Search NASA⌕ Search

SEARCH · Search NASA

Results for “Overview”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,297 records · Page 72

Overview of the NASA Docking System (NDS) and the International Docking System Standard (IDSS)

The NASA/JSC Engineering Directorate has been developing the technology for a Low Impact Docking System (LIDS) for many years. LIDS had been chosen to be the Constellation Program baseline. In February 2009, the International Space Station (ISS) Multilateral control Board (MCB) began an initiative to develop an International Docking System Standard (IDSS) to facilitate greater international cooperation in space and enable emergency crew rescue missions. Discussions as to whether the LIDS could be made compatible with the IDSS were under way. With the cancellation of the Constellation Program, NASA made a policy decision to convert both of the docking ports on the United States On-orbit Segment (USOS) to IDSS ports and NASA moved the LIDS project under the ISS Program. LIDS was redesigned to become the NASA implementation of the emerging IDSS, and its name was changed to the NASA Docking System (NDS). The NDS design will be certified as a gblack box h which can be integrated onto vehicles planning to dock to the ISS IDSS ports. This presentation will discuss the evolution of the IDSS from both the LIDS and the Androgynous Peripheral Assembly System (APAS) and outline the interface requirements which are given in the IDSS Interface Definition Document (IDD). It also will give an overview of the current NDS design, and touch on ISS plans for converting its docking ports to be IDSS compliant.

Parma, George F.↗

Fundamental Aeronautics Program: Overview of Project Work in Supersonic Cruise Efficiency

The Supersonics Project, part of NASA?s Fundamental Aeronautics Program, contains a number of technical challenge areas which include sonic boom community response, airport noise, high altitude emissions, cruise efficiency, light weight durable engines/airframes, and integrated multi-discipline system design. This presentation provides an overview of the current (2011) activities in the supersonic cruise efficiency technical challenge, and is focused specifically on propulsion technologies. The intent is to develop and validate high-performance supersonic inlet and nozzle technologies. Additional work is planned for design and analysis tools for highly-integrated low-noise, low-boom applications. If successful, the payoffs include improved technologies and tools for optimized propulsion systems, propulsion technologies for a minimized sonic boom signature, and a balanced approach to meeting efficiency and community noise goals. In this propulsion area, the work is divided into advanced supersonic inlet concepts, advanced supersonic nozzle concepts, low fidelity computational tool development, high fidelity computational tools, and improved sensors and measurement capability. The current work in each area is summarized.

Castner, Raymond↗

Overview of the Novel Intelligent JAXA Active Rotor Program

The Novel Intelligent JAXA Active Rotor (NINJA Rotor) program is a cooperative effort between JAXA and NASA, involving a test of a JAXA pressure-instrumented, active-flap rotor in the 40- by 80-Foot Wind Tunnel at Ames Research Center. The objectives of the program are to obtain an experimental database of a rotor with active flaps and blade pressure instrumentation, and to use that data to develop analyses to predict the aerodynamic and aeroacoustic performance of rotors with active flaps. An overview of the program is presented, including a description of the rotor and preliminary pretest calculations.

Saito, Shigeru↗

Canadian Experiment for Soil Moisture in 2010 (CanEX-SM10): Overview and Preliminary Results

The Canadian Experiment for Soil Moisture in 2010 (CanEx-SM10) was carried out in Saskatchewan, Canada from 31 May to 16 June, 2010. Its main objective was to contribute to Soil Moisture and Ocean salinity (SMOS) mission validation and the pre-launch assessment of Soil Moisture and Active and Passive (SMAP) mission. During CanEx-SM10, SMOS data as well as other passive and active microwave measurements were collected by both airborne and satellite platforms. Ground-based measurements of soil (moisture, temperature, roughness, bulk density) and vegetation characteristics (Leaf Area Index, biomass, vegetation height) were conducted close in time to the airborne and satellite acquisitions. Besides, two ground-based in situ networks provided continuous measurements of meteorological conditions and soil moisture and soil temperature profiles. Two sites, each covering 33 km x 71 km (about two SMOS pixels) were selected in agricultural and boreal forested areas in order to provide contrasting soil and vegetation conditions. This paper describes the measurement strategy, provides an overview of the data sets and presents preliminary results. Over the agricultural area, the airborne L-band brightness temperatures matched up well with the SMOS data. The Radio frequency interference (RFI) observed in both SMOS and the airborne L-band radiometer data exhibited spatial and temporal variability and polarization dependency. The temporal evolution of SMOS soil moisture product matched that observed with the ground data, but the absolute soil moisture estimates did not meet the accuracy requirements (0.04 m3/m3) of the SMOS mission. AMSR-E soil moisture estimates are more closely correlated with measured soil moisture.

Magagi, Ramata↗

An Overview of STS-132 MRM1 Cargo Element Thermal Model Development and Analyses

STS-132 was launched in May 2010 and delivered the Russian Mini Research Module 1 (MRM1) cargo element to the International Space Station as part of the ULF-4 assembly flight. The cargo element consisted of the module outfitted with externally mounted Multi-purpose Laboratory Module (MLM) Airlock, MLM radiator, Portable Work Platform (PWP), and a European Robotic Arm (ERA) spare elbow. Prior to every Shuttle flight, hardware developers are required to determine compatibility of their hardware to thermal environments experienced during the Shuttle mission and once the element is integrated with the ISS. Thermal models are provided to the Shuttle program to determine the impact of the payload on the Orbiter hardware, as well as the ISS program to determine impacts on other ISS payloads in the Orbiter. Historically the Russian International Partner (IP) develops models in formats not compatible with software used by Space Shuttle or ISS programs. This prompted NASA and Lockheed Martin to develop a unique set of thermal models for the MRM1 cargo element. Subsequent ULF-4 mission analyses performed with the models assessed the launch to activation response, identified operational criteria documented in flight rules, and ensured compliance with the mission timeline and no hazards to the crew, orbiter, or ISS. This presentation provides an overview of the work performed, depicts unique approaches in model development, discusses lessons learned, and issue resolution approaches. Though development and analysis efforts spanned over four years and presented various integration challenges it provided an example of successful collaboration with our International Partners.

Perez, Miguel Fernando↗

Inflatable Re-entry Vehicle Experiment (IRVE-4) Overview

The suite of Inflatable Re-Entry Vehicle Experiments (IRVE) is designed to further our knowledge and understanding of Hypersonic Inflatable Aerodynamic Decelerators (HIADs). Before infusion into a future mission, three challenges need to be addressed: surviving the heat pulse during re-entry, demonstrating system performance at relevant scales, and demonstrating controllability in the atmosphere. IRVE-4 will contribute to a better understanding of controllability by characterizing how a HIAD responds to a set of controlled inputs. The ability to control a HIAD is vital for missions that are g-limited, require precision targeting and guidance for aerocapture or entry, descent, and landing. The IRVE-4 flight test will focus on taking a first look into controlling a HIAD. This paper will give an overview of the IRVE-4 mission including the control response portion of the flight test sequence, and will provide a review of the mission s development.

Litton, Daniel K.↗

Overview of the NASA Entry, Descent and Landing Systems Analysis Exploration Feed-Forward Study

Technology required to land large payloads (20 to 50 mt) on Mars remains elusive. In an effort to identify the most viable investment path, NASA and others have been studying various concepts. One such study, the Entry, Descent and Landing Systems Analysis (EDLSA) Study [1] identified three potential options: the rigid aeroshell, the inflatable aeroshell and supersonic retropropulsion (SRP). In an effort to drive out additional levels of design detail, a smaller demonstrator, or exploration feed-forward (EFF), robotic mission was devised that utilized two of the three (inflatable aeroshell and SRP) high potential technologies in a configuration to demonstrate landing a two to four metric ton payload on Mars. This paper presents and overview of the maximum landed mass, inflatable aeroshell controllability and sensor suite capability assessments of the selected technologies and recommends specific technology areas for additional work.

DwyerCianciolo, Alicia M.↗

GPM Mission Overview

The Global Precipitation Measurement (GPM) Mission is an international satellite mission to unify and advance precipitation measurements from a constellation of research and operational sensors to provide "next-generation" precipitation products. Relative to current global rainfall products, GPM data products will be characterized by: (1) more accurate instantaneous precipitation measurements (especially for light rain and cold-season solid/snow precipitation), (2) more frequent sampling by an expanded constellation of microwave radiometers that include operational humidity sounders over land, (3) inter-calibrated microwave brightness temperatures from constellation radiometers within a unified framework, and (4) physical-based precipitation retrievals from constellation radiometers using a common a priori cloud hydrometeor database derived from GPM Core sensor measurements. The cornerstone of the GPM mission is the deployment of a Core Observatory in a unique 65 degree non-Sun-synchronous orbit to serve as a physics observatory and a calibration reference to improve precipitation measurements by a constellation of dedicated and operational passive microwave sensors. The Core Observatory will carry a KulKa-band Dual-frequency Precipitation Radar (DPR) and a multi-channel (10-183 GHz) GPM Microwave Radiometer (GMI). The combined use ofDPR and GMI measurements will place greater constraints on possible solutions to radiometer retrievals to improve the accuracy and consistency of precipitation retrievals from all constellation radiometers. As a science mission with integrated application goals, GPM is designed to (1) advance precipitation measurement capability from space through combined use of active and passive microwave sensors, (2) advance the knowledge of the global water/energy cycle and freshwater availability through better description of the space-time variability of global precipitation, and (3) improve weather, climate, and hydrological prediction capabilities through more accurate and frequent measurements of instantaneous precipitation rates and time-integrated rainfall accumulation. An overview of the GPM mission concept and science activities in the United States, together with an update on international collaborations in radiometer intercalibration and ground validation, will be presented.

Hou, Arthur Y.↗

Overview of Orion Crew Module and Launch Abort Vehicle Dynamic Stability

With the retirement of the Space Shuttle, NASA is designing a new spacecraft, called Orion, to fly astronauts to low earth orbit and beyond. Characterization of the dynamic stability of the Orion spacecraft is important for the design of the spacecraft and trajectory construction. Dynamic stability affects the stability and control of the Orion Crew Module during re-entry, especially below Mach = 2.0 and including flight under the drogues. The Launch Abort Vehicle is affected by dynamic stability as well, especially during the re-orientation and heatshield forward segments of the flight. The dynamic stability was assessed using the forced oscillation technique, free-to-oscillate, ballistic range, and sub-scale free-flight tests. All of the test techniques demonstrated that in heatshield-forward flight the Crew Module and Launch Abort Vehicle are dynamically unstable in a significant portion of their flight trajectory. This paper will provide a brief overview of the Orion dynamic aero program and a high-level summary of the dynamic stability characteristics of the Orion spacecraft.

D. Bruce Owens↗

Overview of ERA Ultra High Bypass Propulsor Technology Development

A review of the current research being conducted under the Environmentally Responsible Aviation (ERA) Ultra High Bypass (UHB) Testing subelement is presented. The four exiting tasks under the subelement, a description of each task, and the current status of each are given. The four tasks are: 1. Collaborate with P&W to design, fabricate and test a second generation of Geared Turbofan 2. Design, fabricate and test advanced Over the Rotor acoustic treatment and acoustically treated Soft Vanes 3. Develop a Shape Memory Alloy Variable Area Nozzle concept and demonstrate prototype 4. Refurbish and update the GRC Ultra High Bypass Drive Rig Following the current task updates, an overview of three proposed additional tasks to support the existing tasks is presented. The additional tasks would allow noise reduction and noise diagnostic testing technologies to be demonstrated at TRL 4 as part of existing planned fan model testing in the NASA Glenn 9 x15 Low Speed Wind Tunnel under the ERA UHB Testing subelement.

Hughes, Christopher↗

Risk Assessment Overview

Risk assessment is used in many industries to identify and manage risks. Initially developed for use on aeronautical and nuclear systems, risk assessment has been applied to transportation, chemical, computer, financial, and security systems among others. It is used to gain an understanding of the weaknesses or vulnerabilities in a system so modification can be made to increase operability, efficiency, and safety and to reduce failure and down-time. Risk assessment results are primary inputs to risk-informed decision making; where risk information including uncertainty is used along with other pertinent information to assist management in the decision-making process. Therefore, to be useful, a risk assessment must be directed at specific objectives. As the world embraces the globalization of trade and manufacturing, understanding the associated risk become important to decision making. Applying risk assessment techniques to a global system of development, manufacturing, and transportation can provide insight into how the system can fail, the likelihood of system failure and the consequences of system failure. The risk assessment can identify those elements that contribute most to risk and identify measures to prevent and mitigate failures, disruptions, and damaging outcomes. In addition, risk associated with public and environment impact can be identified. The risk insights gained can be applied to making decisions concerning suitable development and manufacturing locations, supply chains, and transportation strategies. While risk assessment has been mostly applied to mechanical and electrical systems, the concepts and techniques can be applied across other systems and activities. This paper provides a basic overview of the development of a risk assessment.

Prassinos, Peter G.↗

KSC Engineering Academy (KEA): Ares 1-X Overview

The presentation provides an overview of the ARES 1-X program. Videos include avionics ATVC actuator testing, GS damper retractor, GS vortex shedding, RoCS hot fire at WSTF, RoCS Peacekeeper tests, RoCS installation, thrust OSC, amd Ares 1-X fly through.

Ess, Bob↗

Overview of Pre-Flight Physical Training, In-Flight Exercise Countermeasures and the Post-Flight Reconditioning Program for International Space Station Astronauts

International Space Station (ISS) astronauts receive supervised physical training pre-flight, utilize exercise countermeasures in-flight, and participate in a structured reconditioning program post-flight. Despite recent advances in exercise hardware and prescribed exercise countermeasures, ISS crewmembers are still found to have variable levels of deconditioning post-flight. This presentation provides an overview of the astronaut medical certification requirements, pre-flight physical training, in-flight exercise countermeasures, and the post-flight reconditioning program. Astronauts must meet medical certification requirements on selection, annually, and prior to ISS missions. In addition, extensive physical fitness testing and standardized medical assessments are performed on long duration crewmembers pre-flight. Limited physical fitness assessments and medical examinations are performed in-flight to develop exercise countermeasure prescriptions, ensure that the crewmembers are physically capable of performing mission tasks, and monitor astronaut health. Upon mission completion, long duration astronauts must re-adapt to the 1 G environment, and be certified as fit to return to space flight training and active duty. A structured, supervised postflight reconditioning program has been developed to prevent injuries, facilitate re-adaptation to the 1 G environment, and subsequently return astronauts to training and space flight. The NASA reconditioning program is implemented by the Astronaut Strength, Conditioning, and Rehabilitation (ASCR) team and supervised by NASA flight surgeons. This program has evolved over the past 10 years of the International Space Station (ISS) program and has been successful in ensuring that long duration astronauts safely re-adapt to the 1 g environment and return to active duty. Lessons learned from this approach to managing deconditioning can be applied to terrestrial medicine and future exploration space flight missions.

Kerstman, Eric↗

Orbital Fitness: An Overview of Space Shuttle Cardiopulmonary Exercise Physiology Findings

Limited observations regarding the cardiopulmonary responses to aerobic exercise had been conducted during short-duration spaceflight before the Space Shuttle program. This presentation focuses on the findings regarding changes observed in the cardiopulmonary exercise responses during and following Shuttle flights. During flight, maximum oxygen uptake (VO2max) remained unchanged as did the maximum work rate achievable during cycle exercise testing conducted during the last full flight day. Immediately following flight, the ubiquitous finding, confirmed by investigations conducted during the Spacelab Life Sciences missions 1 and 2 and by NASA Detailed Supplemental Objective studies, indicated that VO2max was reduced; however, the reduction in VO2max was transient and returned to preflight levels within 7 days following return. Studies regarding the influence of aerobic exercise countermeasures performed during flight on postflight performance were mostly limited to the examination of the heart rate (HR) response to submaximal exercise testing on landing day. These studies revealed that exercise HR was elevated in individuals who performed little to no exercise during their missions as compared to individuals who performed regular exercise. In addition, astronauts who performed little to no aerobic exercise during flight demonstrated an increased HR and lowered pulse pressure response to the standard stand test on landing day, indicating a decrease in orthostatic function in these individuals. With regard to exercise modality, four devices were examined during the Shuttle era: two treadmills, a cycle ergometer, and a rowing device. Although there were limited investigations regarding the use of these devices for exercise training aboard the Shuttle, there was no clear consensus reached regarding which proved to be a "superior" device. Each device had a unique operational or physiologic limitation associated with its use. In conclusion, exercise research conducted during the Shuttle Program demonstrated that attenuation of postflight deconditioning was possible through use of exercise countermeasures and the Shuttle served as a test bed for equipment destined for use on the International Space Station. Learning Objective: Overview of the Space Shuttle Program research results related to aerobic capacity and performance, including what was learned from research and effectiveness of exercise countermeasures.

Moore, Alan D.↗

Commercial Crew Development Program Overview

NASA's Commercial Crew Development Program is designed to stimulate efforts within the private sector that will aid in the development and demonstration of safe, reliable, and cost-effective space transportation capabilities. With the goal of delivery cargo and eventually crew to Low Earth Orbit (LEO) and the International Space Station (ISS) the program is designed to foster the development of new spacecraft and launch vehicles in the commercial sector. Through Space Act Agreements (SAAs) in 2011 NASA provided $50M of funding to four partners; Blue Origin, The Boeing Company, Sierra Nevada Corporation, and SpaceX. Additional, NASA has signed two unfunded SAAs with ATK and United Space Alliance. This paper will give a brief summary of these SAAs. Additionally, a brief overview will be provided of the released version of the Commercial Crew Development Program plans and requirements documents.

Russell, Richard W.↗

Overview of the James Webb Space Telescope

The James Webb Space Telescope (JWST) is a large aperture (6.5 meter), cryogenic space telescope with a suite of near and mid-infrared instruments covering the wavelength range of 0.6 microns to 28 microns. JWST's primary science goals are to detect and characterize the first galaxies, and study the assembly of galaxies, star formation, and the formation of evolution of planetary systems. JWST is a segmented mirror telescope operating at approx.40K, a temperature achieved by passive cooling of the observatory, via a large, 5-layer membrane-based sunshield. We will review the scientific capabilities of JWST in the context of their synergy with survey facilities, and with the next generation of ground-based Extremely Large Telescopes. We will also present an overview of the observatory design, and report on recent progress in the construction of the observatory and its science instruments.

Clampin, Mark↗

The Global Precipitation Measurement (GPM) Mission: Overview and U.S. Status

The Global Precipitation Measurement (GPM) Mission is an international satellite mission specifically designed to unify and advance precipitation measurements from a constellation of research and operational microwave sensors. The cornerstone of the GPM mission is the deployment of a Core Observatory in a 65 deg non-Sun-synchronous orbit to serve as a physics observatory and a transfer standard for inter-calibration of constellation radiometers. The GPM Core Observatory will carry a Ku/Ka-band Dual-frequency Precipitation Radar (DPR) and a conical-scanning multi-channel (10-183 GHz) GPM Microwave Radiometer (GMI). The first space-borne dual-frequency radar will provide not only measurements of 3-D precipitation structures but also quantitative information on microphysical properties of precipitating particles needed for improving precipitation retrievals from passive microwave sensors. The combined use of DPR and GMI measurements will place greater constraints on radiometer retrievals to improve the accuracy and consistency of precipitation estimates from all constellation radiometers. The GPM constellation is envisioned to comprise five or more conical-scanning microwave radiometers and four or more cross-track microwave sounders on operational satellites. NASA and the Japan Aerospace Exploration Agency (JAXA) plan to launch the GPM Core in July 2013. NASA will provide a second radiometer to be flown on a partner-provided GPM Low-Inclination Observatory (L10) to improve near real-time monitoring of hurricanes and mid-latitude storms. NASA and the Brazilian Space Program (AEB/IPNE) are currently engaged in a one-year study on potential L10 partnership. JAXA will contribute to GPM data from the Global Change Observation Mission-Water (GCOM-W) satellite. Additional partnerships are under development to include microwave radiometers on the French-Indian Megha-Tropiques satellite and U.S. Defense Meteorological Satellite Program (DMSP) satellites, as well as cross-track scanning humidity sounders on operational satellites such as the National Polar-orbiting Operational Environmental Satellite System (NPOESS) Preparatory Project (NPP), POES, the NASA/NOAA Joint Polar Satellite System (JPSS), and EUMETSAT MetOp satellites. Data from Chinese and Russian microwave radiometers may also become available through international collaboration under the auspices of the Committee on Earth Observation Satellites (CEOS) and Group on Earth Observations (GEO). The current generation of global rainfall products combines observations from a network of uncoordinated satellite missions using a variety of merging techniques. Relative to current data products, GPM's "nextgeneration" precipitation products will be characterized by: (1) more accurate instantaneous precipitation estimate (especially for light rain and cold-season solid precipitation), (2) more frequent sampling by an expanded constellation of microwave radiometers including operational humidity sounders over land, (3) intercalibrated microwave brightness temperatures from constellation radiometers within a unified framework, and (4) physical-based precipitation retrievals from constellation radiometers using a common a priori hydrometeor database constrained by combined radar/radiometer measurements provided by the GPM Core Observatory. An overview of the GPM mission concept, the U.S. GPM program status and updates on international science collaborations on GPM will be presented.

Hou, Arthur Y.↗