Search NASA⌕ Search

SEARCH · Search NASA

Results for “projects”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,279 records · Page 71

The implications of uncertain renewable resource potentials for global wind and solar electricity projections

Studies exploring long-term energy system transitions rely on resource cost-supply curves derived from estimates of renewable energy (RE) potentials to generate wind and solar power projections. However, estimates of RE potentials are characterized by large uncertainties stemming from methodological assumptions that vary across studies, including factors such as the suitability of land and the performance and configuration of technology. Based on a synthesis of modeling approaches and parameter values used in prior studies, we explore the implications of these uncertain assumptions for onshore wind and solar photovoltaic electricity generation projections globally using the Global Change Analysis Model. We show that variability in parametric assumptions related to land use (e.g. land suitability) are responsible for the most substantial uncertainty in both wind and solar generation projections. Additionally, assumptions about the average turbine installation density and turbine technology are responsible for substantial uncertainty in wind generation projections. Under scenarios that account for climate impacts on wind and solar energy, we find that these parametric uncertainties are far more significant than those emerging from differences in climate models and scenarios in a global assessment, but uncertainty surrounding climate impacts (across models and scenarios) have significant effects regionally, especially for wind. Our analysis suggests the need for studies focusing on long-term energy system transitions to account for this uncertainty.

14 SOLAR ENERGY↗

Sparse matrix transform for fast projection to reduced dimension

We investigate three algorithms that use the sparse matrix transform (SMT) to produce variance-maximizing linear projections to a lower-dimensional space. The SMT expresses the projection as a sequence of Givens rotations and this enables computationally efficient implementation of the projection operator. The baseline algorithm uses the SMT to directly approximate the optimal solution that is given by principal components analysis (PCA). A variant of the baseline begins with a standard SMT solution, but prunes the sequence of Givens rotations to only include those that contribute to the variance maximization. Finally, a simpler and faster third algorithm is introduced; this also estimates the projection operator with a sequence of Givens rotations, but in this case, the rotations are chosen to optimize a criterion that more directly expresses the dimension reduction criterion.

97 MATHEMATICS AND COMPUTING↗

Field Quality Measurement of a 4.2-m-Long Prototype Low- $\beta$ Nb $_3$ Sn Quadrupole Magnet During the Assembly Stage for the High-Luminosity LHC Accelerator Upgrade Project

The U.S. High-Luminosity LHC Accelerator Upgrade Project, in collaboration with CERN, is developing Nb 3 Sn quadrupole magnets (MQXFA) to be installed at the interaction region of the LHC. The project will deliver 20 MQXFA magnets in 10 cold masses. These magnets need to meet the stringent requirements on field quality at the nominal operating current. Compared to the mature NbTi accelerator magnet technology, achieving excellent field quality can be challenging for Nb 3 Sn magnets. To help track, understand, and allow effective correction of geometric field errors, field quality measurements at room temperature during the MQXFA assembly stage was planned for the project. The measurements also intend to evaluate the magnetic axis and twist angle along the magnet aperture. We report the first measurement on a prototype MQXFA magnet using a recently developed measurement system. The magnetic axis and twist angle met the acceptance criteria. Further development needs for the room-temperature measurements were discussed. Here, we expect that statistics obtained from such measurements throughout the project will provide insight into future applications of high-performance Nb 3 Sn accelerator magnets.

43 PARTICLE ACCELERATORS↗

CMIP6-based Multi-model Hydroclimate Projection over the Conterminous US, Version 1.1

This dataset presents a suite of high-resolution downscaled hydro-climate projections over the conterminous United States (CONUS) based on multiple selected Global Climate Models (GCMs) from the Coupled Models Intercomparison Project phase 6 (CMIP6). The CMIP6 GCMs are downscaled using either statistical (DBCCA) or dynamical (RegCM) downscaling approaches based on two meteorological reference datasets (Daymet and Livneh). Subsequently, the downscaled precipitation, temperature, and wind speed are employed to drive two calibrated hydrologic models (VIC and PRMS), enabling the simulation of projected future hydrologic responses across the CONUS. Each ensemble member covers the 1980-2019 baseline and 2020-2059 near-future periods under the high-end (SSP585) emission scenario. Moreover, utilizing only DBCCA and Daymet, the projections are further extended to the 2060-2099 far-future period and across three additional emission scenarios (SSP370, SSP245, and SSP126). This dataset is formulated to support the SECURE Water Act Section 9505 Assessment for the US Department of Energy (DOE) Water Power Technologies Office (WPTO). For further details on this dataset, please refer to Kao et al. (2022) and Rastogi et al. (2022).

13 HYDRO ENERGY↗

CMIP6-based Multi-model Streamflow Projections over the Conterminous US, Version 1.1

This dataset presents an ensemble of streamflow projections covering the conterminous United States (CONUS), developed to support the SECURE Water Act Section 9505 Assessment for the US Department of Energy (DOE) Water Power Technologies Office (WPTO). Multiple Coupled Models Intercomparison Project phase 6 (CMIP6) Global Climate Models (GCMs) were downscaled using either statistical (DBCCA) or dynamical (RegCM) downscaling methods, based on two meteorological reference datasets (Daymet and Livneh). Subsequently, the downscaled precipitation, temperature, and wind speed data were used to drive two calibrated hydrologic models (VIC and PRMS), with total runoff routed through the Routing Application for Parallel computatIon of Discharge (RAPID) routing model, producing an ensemble of streamflow projections across 2.7 million NHDPlusV2 stream reaches across the CONUS. Each ensemble member covers the 1980-2019 baseline and 2020-2059 near-future periods under the high-end (SSP585) emission scenario. Additionally, using only DBCCA and Daymet, the projections extend to the 2060-2099 far-future period and encompass three additional emission scenarios (SSP370, SSP245, and SSP126). This dataset is designed to support the SECURE Water Act Section 9505 Assessment for the US Department of Energy (DOE) Water Power Technologies Office (WPTO). For further details, refer to Kao et al. (2022), Rastogi et al. (2022), and Ghimire et al. (2023).

13 HYDRO ENERGY↗

Geothermal Project Database Supporting Barriers and Viability Analysis for Development by 2020 Timeline

This data provides the underlying project-level analysis and data sources complied in response to the DOE request to determine the amount of geothermal capacity that could be available to meet the President's request to double renewable energy capacity by 2020. The enclosed data contains compiled data on individual project names and locations (by geothermal area and region), ownership, estimated nameplate capacity, and project status, and also contains inferred data on the barriers and viability of the project to meet a 2020 development timeline. The analysis of this data is discussed in the attached NREL report.

15 GEOTHERMAL ENERGY↗

How Do The EV Project Participants Feel about Charging Their EV at Home?

Key Observations from the Survey of the EV Project Participants; In June 2013, 72% of EV Project participants were very satisfied with their home charging experience; 21% of participants relied totally on home charging for all of their charging needs; Volt owners relied more on home charging than Leaf owners, who reported more use of away-from-home charging; 74% of participants reported that they plug in their plug-in electric vehicle (PEV) every time they park at home. Others plugged in as they determined necessary to support their driving needs; 40% of participants reported that they would not have or are unsure that in June 2013 whether they would have purchased an alternating current (AC) Level 2 electric vehicle supply equipment (EVSE) for home charging if it had not been provided by The EV Project; and 61% of participants reported that The EV Project incentive was very important or important in their decision to obtain a PEV.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Cost Projections for Utility-Scale Battery Storage

In this work we document the development of cost and performance projections for utility-scale lithium-ion battery systems, with a focus on 4-hour duration systems. The projections are developed from an analysis of over 25 publications that consider utility-scale storage costs. The suite of publications demonstrates varied cost reduction for battery storage over time. Figure ES-1 shows the low, mid, and high cost projections developed in this work (on a normalized basis) relative to the published values. Figure ES-2 shows the overall capital cost for a 4-hour battery system based on those projections, with storage costs of 124 dollars/kWh, 207 dollars/kWh, and 338 dollars/kWh in 2030 and 76 dollars/kWh, 156 dollars/kWh, and 258 dollars/kWh in 2050. Battery variable operations and maintenance costs, lifetimes, and efficiencies are also discussed, with recommended values selected based on the publications surveyed.

25 ENERGY STORAGE↗

The Verification and Validation Strategy Within the Second Wind Forecast Improvement Project (WFIP 2)

The Wind Forecast Improvement Project 2 (WFIP2), in the complex terrain of the Columbia Gorge, focuses on a set of weather phenomena that poses particular challenges for wind and wind power forecasting. It further aims to understand and improve the skill of weather forecast models, particularly the National Oceanic and Atmospheric Administration's (NOAA's) High Resolution Rapid Refresh (HRRR), in complex terrain. The project also includes an extensive field campaign in the Columbia River Gorge, during which data from many different instruments were collected. WFIP2 is funded by the U.S. Department of Energy (DOE). Scientists from four U.S. national laboratories, NOAA, Vaisala, and universities contribute to the project with wide and varied interests and skill sets. Therefore, coordinated verification & validation (V&V) efforts across these members allows for the development of a clear picture of model improvements and scientific findings within WFIP2. The WFIP2 V&V team is tasked with providing tools, methods, and guidance to enable repeatable, metrics-based assessment of the Weather Research and Forecasting (WRF) model and associated modeling suites for analysis and forecasting of mesoscale weather phenomena that are important for wind energy in the Columbia River Gorge and other parts of the continental United States. This report summarizes what has been worked on and accomplished within the duration of the WFIP2 project, 4 years, by the V&V team.

17 WIND ENERGY↗

Cost Projections for Utility-Scale Battery Storage (2020 Update)

In this work we describe the development of cost and performance projections for utility-scale lithium-ion battery systems, with a focus on 4-hour duration systems. The projections are developed from an analysis of 19 publications that consider utility-scale storage costs. The suite of publications demonstrates varied cost reductions for battery storage over time. Figure ES-1 shows the low, mid, and high cost projections developed in this work (on a normalized basis) relative to the published values. Figure ES-2 shows the overall capital cost for a 4-hour battery system based on those projections, with storage costs of $\$$144/kWh, $\$$208/kWh, and $\$$293/kWh in 2030 and $\$$88/kWh, $\$$156/kWh, and $\$$219/kWh in 2050. Battery variable operations and maintenance costs, lifetimes, and efficiencies are also discussed, with recommended values selected based on the publications surveyed.

14 SOLAR ENERGY↗

Cost Projections for Utility-Scale Battery Storage: 2021 Update

In this work we describe the development of cost and performance projections for utility-scale lithium-ion battery systems, with a focus on 4-hour duration systems. The projections are developed from an analysis of recent publications that consider utility-scale storage costs. The suite of publications demonstrates varied cost reductions for battery storage over time. Figure ES-1 shows the low, mid, and high cost projections developed in this work (on a normalized basis) relative to the published values. Figure ES-2 shows the overall capital cost for a 4-hour battery system based on those projections, with storage costs of $\$$143/kWh, $\$$198/kWh, and $\$$248/kWh in 2030 and $\$$87/kWh, $\$$149/kWh, and $\$$248/kWh in 2050. Battery variable operations and maintenance costs, lifetimes, and efficiencies are also discussed, with recommended values selected based on the publications surveyed.

25 ENERGY STORAGE↗

The 300 Area Integrated Field Research Challenge Quality Assurance Project Plan

Pacific Northwest National Laboratory and a group of expert collaborators are using the U.S. Department of Energy Hanford Site 300 Area uranium plume within the footprint of the 300-FF-5 groundwater operable unit as a site for an Integrated Field-Scale Subsurface Research Challenge (IFRC). The IFRC is entitled Multi-Scale Mass Transfer Processes Controlling Natural Attenuation and Engineered Remediation: An IFRC Focused on the Hanford Site 300 Area Uranium Plume Project. The theme is investigation of multi-scale mass transfer processes. A series of forefront science questions on mass transfer are posed for research that relate to the effect of spatial heterogeneities; the importance of scale; coupled interactions between biogeochemical, hydrologic, and mass transfer processes; and measurements/approaches needed to characterize and model a mass transfer-dominated system. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the 300 Area IFRC Project. This plan is designed to be used exclusively by project staff.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

SAPHIRE 8 Software Project Plan

This project is being conducted at the request of the DOE and the NRC. The INL has been requested by the NRC to improve and maintain the Systems Analysis Programs for Hands-on Integrated Reliability Evaluation (SAPHIRE) tool set concurrent with the changing needs of the user community as well as staying current with new technologies. Successful completion will be upon NRC approved release of all software and accompanying documentation in a timely fashion. This project will enhance the SAPHIRE tool set for the user community (NRC, Nuclear Power Plant operations, Probabilistic Risk Analysis (PRA) model developers) by providing improved Common Cause Failure (CCF), External Events, Level 2, and Significance Determination Process (SDP) analysis capabilities. The SAPHIRE development team at the Idaho National Laboratory is responsible for successful completion of this project. The project is under the supervision of Curtis L. Smith, PhD, Technical Lead for the SAPHIRE application. All current capabilities from SAPHIRE version 7 will be maintained in SAPHIRE 8. The following additional capabilities will be incorporated: • Incorporation of SPAR models for the SDP interface. • Improved quality assurance activities for PRA calculations of SAPHIRE Version 8. • Continue the current activities for code maintenance, documentation, and user support for the code.

99 GENERAL AND MISCELLANEOUS↗

Decline in Seasonal Snow during a Projected 20-Year Dry Spell

Snowpack loss in midlatitude mountains is ubiquitously projected by Earth system models, though the magnitudes, persistence, and time horizons of decline vary. Using daily downscaled hydroclimate and snow projections, we examine changes in snow seasonality across the U.S. Pacific Southwest region during a simulated severe 20-year dry spell in the 21st century (2051–2070) developed as part of the 4th California Climate Change Assessment to provide a “stress test” for water resources. Across California’s mountains, substantial declines (30–100% loss) in median peak annual snow water equivalent accompany changes in snow seasonality throughout the region compared to the historic period. We find that 80% of historic seasonal snowpacks transition to ephemeral conditions. Subsetting empirical-statistical wildfire projections for California by snow seasonality transition regions indicates a two-to-four-fold increase in the area burned, consistent with recent observations of high elevation wildfires following extended drought conditions. By analyzing six of the major California snow-fed river systems, we demonstrate snowpack reductions and seasonality transitions result in concomitant declines in annual runoff (47–58% of historical values). The negative impacts to statewide water supply reliability by the projected dry spell will likely be magnified by changes in snowpack seasonality and increased wildfire activity.

54 ENVIRONMENTAL SCIENCES↗

Learning from project experiences using a legacy-based approach

As project teams become used more widely, the question of how to capitalize on the knowledge learned in project teams remains an open issue. Using previous research on shared cognition in groups, an approach to promoting post-project learning was developed. This Legacy Review concept was tested on four in tact project teams. The results from those test sessions were used to develop a model of team learning via group cognitive processes. The model and supporting propositions are presented.

knowledge reuse↗

Using Paleo-climate Comparisons to Constrain Future Projections in CMIP5

We present a description of the theoretical framework and best practice for using the paleo-climate model component of the Coupled Model Intercomparison Project (Phase 5) (CMIP5) to constrain future projections of climate using the same models. The constraints arise from measures of skill in hindcasting paleo-climate changes from the present over 3 periods: the Last Glacial Maximum (LGM) (21 thousand years before present, ka), the mid-Holocene (MH) (6 ka) and the Last Millennium (LM) (8501850 CE). The skill measures may be used to validate robust patterns of climate change across scenarios or to distinguish between models that have differing outcomes in future scenarios. We find that the multi-model ensemble of paleo-simulations is adequate for addressing at least some of these issues. For example, selected benchmarks for the LGM and MH are correlated to the rank of future projections of precipitationtemperature or sea ice extent to indicate that models that produce the best agreement with paleoclimate information give demonstrably different future results than the rest of the models. We also find that some comparisons, for instance associated with model variability, are strongly dependent on uncertain forcing timeseries, or show time dependent behaviour, making direct inferences for the future problematic. Overall, we demonstrate that there is a strong potential for the paleo-climate simulations to help inform the future projections and urge all the modeling groups to complete this subset of the CMIP5 runs.

paleoclimate↗

Uncertainty Assessment of the NASA Earth Exchange Global Daily Downscaled Climate Projections (NEX-GDDP) Dataset

The NASA Earth Exchange Global Daily Downscaled Projections (NEX-GDDP) dataset is comprised of downscaled climate projections that are derived from 21 General Circulation Model (GCM) runs conducted under the Coupled Model Intercomparison Project Phase 5 (CMIP5) and across two of the four greenhouse gas emissions scenarios (RCP4.5 and RCP8.5). Each of the climate projections includes daily maximum temperature, minimum temperature, and precipitation for the periods from 1950 through 2100 and the spatial resolution is 0.25 degrees (approximately 25 km x 25 km). The GDDP dataset has received warm welcome from the science community in conducting studies of climate change impacts at local to regional scales, but a comprehensive evaluation of its uncertainties is still missing. In this study, we apply the Perfect Model Experiment framework (Dixon et al. 2016) to quantify the key sources of uncertainties from the observational baseline dataset, the downscaling algorithm, and some intrinsic assumptions (e.g., the stationary assumption) inherent to the statistical downscaling techniques. We developed a set of metrics to evaluate downscaling errors resulted from bias-correction ("quantile-mapping"), spatial disaggregation, as well as the temporal-spatial non-stationarity of climate variability. Our results highlight the spatial disaggregation (or interpolation) errors, which dominate the overall uncertainties of the GDDP dataset, especially over heterogeneous and complex terrains (e.g., mountains and coastal area). In comparison, the temporal errors in the GDDP dataset tend to be more constrained. Our results also indicate that the downscaled daily precipitation also has relatively larger uncertainties than the temperature fields, reflecting the rather stochastic nature of precipitation in space. Therefore, our results provide insights in improving statistical downscaling algorithms and products in the future.

climate projection↗