Search NASA⌕ Search

SEARCH · Search NASA

Results for “RADIOACTIVE WASTE STORAGE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,297 records · Page 72

RCRA Personnel Training, Course 7488

Federal and state regulations require hazardous and mixed waste facility workers at treatment and storage facilities (TSFs) and <90-day accumulation areas to be trained in hazardous and mixed waste management. This course will refamiliarize and update <90-day accumulation area workers, TSF workers, and supervisors of TSF workers regarding waste identification, pollution prevention, storage area requirements, emergency response procedures, and record-keeping requirements.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Develop Plan for Analysis of the Effluent from GCM Production

This milestone is focused on developing a plan for the analysis of the effluent from the Sandia low temperature sintering Bi-Si-Zn oxide glass composite material (GCM) waste form for the long term storage of iodine and its capture materials.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

La Hague Legacy Waste Recovery Program: Scope, Progress and Issues -12080

A significant inventory of process waste of varying natures and quantities has been generated during the thirty years of operation of UP2 400 facility on the site of La Hague, France. The retrieval, packaging and final storage of such an inventory has never been achieved before in France and thus requires the design and qualification of new processes, equipment, and waste packages. Following AREVA strategic decisions and French safety authority requirements, the legacy waste program has begun around the year 2000 and is scheduled to be completed around the year 2025. It is under the responsibility of AREVA Site Value Development Project teams. For each category of waste to be recovered, AREVA teams conducted detailed investigations, defined recovery modes, treatment processes, as well as final waste package forms, which they subsequently submitted to French safety and waste management authorities. A Task force initiative was subsequently launched to optimize the program cost and scenario, and lead to an optimization of about 15% of the entire program. The qualification of processes and waste packages required a significant amount of research and development which is now well under way for processes, and scheduled to be completed in 2015. Preparation work has begun on several installations to clear space for the construction of future retrieval facilities, scheduled to begin in the coming three years. La Hague Legacy waste retrieval program represents a significant challenge in the sense that it covers a significant variety and quantity of waste needing recovery and reconditioning, with tight financial objectives and a binding recovery schedule. During the past five years, AREVA SVD successfully conducted design, research, development, and qualification activities which lead to the definition of qualified processes and waste packages for each retrieval program. Preparation work and supplier consultations are now on-going, in order to meet our objectives of beginning retrieval operations in compliance with our commitments to the safety authorities, in 2015 and 2016. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Belgian Research and Development Feasibility Programme for the Geological Disposal of High-Level and Long-Lived Radioactive Waste - 12338

ONDRAF/NIRAS, the Belgian Agency for Radioactive Waste and Enriched Fissile Materials, considers geological disposal in the poorly indurated Boom Clay as the reference solution for the long-term management of high-level and/or long-lived radioactive waste. To develop a safety concept and design for geological disposal, ONDRAF/NIRAS follows an iterative process demonstrating that the repository will be both safe and feasible to implement. This process is called the safety strategy. A part of the safety strategy is the feasibility programme which aims at demonstrating, at a conceptual level, that the proposed geological disposal system can be constructed, operated and progressively closed. The followed methodology is based on the substantiation of a hierarchy of feasibility statements. These statements cover all activities from the removal of primary waste packages from interim storage buildings to the closure of the disposal site and a period of institutional control. They focus on engineering practicability, health and safety and environmental considerations, costs and quality assurance issues. A 4 year research project to support the R and D feasibility programme was launched in 2009 with several international partners coordinated by ONDRAF/NIRAS. It aims at confirming that there are no fundamental flaws or show-stoppers in the feasibility of building and operating the facilities for geological disposal in the Boom Clay. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterisation of MR reactor pond in nNRC 'Kurchatov institute' before dismantling work

In this work complex α-, β-, γ-spectrometric research of water, bottom slimes and deposits on walls of the reactor pond and the storage pond of the MR reactor was made. Identify, that the main dose forming radionuclide, during dismantling work on the reactor MR, is Cs-137. It is shown, that specific activity of radionuclides in bottom slimes considerably exceed specific activity of radionuclides in water from ponds, and near to high level radioactive waste. It is detected that decreasing the water level in reactor ponds on 1 m, increase the exposure dose rate at a distance 1 m from the pond in 2 times. The observed increase in exposure dose rate can be explained by contribution on dose rate the cesium-137 deposed on walls of the storage pond. Effectiveness of cleaning of walls of the pool of storage from deposits by a water jet of high pressure is investigated. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Proposed Path Forward for Standardization - 17131

Incorporation of a standardized canister system into the commercial waste management system represents an opportunity to develop an integrated approach to storage, transportation, and disposal issues. However, regardless of timing and method, deployment of such a system would have the potential to cause significant system-wide impacts. The current inventory of commercial spent nuclear fuel dry storage systems is diverse and increasing. In addition, the currently loaded systems are large-capacity systems (up to 37 pressurized water reactor assemblies or 89 boiling water reactor assemblies) that are now able to accommodate large (greater than 45 kilowatts) amounts of heat during storage, with the potential to accommodate fairly high heat loads (∼32 kilowatts) for transportation as well. A standardized canister system designed with disposition in mind would likely be significantly smaller than the current systems and have dramatically lower heat limit maximums. Over the past few years, the Department of Energy (DOE) Office of Nuclear Energy Fuel Cycle Technologies Nuclear Fuels Storage and Transportation Planning Project (NFST) has performed a number of system analyses using logistic simulations to evaluate the impacts of incorporating these smaller canisters into the commercial waste management system. These simulations predict the amount of resources (e.g., staff, canisters/casks, rail-cars, facilities), the size of facilities, and the timing of operations, as well as provide rough order-of-magnitude cost estimates. In addition to system analyses, DOE funded efforts by EnergySolutions to develop a generic design of a small-capacity standardized canister system and investigate innovative operational approaches to minimize the at-reactor operational impacts of loading such smaller canisters. A result of EnergySolutions' work was the development of a 'canister-in-carrier' concept that would allow for loading, storing, transporting, and potentially disposing of groups of small canisters at the same time. With the inclusion of this new concept, the most recent system analyses show that incorporating standardized canister systems into the commercial waste management system has the potential for some system-wide cost reductions in addition to the flexibility that smaller canisters would provide to the system. Based on these analyses, the authors of this paper recommend that DOE fund (1) a demonstration of the ability to weld up to four small canisters at the same time to confirm the feasibility and practicality of the canister-in-carrier concept and (2) the development of a more detailed conceptual design for future applications for Certificates of Compliance, if standardized canisters were incorporated into the commercial waste management system. This paper documents both the results of the latest assessment of standardized canister concepts including the canister-in-carrier concept and the authors' recommendations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Model from the Mind to the Operating Facility - 16448

The reprocessing of Spent Magnox fuel has been undertaken at the Sellafield site in the United Kingdom (UK) for more than 50 years and is now entering the final few years of its operating programme. The age of this facility has resulted in additional operational challenges which have led to the need for a sustained programme of continuous improvement. It has therefore been necessary to assess what potential plant improvements are key to delivering a successful end to the operating programme. In 2003 the UK National Nuclear Laboratory (NNL) (then Nexia Solutions) worked with Sellafield Ltd to produce a visual discrete event simulation (DES) model. The DES approach models plant equipment (such as a storage pond crane or fuel element processing equipment), and the key processes that these items undertake. Process times, availability and process logic are all combined to provide a prediction of the plant performance. Through the use of 'what-if' scenarios, changes to any model parameter can be undertaken. The benefits of such an approach have been in the ability for Sellafield Ltd to understand which changes to make and which do not add value. This then allows the operating facility to focus the improvement programme on quantitatively underpinned benefits, thus increasing the potential to complete the reprocessing programme ahead of schedule, which is a key aim for Sellafield Ltd. Maximising the benefit of this model has required a close working relationship between NNL, Sellafield Ltd Technical and the Sellafield Ltd Operations teams to ensure that the model is using the correct information and is addressing the real issues at hand. Over the past 12 years many ideas have been assessed and three examples have been selected to demonstrate the range of use of the model, and the different approaches used to identify issues and opportunities, agree an approach and provide solutions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning of the Chernobyl NPP: Problems, Progress, Prospects - 18485

Decommissioning of the Chernobyl NPP provides a special case due to a number of peculiarities: it is prescheduled decommissioning, the facilities undergone a major accident with off-site contamination, no previous experience of decommissioning of RBMK-type nuclear power units, unavailability of proper spent fuel and radioactive waste management infrastructure, special types of waste. The most challenging issue is the final decommissioning of the Unit 4 destroyed by the major accident on 26 April 1986. Neither of four RBMK-1000 nuclear power units was in operation till the end of the design-based lifetime, Units 1 and 3 being in operation for 19 years each, Units 2 and 4 even less. The last operating unit, Unit 3, was permanently shutdown on December 15 2000, however the main obstacle to complete a complex technological and radiological survey was spent fuel left in reactor pools and in the core due to lack of capacity in the existing interim spent fuel storage of wet type (ISF-1). So removal of spent fuel from the core and reactor pools was considered as one of the priority tasks. While construction of ISF-2 (of dry type) was delayed due to different reasons, safety reassessment and modernization of ISF-1 enabled capacity increase and transfer of all non-damaged fuel assemblies into ISF-1. Thus Chernobyl NPP Units were fully vacated from spent fuel. Since that Chernobyl NPP Units are considered as the radioactive waste facility. Dismantlement of Units 1,2 turbine hall equipment is on the way and some progress is achieved in technical solution for fragmentation of long-size equipment. All dismantled equipment after decontamination and characterization is either released from regulatory control or disposed as solid radioactive waste. The details are discussed in the paper. Eventually the comprehensive technological and radiological survey of Chernobyl NPP Units had been completed and detailed decommissioning programme had been endorsed. The decommissioning strategy chosen for the Chernobyl NPP is based on the deferred dismantlement approach, so final dismantlement of all equipment and constructions is supposed after some period of decay storage. However, the issue of the final state of the site and its further use is still open. The main reason for it is the lack of clear picture as for the destroyed Unit 4, as technical solutions concerning its highly damaged and contaminated constructions and so called fuel containing masses (FCM) are not available yet. It could be reasonably predicted also that the internal part of the so called exclusion zone will not be released into non-restricted use in near future due to characteristics of its contamination. Possible implications of these and other factors on further decommissioning activities and some approaches to find solutions are discussed in the paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Management of Disused Radioactive Sealed Sources in the Slovak Republic - 12100

After splitting-up the Czechoslovak Federation in 1993, the system of management of institutional radioactive waste, where disused sources represent its significant part, had had to build from beginning, since all corresponding activities had remained in the Czech part of the Federation. The paper presents the development of legislative and institutional framework of the disused radioactive sealed source management, development of the national inventory and development of management practices. According the Governmental decision (1994), the management of disused sealed sources and institutional radioactive waste at whole was based on maximal utilization of facilities inside nuclear facilities, particularly in the NPP A1 (shut down in the past, currently under decommissioning). This approach has been recently changing by Governmental decision (2009) to construct 'non-nuclear facility' - central storage for remained disused sealed sources collected from the places of use, where they were stored in some cases for tens of years. The approaches to siting and construction of this storage facility will be presented, as well as the current approaches to solution of the disused radioactive sources final disposal. Environmental impact assessment process in regard to the given facility/activity is slowly drawing to a close. The final statement of the Ministry of Environment can be expected in January or February 2012, probably recommending option 1 as preferred [6]. According to the Slovak legislation, the final statement has a status of recommendation for ongoing processes leading to the siting license. Very recently, in December 2012, Government of the Slovak republic decided to postpone putting the facility into operation by the end of June, 2014. (author)

07 ISOTOPE AND RADIATION SOURCES↗

Removal or storage of environmental pollutants and alternative fuel sources with inorganic adsorbents via host–guest encapsulation

The ever-increasing demands of the modern world continue to place substantial strain on the environment. To help alleviate the damage done to the natural world, the encapsulation of small molecules or ions (guests) into porous inorganic structural frameworks (hosts) provides a potential remedy for some of the environmental concerns facing us today. These concerns include the removal of harmful pollutants from water or air, the safe entrapment of nuclear waste materials, or the purification and storage of small molecules that act as alternative fuel sources. For this study, we review the trends in using inorganic materials as hostmedia for the removal or storage of various wastes and alternative fuels. In conclusion, we cover the treatment of water contaminated with dyes or heavy metals, air pollution alleviation via CO 2 , SO x , NO x , and volatile organic compound containment, nuclear waste immobilization, and storage for H 2 and methane as alternative fuels.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Momentum informed muon scattering tomography for monitoring spent nuclear fuels in dry storage cask

Development of an effective monitoring method for spent nuclear fuel (SNF) in a dry storage cask (DSC) is important to meet the increasing demand for dry storage investigations. The DSC investigation should provide information about the quantity of stored SNF, and quality assurance of materials should be possible without opening the cask. However, traditional nondestructive examination (NDE) methods such as x-rays are difficult to deploy for DSC investigation because a typical DSC is intentionally designed to shield against radiation. To address this challenge, cosmic ray muons (CRMs) are used as an alternative NDE radiation probe because they can easily penetrate an entire DSC system; however, a wide application of muons is often hindered due to the naturally low CRM flux (~10 4 muons/m 2 /min). This paper introduces a newly proposed imaging algorithm, momentum-informed muon scattering tomography (MMST) , and presents how a limitation of the current muon scattering tomography technique has been addressed by measuring muon momentum. To demonstrate its functionality, a commercial DSC with 24 pressurized light water reactor fuel assemblies (FAs) and the MMST system were designed in GEANT4. Three noticeable improvements were observed for MMST system as a DSC investigation tool: (1) a signal stabilization, (2) an enhanced capability to differentiate various materials, and (3) statistically increased precision to identify and locate missing FAs. The results show that MMST improves the investigation accuracy from 79 to 98% when one FA is missing and 51% to 88% when one-half FA is missing. The advancement of the NDE technique using CRM for DSC verification is expected to resolve long-standing problems in increasing demand for DSC inspections and nuclear security.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Test plan for formulation and evaluation of grouted waste forms with shine process wastes

The objective of this experimental project is to demonstrate that waste streams generated during the production of Mo99 by the SHINE Medical Technologies (SHINE) process can be immobilized in cement-based grouted waste forms having physical, chemical, and radiological stabilities that meet regulatory requirements for handling, storage, transport, and disposal.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Idaho-Developed Technologies, Processes Offer Unique Solutions to Waste Management Challenges - 19281

INL Site cleanup contractor Fluor Idaho, LLC (Fluor Idaho) and its predecessors have developed a host of state-of-the-art technologies and specialized processes for nuclear waste handling, treatment, storage, and shipping. The cleanup program has also repurposed and upgraded previously idled Cold War-era buildings to treat and repackage both on- and off-site generated radioactive and hazardous wastes. And lastly, Fluor Idaho is using one-of-a-kind equipment to protect waste management personnel as they undertake their work to meet cleanup commitments that the Department of Energy (DOE) made to the state of Idaho. Such applications, although developed for Idaho's wastes, have the potential to benefit other facilities within the DOE Complex. Engineers and fabricators have teamed up to develop truly unique devices made of specialized metals, like stainless steel alloys, and more readily available materials such as Lexan. All waste types that Fluor Idaho manages daily - spent nuclear fuel, both high- and low-level wastes, and both remote-handled (RH) and CH-TRU - benefit from these innovations. Without question, the greatest number of specialized equipment, processes, and worker-protection technologies developed are for the retrieving, characterizing, repackaging, and shipping of TRU wastes, which makes sense considering the INL Site stores the most TRU waste in the DOE Complex. On the CH-TRU retrieval front, crews are using specially modified Gradall excavators to protect workers while they exhume Rocky Flats Plant wastes that were sent to Idaho in the 1950's and 1960's and buried in a shallow landfill. The excavators are supplied with extra Lexan windows to protect operators from the potential for flying debris during exhumation. On-board supplied air, pumped into the cab, and individual air supplies protect workers from inhalation hazards. Also on-board infrared cameras allow operators to detect heat generating from reactive metals at the dig face. At the Advanced Mixed Waste Treatment Facility (AMWTP), Brokk robotic arm operators use a 'super clam' claw, designed and built at the INL Site, on the remotely operated heavy equipment to size-reduce waste boxes, drums, concrete, and metal containing TRU constituents. The super clam is so powerful and dexterous that operators can crush a 55-gallon drum into the size of a basketball, but also delicately turn the pages of a magazine. Boxes too large to be sized at the AMWTP's box-lines are sent to the Accelerated Retrieval Project VII facility to be sized by Waste Management personnel. Such waste boxes, which sometimes contain 'flighty' plutonium-238 material, have forced the project to employ a heavily ventilated and filtered interior tent. Not all technologies developed for the Waste Management program are high-technology; in fact, one piece of equipment is so simple it's literally ingenious. Operators who inspect and repackage RH-TRU inside a hot cell at the Idaho Nuclear Technology and Engineering Center (INTEC) needed a backup plan in case the hot cell port couldn't be closed in the event of a power outage. Engineers and fabricators collaborated to develop a port cover actuator mechanism, which allows operators to open and close the cell's hatch cover with nothing more than a cordless drill. Also at INTEC, Maintenance Shop fabricators developed a Lexan container or 'pig' suitable for shielding neutron-emitting TRU waste sources. Lexan was chosen as the preferred shielded container material for this special type of waste because neutrons are best shielded with materials containing lots of hydrogen, such as plastics, which are composed of carbon and hydrogen molecules. Once approved for shipment, the high-activity waste will be loaded into specialty casks and shipped to WIPP for permanent disposal. Although all these technologies and processes were initially developed for resolving challenges at the INL Site, their applications could be far-reaching. Like the INL Site, many other facilities in the DOE Complex manage, treat, store, and ship TRU, low-and high-level wastes, and spent nuclear fuel. The technologies and processes developed in Idaho protect Waste Management personnel as they undertake their work, but these benefits could be utilized by other facilities and personnel doing similar work. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization of oxide films on aluminum materials following reactor exposure and wet storage in the SRS L-Basin

This report describes the characterization of oxide films on one cropped piece of 6061, one 6063, and one cropped piece that could have been either 6061 or 6063 aluminum-based alloy, stored wet for up to approximately 40 years in L-Basin on the Savannah River Site (SRS). One 6061 cropping was from a Missouri University Research Reactor (MURR) fuel element. The 6063 piece was from a cropping from a Universal Sleeve Housing (USH). The Mark-16B fuel assembly could have been either 6061 or 6063 based on design drawings. Both the Mark-16B and USH were used in SRS Production Reactors. Characterization of the as-received oxides includes the oxide morphology, thickness, structure, and chemical composition. The aim is to characterize the oxide layer on aluminum cladding and fuel components that have reactor service and long-term basin storage service.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Innovative Approach to SCC Inspection and Evaluation of Canister in Dry Storage

This final report is summarized four years of work of awarded project number DE-NE0008442\IRP-15-9318, title as: “Innovative Approach to SCC Inspection and Evaluation of Canister in Dry” supported by Nuclear Energy University Program\Integrated Research Program, NEUP\IRP, where last year is an extension of no cost project. This research work is focused on the possible degradation of dry storage canister holding used nuclear fuel (UNF), due to exposure of marine atmospheric environment. The canister usually designed from a welded austenitic stainless-steel of types 304 or 316, encased in a concrete shell known as an overpack. This canister designed and licensed for 20 years with an extension period need to be determined, in addition 20 years or more. These casks are located throughout the country in Independent Spent Fuel Storage Installations (IFSFIs) often on the site close to nuclear power plants, that are often located in coastal or lake-side regions where a marine atmospheric salt air environment exist. As a result of several recent decisions, such as not pursuing Yucca Mountain as a long-term geologic repository storage facility for UNF and the cancellation of the construction of a reprocessing facility in the 1980s due to proliferation risks, interim dry storage facilities for long-term storage are vital option for the immediate future of nuclear energy technology. One of the primary concerns with respect to the long-term performance of the storage casks is the potential for corrosion initiation due to deliquescence of salts deposited on the canister surface as aerosols; in regions of high residual weld stresses, this may lead to localized stress corrosion cracking (SCC). Dust and aerosols in the air being drawn though ventilation openings in the overpacks of passively ventilated dry canister storage systems may be deposited on the stainless-steel canister outer surfaces. Under these conditions, localized corrosion attack can occur. Chlorides ions deliquescence on the canister surface, a process by which the salts essentially pull moisture out of the air, creating a concentrated salt brine on the canister surface. Chloride-induced stress corrosion cracking (CISCC) of welded zones is of special concern, as it a well-documented mode of attack for austenitic stainless steels marine environments, and many independent spent fuel storage installations (ISFSIs) are located in coastal areas. Recent canister inspections have shown that chloride salts are present on the surface of in-service canisters at near-marine settings. However, canister surface inspections of satisfactory resolution to detect SCC have never been carried out in details, because access to the canister surfaces through vents in the overpacks is extremely limited, and high radiation fields make removal of the canisters from the overpacks undesirable. Although no significant corrosion damage has not been detected up to date, there is concern that this may lead to pitting corrosion, which could in turn develop into stress corrosion cracking, causing canister structural failure. The initiation and propagation of pitting corrosion has been widely studied in full immersion conditions, but limited studies have been done on marine atmospheric conditions, which is a focus of this work, these includes laboratory and field experimentally and propagation rate modeling of pitting and transition to crack, and crack propagation rate. It is known, however, that the rate of atmospheric corrosion can be affected by variations in relative humidity (RH), salt density, salt type, droplet area, temperature and stainless-steel microstructure and residual stress particularly in welded zones of canisters. The integrated research program has identified potential deterioration mechanisms for the stainless-steel canisters containing the UNF in dry storage that require detailed research and investigation and will have an impact on the performance of long-term interim storage under the normal and extreme environmental conditions experienced during the duration of this storage. The prediction and monitoring of canister corrosion processes while in storage can provide important data for the assessment of interim storage performance and the safety to the public. This report comprises of mainly the published results in different journals and covering a wide range spectrum from susceptible stainless-steel types 304\316 microstructural analysis through the implant test at atmospheric environment, residual stress analysis of mockup canister and simulation, inspection methodology includes nonlinear ultrasound and vibro-thermography and stochastic modeling and simulation of pits propagation rates and transition to cracks. Description of field specimens installed at ISFSI of Main Yankee is given in the following chapters and will be analyzed in the coming future and serves as an important data for a stochastic analysis as it was drawn from the publications and reports described in this report. The purpose of this report is to bring together the project efforts that includes improving in our understanding of structural aging performance at current dry storage casks fleet at ISFSIs in the context of remedial maintenance and inspection applications technologies.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Deep Geologic Nuclear Waste Disposal - No New Taxes - 12469

To some, the perceived inability of the United States to dispose of high-level nuclear waste justifies a moratorium on expansion of nuclear power in this country. Instead, it is more an example of how science yields to social pressure, even on a subject as technical as nuclear waste. Most of the problems, however, stem from confusion on the part of the public and their elected officials, not from a lack of scientific knowledge. We know where to put nuclear waste, how to put it there, how much it will cost, and how well it will work. And it's all about the geology. The President's Blue Ribbon Commission on America's Nuclear Future has drafted a number of recommendations addressing nuclear energy and waste issues (BRC 2011) and three recommendations, in particular, have set the stage for a new strategy to dispose of high-level nuclear waste and to manage spent nuclear fuel in the United States: 1) interim storage for spent nuclear fuel, 2) resumption of the site selection process for a second repository, and 3) a quasi-government entity to execute the program and take control of the Nuclear Waste Fund in order to do so. The first two recommendations allow removal and storage of spent fuel from reactor sites to be used in the future, and allows permanent disposal of actual waste, while the third controls cost and administration. The Nuclear Waste Policy Act of 1982 (NPWA 1982) provides the second repository different waste criteria, retrievability, and schedule, so massive salt returns as the candidate formation of choice. The cost (in 2007 dollars) of disposing of 83,000 metric tons of heavy metal (MTHM) high-level waste (HLW) is about $ 83 billion (b) in volcanic tuff, $ 29 b in massive salt, and $ 77 b in crystalline rock. Only in salt is the annual revenue stream from the Nuclear Waste Fund more than sufficient to accomplish this program without additional taxes or rate hikes. The cost is determined primarily by the suitability of the geologic formation, i.e., how well it performs on its own for millions of years with little engineering assistance from humans. It is critical that the states most affected by this issue (WA, SC, ID, TN, NM and perhaps others) develop an independent multi-state agreement in order for a successful program to move forward. Federal approval would follow. Unknown to most, the United States has a successful operating deep permanent geologic nuclear repository for high and low activity waste, called the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico. Its success results from several factors, including an optimal geologic and physio-graphic setting, a strong scientific basis, early regional community support, frequent interactions among stakeholders at all stages of the process, long-term commitment from the upper management of the U.S. Department of Energy (DOE) over several administrations, strong New Mexico State involvement and oversight, and constant environmental monitoring from before nuclear waste was first emplaced in the WIPP underground (in 1999) to the present. WIPP is located in the massive bedded salts of the Salado Formation, whose geological, physical, chemical, redox, thermal, and creep-closure properties make it an ideal formation for long-term disposal, long-term in this case being greater than 200 million years. These properties also mean minimal engineering requirements as the rock does most of the work of isolating the waste. WIPP has been operating for twelve years, and as of this writing, has disposed of over 80,000 m{sup 3} of nuclear weapons waste, called transuranic or TRU waste (>100 nCurie/g but <23 Curie/1000 cm{sup 3}) including some high activity waste from reprocessing of spent fuel from old weapons reactors. All nuclear waste of any type from any source can be disposed in this formation better, safer and cheaper than in any other geologic formation. At the same time, it is critical that we complete the Yucca Mountain license application review so as not to undermine the credibility of the Nuclear Regulatory Commission and the scientific community. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Accelerating the Decommissioning of the Sellafield Pile Fuel Storage Pond Using Innovative Remote Tooling Developed with the Supply Chain - 16437

The Pile Fuel Storage Pond (PFSP) at Sellafield and adjoining de-canning building provided the storage, cooling and de-canning facility for used fuel and isotopes from the two Windscale reactors and later some Magnox fuel from the Calder Hall reactors. Operations ceased in the 1970's and the facilities are now undergoing a programme of accelerated decommissioning. The pond is a sub-divided outdoor storage pond containing skips of irradiated fuel and miscellaneous waste items and the building contains a series of sub-ponds, known as bays, connected underwater to the main pond. The radiation environment and access limitations necessitate the use of remote technology for the decommissioning programme. This paper describes the philosophy and approach and the technology and equipment adopted for the removal and export of key plant equipment and waste items from within the PFSP. In order to progress the project cost effectively and speedily, the Sellafield project team looked for partners in the supply chain with the required experience, expertise and facilities to supply and test 'commercial off-the-shelf' (COTS) or modified proprietary equipment. This COTS approach minimised the need for multiple, expensive and lengthy design and manufacturing tasks associated with bespoke equipment. Sellafield partnered with specialist remote handling contractor, James Fisher Nuclear, and the respective project teams worked closely together at every stage of the project from qualifying requirements, identifying potential solutions, through to development, testing, training and final deployment. Optioneering of potential solutions involved early 'proof of principle' trials in JFN rig hall facilities, utilising existing equipment and plant mock-ups, along with other equipment manufactured in-house. Together the project teams selected the best solution to take forward, adopting a practical and trials based approach, which allowed rapid and cost effective modification of the solution throughout the project with minimal impact on the programme. When the final solution was validated, plant operators then gained familiarity and training on the equipment so they could execute the work efficiently on plant and so minimise their dose uptake. The removal of a Large De-canner is described in detail. This was a significant obstruction to the emptying, modification and re-use of the bay and a key milestone in the clean-up of the PFSP. The de-canners are large and heavy pieces of equipment which weigh 6.5 t each and approximately 6.5 m long. Their removal was further complicated by limited equipment and man access, radiological contamination from de-canning fuel, challenging material properties, unknown equipment condition and complex lifting requirements. Sellafield Ltd and JFN project teams worked closely together to rapidly develop, trial and deploy a succession of adapted 'commercial off-the-shelf' (COTS) tools whilst addressing emerging challenges and completing the overall task on time and budget. The Sellafield and JFN project and design teams provided an underwater: wheel stop removal tool; towing trolley; grinder on a carbon fibre pole, chute cutting 600 mm circular saw and hydraulic 6 t winch. The suite of tools will be reused on the remaining de-canners in the PFSP and First Generation Magnox Fuel Storage Pond (FGMSP) giving cost and programme savings. Each of the tools can also be used, and some have already been, for other tasks in the bay retrievals such as the size reduction of support frames, large steel sections and chemical de-canner preparatory works. The 'learning from experience' acquired during the project was shared by the Sellafield project with other decommissioning projects across the site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste management best practices for decommissioning of nuclear power plants - 15274

Decommissioning of a nuclear power plant involves the safe disposition of a large quantity of radioactive, hazardous and conventional waste. A number of nuclear power plant decommissioning projects have been completed or are nearing completion in the US, Germany and Spain. These projects have used various waste disposal and interim storage options, and have developed successful methods for handling the large quantities of waste created by the decommissioning. Additionally, decommissioning projects in several Asian and European countries are in progress or are in the planning stages such that strategies for the handling of decommissioning waste are being developed and/or implemented to address the regulatory requirements and disposal options available in these countries. These experiences provide important lessons learned and successful strategies for the handling of waste from power plant decommissioning projects. As the handling and disposition of decommissioning waste have a substantial effect on power plant decommissioning cost, schedule and complexity, these lessons learned are valuable for planning future decommissioning projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗