Search NASA⌕ Search

SEARCH · Search NASA

Results for “Waste Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,297 records · Page 72

Implementation of Lessons Learned - 17406

Following a negative occurrence or event, putting corrective actions into place to address an organisation's systemic and administrative weaknesses is paramount to that organisation's future success. At Los Alamos National Laboratory (LANL, or the Laboratory), recent experiences emphasize this critical point. On February 14, 2014, transuranic (TRU) waste management at DOE facilities changed significantly when a drum of mixed hazardous and TRU (MTRU) waste from LANL breached after its disposal at the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico. Shortly following the LANL-WIPP event, several internal and external investigations and analyses were conducted by LANL, the U.S. Department of Energy (DOE) and others, including the DOE Inspector General and an Office of Environmental Management Accident Investigation Board (AIB), to determine the cause of the LANL drum breach at WIPP. Internal investigations led LANL to self-disclose non-compliancies including treatment without a permit and improper waste characterization to the New Mexico Environment Department (NMED), leading to a Settlement Agreement in January 2016. The Settlement Agreement, together with the other investigations, led LANL to identify and implement many corrective actions related to its waste management practices. The Laboratory recognized the need to revisit implementation of some fundamental concepts, and noted the following 'Lessons Learned': - Communicating requirements more clearly, - Using technical expertise more effectively, and - Improving implementation of policies and procedures. This paper presents the actions LANL has taken to prevent recurrence and demonstrate the Laboratory's commitment to compliant waste management requirements. They have focused on promoting a better understanding of the regulatory requirements in order to address the key root causes and the resulting Lessons Learned, as follows: - Ensure that all levels of a Project Team understand the regulatory requirements related to performing the work;- Engage RCRA subject matter experts in planning (for both initial project plans and subsequent modifications to plans); - Validate that Project Teams' plans and procedures will be effective in meeting regulatory requirements; and - Verify implementation. We believe the corrective actions taken since the drum event at WIPP will fundamentally improve our way of doing business throughout the Laboratory. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Identification and prioritization of high risk deteriorating support infrastructure - 15475

Identification and prioritization for the re-capitalization of deteriorating waste processing and storage support infrastructure and information technology (IT) is essential for a safe, cost effective, and sustainable waste management program. Funding restraints have limited programs to performing only maintenance on aging infrastructure support systems whose operational costs, technological obsolescence, and reliability risks continue to grow without a disciplined and balanced re-capitalization program. Savannah River Site (SRS) comprises both Department of Energy Environmental Management and NNSA missions, and includes a lab, Savannah River National Laboratory. SRS has developed a crosscutting identification and prioritization tool and process that provides integration of all Site mission support infrastructure re-capitalization requirements and prioritizes into a single database that can be readily accessed for infrastructure investment decisions. This database, referred to as the SRS Critical Integrated Infrastructure Priority List (CIIPL) captures risk data that includes impacts toward safety, regulatory compliance, mission, and cost for inclusion in its prioritization process. Further, the CIIPL provides a status of each entered project's readiness for execution that includes funding source, reliability of current cost estimate, and an out year budget profile. The SRS CIIPL, created in 2009, was initially comprised of re-capitalization projects for the Site's common infrastructure (i.e. shared roads and utilities) that supported all Site missions and activities. As mission program funding became constrained, the value for a Site wide integrated prioritization tool became more apparent and the CIIPL grew to include all Site mission and tenant activities which included safeguards and security requirements. The SRS CIIPL has become a highly effective tool for achieving senior management situational awareness of the Site's most pressing support infrastructure and IT needs. The mission programs have used the CIIPL to prioritize and fund high risk projects within their own program budgets. This past year, the CIIPL was used as a budgeting and decision making tool to allocate funding for two common infrastructures high risk projects for the FY16 Site budget submission and has received laudatory comments from DOE headquarters review teams. The SRS CIIPL and its process can be a benefit to other waste management organizations by demonstrating a proven approach toward the integration of support infrastructure and IT re-capitalization requirements across diverse mission and tenant boundaries. The SRS CIIPL can provide senior management with an objective decision making tool that delivers a balanced evaluation of project requirements in terms of multiple risk criteria; safety, regulatory, mission, and cost impacts. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of Streamlined Nuclear Safety Analysis Tool for Spent Nuclear Fuel Applications

To understand the changing nuclear and mechanical characteristics of spent nuclear fuel (SNF) or used nuclear fuel (UNF) and the different storage, transportation, and disposal systems at various stages within the waste management system, different types of analyses are required. These analyses require the use of assorted tools and numerous types of data. Using the appropriate modeling and simulation (M&S) parameters and selecting from the diversity of analytic tools to conduct SNF analyses can be a tedious, error-prone, and time-consuming undertaking for analysts and reviewers alike. A new, integrated data and analysis system was designed to simplify and automate performance of accurate, efficient evaluations for characterizing the input to the overall U.S. nuclear waste management system—the UNF-Storage, Transportation & Disposal Analysis Resource and Data System (UNF-ST&DARDS). A relational database has been assembled to provide a standard means by which UNF-ST&DARDS can succinctly store and retrieve M&S parameters for specific SNF analysis. A library of various analysis model templates is used to communicate M&S parameters for the most appropriate M&S application. A process manager facilitates performance of actual as-loaded, assembly-specific, and cask-specific evaluations. Interactive visualization capabilities facilitate data analysis and results interpretation. To date, UNF-ST&DARDS has completed (1) explicit depletion and decay analysis of every fuel assembly (~245 000) discharged from commercial U.S. reactors through June 2013, with 13 cooling time steps (results include isotopic compositions for 142 isotopes, and radiation and thermal source terms); (2) SNF radiation dose rate evaluations at 1 m for all the fuel assemblies discharged through June 2013; and (3) criticality, shielding, thermal, and containment analyses of hundreds of loaded casks. In conclusion, UNF-ST&DARDS also provides various automated report generation capabilities with dynamic figure and table update capabilities based on changes to the Unified Database.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Los Alamos National Laboratory Hazardous Waste Facility Permit Community Relations Plan

Hazardous waste management activities are regulated by the New Mexico Environment Department (NMED) pursuant to New Mexico Hazardous Waste Act (HWA; Chapter 74, Article 4 NMSA 1978) and regulations under the Act. In 1989, NMED issued the Hazardous Waste Facility Permit (EPA ID Number NM0890010515- 1) that established standards for the Laboratory to manage, store, and treat hazardous wastes on-site and to undertake the closure and post closure care of permitted waste management units.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Can Small Countries Benefit from the E-waste Global Value Chain?

E-waste is a term used to cover items of all types of electrical and electronic equipment and its parts that have been discarded by the owners as waste without the intention of re-use, because this equipment has ceased to be of any value to its owners. E-waste is one of the fastestgrowing waste streams globally. Since the Rio Summit Earth summit organized by the United Nations in 1992, the concept of sustainability extends to rendering basic services such as Solid Waste Management and dealing with e-waste. People are afraid of e-waste because of its possible negative effects on health and because it could pollute the environment. Indicators of unsustainable service provision concerninge-waste include irregular collection, open dumping, burning of solid and e-waste in open spaces. Often collection covers a small part of the country, cost recovery is limited or not existent, and one notes poor utilization of available resources with no or very limited reuse and recycling.

54 ENVIRONMENTAL SCIENCES↗

Development of a Preliminary Performance Assessment to Support Single-Shell Tank Waste Retrieval - 19446

A preliminary Performance Assessment (PA) of Single-Shell Tank (SST) Waste Management Area A-AX (WMA A-AX) located at DoE's Hanford Site in southeastern Washington is being conducted to satisfy the requirements of the Hanford Federal Facility Agreement and Consent Order (HFFACO), as well as other Federal and State requirements of closure plans and permits. The WMA A-AX PA effort is assessing the fate, transport, and impacts of radionuclides and hazardous chemicals within residual wastes left in tanks, ancillary equipment, and facilities in their assumed closed configuration, and the subsequent risks to humans into the far future. WMA A-AX includes the 241-A Tank Farm (A Farm), the 241-AX Tank Farm (AX Farm), and the ancillary equipment associated with each Farm. There are six underground SSTs in A Farm, and four underground SSTs in AX Farm. Each of these SSTs have a storage capacity of 1,000,000 gallons. A complex waste transfer system of ancillary equipment supported the transfer and storage of waste within WMA A-AX SSTs. This ancillary equipment includes transfer lines, catch tanks, diversion boxes, vaults, valve pits, and other miscellaneous structures. This paper emphasizes the development of the PA effort focused on radiological impacts to meet the requirements for a closure authorization under DOE Order 435.1. Lessons learned from retrieval and development of a recently completed PA of the nearby Waste Management Area C (WMA C) led to the decision to develop a preliminary PA for WMA A-AX prior to initiation of retrieval efforts so that a site-specific risk management capability could be available to support anticipated retrieval decisions. The technical approach for the PA analysis includes developing both a process-level model using site-specific hydrogeological data, as well as a system-level model. The system model is being developed to facilitate uncertainty and sensitivity analyses being conducted in the PA effort. Preliminary results of the DOE Order 435.1 PA are evaluating potential impacts to the groundwater and air pathways to determine radiation exposure once radionuclides are released to the environment from residual waste after closure of the tank farm. To meet other analysis requirements in DOE Order 435.1, the PA effort must also evaluate potential radiological impacts from inadvertent intruder scenarios into the closed WMA A-AX facility. The results of the PA evaluation will be compared to performance objectives and measures in the DOE Order 435.1 to support retrieval and eventual closure decisions at WMA A-AX. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NEUTRONICS ANALYSES FOR SNS TARGETS DEPOSITIONS

In order to deposit Spallation Neutron Source (SNS) spent facility components replaced due to end-of-life radiation-induced material damage or burn-up, or because of mechanical failure or design improvements, waste classification analyses are being performed. These analyses include an accurate estimate of the radionuclide inventory, on which base components are classified and an appropriate container for transport and storage is determined. After the choice for the container is made, transport calculations are performed for the facility component to be placed inside the container, ensuring compliance with waste management regulations. When necessary, additional shielding is added. Most of the effort is concentrated on the target deposition, which normally takes place once or twice per year. Additionally, the second target station (STS) is in a process of design and waste management analyses for the STS target are being developed to support a deposition plan

Popova, Irina I↗

Selection of Vadose Zone Flow and Transport Properties with Gravel Fraction Corrections for the Hanford Site Composite Analysis and Cumulative Impact Evaluation

This environmental calculation file (ECF) is a compilation of hydrologic and radiological/chemical properties to be used for the updated Hanford Site Composite Analysis (CA) and Cumulative Impact Evaluation (CIE) vadose zone (VZ) modeling. The CA will provide an all-pathways dose projection to a hypothetical future member of the public from all planned low-level radioactive waste disposal facilities and potential contributions from all other projected end-state sources of radioactive material left at the Hanford Site following site closure. Its primary purpose is to support the decision-making process of the U.S. Department of Energy (DOE) under DOE O 435.1 Chg 1, Radioactive Waste Management, related to managing low-level waste disposal facilities at the Hanford Site. The CIE evaluates the effects of cleanup decisions regarding groundwater quality in the Hanford Site Central Plateau (DOE/RL-2018-69, Cumulative Impact Evaluation Technical Approach Document). Due to the complexity and large number of waste sites in source operable units (OUs), the computational tools used for the CIE must be capable of representing a range of site conditions and source terms in the VZ while also efficiently computing the impact that cleanup decisions have on the underlying aquifer. Waste-site proximity between and within source OUs has resulted in contaminants commingling in the vadose and saturated zones in complex ways. Plume commingling requires cleanup decisions to be evaluated considering the surrounding waste sites and existing groundwater contamination, therefore demonstrating the need to evaluate cumulative impacts from the VZ to groundwater.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning of the Chernobyl NPP: Problems, Progress, Prospects - 18485

Decommissioning of the Chernobyl NPP provides a special case due to a number of peculiarities: it is prescheduled decommissioning, the facilities undergone a major accident with off-site contamination, no previous experience of decommissioning of RBMK-type nuclear power units, unavailability of proper spent fuel and radioactive waste management infrastructure, special types of waste. The most challenging issue is the final decommissioning of the Unit 4 destroyed by the major accident on 26 April 1986. Neither of four RBMK-1000 nuclear power units was in operation till the end of the design-based lifetime, Units 1 and 3 being in operation for 19 years each, Units 2 and 4 even less. The last operating unit, Unit 3, was permanently shutdown on December 15 2000, however the main obstacle to complete a complex technological and radiological survey was spent fuel left in reactor pools and in the core due to lack of capacity in the existing interim spent fuel storage of wet type (ISF-1). So removal of spent fuel from the core and reactor pools was considered as one of the priority tasks. While construction of ISF-2 (of dry type) was delayed due to different reasons, safety reassessment and modernization of ISF-1 enabled capacity increase and transfer of all non-damaged fuel assemblies into ISF-1. Thus Chernobyl NPP Units were fully vacated from spent fuel. Since that Chernobyl NPP Units are considered as the radioactive waste facility. Dismantlement of Units 1,2 turbine hall equipment is on the way and some progress is achieved in technical solution for fragmentation of long-size equipment. All dismantled equipment after decontamination and characterization is either released from regulatory control or disposed as solid radioactive waste. The details are discussed in the paper. Eventually the comprehensive technological and radiological survey of Chernobyl NPP Units had been completed and detailed decommissioning programme had been endorsed. The decommissioning strategy chosen for the Chernobyl NPP is based on the deferred dismantlement approach, so final dismantlement of all equipment and constructions is supposed after some period of decay storage. However, the issue of the final state of the site and its further use is still open. The main reason for it is the lack of clear picture as for the destroyed Unit 4, as technical solutions concerning its highly damaged and contaminated constructions and so called fuel containing masses (FCM) are not available yet. It could be reasonably predicted also that the internal part of the so called exclusion zone will not be released into non-restricted use in near future due to characteristics of its contamination. Possible implications of these and other factors on further decommissioning activities and some approaches to find solutions are discussed in the paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FY2020 Savannah River Site Composite Analysis Annual Summary Review

This document provides the Department of Energy (DOE) Order 435.1 and its manual, Radioactive Waste Management (DOE 2021a, 2021b) required Annual Review for the Savannah River Site (SRS) Composite Analysis (CA). Progress made to-date toward addressing the secondary issue from the LFRG review of the 2010 SRS CA has focused primarily upon inventory estimate improvements. Inventory impacts dose in a linear fashion and reduces the uncertainty with the CA conclusions. Maintenance items are addressed, as funding allows, based on the relative risk associated with meeting the performance objectives. Currently, there is minimal risk in exceeding the DOE 100 mrem/yr CA primary dose limit or the DOE 30 mrem/yr dose constraint (administrative limit). Proposed activities, discoveries, new information and changes potentially affecting the 2010 SRS CA are documented in this and earlier Annual Summary reports, and a consolidated list of changes since the 2010 CA is documented in this report. The impact to the CA of changes arising from updated performance assessment (PA) baselines [i.e., Saltstone Disposal Facility (SDF), E-Area Low-Level Waste Facility (ELLWF), and F & H Tank Farm (FTF & HTF) closures] is expected to be minor for the following reasons: The primary contributors to the SRS CA dose impact at the Upper Three Runs (UTR) point of assessment (POA) are the H-Canyon and Mixed Waste Management Facility (MWMF), contributing 68% and 9%, respectively, to the dose impact at that POA. The combined contribution to the UTR dose impact from all PA’s (SDF, ELLWF, FTF and HTF) is ~2% of this total. The 2010 SRS CA model validation performed indicates that the CA projected dose, while generally conservative, provides a reasonable representation of the maximum annual doses. Doses evaluated are well below the SRS established 15 mrem/yr administrative limit (Crapse et al. 2011). Based on the assessment presented within this annual review and collective engineering judgement, the conclusions of the 2010 SRS CA remain valid and there is reasonable assurance that SRS will meet the performance objectives delineated in DOE Manual 435.1-1. The 2010 SRS CA should be updated to incorporate PA changes, proposed changes to inventories and sources and model improvements accumulated since the 2010 CA. The timing will be dependent on the completion of the ongoing E-Area PA revision.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Site Composite Analysis: Radionuclide Selection for Groundwater Pathway Evaluation.

The updated Hanford Site Composite Analysis (CA) will provide an all-pathways dose projection to a hypothetical future member of the public from all planned low-level radioactive waste disposal facilities and potential contributions from all other projected end-state sources of radioactive material left at the Hanford Site following site closure. Its primary purpose is to support the decision-making process of the U.S. Department of Energy (DOE) under DOE O 435.1-1, Radioactive Waste Management, related to managing low-level waste disposal facilities at the Hanford Site. A key aspect of conducting a CA is selecting the radionuclides to be included in the quantitative analysis.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Comprehensive Survey of Coal Ash Law and Commercialization: Its Environmental Risks, Disposal Regulation, and Beneficial Use Markets

This white paper was commissioned by the National Association of Regulatory Utility Commissioners (NARUC) under a grant from the U.S. Department of Energy (DOE), in response to a major rule, Hazardous and Solid Waste Management System; Disposal of Coal Combustion Residuals From Electric Utilities; Final Rule (Final Rule) issued by the U.S. Environmental Protection Agency (EPA) on April 17, 2015, on coal ash disposal and remediation of disposal sites, which has significant implications to states. It subjects state environmental agencies and public utility commissions to regulatory responsibilities to implement federal regulations under the Final Rule and oversee the cost implications on electric customers. To better evaluate the regulatory issues underlying the choices facing utilities and independent power producers (IPPs) regarding coal ash management options under the Final Rule, an overview of coal ash production and disposal practices is helpful. This comprehensive survey provides background information on the following topics: (a) coal ash production by a coal combustion generation plant, (b) the historical practices of utility waste management practices, (c) coal ash toxicity and related constituents, (d) further understanding of potential impacts to groundwater, and (e) the aging structures and outdated designs of coal ash surface impoundments and landfills.

01 COAL, LIGNITE, AND PEAT↗

Advanced Life Support Technologies and Scenarios

As NASA looks beyond the International Space Station toward long-duration, deep space missions away from Earth, the current practice of supplying consumables and spares will not be practical nor affordable. New approaches are sought for life support and habitation systems that will reduce dependency on Earth and increase mission sustainability. To reduce launch mass, further closure of Environmental Control and Life Support Systems (ECLSS) beyond the current capability of the ISS will be required. Areas of particular interest include achieving higher degrees of recycling within Atmosphere Revitalization, Water Recovery and Waste Management Systems. NASA is currently investigating advanced carbon dioxide reduction processes that surpass the level of oxygen recovery available from the Sabatier Carbon Dioxide Reduction Assembly (CRA) on the ISS. Improving the efficiency of the recovery of water from spacecraft solid and liquid wastes is possible through use of emerging technologies such as the heat melt compactor and brine dewatering systems. Another significant consumable is that of food. Food production systems based on higher plants may not only contribute significantly to the diet, but also contribute to atmosphere revitalization, water purification and waste utilization. Bioreactors may be potentially utilized for wastewater and solid waste management. The level at which bioregenerative technologies are utilized will depend on their comparative requirements for spacecraft resources including mass, power, volume, heat rejection, crew time and reliability. Planetary protection requirements will need to be considered for missions to other solar system bodies.

Barta, Daniel J.↗

Status Update on the NCRP Scientific Committee SC 5-1 Report: Decision Making for Late-Phase Recovery from Nuclear or Radiological Incidents - 13450

In August 2008, the U.S. Department of Homeland Security (DHS) issued its final Protective Action Guide (PAG) for radiological dispersal device (RDD) and improvised nuclear device (IND) incidents. This document specifies protective actions for public health during the early and intermediate phases and cleanup guidance for the late phase of RDD or IND incidents, and it discusses approaches to implementing the necessary actions. However, while the PAG provides specific guidance for the early and intermediate phases, it prescribes no equivalent guidance for the late-phase cleanup actions. Instead, the PAG offers a general description of a complex process using a site-specific optimization approach. This approach does not predetermine cleanup levels but approaches the problem from the factors that would bear on the final agreed-on cleanup levels. Based on this approach, the decision-making process involves multifaceted considerations including public health, the environment, and the economy, as well as socio-political factors. In an effort to fully define the process and approach to be used in optimizing late-phase recovery and site restoration following an RDD or IND incident, DHS has tasked the NCRP with preparing a comprehensive report addressing all aspects of the optimization process. Preparation of the NCRP report is a three-year (2010-2013) project assigned to a scientific committee, the Scientific Committee (SC) 5-1; the report was initially titled, Approach to Optimizing Decision Making for Late- Phase Recovery from Nuclear or Radiological Terrorism Incidents. Members of SC 5-1 represent a broad range of expertise, including homeland security, health physics, risk and decision analysis, economics, environmental remediation and radioactive waste management, and communication. In the wake of the Fukushima nuclear accident of 2011, and guided by a recent process led by the White House through a Principal Level Exercise (PLE), the optimization approach has since been expanded to include off-site contamination from major nuclear power plant accidents as well as other nuclear or radiological incidents. The expanded application under the current guidance has thus led to a broadened scope of the report, which is reflected in its new title, Decision Making for Late-Phase Recovery from Nuclear or Radiological Incidents. The NCRP report, which is due for publication in 2013, will substantiate the current DHS guidance by clarifying and elaborating on the processes required for the development and implementation of procedures for optimizing decision making for late-phase recovery, enabling the establishment of cleanup goals on a site-specific basis. The report will contain a series of topics addressing important issues related to the long-term recovery from nuclear or radiological incidents. Special topics relevant to supporting the optimization of the decision-making process will include cost-benefit analysis, radioactive waste management, risk communication, stakeholder interaction, risk assessment, and decontamination approaches and techniques. The committee also evaluated past nuclear and radiological incidents for their relevance to the report, including the emerging issues associated with the Fukushima nuclear accident. Thus, due to the commonality of the late-phase issues (such as the potential widespread contamination following an event), the majority of the information pertaining to the response in the late-phase decision-making period, including site-specific optimization framework and approach, could be used or adapted for use in case of similar situations that are not due to terrorism, such as those that would be caused by major nuclear facility accidents or radiological incidents. To ensure that the report and the NCRP recommendations are current and relevant to the effective implementation of federal guidance, SC 5-1 has actively coordinated with the agencies of interest and other relevant stakeholders throughout the duration of the project. The resulting report will be an important resource to guide those involved in late-phase recovery efforts following a nuclear or radiological incident. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Covalent Organic Frameworks as a Decorating Platform for Utilization and Affinity Enhancement of Chelating Sites for Radionuclide Sequestration

The potential consequences of nuclear events and the complexity of nuclear waste management motivate the development of selective solid-phase sorbents to provide enhanced protection. Herein, we show that two dimensional covalent organic frameworks (COFs) with unique structures possess all the traits to be well-suited as a platform for the deployment of highly efficient sorbents such that they exhibit remarkable performance, as demonstrated by uranium capture. The chelating groups laced on the open one dimensional channels exhibit exceptional accessibility, allowing significantly higher utilization efficiency. In addition, the two dimensional extended polygons packed closely in an eclipsed fashion bring chelating groups in adjacent layers parallel to each other, which may facilitate their cooperation, thereby leading to high affinity towards specific ions. As a result, the amidoxime functionalized COFs far outperform their corresponding amorphous analogues in terms of adsorption capacities, kinetics, and affinities

Sun, Qi↗

Composite Analysis for Low-Level Waste Disposal in the Hanford Site Central Plateau (FY 2020) (Rev. 2)

This document provides an updated Hanford Site composite analysis (CA). A Hanford Site CA was prepared and issued in 1998 (PNNL-11800) with an addendum provided in 2002 (PNNL-11800 Addendum 1). The CA was approved in 2002 (Frei, 2002) and has been maintained (DOE/RL-2000-29 and subsequent revisions) to support low-level waste disposal performance assessments (PAs) and disposal authorizations for facilities at the Hanford Site, including the following: Continued operation of the Environmental Restoration Disposal Facility (ERDF) and the 200 East and 200 West Low-Level Burial Grounds; Construction of the Integrated Disposal Facility (IDF); Forthcoming closure of tank residual waste systems such as Waste Management Area (WMA) C. The CA maintenance program resulted in a determination in 2015 (DOE/RL-2015-66) that the Hanford Site CA needed an update for the following reasons: While the initial Hanford Site CA has been maintained since 2001, the accumulation of basis changes reported in the annual summary reports over the succeeding 14 years merit evaluation in an updated analysis; The U.S. Department of Energy (DOE) Headquarters requested in a memorandum in 2015 (Gilbertson and Marcinowski, 2015) that “as soon as the relevant PAs are complete, the CA will be revised to account for all of the new information.” This updated Hanford Site CA accounts for the following new information: 1. Inclusion of a detailed Hanford Site baseline disposition that projects remedial activities through site closure. There have been significant changes through decision making in the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) process that were not available when the original CA was produced; 2. Inclusion of an updated inventory basis, new modeling capabilities, and new decisions reached in the associated record of decision (ROD) that was provided by issuance of DOE/EIS-0391 in fiscal year (FY) 2013. Development of a Hanford Site groundwater model from the baseline provided in a technical transfer of models for the Final Tank Closure and Waste Management Environmental Impact Statement (DOE/EIS-0391) commenced in FY 2014 and resulted in the plateau-to-river (P2R) groundwater flow model that is used in this updated Hanford Site CA; 3. Accounting for pump and treat systems, which were not evaluated in the initial CA. Pump and treat systems have had significant impact on groundwater flow system behavior, contaminant transport, and contaminant removal from Hanford Site groundwater. This process is accounted for in the use of the P2R model for this updated Hanford Site CA; 4. Inclusion of water-level data collected since the initial CA was completed. Data collected as the unconfined aquifer water levels continue to recede since the cessation of large liquid discharges in the late 1990s have led to marked improvement in understanding of the flow system for future conditions, particularly regarding northward flow potential in the critical Gable Gap area. The calibration in the latest version of the P2R model accounts for this information; 5. Inclusion of results from the revised ERDF PA completed in 2013 (WCH-5209) that account for updated inventory and expansion of the ERDF facility to about twice the size that was evaluated in the original CA; 6. Use of updated geoframeworks to provide the structural basis for numerical fate and transport models in the groundwater pathway of this updated CA. The geologic basis for groundwater models has continued to improve with additional data collection and interpretation with the creation and maintenance of the Hanford South Geoframework and the Central Plateau Vadose Zone Geoframework tools; 7. Incorporation of updated tank residual inventory estimates. Tank residual inventory estimates have improved with the incorporation of tank retrieval inventory data for those tanks that have completed retrieval. The CA inventory data package includes this updated information; 8. Incorporation of WMA C PA results. Two additional PAs for tank farm closure decisions are in preparation during the period required to prepare an updated Hanford Site CA: WMA C (FY 2016) and WMA A-AX (in preparation). The WMA C PA results are incorporated into the updated Hanford Site CA, and its grouted residuals model is used as the basis for a release model to account for the other tank farm systems modeling in this updated CA; 9. An update to the IDF PA was submitted in FY 2017 and has been reviewed and approved. The results of the IDF PA are incorporated into this updated CA; 10. Updated risk assessment scenarios. The risk assessment scenarios currently in use for Hanford Site CERCLA and Resource Conservation and Recovery Act of 1976 (RCRA) analyses differ from those evaluated in the initial Hanford Site CA. The representative person exposure scenario evaluated in this updated Hanford Site CA is consistent with recent PAs and CERCLA and RCRA analyses as the Hanford Site. This updated Hanford Site CA provides the following: A comparison of the updated Hanford Site CA all-pathway dose results with the performance measures during the compliance period, which is assumed to begin with site closure in calendar 2070 with the last scheduled disposal action and continue for 1,000 years postclosure (to calendar year 3069); A comparison of Hanford Site CA all-pathway dose results with the performance measures during the postcompliance period to address potential peaks beyond the compliance period. This is accomplished by evaluating dose in the period for 9,000 years following the compliance period (i.e., from calendar year 3070 to 12070).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modeling a Thermal-Spectrum LEU-fueled Molten Salt Reactor Co-fueled with Thorium in SCALE 6.3.1 and Serpent-2

Interest in the development of advanced nuclear fission reactors for commercial electricity production has risen in recent years, with Generation IV reactor designs offering numerous advantages in safety, efficiency, fuel cycle sustainability, and waste management. In particular, thorium-fueled molten salt reactors (MSRs) are considerably promising for enhancing fuel cycle sustainability in their ability to breed fissile 233U fuel from thorium, a presently untapped and widely abundant resource. A novel MSR fuel cycle concept, the ”Sourdough” refueling and waste management strategy, has previously been demonstrated with a traditional uranium-based fuel cycle in a thermal-spectrum MSR operating with low enriched uranium (LEU) fuel with favorable neutronic performance. However, the ability to use this unique fuel cycle approach with thorium-based molten salt fuels has not yet been studied. In this work, the Sourdough fuel cycle was implemented in a small, thermal-spectrum MSR fueled with high assay low enriched uranium (HALEU) and fertile 232Th for breeding 233U fuel. Relevant neutronic data, including fuel and isothermal temperature feedback behavior, was studied using the SCALE 6.3.1 and Serpent-2 code systems, and keff data was measured during simulated depletion at 400 MWth. The Sourdough fuel cycle concept is shown to perform favorably with a thorium-fueled MSR model, thus warranting further study into its use in other MSR designs.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Data Sharing Report for the Quantification of Removable Activity in Various Surveillance and Maintenance Facilities at the Oak Ridge National Laboratory Oak Ridge TN

The U.S. Department of Energy (DOE) Oak Ridge Office of Environmental Management (OR-EM) requested that Oak Ridge Associated Universities (ORAU), working under the Oak Ridge Institute for Science and Education (ORISE) contract, provide technical and independent waste management planning support using American Recovery and Reinvestment Act (ARRA) funds. Specifically, DOE OR-EM requested that ORAU plan and implement a sampling and analysis campaign targeting potential removable radiological contamination that may be transferrable to future personal protective equipment (PPE) and contamination control materials—collectively referred to as PPE throughout the remainder of this report—used in certain URS|CH2M Oak Ridge, LLC (UCOR) Surveillance and Maintenance (S&M) Project facilities at the Oak Ridge National Laboratory (ORNL). Routine surveys in Bldgs. 3001, 3005, 3010, 3028, 3029, 3038, 3042, 3517, 4507, and 7500 continuously generate PPE. The waste is comprised of Tyvek coveralls, gloves, booties, Herculite, and other materials used to prevent worker exposure or the spread of contamination during routine maintenance and monitoring activities. This report describes the effort to collect and quantify removable activity that may be used by the ORNL S&M Project team to develop radiation instrumentation “screening criteria.” Material potentially containing removable activity was collected on smears, including both masselin large-area wipes (LAWs) and standard paper smears, and analyzed for site-related constituents (SRCs) in an analytical laboratory. The screening criteria, if approved, may be used to expedite waste disposition of relatively clean PPE. The ultimate objectives of this effort were to: 1) determine whether screening criteria can be developed for these facilities, and 2) provide process knowledge information for future site planners. The screening criteria, if calculated, must be formally approved by Federal Facility Agreement parties prior to use for ORNL S&M Project PPE disposal at the Environmental Management Waste Management Facility (EMWMF). ORAU executed the approved sampling and analysis plan (SAP) (DOE 2013) while closely coordinating with ORNL S&M Project personnel and using guidelines outlined in the Waste Handling Plan for Surveillance and Maintenance Activities at the Oak Ridge National Laboratory, DOE/OR/01-2565&D2 (WHP) (DOE 2012). WHP guidelines were followed because the PPE waste targeted by this SAP is consistent with that addressed under the approved Waste Lot (WL) 108.1 profile for disposal at EMWMF—this PPE is a “future waste stream” as defined in the WHP. The SAP presents sampling strategy and methodology, sample selection guidelines, and analytical guidelines and requirements necessary for characterizing future ORNL S&M Project PPE waste. This report presents a review of the sample and analysis methods including data quality objectives (DQOs), required deviations from the original design, summary of field activities, radiation measurement data, analytical laboratory results, a brief presentation of results, and process knowledge summaries.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗