent several days in the hands-on work at ZERT, using carbon dioxide detection and monitoring equipment. 1 photo.

20 FOSSIL-FUELED POWER PLANTS↗

Challenges for Lithuania: Ignalina NPP Early Closure

As a condition of accession into the European Union (EU), Lithuania is committed to the closure and decommissioning of Ignalina NPP comprising two RBMK-1500 reactor units (Fig. 1). It was agreed in a special protocol to the Accession Treaty that, in return for adequate EU financial assistance, Unit 1 would be closed before 2005 and Unit 2 by the end of 2009. The first unit was duly shut down on December 31, 2004. Lithuania, which has borders with Russia (Kaliningrad territory), Poland, Latvia and Belarus, spent fifty years as part of the Soviet Union and was deeply integrated into its economy and electrical infrastructure. At the break-up of the USSR, Lithuania inherited electricity generating capacity designed to supply the north-west region including ownership of Ignalina NPP located in the north-east of the country. Ignalina NPP Unit 1 was commissioned in 1983, Unit 2 in 1987; the planned lifespan of each unit was 30 years. Construction of a third unit was started but never completed. Since Lithuania became independent in 1990, Ignalina NPP has typically contributed more than 70% of national power supply. The town of Visaginas (population approx. 30,000) was purpose built to serve the plant and staff were brought in from throughout the USSR. With 3200 direct employees, Ignalina NPP remains by far the largest employer. Although there are pockets of Russian-language speakers in communities throughout Lithuania, Visaginas is the only example on a whole-town scale. Thus closure of Ignalina NPP within the restricted timescale required by the EU Accession Treaty commitment set an exceptional challenge to Lithuania. However, since the preparatory phase of decommissioning started in 2000, notable progress has been made, experience gained and lessons learnt. At present Unit 1 remains partially fueled in a state of care and maintenance. Partly burnt fuel is being transferred from Unit 1 to Unit 2 for further irradiation in order to minimize the commitment of new fuel thereby reducing operating costs and the final quantity of spent fuel. Design and construction of the facilities for spent fuel storage, waste processing and free-release is ongoing. The siting of the Near Surface Repository is now in the final stages of approval and construction of the landfill facility is under tendering. In order to facilitate the approval process and minimize the transport of waste, both disposal facilities will be within the boundary of the NPP site. Approximately 450 staff are employed at the shutdown Unit 1 for the safe maintenance of essential systems. The total staffing level at the plant is currently being reduced by around 200 each year, with a larger release to take place at the closure of Unit 2. It is envisaged that 2000 staff will be required for the dismantling operations. Although Ignalina NPP is still in the early stages of closure and decommissioning, some important lessons have already been learnt: Firstly, the importance considering social and financial issues as well as technical factors in deciding the decommissioning strategy. This should be done before the preparation is started of the FDP. The same broad consideration should also be given to the economic restructuring of the local area. Consultation is necessary with local and national authorities, and other stakeholders up to ensure a common vision. At Ignalina NPP it was considered essential to staff morale and the maintenance of a strong safety culture to guarantee the special social and employment benefits to dismissed staff in law [9]. At the same time, measures were also adopted to encourage certain key personnel to remain at the plant until closure. The case of Lithuania, which at independence had no legislative framework or management infrastructure for radioactive waste, may be exceptional; however, for all decommissioning projects it is necessary to have, from the outset, a clear strategy on waste storage and disposal. Finally, coordination at all levels must be assured, especially with the involvement of the nuclear regulators and other regulatory authorities, to achieve a smooth progression from operation into decommissioning.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Siting GNEP at the Savannah River Site: Using Legacy and Infrastructure in a Commercial Energy Park Concept

The Savannah River Site (SRS) was proposed as one of eleven potential sites to be included in the U.S. Department of Energy Programmatic Environmental Impact Statement (PEIS) for the Global Nuclear Energy Partnership (GNEP) program. The approach to meet siting and infrastructure requirements for possible GNEP facilities at the SRS focused on available infrastructure including land, cooling water systems, high voltage power supplies, existing heavy haul roadways, existing analytical capabilities, and existing waste handling capabilities. Additional siting criteria and existing SRS capabilities and conditions were developed to locate the GNEP within a commercial Energy Park contained within, but separate from, the SRS. Included as part of, or corollary to, existing infrastructure at the SRS was the availability of a nuclear trained workforce living within the area. The SRS consists of approximately 803 square kilometers (310 square miles) in the Upper Atlantic Coastal Plain of South Carolina bordering along the Savannah River. Historic production reactors, processing, and laboratory facilities are currently being decommissioned and destroyed while new facilities such as the MOX facility are being built. Existing legacy infrastructure, beneficial to the potential GNEP facilities, continues to exist and operate. The SRS has a long history of processing, reprocessing and in the disposition of nuclear fuels and byproducts continuing through today with HCanyon as the only DOE facility currently capable of uranium reprocessing. Because of ongoing operations and maintenance of historic systems, SRS has existing infrastructure immediately available for GNEP facilities in or near the proposed Energy Park. The Energy Park location was chosen to achieve maximum use of this legacy infrastructure. In summary: Requirements for potential or conceivable GNEP facilities can be met using the existing facilities and infrastructure of the SRS. A potential commercially operated Energy Park located within the existing boundaries of the SRS can use existing site infrastructure to lessen the overall construction costs and decrease the start up time for our national GNEP program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

New York Marcellus Shale: Industry boom put on hold

Key catalysts for Marcellus Shale drilling in New York were identified. New York remains the only state in the nation with a legislative moratorium on high-volume hydraulic fracturing, as regulators and state lawmakers work to balance the advantages of potential economic benefits while protecting public drinking water resources and the environment. New York is being particularly careful to work on implementing sufficiently strict regulations to mitigate the environmental impacts Pennsylvania has already seen, such as methane gas releases, fracturing fluid releases, flowback water and brine controls, and total dissolved solids discharges. In addition to economic and environmental lessons learned, the New York Department of Environmental Conservation (DEC) also acknowledges impacts to housing markets, security, and other local issues, and may impose stringent measures to mitigate potential risks to local communities. Despite the moratorium, New York has the opportunity to take advantage of increased capital investment, tax revenue generation, and job creation opportunities by increasing shale gas activity. The combination of economic benefits, industry pressure, and recent technological advances will drive the pursuit of natural gas drilling in New York. We identify four principal catalysts as follows: Catalyst 1: Pressure from Within the State. Although high-volume hydraulic fracturing has become a nationally controversial technology, shale fracturing activity is common in every U.S. state except New York. The regulatory process has delayed potential economic opportunities for state and local economies, as well as many industry stakeholders. In 2010, shale gas production accounted for $18.6 billion in federal royalty and local, state, and federal tax revenues. (1) This is expected to continue to grow substantially. The DEC is under increased pressure to open the state to the same opportunities that Alabama, Arkansas, California, Colorado, Kansas, Louisiana, Montana, New Mexico, North Dakota, Ohio, Oklahoma, Pennsylvania, South Dakota, Texas, Utah, West Virginia, and Wyoming are pursuing. Positive labor market impacts are another major economic draw. According to the Revised Draft SGEIS on the Oil, Gas and Solution Mining Regulatory Program (September 2011), hydraulic fracturing would create between 4,408 and 17,634 full-time equivalent (FTE) direct construction jobs in New York State. Indirect employment in other sectors would add an additional 29,174 FTE jobs. Furthermore, the SGEIS analysis suggests that drilling activities could add an estimated $621.9 million to $2.5 billion in employee earnings (direct and indirect) per year, depending upon how much of the shale is developed. The state would also receive direct tax receipts from leasing land, and has the potential to see an increase in generated indirect revenue. Estimates range from $31 million to $125 million per year in personal income tax receipts, and local governments would benefit from revenue sharing. Some landowner groups say the continued delay in drilling is costing tens of thousands of jobs and millions of dollars in growth for New York, especially in the economically stunted upstate. A number of New York counties near Pennsylvania, such as Chemung, NY, have experienced economic uptick from Pennsylvania drilling activity just across the border. Chemung officials reported that approximately 1,300 county residents are currently employed by the drilling industry in Pennsylvania. The Marcellus shale boom is expected to continue over the next decade and beyond. By 2015, gas drilling activity could bring 20,000 jobs to New York State alone. Other states, such as Pennsylvania and West Virginia, are also expected to see a significant increase in the number of jobs. Catalyst 2: Political Reality of the Moratorium. Oil and gas drilling has taken place in New York since the 19th century, and it remains an important industry with more than 13,000 currently active wells. The use of hydraulic fracturing in particular has been employed for decades. Yet, as technological advancements have enabled access to gas in areas where drilling is not common practice, public concern has ballooned. Opponents argue that more oversight is necessary to protect the environment and public health, while supporters believe the industry is already adequately regulated. Although it is important for New York to complete a thorough environmental and regulatory review, an extended ban could lead to litigation by property owners who have been stripped of the ability to lease their mineral rights. Other states are moving forward by implementing legislative guidelines or rules created by commissions to ensure that resources are developed safely. One of the most controversial issues in other states to date has revolved around the public disclosure of chemical additives in drilling fluid. While the industry is hesitant to reveal trade secrets, the public and many officials want the security of knowing what chemicals are pumped into the ground. Industry transparency could help mitigate the public concern and controversy that is delaying a lift of the moratorium. Currently, at least five other states have set chemical disclosure rules. Arkansas, Michigan, Montana, Texas, and Wyoming require disclosure of the chemical components of drilling fluid. Colorado has the most stringent rules, requiring not just the disclosure of the additives but of their concentrations as well. As more states continue to allow hydraulic fracturing, New York will likely lift the moratorium and instead implement more stringent regulations that help to alleviate public concern surrounding hydraulic fracturing. This will allow the state to safely pursue the expansive opportunities offered by the Marcellus shale without falling behind economically. Catalyst 3: Energy and Infrastructure Benefits. Natural gas provides a key source of energy in the Northeast. The DEC estimates the Marcellus shale gas resource potential to be between 168-516 Tcf. Even at the low end of this range, Marcellus alone could supply seven years of total U.S. energy consumption, and it would provide a local resource for New York. One report suggests that savings from lower natural gas costs would result in an average annual savings of $926 per household. (4) Industry growth is leading to lower natural gas and electric power prices, while decreasing reliance on Liquid Natural Gas (LNG) imports and enhancing domestic energy security. This makes development of the resources an even more attractive commitment to New York. In addition, the natural gas business is predominantly regional in scope. Drilling companies would be required to build new pipelines for gas development in New York, therefore State regulators face valuable ancillary benefits of natural gas development such as infrastructure improvements. Catalyst 4: Technology Improvements. Lastly, the moratorium itself does not prevent the use of alternative drilling technologies, such as non-hydraulic fracturing, for shale gas production. Developers are already using new systems in Texas and Canada, as well as in France where hydraulic fracturing is banned country-wide. Commercial viability of these new technologies could ultimately provide an alternative to jumpstart shale drilling in New York if necessary. The potential benefits from development of the Marcellus shale in New York are undeniable, though regulators are still working to balance the need to stimulate the economy with environmental protection and public health. Since closing the public comment period in January, the DEC has signaled that much more work is needed, making no promises to near-term completion. While, neighboring states are feeling the economic benefits of drilling, the political environment and the recession continues adding pressure to the process in New York state.

03 NATURAL GAS↗

INTEGRATION OF THE H3D-M400 DETECTOR AND SPOT ROBOT FOR AUTOMATED AREA SURVEY MISSIONS

Office of Nuclear Smuggling Detection and Deterrence (NSDD) is charged to identify and develop technologies to detect, disrupt, and investigate smuggling of radiological and nuclear materials •Border protection involves primary inspections using Radiation Portal Monitors (RPM), complimented with secondary and area survey inspections, usually performed manually using portable radiation detectors (PRDs) -RPM rely on fast technologies which provide quick scans of passing cargo/vehicles -Secondary inspections rely on trained, field deployed staff responsible for additional interdiction of screened cargo/vehicle putting them in potentially hazardous environment -Area survey inspections rely on trained, field deployed staff responsible for scanning and identifying presence of radiation while patrolling through a facility or public space •This project explores the use of technology which could reduce risks to field inspectors and add efficiency •The work presented here is a proof of principle of detector-robot integration to perform area survey inspections

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Towards a framework of nuclear competencies

For the countries considering the introduction of a nuclear energy program, the management of human resources should be a part of the wider integrated management system in order to ensure long term safe and reliable operation. Nuclear energy strategy and approaches to human resources development should take into consideration such fundamental aspects as: development and implementation of a workforce plan, required competencies and qualifications, prerequisites for staffing a nuclear energy program, needed training programs and training facilities, qualification and training requirements. Development of common instruments that respond to the above needs and vision has lead to a new concept of European Credit System for Vocational Education and Training. The European Credit System for Vocational Education and Training (ECVET) is based on definition of 'learning outcomes ' in terms of knowledge, skills and competence, and on identification of portfolios of learning outcomes that allow an individual to prove competencies in a coherent manner. ECVET proposes a common understanding of basic definitions of education and training as well as of the new proposed concepts and it should be recognized by all employers in the EU. In this context, a number of 'Euratom Fission Training Schemes' (EFTS) have been launched in specific areas where a shortage of skilled professionals has been identified. In these schemes the competence building is the result of traditional education plus life-long learning, non-traditional learning, and other forms of educational experiences, relying, in particular, on border-less mobility to get acquainted with various sectors. Each particular Training Scheme should follow a similar path for the achievement of the designed learning outcomes (knowledge, skills, and attitudes). This path to the Training Scheme consists of different activities regarding: definition of training scheme learning outcomes and modules, assessment of prerequisites and student selection, student interview for development of individual training plan, start of the training activities under a specific training scheme. The introduction and recognition of ECVET will lead to a common taxonomy of competencies, and will provide also information about qualifications and units in numerical form, enabling mutual recognition of a training scheme. The description of the learning outcomes to be achieved for qualifying to a specific job profile may follow the analysis phase of the systematic approach to training (SAT). This would ensure a common tool, already used by all trainers. All these steps contribute to establishing of a framework of nuclear competencies recognized and accepted throughout member states. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Tritium level along Romanian Black Sea Coast

Establishing the tritium level along the Romanian Black Sea Coast, after 10 years of exploitation of the nuclear power plant from Cernavoda, is a first step in evaluating its impact on the Black Sea ecosystem. The monitoring program consists of tritium activity concentration measurement in sea water and precipitation from Black Sea Coast between April 2005 and April 2006. The sampling points were spread over the Danube-Black Sea Canal - before the locks Agigea and Navodari, and Black Sea along the coast to the Bulgarian border. The average tritium concentration in sea water collected from the sampling locations had the value of 11.1 {+-} 2.1 TU, close to tritium concentration in precipitation. Although an operating nuclear power plant exists in the monitored area, the values of tritium concentration in two locations are slightly higher than those recorded elsewhere. To conclude, it could be emphasized that until now, Cernavoda NPP did not had any influence on the tritium concentration of the Black Sea Shore. (authors)

54 ENVIRONMENTAL SCIENCES↗

A Canadian Solution for Management of Mixed Liquid Waste - 13384

Mixed liquid wastes (MLW) from Canadian nuclear facilities consist of solvents, PCB (Poly Chlorinated Biphenyls) and non-PCB contaminated oils and aqueous wastes. Historically, MLW drums were shipped to a licensed US facility for destruction via incineration. This option is relatively expensive considering the significant logistics and destruction costs involved. In addition, commercial waste destruction facilities in US cannot accept PCB wastes from non-US jurisdictions. Because of this, Kinectrics has recently developed a novel and flexible process for disposing both PCB as well as non-PCB contaminated MLW within Canada. This avoids the need for cross-border shipments which significantly reduces the complexity and cost for waste disposal. This paper presents an overview of the various approaches and activities undertaken to date by Kinectrics for successfully processing and disposing the MLW drums. A summary of the results, challenges and how they were overcome are also presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preparation for the Recovery of Spent Nuclear Fuel (SNF) at Andreeva Bay, North West Russia - 13309

Andreeva Bay is located near Murmansk in the Russian Federation close to the Norwegian border. The ex-naval site was used to de-fuel nuclear-powered submarines and icebreakers during the Cold War. Approximately 22,000 fuel assemblies remain in three Dry Storage Units (DSUs) which means that Andreeva Bay has one of the largest stockpiles of highly enriched spent nuclear fuel (SNF) in the world. The high contamination and deteriorating condition of the SNF canisters has made improvements to the management of the SNF a high priority for the international community for safety, security and environmental reasons. International Donors have, since 2002, provided support to projects at Andreeva concerned with improving the management of the SNF. This long-term programme of work has been coordinated between the International Donors and responsible bodies within the Russian Federation. Options for the safe and secure management of SNF at Andreeva Bay were considered in 2004 and developed by a number of Russian Institutes with international participation. This consisted of site investigations, surveys and studies to understand the technical challenges. A principal agreement was reached that the SNF would be removed from the site altogether and transported to Russia's reprocessing facility at Mayak in the Urals. The analytical studies provided the information necessary to develop the construction plan for the site. Following design and regulatory processes, stakeholders endorsed the technical solution in April 2007. This detailed the processes, facilities and equipment required to safely remove the SNF and identified other site services and support facilities required on the site. Implementation of this strategy is now well underway with the facilities in various states of construction. Physical works have been performed to address the most urgent tasks including weather protection over one of the DSUs, installation of shielding over the cells, provision of radiation protection infrastructure and general preparation of the site for construction of the facilities for the removal of the SNF. This paper describes the development and implementation of the strategy and work to improve the safe and secure management of SNF, preparing it for retrieval and removal from Andreeva Bay. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radio-Ecological Conditions of Groundwater in the Area of Uranium Mining and Milling Facility - 13525

Manmade chemical and radioactive contamination of groundwater is one of damaging effects of the uranium mining and milling facilities. Groundwater contamination is of special importance for the area of Priargun Production Mining and Chemical Association, JSC 'PPMCA', because groundwater is the only source of drinking water. The paper describes natural conditions of the site, provides information on changes of near-surface area since the beginning of the company, illustrates the main trends of contaminators migration and assesses manmade impact on the quality and mode of near-surface and ground waters. The paper also provides the results of chemical and radioactive measurements in groundwater at various distances from the sources of manmade contamination to the drinking water supply areas. We show that development of deposits, mine water discharge, leakages from tailing dams and cinder storage facility changed general hydro-chemical balance of the area, contributed to new (overlaid) aureoles and flows of scattering paragenetic uranium elements, which are much smaller in comparison with natural ones. However, increasing flow of groundwater stream at the mouth of Sukhoi Urulyungui due to technological water infiltration, mixing of natural water with filtration streams from industrial reservoirs and sites, containing elevated (relative to natural background) levels of sulfate-, hydro-carbonate and carbonate- ions, led to the development and moving of the uranium contamination aureole from the undeveloped field 'Polevoye' to the water inlet area. The aureole front crossed the southern border of water inlet of drinking purpose. The qualitative composition of groundwater, especially in the southern part of water inlet, steadily changes for the worse. The current Russian intervention levels of gross alpha activity and of some natural radionuclides including {sup 222}Rn are in excess in drinking water; regulations for fluorine and manganese concentrations are also in excess. Possible ways to improve the situation are considered. (authors)

54 ENVIRONMENTAL SCIENCES↗

British Petroleum's Deepwater Horizon Accident and the Thinking, Engaged Workforce - 13265

On April 20, 2010, hydrocarbons escaped from the Macondo well into Transocean's Deepwater Horizon, resulting in fire and multiple explosions. 11 people on the rig died. The billion dollar Deepwater Horizon sank. 4.9 M gallons of product flowed from the well for 87 days creating an environmental nightmare for communities bordering on the Gulf of Mexico. BP established a $20 B reserve to pay for damages. Investigations and legal culpability continue to this day. In September 2010, the Institute for Nuclear Power Operators (INPO) issued Significant Operating Experience Report (SOER) 10-2, Engaged, Thinking Organizations. The industry had experienced 11 events, 9 in US commercial nuclear utilities, and 2 international, that had disturbing trends. The underlying causes highlighted by INPO were inadequate recognition of risk, weaknesses in application of significant operating experience, tolerance of equipment and personnel problems, and a significant drift in standards. While the noted INPO problems and the Deepwater Horizon event appear to have nothing in common, they do exhibit similarities in a drift away from expected behavior on the part of front line workers and their supervisors. At the same time, hidden hazards are accumulating in the environment leading to error intolerant conditions. Without a good understanding of this concept, many organizations tend to focus on the person who 'touched it last', while missing the deeper organizational factors that led that individual to think that what they were doing was correct. An understanding of this failure model is important in reconstruction of events and crafting effective corrective actions. It is much more important, however, for leaders in high hazard industries to recognize when they are approaching error intolerant conditions and take steps immediately to add safety margin. (authors)

02 PETROLEUM↗

International Perspective on the Application of Non-Destructive Assay Technology Platforms for Sentencing and Disposal of Radioactive Waste - 12113

Over the past decade, major technology improvements have been introduced in the field of Non-Destructive Assay (NDA) for the management and disposal of radioactive waste in compliance with an evolving regulatory structure. For example in the United States, various NDA technologies have been successfully developed to meet the stringent characterization requirements of the Department of Energy. The use of this instrumentation, combined with the compliant operational processes and expertise levels that have emerged in parallel, have enabled over 75,000 m{sup 3} (or in excess of 145,000 containers) of contact and remote handled transuranic (TRU) waste to be sentenced to date to the Waste Isolation Pilot Plant from 10 different consignor sites. Many of these techniques have applicability that transcends national borders and can be used for common characterization challenges in waste sentencing and disposal on an international basis. Applicable waste streams could include LLW, ILW, TRU and HLW. There are specific design aspects of assay equipment that must be tailored to meet the applicable regulatory requirements for detection and quantification of a set of nuclides of interest to a prescribed limit of detection and measurement uncertainty. Each host nation will have specific challenges in the form of matrix types and processes, availability of historical information, needs for portable versus fixed instruments and the requirement to measure all containers versus assay of a representative sample. Furthermore, the practice of load management (combining smaller packages into a larger package designed to meet the overall waste acceptance criteria for the bulk container) may not have universal acceptability. An evaluation has been performed on a sample of the most successful technologies that have recently emerged to understand their applicability in other countries. Two types of instrumentation 'suite' are considered for measurements on drums and larger boxes / crates: (i) High Efficiency Neutron Coincidence counting combined with gamma isotopic analysis (e.g. the SuperHENC), and (ii) Portable NDA using neutron slab counters and far field high resolution gamma spectroscopy. Target countries (outside the United States) for these applications are: China, Japan, UK, Sweden and Canada. Specific challenges in each country are addressed and the applicability of the technologies as 'universal platforms' is considered. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

OSRP Source Repatriations-Case Studies: Brazil, Ecuador, Uruguay

The Global Threat Reduction Initiative's (GTRI) Offsite Source Recovery Project (OSRP) began recovering excess and unwanted radioactive sealed sources (sources) in 1999. As of February 2012, the project had recovered over 30,000 sources totaling over 820,000 Ci. OSRP grew out of early efforts at Los Alamos National Laboratory (LANL) to recover disused excess Plutonium- 239 (Pu-239) sources that were distributed in the 1960's and 1970's under the Atoms for Peace Program. Source recovery was initially considered a waste management activity. However, after the 9/11 terrorist attacks, the interagency community began to recognize that excess and unwanted radioactive sealed sources pose a national security threat, particularly those that lack a disposition path. After OSRP's transfer to the U.S. National Nuclear Security Administration (NNSA) to be part of GTRI, its mission was expanded to include all disused sealed sources that might require national security consideration. Recognizing the transnational threat posed by porous borders and the ubiquitous nature of sources, GTRI/OSRP repatriates U.S. origin sources based on threat reduction prioritization criteria. For example, several recent challenging source repatriation missions have been conducted by GTRI/OSRP in South America. These include the repatriation of a significant amount of Cs-137 and other isotopes from Brazil; re-packaging of conditioned Ra-226 sources in Ecuador for future repatriation; and, multilateral cooperation in the consolidation and export of Canadian, US, and Indian Co-60/Cs-137 sources from Uruguay. In addition, cooperation with regulators and private source owners in other countries presents opportunities for GTRI/OSRP to exchange best practices for managing disused sources. These positive experiences often result in long-term cooperation and information sharing with key foreign counterparts. International source recovery operations are essential to the preservation of U.S. national security interests. They are also mutually beneficial for fostering positive relationships with other governments and private industry, and demonstrate that responsible end-of-life options are given to legacy U.S.-origin sources in other countries. GTRI/OSRP does not take back sources that have a viable path for commercial disposal. Most US origin sources were sold commercially and were not provided by the US government. Below is a synopsis of cooperative efforts with Brazil, Ecuador, and Uruguay. Bilateral and multilateral efforts have been successful in removing hundreds of U.S.origin sealed radioactive sources from Latin American countries to the U.S. As many disused sources remain in the region, and since repatriation is not always an option, GTRI will continue to work with those countries to ensure that these sources are stored securely for the long-term. Successful Latin America operations should serve as a model for other regional cooperation in the repatriation of sealed sources, encouraging other source exporting countries to implement similar programs. Securing and removing sources, both domestically and internationally, is crucial to strengthening the life-cycle management of radioactive sources worldwide. Such efforts not only prevent these materials from being used maliciously, but also address public health and safety concerns, and under-gird the IAEA Code of Conduct on the Safety and Security of Radioactive Sources. (authors)

07 ISOTOPE AND RADIATION SOURCES↗

Disposing of High-Level Radioactive Waste in Germany - A Note from the Licensing Authority - 12530

Following the national German consensus on the termination of utilisation of nuclear energy in the summer of 2011, the Federal and Laender Governments have declared their intention to work together on a national consensus on the disposal of radioactive waste as well. Projected in the early 1970's the Federal Government had started exploring the possibility to establish a repository for HLW at the Gorleben site in 1977. However, there is still no repository available in Germany today. The delay results mainly from the national conflict over the suitability of the designated Gorleben site, considerably disrupting German society along the crevice that runs between supporters and opponents of nuclear energy. The Gorleben salt dome is situated in Lower Saxony, the German state that also hosts the infamous Asse mine repository for LLW and ILW and the Konrad repository project designated to receive LLW and ILW as well. With the fourth German project, the Morsleben L/ILW repository only 20 km away across the state border, the state of Lower Saxony carries the main load for the disposal of radioactive waste in Germany. After more than 25 years of exploration and a 10 year moratorium the Gorleben project has now reached a cross-road. Current plans for setting up a new site selection procedure in Germany call for the selection and exploration of up to four alternative sites, depending only on suitable geology. In the meantime the discussion is still open on whether the Gorleben project should be terminated in order to pacify the societal conflict or being kept in the selection process on account of its promising geology. The Lower Saxony Ministry for Environment and Climate Protection proposes to follow a twelve-step-program for finding the appropriate site, including the Gorleben site in the process. With its long history of exploration the site is the benchmark that alternative sites will have to compare with. Following the national consensus of 2011 on the termination of nuclear energy utilisation, it is now the time to reach a national consensus on the disposal of radioactive waste as well. This is a task that the country and society, federal and state governments, political parties and the citizens will have to jointly master within the current generation and within German territory. The basis for the consensus will be a reset to the beginning of this process. It has to start with a new site selection procedure that will take into account and compare up to four alternative sites. This procedure will have to follow the principle of highest possible security. It should be based on a stepwise approach, strictly following scientific criteria. Public confidence in the process and trust can only be achieved by a transparent procedure allowing for the participation of the public and the stakeholders. It is therefore mandatory to consult, both on a national and regional level, all involved parties (public authority, scientist and citizen). The national consensus must also include a decision on the future of the Gorleben exploratory site. The site selection procedure must therefore take this site into account as well. Furthermore, the final decision on safe disposal of German radioactive wastes must be made by sovereign rule by Federal Parliament and Federal Council. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗