Search NASA⌕ Search

SEARCH · Search NASA

Results for “Power Grid Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,297 records · Page 72

Bilevel Nodal Behind-the-meter Solar Disaggregation Under Unexpected Extreme Weather Conditions

As the power grid undergoes significant paradigm shift due to the increasing penetration of renewable generation, the ever-growing installation of behind-the-meter (BTM) solar generation in the power grid also has a significant impact on nodal loads, posing challenges on transmission operators. Furthermore, increasing frequent and severe extreme weather events intertwine with ubiquitous BTM solar generations and have amplified the challenges of accurately model nodal load profiles, especially under the lack of ground-truth information for verification. To tackle these challenges, this paper introduces a bilevel model that utilizes year-long data (e.g., proxy solar, zonal load, and individual node load profiles) to disaggregate metered profiles into actual demand and BTM solar generation at each transmission node. The proxy solar not only scales the BTM solar generation of individual nodes but also create a compensation term for enhancing performance on days with unexpected extreme weather events. The proposed algorithm is validated with real-world PJM Interconnection data during unexpected events like the recent Winter Storm Elliott. For quantitative evaluations, a novel Score error is introduced, which is based on mean percentages and load scales and offers a universal assessment method suitable for all nodes and different data formats (e.g., normalized or raw values).

behind-the-meter solar, load disaggregations, load↗

GridOPTICS Software System

GridOPTICS Software System (GOSS) is a middleware that facilitates creation of new, modular and flexible operational and planning platforms that can meet the challenges of the next generation power grid. GOSS enables Department of Energy, power system utilities, and vendors to build better tools faster. GOSS makes it possible to integrate Future Power Grid Initiative software products/prototypes into existing power grid software systems, including the PNNL PowerNet and EIOC environments. GOSS is designed to allow power grid applications developed for different underlying software platforms installed in different utilities to communicate with ease. This can be done in compliance with existing security and data sharing policies between the utilities. GOSS not only supports one-to-one data transfer between applications, but also publisher/subscriber scheme. To support interoperability requirements of future EMS, GOSS is designed for CIM compliance. In addition to this, it supports authentication and authorization capabilities to protect the system from cyber threats. In summary, the contributions of the GOSS middleware are as follows: A platform to support future EMS development. A middleware that promotes interoperability between power grid applications. A distributed architecture that separates data sources from power grid applications. Support for data exchange with either one-to-one or publisher/subscriber interfaces. An authentication and authorization scheme for limiting the access to data between utilities.

Akyol, BoraA↗

Hybrid-RL-MPC4CLR (Hybird-Reinforcement-Learning-Model-Predictive-Control-for-Reserve-Policy-Assisted-Critical-Load-Restoration-in-Distribution-Grids)

Hybrid-RL-MPC4CLR was developed as a hybrid controller for active distribution grid critical load restoration, combining deep reinforcement learning (RL) and model predictive control (MPC) aiming at maximizing total restored load following an extreme event. The RL determines a policy for quantifying operating reserve requirements, thereby hedging against uncertainty, while the MPC models grid operations incorporating the RL policy actions (i.e., reserve requirements), renewable (wind and solar) power predictions, and load demand forecasts. The developers formulated the reserve requirement determination problem as a sequential decision-making problem based on the Markov Decision Process (MDP) and design an RL learning environment based on the OpenAI Gym framework and MPC simulation. The RL agent reward and MPC objective function aim to maximize and monotonically increase total restored load and minimize load shedding and renewable power curtailment. The software is developed using various software packages in Python. The MPC's optimal power flow (OPF) model is implemented using the Pyomo package, the RL simulation environment is implemented using the MPC simulation with various scenarios of renewable energy and load demand profiles and power outage beginning times, based on the OpenAI Gym framework. The RL agent training is performed using the RLlib Ray package. The RL algorithm is trained offline using historical forecasts of renewable generation and load demand profiles. Simulation analysis and performance tests are conducted using a modified IEEE 13-bus distribution test feeder containing wind turbine, photovoltaic, microturbine, and battery.

Eseye, Abinet Tesfaye↗

Comparison of Routable Control System Security Approaches

This document is an supplement to the 'Secure and Efficient Routable Control Systems.' It addressed security in routable control system communication. The control system environment that monitors and manages the power grid historically has utilized serial communication mechanisms. Leased-line serial communication environments operating at 1200 to 9600 baud rates are common. However, recent trends show that communication media such as fiber, optical carrier 3 (OC-3) speeds, mesh-based high-speed wireless, and the Internet are becoming the media of choice. In addition, a dichotomy has developed between the electrical transmission and distribution environments, with more modern communication infrastructures deployed by transmission utilities. The preceding diagram represents a typical control system. The Communication Links cloud supports all of the communication mechanisms a utility might deploy between the control center and devices in the field. Current methodologies used for security implementations are primarily led by single vendors or standards bodies. However, these entities tend to focus on individual protocols. The result is an environment that contains a mixture of security solutions that may only address some communication protocols at an increasing operational burden for the utility. A single approach is needed that meets operational requirements, is simple to operate, and provides the necessary level of security for all control system communication. The solution should be application independent (e.g., Distributed Network Protocol/Internet Protocol [DNP/IP], International Electrotechnical Commission [IEC] C37.118, Object Linking and Embedding for Process Control [OPC], etc.) and focus on the transport layer. In an ideal setting, a well-designed suite of standards for control system communication will be used for vendor implementation and compliance testing. An expected outcome of this effort is an international standard.

99 GENERAL AND MISCELLANEOUS↗

Eastern Interconnection Demand Response Potential

Demand response (DR), one of the key components in the Smart Grid initiative, has received increasing interest in recent years among power utilities, independent system operators, and policy makers. With this surge of interest in DR, in April 2010 the Department of Energy (DOE) issued a research call to provide technical support to the interconnection-level electric infrastructure planning projects they had issued earlier in the year. In Area of Interest 2, they identified a need/purpose: “The Eastern Interconnection States’ Planning Council (EISPC) seeks to significantly improve the knowledge base and modeling capabilities of demand-side resources for purposes of transmission planning.” In response to the research call, Oak Ridge National Laboratory (ORNL) conducted a research project to estimate the DR potential peak load reductions in the Eastern Interconnection area over the next two decades until 2030, as well as analyzed costs and benefits occurring out of the DR resources. This final report is the outcome of the study by a team of ORNL researchers with diverse backgrounds in engineering, economics, and public policy.

demand response↗

Energy-Flow-Environment Linkage Map

Understanding how flexibility in environmental requirements can facilitate co-optimization of hydropower production outcomes and environmental outcomes is critical for future grid decision-making and operations as renewable energy resources increase. The environmental and power system outcomes connectivity linkage maps presented here provide a framework for conceptually and quantitatively linking power system outcomes to environmental outcomes through hydropower flow decisions. The Executive Summary Map serves as a starting for exploring the links between hydropower system performance outcomes and environmental outcomes. The centralized topic is “Flow from Hydropower System,” and connects the hydropower operations through “Flow through turbines” and “Non-turbine flows”, and to environmental outcomes through Reservoir elevation” and “Flow downstream of the hydropower system”. To the left of these central topics, “Hydro-mechanical operations” are linked through “Hydro-electrical operations” to “Hydropower performance outcomes” (“Reliability”, “Resilience”, “Revenue”, “Emissions”). On the right, environmental outcomes are grouped together by their physical location: “Upstream Outcomes” (“Upstream geomorphology”, “Upstream recreation”, “Upstream habitat”, “Upstream biota and biodiversity”, “Upstream water quality and greenhouse gas”), Outcomes relevant to both “Upstream/downstream or dam interface” (“Navigation”, “Dam safety and maintenance", “Human health”, “Water supply”, “Flood control”, ”Fish passage”), and “Downstream outcomes“ (e.g., “Downstream geomorphology”, “Downstream recreations”, “Downstream habitat”, “Downstream biota and biodiversity”, “Downstream water quality and greenhouse gas”). Each of these subtopics (e.g., “Hydro-mechanical operations”, “Hydro-electrical operations”, “Upstream geomorphology”, “Upstream recreation”) is further explored through their corresponding submaps. The “Read Me” file provides more detail information on map navigation. The “Models and tools database” file provides detailed information of models and tools presented in the maps.

13 HYDRO ENERGY↗

GridOPTICS Software System

GridOPTICS Software System (GOSS) is a middleware that facilitates creation of new, modular and flexible operational and planning platforms that can meet the challenges of the next generation power grid. GOSS enables Department of Energy, power system utilities, and vendors to build better tools faster. GOSS makes it possible to integrate Future Power Grid Initiative software products/prototypes into existing power grid software systems, including the PNNL PowerNet and EIOC environments. GOSS is designed to allow power grid applications developed for different underlying software platforms installed in different utilities to communicate with ease. This can be done in compliance with existing security and data sharing policies between the utilities. GOSS not only supports one-to-one data transfer between applications, but also publisher/subscriber scheme. To support interoperability requirements of future EMS, GOSS is designed for CIM compliance. In addition to this, it supports authentication and authorization capabilities to protect the system from cyber threats. In summary, the contributions of the GOSS middleware are as follows: A platform to support future EMS development. A middleware that promotes interoperability between power grid applications. A distributed architecture that separates data sources from power grid applications. Support for data exchange with either one-to-one or publisher/subscriber interfaces. An authentication and authorization scheme for limiting the access to data between utilities.

Akyol, Bora A↗

A Hybrid Reinforcement Learning-MPC Approach for Distribution System Critical Load Restoration: Preprint

This paper proposes a hybrid control approach for distribution system critical load restoration, combining deep reinforcement learning (RL) and model predictive control (MPC) aiming at maximizing total restored load following an extreme event. RL determines a policy for quantifying operating reserve requirements, thereby hedging against uncertainty, while MPC models grid operations incorporating RL policy actions, i.e., the reserve requirement, renewable (wind and solar) power predictions, and load demand forecasts. We formulate the reserve requirement determination problem as a sequential decision making problem based on the Markov Decision Process (MDP) and design an RL learning environment based on the OpenAI Gym framework and MPC. The RL agent reward and MPC objective function aim to maximize and monotonically increase total restored load and minimize load shedding and renewable power curtailment. The RL algorithm is trained off-line using historical forecast of renewable generation and load demand. The method is tested using a modified IEEE 13-bus distribution test feeder containing wind turbine, photovoltaic, microturbine and battery. Case studies demonstrated that the proposed method outperforms other operating reserve determination methods.

distribution system↗

A Unified Metric for Fast Frequency Response in Low-Inertia Power Systems: Preprint

Future power system with more inverter-based resources (IBRs) is vulnerable to the frequency-decline contingency. Fast frequency response (FFR) provided by IBRs is a good candidate to arrest the frequency excursion. Diverse types of FFRs have been integrated into the power system. Without a unified quantification of FFRs, it is hard for the grid operators to fully leverage the FFR capabilities of IBRs. This work introduces potential unified metrics of prevailing FFRs. We utilized the metric-to-frequency (M2F) mapping to validate the accuracy of the metrics. The results show the proposed metric to be simple yet accurate.

effective inertia↗

Status of the LANSCE refurbishment project

The Los Alamos Neutron Science Center (LANSCE) accelerator is an 800-MeV proton linac that drives user facilities for isotope production, proton radiography, ultra-cold neutrons, weapons neutron research and various sciences using neutron scattering. The LANSCE Refurbishment Project (LANSCE-R) is an ambitious project to refurbish key elements of the LANSCE accelerator that are becoming obsolete or nearing end-of-life. The preliminary design phase for the project is funded and underway. The 6 year, $150M (US) project will enable future decades of reliable, high-performance operation. It will replace a substantial fraction of the radio-frequency power systems (gridded tubes and klystrons) with modern systems, completely refurbish the original accelerator control and timing systems, replace obsolete diagnostic devices, and modernize other ancillary systems. An overview of the LANSCE-R project will be presented. The project requirements will be discussed, the preliminary technical solutions presented, and the plan for successful project execution while meeting annual customer expectations for beam delivery will be reviewed.

43 PARTICLE ACCELERATORS↗

Feasible Actuator Range Modifier (FARM), a Tool Aiding the Solution of Unit Dispatch Problems for Advanced Energy Systems

Integrated energy systems (IESs) seek to minimize power generating costs in future power grids through the coupling of different energy technologies. To accommodate fluctuations in load demand due to the penetration of renewable energy sources, flexible operation capabilities must be fully exploited, and even power plants that are traditionally considered as base-load units need to be operated according to unconventional paradigms. Thermomechanical loads induced by frequent power adjustments can accelerate the wear and tear. If a unit is flexibly operated without respecting limits on materials, the risk of failures of expensive components will eventually increase, nullifying the additional profits ensured by flexible operation. In addition to the bounds on power variations (explicit constraints),the solution of the unit dispatch problem needs to meet the limits on the variation of key process variables, including temperature, pressure and flow rate (implicit constraints).The FARM (Feasible Actuator Range Modifier) module was developed to enable existing optimization algorithms to identify solutions to the unit dispatch problem that are both economically favorable and technologically sustainable. Thanks to the iterative dispatcher–validator scheme, FARM permits addressing all the imposed constraints without excessively increasing the computational costs. In this work, the algorithms constituting the module are described, and the performance was assessed by solving the unit dispatch problem for an IES composed of three units, i.e., balance of plant, gas turbine, and high-temperature steam electrolysis. Finally, the FARM module provides dedicated tools for visualizing the response of the constrained variables of interest during operational transients and a tool aiding the operator at making decisions. These techniques might represent the first step towards the deployment of an ecological interface design (EID) for IES units.

47 OTHER INSTRUMENTATION↗

Welcome to the Special Issue on Grid-Edge Computing With Behind-the-Meter Resources [Guest Editorial]

The integration of distributed energy resources (DERs), such as solar photovoltaic systems, as well as other synergistic assets, including electric vehicles, energy storage, and smart appliances, in electric power systems has been dramatically increasing in the past few years. These assets have the capability to provide much-needed flexibility to electric power systems for improved grid reliability, resilience, and economic efficiency; however, most of these resources are located behind the meter (BTM) on customer premises, and their flexibility is not fully used in current grid operations. Grid-edge computing plays an important role in unlocking the great benefits and potential that BTM resources could provide to electric power systems by enhancing visibility and controllability at the grid edge.

behind-the-meter resources↗

Real-Time Federated Cyber-Transmission-Distribution Testbed Architecture for the Resiliency Analysis

With the ongoing automation driven by the push toward the smart electric grid and the advancement in associated cyber infrastructure, the interaction between physical [electric transmission and distribution (T&D) systems], cyber (communication, automation, and control), and human (grid operators and decision-makers) is increasingly becoming more complex. This creates the requirement of analyzing the effect of the transmission system on the distribution system and vice versa with consideration of the additional complexity of the cyber infrastructure. Such an integrated testbed will also help with resiliency analysis, where resiliency refers to the ability of the system to continue serving energy to the critical loads even with limited extreme contingencies. Interaction of the physical power grid with the cyber layer can be effectively modeled using real-time (RT) simulator for developing and validating various operational and control algorithms. Testbeds using RT simulators with multiple capabilities have been developed at different institutions. Still, no single existing testbed can offer full scalability while simultaneously meeting high fidelity requirements for resiliency experimentation. Co-simulating federated testbed assets can provide a scalable experimentation platform that can be leveraged for verification and validation. In this article, an architecture is developed for federated cyber-physical testbed. A local federation with two real-time simulators is developed: real-time digital simulator (RTDS) and OPAL-RT have been interfaced using VILLAS framework for end-to-end testing. Also, a real-time linear predictor is developed and integrated here to address the communication latency impact on geographically allocated federated RT simulation. Finally, resiliency analysis tools are formulated and utilized for T&D systems. Finally as an illustrative use case, the resiliency of a T&D test system is simulated, and the results are analyzed. A 179-bus Western Electricity Coordinating Council (WECC) transmission system is developed using OPAL-RT/ HYPERSIM, and a modified IEEE 13 node feeder system is modeled in RTDS/RSCAD and interfaced for resiliency analysis.

42 ENGINEERING↗

Lower Snake River Dams Contribution to Grid Services

Hydroelectric generation and water storage have long been components of the clean energy mix, providing both reliable steady output and operational flexibility. As variable renewable energy sources such as wind and solar increasingly replace traditional generation, the role of all flexible resources—including hydropower—in balancing supply and demand continues to evolve. This study examined the contribution of the Lower Snake River (LSR) Dam plants to Bonneville Power Administration grid services in maintaining power system reliability within the Western Interconnection. By analyzing publicly available data, the study evaluated various reliability services through performance metrics including energy capacity, balancing and ramping, voltage and reactive power support, frequency response, and transmission impact. Results indicated that the LSR plants deliver services as expected based on their size, contributing to the balancing process, ramping capabilities, and operational reserves, particularly during peak load conditions and weather events, while also providing measurable frequency and voltage support to the grid.

13 HYDRO ENERGY↗

Pumped Storage Hydropower (PSH) FAST Commissioning Prize Technical Analysis

The US energy landscape has undergone major changes over the past 10 years and will continue to see significant changes in future decades as the power grid increases its reliance on variable renewable energy resources. Because of the inherent variability of these resources, renewable energy growth may require additional energy storage capacity to provide flexible load-following capabilities and other grid services that can quickly adjust to changes in energy demand and generation. Pumped storage hydropower (PSH)—one such energy storage technology—uses pumps to convey water from a lower reservoir to an upper reservoir for energy storage and releases water back to the lower reservoir via a powerhouse for hydropower generation. PSH facility pump and generation cycling often follows economic and energy demand conditions. Across the United States, 43 PSH facilities are in operation and 55 projects are in various permitting or licensing stages. Altogether, the 43 operational projects provide the wide majority (95%) of utility-scale electricity storage in the United States. These facilities also provide significant power and nonpower grid benefits, including large-scale electrical system reserve capacity, grid reliability support, and electricity supply-demand balancing through quick-response capabilities and operational flexibility. PSH systems can accomplish these at a scale (e.g., size) and cost that makes these systems highly attractive from a technical standpoint. Although these research concepts are still in their infancy, they demonstrate promising potential as future PSH energy storage technologies. Although PSH has many advantages, development in the United States has effectively stalled since the 1990s, partially because of the magnitude of project costs and financing interest during development and construction, the length of time from project investment until project revenue begins, permitting challenges, construction risks, competition from other storage technologies (e.g., batteries, hydrogen storage), and electricity market evolution and uncertainty. In short, the time, cost, and risk associated with modern PSH development have resulted in limited growth in the United States recently, despite the growing energy storage demand stemming from increased wind and solar power deployment. Technology innovation is needed to help reduce PSH commissioning time, cost, and risk, particularly during the post-licensing phase of project development. To address challenges facing the PSH industry and to improve PSH commissioning timelines, the US Department of Energy (DOE) Water Power Technologies Office (WPTO) initiated the PSH Furthering Advancements to Shorten Time to (FAST) Commissioning Prize project.

13 HYDRO ENERGY↗

AURORA-SETO_VirginiaTech_ Power & Energy Center

This is a presentation. The outline of the presentation is : Overview multiple grid resiliency projects at Siemens Corporate Technology Introduce AURORA project(AUtonomous and Resilient Operation of energy systems with RenewaAbles) Dive into physics and cyber situation awareness Discuss challenges encountered at building a more resilient distribution grid

24 POWER TRANSMISSION AND DISTRIBUTION↗

Grid and Wind Transient Ride Through Assessment of Type-5 Synchronous Wind Turbine

The integration of the inverter-based renewable energy resources is increasing and replacing conventional synchronous generators in the evolving bulk power system (BPS), impacting the system inertia along the way. Also, the limited over-current capability of power electronic converters continues to deteriorate the grid strength of the evolving power systems. Type-5 wind turbines have the potential to mitigate these problems because this configuration interfaces with the grid through a synchronous generator; hence, its operation and consequent grid impacts might mimic the conventional synchronous generator. The drivetrain of this type of turbines, however, is different from the more common Type-3 and Type-4 turbines. A hydraulic torque converter and gearbox with torque limiting feature are integral parts of a Type-5 wind turbine drivetrain, to isolate the wind speed variations at the wind turbine rotor from the grid connected generator side. This supports the synchronous operation of the generator. However, high fidelity models of Type-5 wind turbine drivetrain including these core components are not openly and widely available for grid integration and transient stability studies. Moreover, Type-5 turbines are not commonly deployed and hence its power generation and frequency stability characteristics are not widely publicized. This hinders appropriate assessment of Type-5 wind power plant's contribution to bulk grid resilience. This work provides transient stability assessment of a standalone Type-5 wind turbine. Normal operation and grid transient studies are performed to see the step load change and wind speed disturbance impacts on the Type-5 drivetrain and generation dispatch. Preliminary results show that Type-5 wind turbines can support load changes of between 0.6 p.u to 1.15 p.u. Beyond this point, the synchronization of the generator starts to deviate from its set point.

17 - WIND ENERGY↗

Renewable Electricity Futures. Operational Analysis of the Western Interconnection at Very High Renewable Penetrations

The Renewable Electricity Futures Study (RE Futures)--an analysis of the costs and grid impacts of integrating large amounts of renewable electricity generation into the U.S. power system--examined renewable energy resources, technical issues regarding the integration of these resources into the grid, and the costs associated with high renewable penetration scenarios. These scenarios included up to 90% of annual generation from renewable sources, although most of the analysis was focused on 80% penetration scenarios. Hourly production cost modeling was performed to understand the operational impacts of high penetrations. One of the conclusions of RE Futures was that further work was necessary to understand whether the operation of the system was possible at sub-hourly time scales and during transient events. This study aimed to address part of this by modeling the operation of the power system at sub-hourly time scales using newer methodologies and updated data sets for transmission and generation infrastructure. The goal of this work was to perform a detailed, sub-hourly analysis of very high penetration scenarios for a single interconnection (the Western Interconnection). It focused on operational impacts, and it helps verify that the operational results from the capacity expansion models are useful. The primary conclusion of this study is that sub-hourly operation of the grid is possible with renewable generation levels between 80% and 90%.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗