Search NASA⌕ Search

SEARCH · Search NASA

Results for “Accelerator Design, Technology, Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,297 records · Page 72

First neutral beam injection experiments on KSTAR tokamak

The first neutral beam (NB) injection system of the Korea Superconducting Tokamak Advanced Research (KSTAR) tokamak was partially completed in 2010 with only 1/3 of its full design capability, and NB heating experiments were carried out during the 2010 KSTAR operation campaign. The ion source is composed of a JAEA bucket plasma generator and a KAERI large multi-aperture accelerator assembly, which is designed to deliver a 1.5 MW, NB power of deuterium at 95 keV. Before the beam injection experiments, discharge, and beam extraction characteristics of the ion source were investigated. The ion source has good beam optics in a broad range of beam perveance. The optimum perveance is 1.1-1.3 {mu}P, and the minimum beam divergence angle measured by the Doppler shift spectroscopy is 0.8 deg. The ion species ratio is D{sup +}:D{sub 2}{sup +}:D{sub 3}{sup +}= 75:20:5 at beam current density of 85 mA/cm{sup 2}. The arc efficiency is more than 1.0 A/kW. In the 2010 KSTAR campaign, a deuterium NB power of 0.7-1.5 MW was successfully injected into the KSTAR plasma with a beam energy of 70-90 keV. L-H transitions were observed within a wide range of beam powers relative to a threshold value. The edge pedestal formation in the T{sub i} and T{sub e} profiles was verified through CES and electron cyclotron emission diagnostics. In every deuterium NB injection, a burst of D-D neutrons was recorded, and increases in the ion temperature and plasma stored energy were found.

43 PARTICLE ACCELERATORS↗

CW/Pulsed H{sup −} ion beam generation with PKU Cs-free 2.45 GHz microwave driven ion source

Circular accelerators used for positron emission tomography (PET, i.e. accelerator used for make radio isotopes) need several mA of CW H- ion beam for their routine operation. Other facilities, like Space Radio-Environment Simulate Assembly (SPRESA), require less than 10 mA pulsed mode H{sup −} beam. Caesium free negative hydrogen ion source is a good choice for those facilities because of its compact structure, easy operation and low cost. Up to now, there is no H{sup −} source able to produce very intense H{sup −} beams with important variation of the duty factor{sup [1]}. Recently, a new version of 2.45 GHz microwave H{sup −} ion source was designed at PKU, based on lessons learnt from the previous one. This non cesiated source is very compact thanks to its permanent magnet configuration. Special attention was paid on the design of the discharge chamber structure, electron dumping and extraction system. Source test to produce H{sup −} ion beams in pulsed and CW mode was carried out on PKU ion source test bench. In CW mode, a 10.8 mA/30keV H{sup −} beam with rms emittance about 0.16 π·mm·mrad has been obtained with only 500 W rf power. The power efficiency reaches 21 mA/kW. In pulsed mode with duty factor of 10% (100Hz/1ms), this compact source can easily deliver 20 mA H{sup −} ion beam at 35 keV with rms emittance about 0.2 π·mm·mrad when RF power is set at 2.2 kW (peak power). Several hour successive running operation in both modes and totaling more than 200 hours proves its high quality. The outside dimension of this new H{sup −} source body is ϕ116 mm × 124 mm, and the entire H{sup −} source infrastructure, including rf matching section, plasma chamber and extraction system, is ϕ310 × 180 mm. The high voltage region is limited with in a ϕ310 mm × 230 mm diagram. Details are given in this paper.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Reactor Design and Decommissioning - An Overview of International Activities in Post Fukushima Era1 - 12396

Accidents at the Fukushima Dai-ichi reactors as a result of the devastating earthquake and tsunami of March 11, 2011 have not only dampened the nuclear renaissance but have also initiated a re-examination of the design and safety features for the existing and planned nuclear reactors. Even though failures of some of the key site features at Fukushima can be attributed to events that in the past would have been considered as beyond the design basis, the industry as well as the regulatory authorities are analyzing what features, especially passive features, should be designed into the new reactor designs to minimize the potential for catastrophic failures. It is also recognized that since the design of the Fukushima BWR reactors which were commissioned in 1971, many advanced safety features are now a part of the newer reactor designs. As the recovery efforts at the Fukushima site are still underway, decisions with respect to the dismantlement and decommissioning of the damaged reactors and structures have not yet been finalized. As it was with Three Mile Island, it could take several decades for dismantlement, decommissioning and clean up, and the project poses especially tough challenges. Near-term assessments have been issued by several organizations, including the IAEA, the USNRC and others. Results of such investigations will lead to additional improvements in system and site design measures including strengthening of the anti-tsunami defenses, more defense-in-depth features in reactor design, and better response planning and preparation involving reactor sites. The question also arises what would the effect be on the decommissioning scene worldwide, and what would the effect be on the new reactors when they are eventually retired and dismantled. This paper provides an overview of the US and international activities related to recovery and decommissioning including the decommissioning features in the reactor design process and examines these from a new perspective in the post Fukushima -accident era. Accidents at the Fukushima Daiichi reactors in the aftermath of the devastating earthquake and tsunami of March 11, 2011 have slowed down the nuclear renaissance world-wide and may have accelerated decommissioning either because some countries have decided to halt or reduce nuclear, or because the new safety requirements may reduce life-time extensions. Even in countries such as the UK and France that favor nuclear energy production existing nuclear sites are more likely to be chosen as sites for future NPPs. Even as the site recovery efforts continue at Fukushima and any decommissioning decisions are farther into the future, the accidents have focused attention on the reactor designs in general and specifically on the Fukushima type BWRs. The regulatory authorities in many countries have initiated a re-examination of the design of the systems, structures and components and considerations of the capability of the station to cope with beyond-design basis events. Enhancements to SSCs and site features for the existing reactors and the reactors that will be built will also impact the decommissioning phase activities. The newer reactor designs of today not only have enhanced safety features but also take into consideration the features that will facilitate future decommissioning. Lessons learned from past management and operation of reactors as well as the lessons from decommissioning are incorporated into the new designs. However, in the post-Fukushima era, the emphasis on beyond-design-basis capability may lead to significant changes in SSCs, which eventually will also have impact on the decommissioning phase. Additionally, where some countries decide to phase out the nuclear power, many reactors may enter the decommissioning phase in the coming decade. While the formal updating and expanding of existing guidance documents for accident cleanup and decommissioning would benefit by waiting until the Fukushima project has progressed sufficiently for that experience to be reliably interpreted, the development of structured on-line sharing of information and especially the creation of an on-line compendium of methods, tools, and techniques by which damaged fuel and other unique situations have been addressed can be addressed sooner and maintained as new problems and solutions arise and are resolved. The IAEA's new 'WEB 2.0 tool' CONNECT is expected to play a significant role in this and related information-sharing activities. The trend in some countries such as the United States has been to re-license the existing reactors for additional twenty years, beyond the original design life. Given the advances in technology over the past four decades, and considering that the newer designs incorporate significant improvements in safety systems, it may not be economical or technically feasible to retrofit enhancements into some of the older reactors. In such cases, the reactors may be retired from service and decommissioned. Overall, the energy demand in the world continues to rise, with sharp increases in the Asian countries, and nuclear power's role in the world's energy supply is expected to continue. Events at Fukushima have led to a re-examination on many fronts, including reactor design and regulatory requirements. Further changes may occur in these areas in the post-Fukushima era. These changes in turn will also impact the world-wide decommissioning scene and the decommissioning phase of the future reactors. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Dynamic modeling and transient studies of a solid-sorbent adsorber for CO{sub 2} capture

The U.S. Department of Energy’s Carbon Capture Simulation Initiative (CCSI) is dedicated to accelerating the commercialization of carbon capture technologies from discovery to development, demonstration, and ultimately the widespread deployment to hundreds of power plants. In this multi-lab initiative in partnership with academic and industrial institutions, the National Energy Technology Laboratory (NETL) leads the development of a multi-scale modeling and simulation toolset for rapid evaluation and deployment of carbon capture systems. One element of the CCSI is focused on optimizing the operation and control of carbon capture systems since this can have a significant impact on the extent and the rate at which commercial-scale capture processes will be scaled-up, deployed, and used in the years to come. Capture processes must be capable of operating over a wide range of transient events, malfunctions, and disturbances, as well as under uncertainties. As part of this work, dynamic simulation and control models, methods, and tools are being developed for CO{sub 2} capture and compression processes and their integration with a baseline commercial-scale supercritical pulverized coal (SCPC) power plant. Solid-sorbent-based post-combustion capture technology was chosen as the first industry challenge problem for CCSI because significant work remains to define and optimize the reactors and processes needed for successful sorbent capture systems. Sorbents offer an advantage because they can reduce the regeneration energy associated with CO{sub 2} capture, thus reducing the parasitic load. In view of this, the current paper focuses on development of a dynamic model of a solid-sorbent CO{sub 2} adsorber-reactor and an analysis of its transient performance with respect to several typical process disturbances. A one-dimensional, non-isothermal, pressure-driven dynamic model of a two-stage bubbling fluidized bed (BFB) adsorber-reactor is developed in Aspen Custom Modeler (ACM). The BFB stages are of overflow-type configuration where the solids leave the stage by flowing over the overflow-weir. Each bed is divided into three regions, namely emulsion, bubble, and cloud-wake regions. In all three regions, the model considers mass and energy balances. Along with the models of the BFB stages, models of other associated hardware are developed and integrated in a single flowsheet. A valid pressure-flow network is developed and a lower-level control system is designed so that the overall CO{sub 2} capture can be maintained at a desired level in face of the typical disturbances. The dynamic model is used for studying the transient responses of a number of important process variables as a result of the disturbances that are typical of post-combustion CO{sub 2} capture processes.

20 FOSSIL-FUELED POWER PLANTS↗

TREATABILITY TEST REPORT FOR THE REMOVAL OF CHROMIUM FROM GROUNDWATER AT 100-D AREA USING ELECTROCOAGULATION

The U.S. Department of Energy (DOE) has committed to accelerate cleanup of contaminated groundwater along the Columbia River. The current treatment approach was driven by a series of Interim Action Records of Decision (IAROD) issued in the mid-1990s. Part of the approach for acceleration involves increasing the rate of groundwater extraction for the chromium plume north of the 100-D Reactor and injecting the treated water in strategic locations to hydraulically direct contaminated groundwater toward the extraction wells. The current treatment system uses ion exchange for Cr(VI) removal, with off-site regeneration of the ion exchange resins. Higher flow rates will increase the cost and frequency of ion exchange resin regeneration; therefore, alternative technologies are being considered for treatment at high flow rates. One of these technologies, electrocoagulation (EC), was evaluated through a pilot-scale treatability test. The primary purpose of the treatability study was to determine the effectiveness of Cr(VI) removal and the robustness/implementability of an EC system. Secondary purposes of the study were to gather information about derivative wastes and to obtain data applicable to scaling the process from the treatability scale to full-scale. The treatability study work plan identified a performance objective and four operational objectives. The performance objective for the treatability study was to determine the efficiency (effectiveness) of hexavalent chromium removal from the groundwater, with a desired concentration of {le} 20 micrograms per liter ({micro}g/L) Cr(VI) in the effluent prior to re-injection. Influent and effluent total chromium and hexavalent chromium data were collected using a field test kit for multiple samples per week, and from off-site laboratory analysis of samples collected approximately monthly. These data met all data quality requirements. Two of three effluent chromium samples analyzed in the off-site (that is, fixed) laboratory met the performance objective during the continuous operational testing. Effluent hexavalent chromium analyzed by the field laboratory met the performance goal in over 90 percent of the samples. All effluent hexavalent chromium samples during the batch testing with high influent hexavalent chromium concentrations ({approx}2000 {micro}g/L) met the performance objective. Although the EC system was able to meet the performance goal, it must be noted that it was not uncommon for the system to be operated in recycle mode to achieve the performance goal. The EC unit was sometimes, but not always, capable of a single pass treatment efficiency high enough to meet the performance goal, and recycling water for multiple treatment passes was effective. An operational objective was to determine the volume and composition of the waste streams to enable proper waste designation. The toxicity characteristic leaching procedure (TCLP) concentrations, pH, and free liquids were determined for solid material from the EC electrodes (mechanically removed scale), the filter press, and the tank bottoms for the effluent and waste collector tanks. These data met all data quality requirements. All solid-phase secondary waste streams were found to be below the TCLP limits for the toxicity characteristic, and a pH value within the limits for the corrosivity characteristic. Out of three samples, two (one of scale from the EC unit and one from filter press solids) failed the free liquid (paint filter) test, which is one of the acceptability criteria for Hanford's Environmental Restoration Disposal Facility (ERDF). The solid-phase waste generation rate was about 0.65-gallon of solid waste per 100 gallons of water treated. It is concluded that the solid-phase secondary waste generated from this technology under the conditions at the test site will meet the toxicity and corrosivity criteria for disposal. It is also concluded that with engineering and/or operational improvements, a solid-phase secondary waste could be produced that would meet the free liquid disposal requirements. The second operational objective was to assess the operational reliability and safety of the system. For the continuous operations testing period from July 23 to September 12,2007, the system was not able to operate unattended. An extensive period of startup and adjustment preceded continuous operations, but was unsuccessful in providing a suitable and robust operating condition. Primary operational reliability problems were related to the sensitivity of the solid separation process to operational conditions such that a robust operating procedure (for example, chemical dosage) was not identified during the treatability test. Poor solids separation and high effluent iron concentrations also led to operational difficulties associated with injection well fouling.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

AVESTAR Center for Operational Excellence of Electricity Generation Plants

To address industry challenges in attaining operational excellence for electricity generation plants, the U.S. Department of Energy’s (DOE) National Energy Technology Laboratory (NETL) has launched a world-class facility for Advanced Virtual Energy Simulation Training and Research (AVESTARTM). This presentation will highlight the AVESTARTM Center simulators, facilities, and comprehensive training, education, and research programs focused on the operation and control of high-efficiency, near-zero-emission electricity generation plants. The AVESTAR Center brings together state-of-the-art, real-time, high-fidelity dynamic simulators with full-scope operator training systems (OTSs) and 3D virtual immersive training systems (ITSs) into an integrated energy plant and control room environment. AVESTAR’s initial offering combines--for the first time--a “gasification with CO2 capture” process simulator with a “combined-cycle” power simulator together in a single OTS/ITS solution for an integrated gasification combined cycle (IGCC) power plant with carbon dioxide (CO2) capture. IGCC systems are an attractive technology option for power generation, especially when capturing and storing CO2 is necessary to satisfy emission targets. The AVESTAR training program offers a variety of courses that merge classroom learning, simulator-based OTS learning in a control-room operations environment, and immersive learning in the interactive 3D virtual plant environment or ITS. All of the courses introduce trainees to base-load plant operation, control, startups, and shutdowns. Advanced courses require participants to become familiar with coordinated control, fuel switching, power-demand load shedding, and load following, as well as to problem solve equipment and process malfunctions. Designed to ensure work force development, training is offered for control room and plant field operators, as well as engineers and managers. Such comprehensive simulator-based instruction allows for realistic training without compromising worker, equipment, and environmental safety. It also better prepares operators and engineers to manage the plant closer to economic constraints while minimizing or avoiding the impact of any potentially harmful, wasteful, or inefficient events. The AVESTAR Center is also used to augment graduate and undergraduate engineering education in the areas of process simulation, dynamics, control, and safety. Students and researchers gain hands-on simulator-based training experience and learn how the commercial-scale power plants respond dynamically to changes in manipulated inputs, such as coal feed flow rate and power demand. Students also analyze how the regulatory control system impacts power plant performance and stability. In addition, students practice start-up, shutdown, and malfunction scenarios. The 3D virtual ITSs are used for plant familiarization, walk-through, equipment animations, and safety scenarios. To further leverage the AVESTAR facilities and simulators, NETL and its university partners are pursuing an innovative and collaborative R&D program. In the area of process control, AVESTAR researchers are developing enhanced strategies for regulatory control and coordinated plant-wide control, including gasifier and gas turbine lead, as well as advanced process control using model predictive control (MPC) techniques. Other AVESTAR R&D focus areas include high-fidelity equipment modeling using partial differential equations, dynamic reduced order modeling, optimal sensor placement, 3D virtual plant simulation, and modern grid. NETL and its partners plan to continue building the AVESTAR portfolio of dynamic simulators, immersive training systems, and advanced research capabilities to satisfy industry’s growing need for training and experience with the operation and control of clean energy plants. Future dynamic simulators under development include natural gas combined cycle (NGCC) and supercritical pulverized coal (SCPC) plants with post-combustion CO2 capture. These dynamic simulators are targeted for use in establishing a Virtual Carbon Capture Center (VCCC), similar in concept to the DOE’s National Carbon Capture Center for slipstream testing. The VCCC will enable developers of CO2 capture technologies to integrate, test, and optimize the operation of their dynamic capture models within the context of baseline power plant dynamic models. The objective is to provide hands-on, simulator-based “learn-by-operating” test platforms to accelerate the scale-up and deployment of CO2 capture technologies. Future AVESTAR plans also include pursuing R&D on the dynamics, operation, and control of integrated electricity generation and storage systems for the modern grid era. Special emphasis will be given to combining load-following energy plants with renewable and distributed generating supplies and fast-ramping energy storage systems to provide near constant baseload power.

97 MATHEMATICS AND COMPUTING↗

The ALICE Transition Radiation Detector: Construction, operation, and performance

The Transition Radiation Detector (TRD) was designed and built to enhance the capabilities of the ALICE detector at the Large Hadron Collider (LHC). While aimed at providing electron identification and triggering, the TRD also contributes significantly to the track reconstruction and calibration in the central barrel of ALICE. In this article, the design, construction, operation, and performance of this detector are discussed. A pion rejection factor of up to 410 is achieved at a momentum of 1 GeV/c in p-Pb collisions and the resolution at high transverse momentum improves by about 40% when including the TRD information in track reconstruction. The triggering capability is demonstrated both for jet, light nuclei, and electron selection.

43 PARTICLE ACCELERATORS↗

U.S. Fusion D-Li Neutron Irradiation Facility: Fusion Prototypic Neutron Source (FPNS) Technology Study

A primary engineering challenge for the realization of fusion energy involves the development of high-performance structural and plasma-facing materials with dimensional stability and resistance to neutron degradation of mechanical properties. The harsh fusion environment, including high levels of helium production and other transmutation products along with high operating temperatures, poses an extreme challenge for materials. Identifying materials that can withstand these conditions is a high priority for fusion energy research. Critical to resolving this gap in scientific understanding is developing a neutron source facility with the ability to mimic the extreme conditions in a fusion reactor. Working with the Department of Energy (DOE) Office of Fusion Energy Sciences (FES), Oak Ridge National Laboratory (ORNL) and the Virtual Laboratory for Technology (VLT) organized a workshop to discuss the need for a Fusion Prototypic Neutron Source (FPNS). [1] While there are a variety of uses for FPNS neutrons, the main driver of US interest is expanding the scientific understanding of materials degradation in the deuterium-tritium (D-T) fusion environment. FPNS will help build the scientific foundation required to enable design of a next step fusion device. Using specifications from previous projects as a guide, key parameters were agreed upon for a near term, moderate cost US facility that would be complementary to the more extensive plans of the International Fusion Materials Irradiation Facility (IFMIF). Types of facilities that could potentially meet those criteria were identified. A scoping study for three technologies was initiated to answer three critical questions: 1) Can the concept meet the key parameters, 2) What is the estimated cost, and 3) What is the estimated schedule. One approach selected for the scoping study is a D-Li stripping source similar to the design of the IFMIF but at a lower beam power and atomic displacement rate for cost and schedule reasons. The purpose of this report is to document the results of the D-Li stripping source option study, providing answers to the three questions. The approach to generating a fusion prototypic neutron source using a deuteron beam incident on a flowing lithium target has been studied for more than 40 years. As a result of the research and development recently executed primarily in Europe and Japan, the ability of this approach to meet key parameters (damage parameters, irradiation volume) outlined in the US workshop for a near-term, moderate cost fusion prototypic neutron source facility is not in doubt. The main question that must be answered is the cost of such a facility. As a result, a strong focus was placed on understanding alternatives for developing the facility and their relative costs. The project was broken into four components for the cost estimate: the ion source, accelerator, lithium target system, and conventional facilities. The cost of the accelerator is an important cost driver for the D-Li stripping concept. To fully understand the range of the accelerator cost, multiple alternatives were considered including normal conducting and superconducting linacs and the frequency of the radiofrequency quadrupole. Multiple previous design studies dating from 1989 through 2017 were examined (costs were escalated to 2019 dollars) and compared. After analysis, two options were selected for costing, one superconducting and one room temperature. We found similar project costs for the two accelerator options, on the order of $100M including design and project management but excluding contingency. Including everything except the conventional facilities, the estimate for the neutron source facility is estimated to be $220M without contingency. Additional significant costs for the facility are the conventional costs arising from the need to construct buildings for the accelerator and target facilities, bringing electrical power to the site including a new substation, and removing the heat from the facility using heat exchangers. While ORNL would oversee this work, much of the effort would be executed by contractors. Estimates for this effort was based on similar projects that are currently being executed at ORNL or were executed at ORNL in the recent past. The estimate for conventional facilities for the neutron facility is $173M without contingency, bringing the total project cost to $393M without contingency. With a 50% contingency, the estimated cost is $589M. The estimate range was established using guidance from the Association for the Advancement of Cost Engineering (AACE). Specifically, guidance from recommended practice 17R-97 provides insight on the expected accuracy range of estimates based on the degree of project definition and the position of the project in the stage-gate process or maturity timeline. An AACE Class 5 type estimate is appropriate for concept screening. The expected accuracy range includes a low end of -50% to -20% and a high end of +30% to +100% around the estimated cost. For the D-Li stripping neutron source, a -20% to +100% cost range was applied for a recommended cost range of $471M to $1,179M. Less emphasis was placed on determining the project schedule due to the fact that the project costs were large and may eliminate this option from consideration. The development of the accelerator facility may require on the order of five years without contingency. A more realistic schedule with contingency may be seven years. However, this estimate should be scrutinized in a preconceptual design activity if a more realistic estimate is needed. Finally, one lesson learned in this process is that the requirements for a near-term, moderate cost facility drives the alternative selection toward existing facilities and infrastructure. The D-Li stripping neutron source option requires a green field site due to the lack of existing buildings and infrastructure that can be reused for this effort. As a result, the conventional facilities costs are a significant fraction of the total facility cost. Other neutron source options where buildings, electrical power, and cooling infrastructure already exist may be able to meet the requirements for a near term, moderate cost facility.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Smart Composite Pressure Vessels (SCPV) with Integrated Health Monitoring

The U.S. Department of Energy (DOE) is promoting and developing more energy efficient and environmentally friendly technologies that will enable America to use less petroleum. Hydrogen fuel cells – which directly convert the chemical energy in hydrogen to electricity with only water and heat as byproducts – are a very attractive solution that can enable this to happen. To date, DOE's efforts have culminated in commercial demonstration of on-board vehicular hydrogen storage systems that can allow for a driving range of greater than 300 miles. This requires storing 5 Kgs of hydrogen onboard a light vehicle. In order to store this quantity of hydrogen, the hydrogen gas needs to be stored in a composite overwrapped pressure vessel (COPV) at a very high internal pressure. The objective of the program was to demonstrate continuous and predictable health-monitoring of composite pressure vessels. A higher confidence in the operational safety of the vessels will lead to reduced burst factor of safety imposed by regulatory standards and hence will help reduce the structural wall thickness that drives the cost of the vessel. Highly optimized Type III (metal lined) and Type IV (polymer lined) COPVs that are manufactured using filament winding process have been designed and qualified for the above mentioned application. However, the main structural component of the COPVs is carbon fiber and the high cost of carbon fiber composite in a pressure vessel is a primary challenge in reducing the cost of gaseous hydrogen storage. Continuous and remote monitoring of structural health of the COPVs as well as optimization of the strength translation of carbon fibers have the potential to allow for reduced factor of safety, thereby reduced amount of carbon and associated cost of the vessel. In the current program, the project team including Steelhead Composites (SHC), University of Tennessee, Knoxville (UTK), Teijin Carbon America, Oak Ridge National Laboratory (ORNL) and LUNA designed, fabricated, and tested smart composite pressure vessels with integrated sensors. Iterative loops of design and testing using coupons, subscale STEB vessels and full size vessels proved that a new generation of high performance carbon fiber can be used for efficient design of Type 3 vessels for H2 storage. Novel analysis techniques were developed to predict the initiation and propagation of interlaminar damage inside the composite shell due to impact damage, a real threat in practical operation. Such an analysis scheme is typically not used in tank design but is an essential tool for health monitoring of composite vessels. Remote sensing of the key signatures of the tank’s operating parameters such as pressure, acceleration and humidity was demonstrated using a unique device that can wirelessly transmit and stream the data to a remote server. Fiber optic sensors were successfully integrated during fabrication of the tanks. These sensors provide a wealth of information regarding the structural health of the vessel when it is subsequently pressurized or subjected to impact damage. Excellent correlation was demonstrated between the fiber optic sensor and mechanical strain gage data, and between the measurements and analytical predictions.

08 HYDROGEN↗

FY23 Report on Water NSTF Testing at Two-Phase Conditions: Off-normal Scenarios

Under support from the Department of Energy (DOE) and the Office of Advanced Reactor Technologies (ART), a large-scale test facility has been constructed at Argonne National Laboratory to generate NQA-1 qualified validation data for passive decay heat removal systems in advanced reactors. The Natural convection Shutdown heat removal Test Facility (NSTF) reflects key features of a ½ scale, water-based, Reactor Cavity Cooling System (RCCS) and is intended to study the behavior, bound performance, and ultimately guide design decisions for passive decay heat removal systems for advanced reactors. In addition to the experimental activities detailed in this report, a supportive computational modeling effort is on-going which has been demonstrated to significantly strengthen the experimental program while also improving accuracy of the computer models. Together these create a mutually beneficial relationship integral to meeting the overall program objective of examining the heat removal performance of the RCCS concept. This report details the experimental activities and upgrades performed during the program’s fifth year of water-based operation. The theme of this year of testing was examining off-normal scenarios. In practice, that meant examining scenarios with blockages or other design basis conditions. From a maintenance and capability standpoint that meant assessing valving options for implementing blockages, assessing drain and refill capabilities, and ensuring in all cases that operators could safely, efficiently, and repeatably bring the facility to an off-normal condition and return it to the normal operating state. In one notable case, no solution existed, nor was a solution commercially available, that met the facility needs for implementing blockages within the two-phase region of the chimney. A valve and feedthrough were custom-designed for NSTF to operate submerged in saturated water while being safely actuated from outside the tank. The fifth year of testing included eight matrix tests consisting of 162 hours of active heating, 9,735 kWh of electrical heating, with seven tests classified as Accepted per NQA-1 and one as Trending. All matrix tests were performed at two-phase flow conditions. The power parametric series from previous years was extended to include another scenario with a decay load equivalent to 1.75 MWt, full scale, further resolving the system flow oscillation response as a function of input power. A depletion test was performed to extend previous work and examine the system’s approach to stagnation and geysering that were not previously observed. This test began at an initial inventory level of 50%, prototypic power of 2.1 MWt, and employed an accelerated drain of 0.75 gpm plus boiloff until stagnation conditions were achieved and multiple geysering events were recorded. Further exploring the geysering phenomenon was a separate effects test examining static boiling in the risers and chimney. This static boiling test was performed at 48 kWe, a higher power than testing in the previous year, and included enhancements to the drain system to remove inventory in a better-controlled and more reliable manner. Two tests were performed, at prototypic conditions of 1.4 MWt and 2.4 MWt, respectively, examining the system response to throttled conditions in the singlephase region of the piping. A ball valve immediately before he riser inlet header was increasingly throttled, progressing the system through a repeatable pattern of two-phase oscillations and stable regimes before ultimately inducing stagnation and geysering. Concluding the year, two tests were performed at baseline conditions of 70% initial inventory level and 2.1 MWt of prototypic decay heat to examine both repeatability and the response to throttling within the two-phase region, at the inventory tank inlet using the custom valve mentioned above. The first such test repeated transient operating conditions and revealed significant sensitivity t

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

The DCU laser ion source

Laser ion sources are used to generate and deliver highly charged ions of various masses and energies. We present details on the design and basic parameters of the DCU laser ion source (LIS). The theoretical aspects of a high voltage (HV) linear LIS are presented and the main issues surrounding laser-plasma formation, ion extraction and modeling of beam transport in relation to the operation of a LIS are detailed. A range of laser power densities (I{approx}10{sup 8}-10{sup 11} W cm{sup -2}) and fluences (F=0.1-3.9 kJ cm{sup -2}) from a Q-switched ruby laser (full-width half-maximum pulse duration {approx}35 ns, {lambda}=694 nm) were used to generate a copper plasma. In ''basic operating mode,'' laser generated plasma ions are electrostatically accelerated using a dc HV bias (5-18 kV). A traditional einzel electrostatic lens system is utilized to transport and collimate the extracted ion beam for detection via a Faraday cup. Peak currents of up to I{approx}600 {mu}A for Cu{sup +} to Cu{sup 3+} ions were recorded. The maximum collected charge reached 94 pC (Cu{sup 2+}). Hydrodynamic simulations and ion probe diagnostics were used to study the plasma plume within the extraction gap. The system measured performance and electrodynamic simulations indicated that the use of a short field-free (L=48 mm) region results in rapid expansion of the injected ion beam in the drift tube. This severely limits the efficiency of the electrostatic lens system and consequently the sources performance. Simulations of ion beam dynamics in a ''continuous einzel array'' were performed and experimentally verified to counter the strong space-charge force present in the ion beam which results from plasma extraction close to the target surface. Ion beam acceleration and injection thus occur at ''high pressure.'' In ''enhanced operating mode,'' peak currents of 3.26 mA (Cu{sup 2+}) were recorded. The collected currents of more highly charged ions (Cu{sup 4+}-Cu{sup 6+}) increased considerably in this mode of operation.

43 PARTICLE ACCELERATORS↗

Advances in 3D transient plasma dynamics and control through MHD and hybrid fluid-kinetic simulations with JOREK

Transient phenomena and their control are of high relevance in magnetic confinement fusion plasmas to guarantee a stable and safe plasma operation. Interpretative simulations can maximize the insights gained from experiments on present machines and predictive simulations can help in the preparation of design, mitigation techniques and operational scenarios for future devices. In this article, we provide an overview of recent advances and novel scientific results obtained with the 3D non-linear hybrid fluid-kinetic code JOREK, covering physics of plasma transients from the core to the scrape-off layer (SOL) both for tokamak and stellarator devices. Substantial progress was made in the physics understanding, model validation with experiments and experiment interpretation, thus, giving confidence for predictions to devices like DTT, ITER and DEMO. The topics addressed comprise a wide range: the edge physics of new operation scenarios and edge localized mode suppression; major disruptions with a focus on runaway electrons and vertical displacement events as well as disruption mitigation by shattered pellet injection; the physics mechanisms and operational limits of the flux pumping regime for sawtooth control; MHD limits of stellarators and work towards incorporating advanced edge/SOL/exhaust dynamics; continuing improvements of the code for more efficient hybrid simulations on conventional and accelerated high performance computing architectures.

disruptions↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

UHT-CAMANCHE: Ultra-High Temperature Ceramic Additively Manufactured Compact Heat Exchangers

The conceptual basis for this project is the convergence of advanced ultra-high temperature ceramic materials and additive manufacturing technologies to produce compact ceramic heat exchangers with complex internal flow path geometries. Task areas were broadly divided into materials and manufacturing development, heat exchanger design, component testing, and techno-economic analysis. Technical challenges included the design and commissioning of new test facilities, improving feature resolution and deposition rate of ceramic additive manufacturing techniques, establishing process-structure-property relationships in additively manufactured ultra-high temperature ceramics, and assessing high temperature materials compatibility in CO 2 environments. The primary candidate material evaluated in this work is a composite comprising zirconium diboride (ZrB2) with 30 vol. % silicon carbide (SiC) which was selected based on its desirable combination of high temperature mechanical properties, high thermal and electrical conductivities, and oxidation resistance. High solids loaded ZrB2-SiC pastes suitable for extrusion-based additive manufacturing were developed for the first time as part of this work. Materials compatibility studies indicate this material oxidizes in CO 2 to form a protective borosilicate scale which transforms to pure silica above 1000°C. Parts made by additive manufacturing displayed enlarged grain sizes produced by pressureless sintering as compared to hot-press sintering. Increases in microstructural coarseness have outsized effect on oxidation performance up to 1400°C due to incomplete oxidation of coarse large diameter SiC particles resulting in lower amounts of silica that apparently inhibit protective scale formation. Additive manufacturing as a forming technique did not appear to significantly affect thermal conductivity, hardness, or elastic modulus, though flexural strength was reduced by half or more as compared to traditionally hot-pressed materials. This effect was attributed to the presence of strength-limiting flaws (ca. 40 microns in size) originating from extrudate inhomogeneities that could potentially be eliminated with further process improvements. Attempts to attain economies of scale for production of multi-kilowatt scale heat exchangers by ceramic additive manufacturing proved difficult. Lack of automation and a modest extrusion rate while retaining fine feature resolution made the overall process labor intensive and limited experimental throughput. A number of full-scale components were taken through post-process heat treatments including drying, binder burnout, and sintering; however, none survived without significant flaws or cracks. Therefore, no operational data from a newly installed heat exchanger test loop were able to be obtained during the performance period. Continued research and development is recommended to improve economic feasibility of ceramic additive manufacturing by standardizing the use of advanced sensors, artificial intelligence, and automation tools to reduce associated labor costs and accelerate production rates. The materials and manufacturing techniques demonstrated in this work are likely to find applications in defense and energy applications.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Development and applications of retro-reflective surfaces for ultrasound in LBE

The Belgian Nuclear Research Centre SCK-CEN is in the process of developing MYRRHA - a fast flux research reactor to replace the aging BR2. MYRRHA is conceptualized as an accelerator driven system cooled by lead bismuth eutectic mixture (LBE). As LBE is opaque to visual light, ultrasonic measurement techniques are employed as the main technology to provide feedback to submerged operations when needed. Conceptually, MYRRHA is a pool type reactor divided in a cold lower plenum and hot upper plenum separated by a diaphragm that forces the main flow through the core. The main flow is cooled by four heat exchangers and driven by two liquid metal pumps. One of the tasks tackled using ultrasound is locating a potentially lost fuel assembly to assist a recovery operation. As all fuel manipulations in MYRRHA are performed in the lower plenum, a potentially lost fuel assembly is located in the lower plenum. Buoyancy will force the lost fuel assembly to float against the diaphragm unless it is still partially inserted in the core. Because of the latter situation, an ultrasonic scan localizing the fuel assembly should be performed from a large distance to avoid a collision with such a partially inserted fuel assembly. Unfortunately, standard machined stainless steel objects, such as a fuel assembly, reflect an ultrasonic pulse in a specular way which induces stringent requirements on the alignment of the ultrasonic sensor with respect to the fuel assembly as we cannot rely on diffuse reflections and/or scattering of the ultrasonic pulse. Moreover, increasing the distance also increases geometric spreading and absorption of the pulse weakening the signal amplitude even faster to noise levels when deviating from perfect alignment. An alternative approach consists in relying on reflections from the known surroundings: a lost fuel assembly will block the line-of-sight to the diaphragm resulting in an anomaly in the reflection - either a shorter than expected time-of-flight of the pulse or a complete absence of a reflection like a shadow. In that way, it suffices to align the sensor with the diaphragm instead of the fuel assembly which is much easier to achieve as the robotics on which the sensor is mounted move parallel with the diaphragm. The alignment requirement in the latter approach can be further relaxed by using a tiling of retro-reflectors on the lower surface of the diaphragm. In that way, alignment becomes less vital and the main source of acoustic energy loss - geometric spread of the beam - is almost completely removed, leaving only absorption losses. In this paper, we present the first results in developing a retro reflectance surface for ultrasound in LBE. We present experimental results for different designs of retro-reflectors in both water and LBE. We discuss both linear and array retro-reflectors of different sizes and investigate the influence of the main relevant ultrasonic parameters such as wavelength and spot size on the strength of the received reflection under different alignment angles. We also demonstrate how retro-reflective surfaces can be exploited when localizing objects using linear and rotating scanning methods. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Hydrodynamic and Radiographic Toolbox (HART)

With a multi-lab and university team, we propose to develop new methods for a Hydrodynamic and Radiographic Toolbox (HART) that will enable a fuller and more extensive use of experimental radiographic data towards better characterizing and reducing uncertainties in predictive modeling of weapons performance. We will achieve this by leveraging recent developments in areas of computational imaging, statistical and machine learning, and reduced order modeling of hydrodynamics. In terms of software practices, by partnering with XCP (RISTRA Project) we will conform to recent XCP standards that are inline with modern software practices and standards and ensure compatibility and ease of inter-operability with existing codes. Three new activities under this proposal include (a) the development and use of deep learning-based surrogates to accelerate reconstruction and variational inference of density fields from radiographs of hydrotests, (b) a model-data fusion strategy that couples deep learning-based density reconstructions with fast hydrodynamics simulators to better constrain the reconstruction, and (c) a method for treating asymmetries using techniques adopted from limited view tomography. All three new activities will be based on improved treatment of scatter, noise, beam spot movement, detector blur, and flat fielding in the forward model, and a use of sophisticated priors to aid in the re construction. The improvements to the forward model and improved algorithmic design of the reconstruction when complete will be contained in the iterative reconstruction code SHIVA—a code project that we have recently initiated. The many ways in which machine learning can be used in the reconstruction work will be contained in a code HERMES that has been initiated with DTRA support. For example, the significant levels of acceleration that will likely be achieved by the use of machine learning techniques will permit us (and are required) to quantify uncertainties in density retrievals. Next, the two-way coupling between density reconstruction and model-based simulation of the hydrodynamics will be contained in code EREBUS, and will permit a fuller realization of the potential of the data to constrain the hydrodynamic model and better address issues related to asymmetries in the problem. Finally, we anticipate that the better consistency with physics achieved in our reconstructions will allow them to be used by X-Division more so than today.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Microchannel-based Membrane-less Extraction of Li from Unconventional Lithium Sources & the Separation of REE

This final report provides an overview of the Project's entire duration, covering July 1, 2021 to December 31, 2023. It primarily focuses on the achievements, technological developments, and unique challenges the team faced while working on separating and extracting Lithium from produced waters. The project's primary aim was to create an integrated, high-throughput, membrane-less, and modular microfluidic platform that could extract Lithium from unconventional sources. We have successfully met all goals and milestones envisioned in the SOPO document. The most critical primary milestones, including the Go-No-Go milestone (refer to the Gantt chart in the Appendices), were successfully accomplished. We demonstrated phase separation (>90%) and extraction (>85%) performance in the MPSE using synthetic, and representative produced water composition feed at 50 ml/min total flow through MPSE 36. We have also performed a parametric study of the MPSE operations, beyond the scope of SOPO, exploring operating conditions of current and broader interest. The extended investigation of operational parameters is concurrent with our efforts to seek further development of the MPSE technology beyond the scope of the Project. Along these lines of development, we have made efforts to be responsive to DOE calls for technological developments of other types of resources (beyond PW) for the recovery of Critical Materials and higher TRL development (beyond TRL 4). During the work on this Project, we developed and implemented three innovative technical approaches that emerged from our efforts to successfully meet the Project milestones. The innovative & original technical approaches developed and implemented in this Project are now the contributions to process engineering that could be clearly credited to the Project. First, Convergent Design Approach is a comprehensive feedforward & feedback loop of four design phases: i) design for functionality, ii) design for manufacturing, iii) design for sustainability, and iv) design for market. Next was Process Intensification. A major aim of this Project was to create an innovative phase separation & extraction microscale-based technology for Li separation – thus the words microchannel-based in the Project title. A microscale-based technology is intrinsically in the center of the Process Intensification domain as defined by its unique principles. Therefore, Process Intensification was implicitly envisioned in the Project’s SOPO. Lastly, Time Scale Analysis is a novel tool for discovering the needs and directions of Process Intensification implementations in any process technology. This Project is fully credited for developing and implementing the three novel technical approaches mentioned above. These are general contributions to process engineering that emerged from this Project. Beyond the original SOPO scope, the OSU-U.Pitt research group utilized a Convergent Design methodology, integrating first-principles mathematical modeling with experimental validation on the Minimum Development Vehicle. By creating these Digital Twins, the team rapidly assessed manufacturing iterations to support TEA analysis. This framework further enabled the development of advanced Surface Modification Techniques, where hydrophobic and oleophobic coating strategies were optimized via Digital Twin tools and validated through rigorous 100-hour longevity testing. TEA Analysis: The closing efforts of this Project were focused on the TEA analysis. TEA analysis had two primary functions: i) enabling critical assessments of design variations withing 10 the Concurrent Design Approach, thus enabling evolution of the MPSE design to reach faster- better-cheaper alternatives; and ii) to create a bridge between the accomplishments of this Project and future projects of higher TRL, beyond TRL 6 level. It is important to note that the TEA model created in the Project stirred the technological solutions for the recovery of critical materials toward a vision of a very profitable modular plant that has unique zero-waste water discharge signature. More importantly, thanks to our experimental performance data and conservative assumptions, the TEA model predicts minimal technological and investment risks. Low cost of a modular unit of a nominal capacity of [1000 tons of Li 2 CO 3 /year] positions the MPSE based technology within the reach of community investors, thus offering a paradigm shift in the development of critical technologies. The project successfully navigated two primary challenges: solvent selection and manufacturing adaptation. Restricted by the SOPO to existing literature for lithium recovery, the team identified a critical need for a "material excellence program" to develop next-generation solvents, eventually concluding with a preliminary investigation into promising Ionic Liquids (ILs). Simultaneously, COVID-19 supply chain disruptions forced a pivot from traditional manufacturing to advanced additive methods at ATAMI-OSU. By transitioning from stainless steel to 3D-printed polymer substrates, the team achieved a transformative three-order-of- magnitude reduction in manufacturing costs and compressed prototyping timelines from several months to just two days. The MPSE technology offers significant energy, environmental, and economic advantages by overcoming the traditional bottlenecks of phase-separation hardware and contactor size. Unlike conventional mixer-settlers or membrane-based systems, MPSE operates without moving parts or fouling-prone membranes, achieving robust performance even with challenging, viscous, or particulate-heavy feeds. Key performance metrics include an energy intensity reduction of 5–50x (3–40 kJ/m 3 ) compared to incumbent technologies and a dramatic reduction of processing time to under 60 seconds, which drastically reduces the physical plant footprint. These technical efficiencies translate into superior economic outcomes; for a 100 t/year Li 2 CO 3 facility, implementing MPSE is projected to nearly halve contactor CAPEX (from $\$$6.08M to $\$$3.01M) and significantly increase the project's Net Present Value (NPV), derisking new investment and enabling distributed critical-mineral processing configurations. The commercialization of MPSE technology is being spearheaded by Vigsur Dynamics Inc., which has adopted a structured, parallel approach to technical and business development since its formation in January 2026. Following extensive customer discovery and engagement with the Oregon State University accelerator, Vigsur Dynamics is working to establish a business model that transitions from pilot demonstrations to modular hardware sales, ultimately aiming for a "build-own-operate" service strategy. Current technical milestones—including 100 hours of continuous operation, superior energy efficiency, and successful 6-unit modular scale-up— provide a foundation for this transition. Backed by ongoing IP licensing and a growing network of industrial and venture advisors, the company is actively de-risking the platform to replace conventional mixer-settler systems in the critical minerals market.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Observations of multimode perturbation decay at non-accelerating, soft x-ray driven ablation fronts

Minimizing the growth of hydrodynamic instabilities is a fundamental design issue facing the achievement of thermonuclear ignition and burn with Inertial Confinement Fusion (ICF). The thin capsules and extreme accelerations found in ICF make it an inherently unstable system primarily to Rayleigh-Taylor (RT) occurring at the ablation front. A potential mechanism by which perturbations at the outer capsule surface can be reduced lies in the already present ablative Richtmyer-Meshkov (RM) effect, which operates during the first shock transit of the ablator. At present, the available Equation of State (EOS) models predict a wide range of behavior for the ablative RM oscillations of multimode isolated defects on plastic (CH) capsules. To resolve these differences, we conducted experiments at the OMEGA Laser Facility [T. R. Boehly et al., Optics Comm. 133 (1997)] that measured the evolution of gaussian-shaped bumps driven by soft x-ray ablation from a halfraum. Shock speeds in the CH target were measured to reach 15 {mu}m/ns for halfraum radiation temperatures of 70 eV lasting for up to 7 ns. The evolution of gaussian-shaped bumps of different widths and heights were measured using on-axis x-ray radiography at up to 37 Multiplication-Sign magnification. Bumps with initial widths of 34 and 44 {mu}m FWHM were found to grow by 3 Multiplication-Sign their initial areal density and then saturate out to 6 ns due to lateral compression of the bump characteristic of the formation of a rippled shock front propagating into the solid target. Narrower 17 {mu}m FWHM bumps, on the other hand, grew by roughly 2 Multiplication-Sign followed immediately by a decrease back to initial values of areal density out to 7 ns, which largely agrees with both LEOS 5310 and SESAME 7592 EOS predictions. The difference in observed behavior suggests that high spatial frequency modes found in narrower bumps are needed to significantly affect the ablation front profile on shorter time scales.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗