Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Readiness”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,297 records · Page 72

Gap Assessment (FY 13 Update)

To help guide its future data collection efforts, The DOE GTO funded a data gap analysis in FY2012 to identify high potential hydrothermal areas where critical data are needed. This analysis was updated in FY2013 and the resulting datasets are represented by this metadata. The original process was published in FY 2012 and is available here: https://pangea.stanford.edu/ERE/db/GeoConf/papers/SGW/2013/Esposito.pdf Though there are many types of data that can be used for hydrothermal exploration, five types of exploration data were targeted for this analysis. These data types were selected for their regional reconnaissance potential, and include many of the primary exploration techniques currently used by the geothermal industry. The data types include: 1. well data 2. geologic maps 3. fault maps 4. geochemistry data 5. geophysical data To determine data coverage, metadata for exploration data (including data type, data status, and coverage information) were collected and catalogued from nodes on the National Geothermal Data System (NGDS). It is the intention of this analysis that the data be updated from this source in a semi-automated fashion as new datasets are added to the NGDS nodes. In addition to this upload, an online tool was developed to allow all geothermal data providers to access this assessment and to directly add metadata themselves and view the results of the analysis via maps of data coverage in Geothermal Prospector (http://maps.nrel.gov/gt_prospector). A grid of the contiguous U.S. was created with 88,000 10-km by 10-km grid cells, and each cell was populated with the status of data availability corresponding to the five data types. Using these five data coverage maps and the USGS Resource Potential Map, sites were identified for future data collection efforts. These sites signify both that the USGS has indicated high favorability of occurrence of geothermal resources and that data gaps exist. The uploaded data are contained in two data files for each data category. The first file contains the grid and is in the SHP file format (shape file.) Each populated grid cell represents a 10k area within which data is known to exist. The second file is a CSV (comma separated value) file that contains all of the individual layers that intersected with the grid. This CSV can be joined with the map to retrieve a list of datasets that are available at any given site. The attributes in the CSV include: 1. grid_id : The id of the grid cell that the data intersects with 2. title: This represents the name of the WFS service that intersected with this grid cell 3. abstract: This represents the description of the WFS service that intersected with this grid cell 4. gap_type: This represents the category of data availability that these data fall within. As the current processing is pulling data from NGDS, this category universally represents data that are available in the NGDS and are ready for acquisition for analytic purposes. 5. proprietary_type: Whether the data are considered proprietary 6. service_type: The type of service 7. base_url: The service URL

15 GEOTHERMAL ENERGY↗

Applying Technology Ranking and Systems Engineering in Advanced Life Support

According to the Advanced Life Support (ALS) Program Plan, the Systems Modeling and Analysis Project (SMAP) has two important tasks: 1) prioritizing investments in ALS Research and Technology Development (R&TD), and 2) guiding the evolution of ALS systems. Investments could be prioritized simply by independently ranking different technologies, but we should also consider a technology's impact on system design. Guiding future ALS systems will require SMAP to consider many aspects of systems engineering. R&TD investments can be prioritized using familiar methods for ranking technology. The first step is gathering data on technology performance, safety, readiness level, and cost. Then the technologies are ranked using metrics or by decision analysis using net present economic value. The R&TD portfolio can be optimized to provide the maximum expected payoff in the face of uncertain future events. But more is needed. The optimum ALS system can not be designed simply by selecting the best technology for each predefined subsystem. Incorporating a new technology, such as food plants, can change the specifications of other subsystems, such as air regeneration. Systems must be designed top-down starting from system objectives, not bottom-up from selected technologies. The familiar top-down systems engineering process includes defining mission objectives, mission design, system specification, technology analysis, preliminary design, and detail design. Technology selection is only one part of systems analysis and engineering, and it is strongly related to the subsystem definitions. ALS systems should be designed using top-down systems engineering. R&TD technology selection should consider how the technology affects ALS system design. Technology ranking is useful but it is only a small part of systems engineering.

Jones, Harry↗

NASA Electrified Aircraft Propulsion Efforts

NASA's broad investments in Electrified Aircraft Propulsion (EAP) are reviewed in this paper. NASA investments are guided by an assessment of potential market impacts, technical key performance parameters, and technology readiness attained through a combination of studies, enabling fundamental research, and flight research. NASA has determined that the impact of EAP varies by market and NASA is considering three markets: national/international, on-demand mobility, and short haul regional air transport. Flight research is underway to demonstrate integrated solutions and inform standards and certification processes. This paper focuses on the vehicle related activities, however there are related NASA activities in air space management and vehicle autonomy activities as well as a breakthrough technology project called the Convergent Aeronautics Solutions Project. A key finding is that sufficient technical advances in key areas have been made which indicate EAP is a viable technology for aircraft. Significant progress has been made to reduce EAP adoption barriers and further work is needed to transition the technology to a commercial product and improve the technology so it is applicable to large transonic aircraft. This paper will review the activities of the Hybrid Gas Electric Subproject of the Advanced Air Transport Technology Project, the Revolutionary Vertical Lift Technology Project, and the X-57 Flight Demonstration Project, and discuss the potential EAP benefits for commercial and military applications.

Jansen, Ralph H.↗

Scaling Analysis Techniques to Establish Experimental Infrastructure for Component, Subsystem, and Integrated System Testing

Hybrid energy system research has the potential to expand the application for nuclear reactor technology beyond electricity. The purpose of this research is to reduce both technical and economic risks associated with energy systems of the future. Nuclear hybrid energy systems (NHES) mitigate the variability of renewable energy sources, provide opportunities to produce revenue from different product streams, and avoid capital inefficiencies by matching electrical output to demand by using excess generation capacity for other purposes when it is available. An essential step in the commercialization and deployment of this advanced technology is scaled testing to demonstrate integrated dynamic performance of advanced systems and components when risks cannot be mitigated adequately by analysis or simulation. Further testing in a prototypical environment is needed for validation and higher confidence. This research supports the development of advanced nuclear reactor technology and NHES, and their adaptation to commercial industrial applications that will potentially advance U.S. energy security, economy, and reliability and further reduce carbon emissions. Experimental infrastructure development for testing and feasibility studies of coupled systems can similarly support other projects having similar developmental needs and can generate data required for validation of models in thermal energy storage and transport, energy, and conversion process development. Experiments performed in the Systems Integration Laboratory will acquire performance data, identify scalability issues, and quantify technology gaps and needs for various hybrid or other energy systems. This report discusses detailed scaling (component and integrated system) and heat transfer figures of merit that will establish the experimental infrastructure for component, subsystem, and integrated system testing to advance the technology readiness of components and systems to the level required for commercial application and demonstration under NHES.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Commercial Absorption Heat Pump Water Heater: Beta Prototype Evaluation

The Beta version of the Commercial Absorption Heat Pump (CAHP) water heater was evaluated in the environmental chambers at Oak Ridge National Laboratory. Ambient air conditions ranged from 17 to 75 oF and inlet water temperatures ranged from 100 to 120oF in order to capture trends in performance. The unit was operated under full fire (100%) and partial fire (55%). The unit was found to perform at 90% of the project goal at the design conditions of 47oF ambient and 100oF water temperatures. The trends across the full range of environmental conditions were as expected for ambient air temperatures above 32oF. Below this temperature and for the full fire condition, frost accumulated on the evaporator coil. In future work a defrost strategy will be enabled, the unit will be thoroughly cleaned of an oil contamination and the rectifier will be reconfigured in order to meet the design goals and have a field test unit ready in early 2017.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Massachusetts and New England Sustainable Aviation Fuel Study

The Massachusetts Port Authority established a project to assess feedstock availability to produce SAF near 10 New England airports. A techno-economic analysis was conducted to determine renewable fuels and SAF that could be produced from these feedstocks. The resource assessment found municipal solid waste, woody biomass, and food waste were most abundant. The techno-economic analysis found that potential fuel production varied widely based on location, feedstock, and technology production pathway ranging from 1 to 369 million gallons of gasoline equivalent per year. An assessment of infrastructure readiness to handle SAF was conducted. It was determined that SAF produced outside of New England should be blended in other regions with more capacity and flexibility and delivered to New England as Jet A is today. For SAF produced in New England, there are terminals that have existing infrastructure to receive, blend, and distribute SAF/Jet A blends.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Advancements in Remote Ground Control Station Operator Pilot in Command Training Program for Beyond Visual Line of Sight Flight Operations

The training program for a Remote Ground Control Station Operator Pilot in Command (R-GCSO PIC) at NASA Langley Research Center marks a pivotal evolution in preparing operators for Beyond Visual Line of Sight (BVLOS) operations. This program, developed within the Advanced Air Mobility (AAM) project High Density Vertiplex (HDV) subproject, was crafted to bridge the gap between traditional Ground Control Station Operators (GCSO) and R-GCSO PICs, focusing on uncrewed aircraft systems (UAS). It encompassed extensive theoretical and practical training, including hands-on experience with advanced simulators and live flight operations, while ensuring a deep understanding of BVLOS complexities. The training leveraged NASA technologies like the MPATH (Measuring Performance for Autonomy Teaming with Humans) ground control station software and incorporated human factors principles to enhance operational readiness. This paper details the program's development, execution, and the critical insights gained, emphasizing the necessity of continuous adaptation in training methodologies to meet the evolving demands of UAS operations in the National Airspace System.

Ground control station operator↗

POWER's Journey and Roadmap: Where Have We Been and Where Are We Going?

This is a keynote presentation for the NASA LaRC's POWER (Prediction of Worldwide Energy Resources) Project's Global Summit to be held from November 6-7 as a on-line interactive webinar. This presentation presents a quick overview of the POWER project, the most recent accomplishments and the an overview of POWER's initiatives in 2025 and beyond.

remote sensing↗

Environmental Control and Life Support System Reliability for Long-Duration Missions Beyond Lower Earth Orbit

NASA has highlighted reliability as critical to future human space exploration, particularly in the area of environmental controls and life support systems. The Advanced Exploration Systems (AES) projects have been encouraged to pursue higher reliability components and systems as part of technology development plans. However, no consensus has been reached on what is meant by improving on reliability, or on how to assess reliability within the AES projects. This became apparent when trying to assess reliability as one of several figures of merit for a regenerable water architecture trade study. In the spring of 2013, the AES Water Recovery Project hosted a series of events at Johnson Space Center with the intended goal of establishing a common language and understanding of NASA's reliability goals, and equipping the projects with acceptable means of assessing the respective systems. This campaign included an educational series in which experts from across the agency and academia provided information on terminology, tools, and techniques associated with evaluating and designing for system reliability. The campaign culminated in a workshop that included members of the Environmental Control and Life Support System and AES communities. The goal of this workshop was to develop a consensus on what reliability means to AES and identify methods for assessing low- to mid-technology readiness level technologies for reliability. This paper details the results of that workshop.

Sargusingh, Miriam J.↗

Lunar Water Extraction Via Lunar Auger Dryer ISRU (LADI)

In 2009, the Lunar Reconnaissance Orbiter (LRO) and Lunar Crater Observation and Sensing Satellite (LCROSS) provided definitive proof of water in the Lunar’s southern permanently shadowed region (PSR)1. Both the 2020 NASA Technology Taxonomy2 and the Lunar Surface Innovation Initiative (LSII) team identified capability gaps in icy regolith transfer and reactor processing in Permanently Shadowed Region (PSR) environmental conditions. A water processing plant operating inside the PSR can continuously process water (and volatiles) for both breathable air and propellant. NASA’s Johnson Space Center (JSC) fabricated a unique breadboard test stand for validating the feasibility of this concept,developed a lunar auger dryer sizing tool, and identified the physical flow and thermal models required to design an Engineering Development Unit (EDU) for environmental testing. Over the two years this project was active, models were developed including: a) a sizing tool that scales the auger parameters based on production targets, b) accurate thermal models in both lab and lunar conditions, c) a Discreet Element Model (DEM) for observing particle effects in low-g, and d) incorporated these subsystem models into a MATLAB parametric Modular Open System Approach (MOSA) system model. These models were validated by testing the auger in both a mechanical and thermal system configuration. The results of this testing increased the Technology Readiness Level (TRL) of the Lunar Auger Dryer ISRU (LADI) system to TRL 4.

Lunar↗

Additively Manufactured Photovoltaic Inverter (AMPVI)

Successful integration of hundreds of gigawatts of solar photovoltaics (PV) into the electric power system requires transformative power conversion system design that optimizes various trade-offs among conflicting objectives, such as performance, reliability, functionality, and cost. To address this need, National Renewable Energy Laboratory, Oak Ridge National Laboratory, and Purdue University teamed up to develop a unique PV inverter design. The Additively Manufactured Photovoltaic Inverter (AMPVI) combines newer wide bandgap high-voltage silicon carbide (SiC) semiconductor devices with revolutionary concepts such as additive manufacturing and multi-objective magnetic design optimization. The AMPVI will not only provide superior technical capabilities in terms of energy conversion but also mitigate market barriers for SiC-based PV inverters. The benefits for this design will include better utilization of PV power due to higher DC voltage, lower operations and maintenance costs, better system efficiency, longer system lifetime, and advanced grid support functionalities for easier grid integration. All these advantages will lead to a significant reduction of the levelized cost of energy for PV systems. Activities in Budget Period 1 (BP1) of this 3-year integrated project were focused on development and component-level validation of the foundational building blocks needed for the AMPVI. Multiple interrelated tasks were completed in parallel during work towards the initial development of the high-voltage SiC-based power block, gate driver, controller board, and control algorithms. Initial development of magnetic design tools and initial inverter thermal and mechanical design was also completed in this period. All these activities ensured that the initial prototype (called “alpha-prototype”) power block and controller would be ready after BP1 for integration into the first inverter prototype (i.e., the alpha-prototype inverter) in BP2.

14 SOLAR ENERGY↗

Enabling Coal Technology with Carbon Capture for Future Markets with Flameless Pressurized Oxy-Combustion (FPO)

Future markets for power are expected to require more load following power plants, which reduces output during the night and early morning. This is when the demand for electricity is the lowest, so plants must respond rapidly at any time to peak loads resulting from the variable output of wind and solar power. A coal power plant based on Flameless Pressurized Oxy-combustion (FPO) can go from 5% to 100% of capacity rate in less than 30 minutes in response to fluctuating demand, operating at capacity when power prices are highest. FPO is a proven oxy-combustion technology that was developed to recover energy from low ranking coal, other brown fuels and wastes. ITEA began developing FPO in 2003 on a 5-MWth pilot in Gioia del Colle, Italy, to destroy hazardous industrial waste and as such, design objectives were very high combustion efficiencies and capture of metals in the fuel in the vitreous slag. The technology was subsequently deployed in 2009 at the 15-MWth scale at the Jurong Island petrochemical cluster in Singapore for waste incineration. FPO is an oxy-combustion process whereby oxygen is separated from the air, and it is used in combustion with recirculated flue gas to maintain combustion temperatures at acceptable levels. The resultant flue gas is primarily CO 2 and water, which allows for a relatively simple and cheap CO 2 capture process. This is in contrast to air-combustion systems which require a complex and costly post-combustion capture (PCC) process. Coal is fed to the combustor slurried in water, and the combustor operates at elevated pressure (approximately 12 bar) which improves the overall efficiency and reduces the size and cost of the combustor. Notably, the FPO cycle maintains high efficiency by recovering most of the heat of vaporisation of the contained water. The combustor is designed to coalesce the molten ash particles so that they settle to the chamber walls and drain to the outlet, significantly reducing the particulate content in the exhaust gas and allowing the use of coals with up to 40% alkaline ash content. FPO is a low-emission technology: zero thermal NOx minimises overall NOx; any organic nitrogen is converted to elemental nitrogen (N2). Total organic content (TOC) at combustor exit is hundreds of times lower than for traditional combustion processes, with dioxin and furans close to zero. Work commenced on a DOE funded pilot demonstration project in October 2016 to provide the design for a 50-MWth FPO pilot plant that can fire a wide range of high-to-low rank coals. The project will investigate updating and improving the cycle for power generation with CO 2 capture by incorporating a turbo-expander with a principal steam power island that utilizes a heat recovery steam generator, increasing the overall efficiency of the cycle. A cost study is also performed on the updated FPO design as part of the project. The FPO pilot plant built based on the design will then be demonstrated over a 3-year test program to generate data for the design of a commercial-scale 500 MWth firing module commercial power plant with integral carbon capture and sequestration (CCS), which could start construction in 2025. A discussion of the levelized cost of electricity (LCOE) of various cases are presented, including a comparison of established supercritical with PCC (SCPC) technologies with FPO fitted with CO 2 compression and liquefaction, and FPO ready for carbon capture and sequestration (CCS-ready). This would enable CO 2 capture for use in enhanced oil recovery (EOR) or sequestration when market conditions make it attractive to do so. In addition, a comparison of LCOE of FPO and conventional processes for firing low-ranking coals with high water and ash content will be provided.

01 COAL, LIGNITE, AND PEAT↗

Developing Technology Performance Level Assessments for Early-Stage Wave Energy Converter Technologies: Preprint

The advantage of using Technology Performance Level (TPL) in conjunction with Technology Readiness Level (TRL) assessments in guiding technology development trajectories to successful outcomes in less time, at less overall cost, and with less encountered risk has been well articulated in the literature. In partnership with industry and international collaborators, a TPL assessment methodology for grid-connected applications has been developed through the application of the systems engineering approach. Metrics under seven different categories have been developed, weighted based on their relative relevance, and combined to yield a composite score. The methodology has been implemented in a spreadsheet tool plus a web application specifically aimed at assessing early stage (TRL 1-3) concepts. The target use cases are (a) technology developers improving their design, to find fatal flaws early, to get feedback on current design, to identify areas of improvement that will yield the highest return on investment, (b) reviewers assessing technologies in competitions or for making funding decisions, (c) investor or project developer doing due diligence, (d) policy makers landscaping the technology domain for formulating R&D strategy. The methodology and the tools are undergoing continuous improvement based on the experience and lessons learnt from applying it to internal and external marine energy technology development projects. The methodology is also being adapted for assessing WECs servicing markets outside the continental grid - broadly categorized as Powering the Blue Economy (PBE) applications. Such applications have vastly different functional requirements entailing a modification of the methodology to account for their higher risk tolerance, reduced price sensitivities, lower power needs, different permitting protocols, etc. This paper presents the latest status of the TPL assessment methodology and tools, describes its adaptation to select PBE markets, and explores its extension to other domains where it could provide a comprehensive and holistic measure of a nascent or disruptive technology's technoeconomic performance potential.

metrics↗

Developing Technology Performance Level Assessments for Early-Stage Wave Energy Converter Technologies

The advantage of using Technology Performance Level (TPL) in conjunction with Technology Readiness Level (TRL) assessments in guiding technology development trajectories to successful outcomes in less time, at less overall cost, and with less encountered risk has been well articulated in the literature. In partnership with industry and international collaborators, a TPL assessment methodology for grid-connected applications has been developed through the application of the systems engineering approach. Metrics under seven different categories have been developed, weighted based on their relative relevance, and combined to yield a composite score. The methodology has been implemented in a spreadsheet tool plus a web application specifically aimed at assessing early stage (TRL 1-3) concepts. The target use cases are (a) technology developers improving their design, to find fatal flaws early, to get feedback on current design, to identify areas of improvement that will yield the highest return on investment, (b) reviewers assessing technologies in competitions or for making funding decisions, (c) investor or project developer doing due diligence, (d) policy makers landscaping the technology domain for formulating R&D strategy. The methodology and the tools are undergoing continuous improvement based on the experience and lessons learnt from applying it to internal and external marine energy technology development projects. The methodology is also being adapted for assessing WECs servicing markets outside the continental grid - broadly categorized as Powering the Blue Economy (PBE) applications. Such applications have vastly different functional requirements entailing a modification of the methodology to account for their higher risk tolerance, reduced price sensitivities, lower power needs, different permitting protocols, etc. This paper presents the latest status of the TPL assessment methodology and tools, describes its adaptation to select PBE markets, and explores its extension to other domains where it could provide a comprehensive and holistic measure of a nascent or disruptive technology's technoeconomic performance potential.

metrics↗

Safety Characteristics in System Application of Software for Human Rated Exploration Missions for the 8th IAASS Conference

NASA and its industry and international partners are embarking on a bold and inspiring development effort to design and build an exploration class space system. The space system is made up of the Orion system, the Space Launch System (SLS) and the Ground Systems Development and Operations (GSDO) system. All are highly coupled together and dependent on each other for the combined safety of the space system. A key area of system safety focus needs to be in the ground and flight application software system (GFAS). In the development, certification and operations of GFAS, there are a series of safety characteristics that define the approach to ensure mission success. This paper will explore and examine the safety characteristics of the GFAS development. The GFAS system integrates the flight software packages of the Orion and SLS with the ground systems and launch countdown sequencers through the 'agile' software development process. A unique approach is needed to develop the GFAS project capabilities within this agile process. NASA has defined the software development process through a set of standards. The standards were written during the infancy of the so-called industry 'agile development' movement and must be tailored to adapt to the highly integrated environment of human exploration systems. Safety of the space systems and the eventual crew on board is paramount during the preparation of the exploration flight systems. A series of software safety characteristics have been incorporated into the development and certification efforts to ensure readiness for use and compatibility with the space systems. Three underlining factors in the exploration architecture require the GFAS system to be unique in its approach to ensure safety for the space systems, both the flight as well as the ground systems. The first are the missions themselves, which are exploration in nature, and go far beyond the comfort of low Earth orbit operations. The second is the current exploration system will launch only one mission per year even less during its developmental phases. Finally, the third is the partnered approach through the use of many different prime contractors, including commercial and international partners, to design and build the exploration systems. These three factors make the challenges to meet the mission preparations and the safety expectations extremely difficult to implement. As NASA leads a team of partners in the exploration beyond earth's influence, it is a safety imperative that the application software used to test, checkout, prepare and launch the exploration systems put safety of the hardware and mission first. Software safety characteristics are built into the design and development process to enable the human rated systems to begin their missions safely and successfully. Exploration missions beyond Earth are inherently risky, however, with solid safety approaches in both hardware and software, the boldness of these missions can be realized for all on the home planet.

capability↗

Global Response of the Space Shuttle External Tank with the Presence of Intertank Stringer Cracks and Radius Blocks

After propellant was loaded into the external tank (ET), the November 5, 2010 launch of Space Shuttle mission STS-133 was scrubbed due to a gaseous hydrogen leak located in a vent line near the ground umbilical and ET connection. Subsequent visual inspections identified cracks in the sprayed-on foam insulation in the forward end of the ET intertank segment, adjacent to the liquid oxygen (LOX) tank, as shown in Figure 1. These cracks necessitated repair of the foam due to debris concerns that violated launch constraints. As part of the repair process, the affected foam was removed to reveal cracks in the underlying external hat stiffeners on the intertank, as shown in Figure 2. Ultimately, five stiffeners were discovered to be cracked adjacent to the LOX tank. As the managing center for the ET Project, NASA Marshall Space Flight Center (MSFC) coordinated failure investigation and repair activities among multiple organizations, which included the ET prime contractor (Lockheed Martin Space Systems Michoud Operations), the Space Shuttle Program Office at the NASA Johnson Space Center (JSC), the NASA Kennedy Space Center (KSC), and the NASA Engineering and Safety Center (NESC). STS-133 utilized the external tank designated as ET-137. Many aspects of the investigation have been reported previously in Refs. 1-7, which focus on the root cause of the failures, the flight readiness rationale and the local analyses of the stringer failures and repair. This paper summarizes the global analyses that were conducted on ET-137 as part of the NESC effort during the investigation, which was conducted primarily to determine if the repairs that were introduced to the stringers would alter the global response of the ET. In the process of the investigation, a new STAGS tabular input capability was developed to more easily introduce the aerodynamic pressure loads using a method that could easily be extended to incorporate finite element property data such as skin and stiffener thicknesses and beam cross-sectional properties.

Lovejoy, Andrew E.↗

40 Years of Processing Pieces of Space

This year marks the 40th year anniversary for the Antarctic Search for Meteorite (ANSMET) program. In 1976, the ANSMET program led the first expedition to Antarctica. The ANSMET program is a US-led field-based science project that recovers meteorite samples from Antarctica. Once a year from late November to late January, a field team consisting of 8 to 12 people, spends 6-8 weeks camping on the ice and collecting meteorites. Since 1976, more than 22,000 meteorite samples have been recovered. These meteorites come from asteroids, planets and other bodies of the solar system. Once collected, the Antarctic meteorites are shipped to NASA/Johnson Space Center (JSC) Houston, TX. in a refrigerated truck and are kept frozen to minimize oxidation until they are ready for initial processing. In Antarctica each meteorite is given a field tag which consists of numbers, once in the lab, this is replaced by an official tag, consisting of the Antarctic field location and year collected. The types and numbers of meteorites that have been classified include 849 carbonaceous chondrites, 135 enstatites, 512 achondrites, 64 stony, 115 irons, 48 others (27 R chondrites, 7 ungrouped), 6,161 H chondrites, 7,668 L chondrites, and 4,589 LL chondrites. Although 80-85 percent of the collected meteorites fall in the ordinary chondrite group, the other approximately 15 percent represent rare types of achondrites and carbonaceous chondrites. These rare meteorites include 25 lunar meteorites, 15 Martian meteorites, scores of various types of carbonaceous chondrites, and unique achondrites. The Antarctic meteorites that have been collected are processed in the Meteorite Processing Lab at JSC in Houston, TX. Initial processing of the meteorites begins with thawing/drying the meteorites in a nitrogen glove box for 24 to 48 hours. The meteorites are then photographed, measured, weighed and a description of the interior and exterior of each meteorite is written. The meteorite is broken and a representative sample, either a 1-3 gram chip or thin section is sent to the Smithsonian Institution for classification. After Antarctic meteorites have been classified and approved by the Nomenclature Committee of the Meteoritical Society, they are announced in the Antarctic Meteorite Newsletter, which is published twice per year (fall and spring) so that scientists may review which meteorites are available to study. Requests for Antarctic Meteorite samples are welcomed from research scientists, regardless of their current state of funding for meteorite studies. Since its inception over 3,300 requests have been made for pieces of these meteorites and over 400 investigators worldwide are active in the study of meteorites.. Research on these samples has been published in more than1500 peer reviewed articles; a listing of papers for any meteorite sample can be generated by accessing http://curator.jsc.nasa.gov/antmet/referencesearch.cfm. Antarctic meteorite samples requested by scientists are prepared several different ways. Most samples are prepared as chips, either using a rock splitter or using a chisel and chipping bowl. In special situations, a researcher may request a meteorite slab in which case the samples are cut using a diamond-bladed bandsaw inside of a dry nitrogen glove box. The meteorites are always cut in a 100 percent liquid-free environment. Additionally, thin/thick sections of Antarctic meteorites are also prepared at JSC. The meteorite thin section lab at JSC can prepare standard 30-micron thin sections, thick sections of variable thickness (100 to 200 microns), or demountable sections using superglue, all section are prepared without using water. Although many of the techniques used back in the '70's are still used today, advances in computers, software, databases, available tools and instrumentation have helped to streamline and shorten the duration of the classification process. In conjunction with present day missions to asteroids and other planets, meteorite studies have not only led to a better understanding of the complex histories of these bodies but have also tied certain meteorite groups to particular asteroid bodies. New meteorite discoveries by the ANSMET program provide a cost effective method for obtaining samples of previously unsampled bodies, allowing scientists to learn more about the origin, composition, and evolution of the solar system. Preservation in our cleanrooms at NASA allows material to be archived for future generations and advances in instrumentation and analysis.

Satterwhite, C. E.↗

Observational Data for Next-Generation Climate Model Evaluation: Requirements, Considerations, and Best Practices

Climate model simulations are an important source of information about our planet’s climate system and also enable informed decision-making under different future scenarios. As a new archive of results from the next generation of climate models is anticipated to become available with the Coupled Model Intercomparison Project phase 7 (CMIP7), the need to develop efficient and robust methods to evaluate models is paramount. Observations are an integral part of model evaluation, providing a means to quantify and understand the degree to which climate models can faithfully reproduce Earth system processes. Such analysis is critical for constraining climate projections, identifying areas of focus for model development, and assisting analysts in deciphering the utility of models for specific applications. Observations of Earth system come from a diversity of sources, span different space–time domains, and are produced by different communities, and each dataset features different data structures and formats, metadata standards, and its own unique uncertainties. Uncertainties in an observational dataset may stem from gaps in temporal and spatial coverage, instrumentation errors, or assumptions in retrieval and processing methods. How then does one ensure that observational data are ready for use and utilized in the most appropriate way for robust, rapid, and routine climate model evaluation? The CMIP7 Model Benchmarking Task Team with input from the broader climate modeling, model evaluation, and observational data communities present a vision and considerations for best practices toward the optimal and appropriate use of observational data to support next-generation climate model evaluation.

Climate models↗