Search NASA⌕ Search

SEARCH · Search NASA

Results for “code verification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,297 records · Page 72

Initial Ada components evaluation

The SAIC has the responsibility for independent test and validation of the SSE. They have been using a mathematical functions library package implemented in Ada to test the SSE IV and V process. The library package consists of elementary mathematical functions and is both machine and accuracy independent. The SSE Ada components evaluation includes code complexity metrics based on Halstead's software science metrics and McCabe's measure of cyclomatic complexity. Halstead's metrics are based on the number of operators and operands on a logical unit of code and are compiled from the number of distinct operators, distinct operands, and total number of occurrences of operators and operands. These metrics give an indication of the physical size of a program in terms of operators and operands and are used diagnostically to point to potential problems. McCabe's Cyclomatic Complexity Metrics (CCM) are compiled from flow charts transformed to equivalent directed graphs. The CCM is a measure of the total number of linearly independent paths through the code's control structure. These metrics were computed for the Ada mathematical functions library using Software Automated Verification and Validation (SAVVAS), the SSE IV and V tool. A table with selected results was shown, indicating that most of these routines are of good quality. Thresholds for the Halstead measures indicate poor quality if the length metric exceeds 260 or difficulty is greater than 190. The McCabe CCM indicated a high quality of software products.

Moebes, Travis↗

The IAEA Coordinated Research Program on HTGR Reactor Physics, Thermal-hydraulics and Depletion Uncertainty Analysis: Description of the Benchmark Test Cases and Phases

The continued development of High Temperature Gas Cooled Reactors (HTGRs) requires verification of design and safety features with reliable high fidelity physics models and robust, efficient, and accurate codes. The uncertainties in the HTR analysis tools are today typically assessed with sensitivity analysis and then a few important input uncertainties (typically based on a PIRT process) are varied in the analysis to find a spread in the parameter of importance. However, one wish to apply a more fundamental approach to determine the predictive capability and accuracies of coupled neutronics/thermal-hydraulics and depletion simulations used for reactor design and safety assessment. Today there is a broader acceptance of the use of uncertainty analysis even in safety studies and it has been accepted by regulators in some cases to replace the traditional conservative analysis. Finally, there is also a renewed focus in supplying reliable covariance data (nuclear data uncertainties) that can then be used in uncertainty methods. Uncertainty and sensitivity studies are therefore becoming an essential component of any significant effort in data and simulation improvement. In order to address uncertainty in analysis and methods in the HTGR community the IAEA launched a Coordinated Research Project (CRP) on the HTGR Uncertainty Analysis in Modelling early in 2012. The project is built on the experience of the OECD/NEA Light Water Reactor (LWR) Uncertainty Analysis in Best-Estimate Modelling (UAM) benchmark activity, but focuses specifically on the peculiarities of HTGR designs and its simulation requirements. Two benchmark problems were defined with the prismatic type design represented by the MHTGR-350 design from General Atomics (GA) while a 250 MW modular pebble bed design, similar to the INET (China) and indirect-cycle PBMR (South Africa) designs are also included. In the paper more detail on the benchmark cases, the different specific phases and tasks and the latest status and plans are presented.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

SU-E-T-435: Development and Commissioning of a Complete System for In-Vivo Dosimetry and Range Verification in Proton Therapy

Purpose: In-vivo dose and beam range verification in proton therapy could play significant roles in proton treatment validation and improvements. Invivo beam range verification, in particular, could enable new treatment techniques one of which, for example, could be the use of anterior fields for prostate treatment instead of opposed lateral fields as in current practice. We have developed and commissioned an integrated system with hardware, software and workflow protocols, to provide a complete solution, simultaneously for both in-vivo dosimetry and range verification for proton therapy. Methods: The system uses a matrix of diodes, up to 12 in total, but separable into three groups for flexibility in application. A special amplifier was developed to capture extremely small signals from very low proton beam current. The software was developed within iMagX, a general platform for image processing in radiation therapy applications. The range determination exploits the inherent relationship between the internal range modulation clock of the proton therapy system and the radiological depth at the point of measurement. The commissioning of the system, for in-vivo dosimetry and for range verification was separately conducted using anthropomorphic phantom. EBT films and TLDs were used for dose comparisons and range scan of the beam distal fall-off was used as ground truth for range verification. Results: For in-vivo dose measurement, the results were in agreement with TLD and EBT films and were within 3% from treatment planning calculations. For range verification, a precision of 0.5mm is achieved in homogeneous phantoms, and a precision of 2mm for anthropomorphic pelvic phantom, except at points with significant range mixing. Conclusion: We completed the commissioning of our system for in-vivo dosimetry and range verification in proton therapy. The results suggest that the system is ready for clinical trials on patient.

07 ISOTOPE AND RADIATION SOURCES↗

New Whole-House Solutions Case Study: Challenges of Achieving 2012 IECC Air Sealing Requirements in Multifamily Dwellings, Upstate New York

While previous versions of the International Energy Conservation Code (IECC) have included provisions to improve the air tightness of dwellings, for the first time, the 2012 IECC mandates compliance verification through blower door testing. Simply completing the Air Barrier and Insulation Installation checklist through visual inspection is no longer sufficient; the 2012 IECC mandates a significantly stricter air sealing requirement. In Climate Zones 3 through 8, air leakage may not exceed 3 ACH50, which is a significant reduction from the 2009 IECC requirement of 7 ACH50. This requirement is for all residential buildings, which includes low-rise multifamily dwellings. While this air leakage rate requirement is an important component to achieving an efficient building thermal envelope, currently, the code language doesn't explicitly address differences between single family and multifamily applications. In addition, the 2012 IECC does not provide an option to sample dwellings for larger multifamily buildings, so compliance would have to be verified on every unit. With compliance with the 2012 IECC air leakage requirements on the horizon, several of Building America team Consortium for Advanced Residential Building's (CARB) multifamily builder partners are evaluating how best to comply with this requirement. Builders are not sure whether it is more practical or beneficial to simply pay for guarded testing or to revise their air sealing strategies to improve compartmentalization to comply with code requirements based on unguarded blower door testing. This report summarizes CARB's research that was conducted to assess the feasibility of meeting the 2012 IECC air leakage requirements in three multifamily buildings.

air leakage↗

Simplifying Requirements Formalization for Resource-Constrained Mission-Critical Software

Developing critical software requires adherence to rigorous software development practices, such as formal requirement specification and verification. Despite their importance, such practices are often considered as complex and challenging tasks that require a strong formal methods background. In this paper, we present our work on simplifying the formal requirements specification experience for resource-constrained mission critical software through the use of structured natural language. To this end, we connect NASA’s FRET, a formal requirement elicitation and authoring tool with the Shelley model checking framework for MicroPython code. We report our experience on using these tools to specify requirements and analyze code from the NASA Ames PHALANX exploration concept.

PHALANX exploration concept↗

Challenges of Achieving 2012 IECC Air Sealing Requirements in Multifamily Dwellings

​While previous versions of the International Energy Conservation Code (IECC) have included provisions to improve the air tightness of dwellings, for the first time, the 2012 IECC mandates compliance verification through blower door testing. Simply completing the Air Barrier and Insulation Installation checklist through visual inspection is no longer sufficient by itself. In addition, the 2012 IECC mandates a significantly stricter air sealing requirement. In Climate Zones 3 through 8, air leakage may not exceed 3 ACH50, which is a significant reduction from the 2009 IECC requirement of 7 ACH50. This requirement is for all residential buildings, which includes low-rise multifamily dwellings. While this air leakage rate requirement is an important component to achieving an efficient building thermal envelope, currently, the code language doesn't explicitly address differences between single family and multifamily applications. In addition, the 2012 IECC does not provide an option to sample dwellings for larger multifamily buildings, so compliance would have to be verified on every unit. With compliance with the 2012 IECC air leakage requirements on the horizon, several of CARB's multifamily builder partners are evaluating how best to comply with this requirement. Builders are not sure whether it is more practical or beneficial to simply pay for guarded testing or to revise their air sealing strategies to improve compartmentalization to comply with code requirements based on unguarded blower door testing. This report summarizes CARB's research that was conducted to assess the feasibility of meeting the 2012 IECC air leakage requirements in 3 multifamily buildings.

&#8203↗

Challenges of Achieving 2012 IECC Air Sealing Requirements in Multifamily Dwellings

While previous versions of the International Energy Conservation Code (IECC) have included provisions to improve the air tightness of dwellings, for the first time, the 2012 IECC mandates compliance verification through blower door testing. Simply completing the Air Barrier and Insulation Installation checklist through visual inspection is no longer sufficient by itself. In addition, the 2012 IECC mandates a significantly stricter air sealing requirement. In Climate Zones 3 through 8, air leakage may not exceed 3 ACH50, which is a significant reduction from the 2009 IECC requirement of 7 ACH50. This requirement is for all residential buildings, which includes low-rise multifamily dwellings. While this air leakage rate requirement is an important component to achieving an efficient building thermal envelope, currently, the code language doesn't explicitly address differences between single family and multifamily applications. In addition, the 2012 IECC does not provide an option to sample dwellings for larger multifamily buildings, so compliance would have to be verified on every unit. With compliance with the 2012 IECC air leakage requirements on the horizon, several of Consortium for Advanced Residential Building's (CARB’s) multifamily builder partners are evaluating how best to comply with this requirement. Builders are not sure whether it is more practical or beneficial to simply pay for guarded testing or to revise their air sealing strategies to improve compartmentalization to comply with code requirements based on unguarded blower door testing. This report summarizes CARB's research that was conducted to assess the feasibility of meeting the 2012 IECC air leakage requirements in 3 multifamily buildings.

2012 IECC↗

Building America Case Study: Challenges of Achieving 2012 IECC Air Sealing Requirements in Multifamily Dwellings, Upstate New York (Fact Sheet)

While previous versions of the International Energy Conservation Code (IECC) have included provisions to improve the air tightness of dwellings, for the first time, the 2012 IECC mandates compliance verification through blower door testing. Simply completing the Air Barrier and Insulation Installation checklist through visual inspection is no longer sufficient by itself. In addition, the 2012 IECC mandates a significantly stricter air sealing requirement. In Climate Zones 3 through 8, air leakage may not exceed 3 ACH50, which is a significant reduction from the 2009 IECC requirement of 7 ACH50. This requirement is for all residential buildings, which includes low-rise multifamily dwellings. While this air leakage rate requirement is an important component to achieving an efficient building thermal envelope, currently, the code language doesn't explicitly address differences between single family and multifamily applications. In addition, the 2012 IECC does not provide an option to sample dwellings for larger multifamily buildings, so compliance would have to be verified on every unit. With compliance with the 2012 IECC air leakage requirements on the horizon, several of CARB's multifamily builder partners are evaluating how best to comply with this requirement. Builders are not sure whether it is more practical or beneficial to simply pay for guarded testing or to revise their air sealing strategies to improve compartmentalization to comply with code requirements based on unguarded blower door testing. This report summarizes CARB's research that was conducted to assess the feasibility of meeting the 2012 IECC air leakage requirements in 3 multifamily buildings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

SU-E-T-03: 3D GPU-Accelerated Secondary Checks of Radiation Therapy Treatment Plans

Purpose: Redundant treatment verifications in conformal and intensity-modulated radiation therapy techniques are traditionally performed with single point calculations. New solutions can replace these checks with 3D treatment plan verifications. This work describes a software tool (Mobius3D, Mobius Medical Systems) that uses a GPU-accelerated collapsed cone algorithm to perform 3D independent verifications of TPS calculations. Methods: Mobius3D comes with reference beam models for common linear accelerators. The system uses an independently developed collapsed cone algorithm updated with recent enhancements. 144 isotropically-spaced cones are used for each voxel for calculations. These complex calculations can be sped up by using GPUs. Mobius3D calculate dose using DICOM information coming from TPS (CT, RT Struct, RT Plan RT Dose). DVH-metrics and 3D gamma tests can be used to compare both TPS and secondary calculations. 170 patients treated with all common techniques as 3DCFRT (including wedged), static and dynamic IMRT and VMAT have been successfully verified with this solution. Results: Calculation times are between 3–5 minutes for 3DCFRT treatments and 15–20 for most complex dMLC and VMAT plans. For all PTVs mean dose and 90% coverage differences are (1.12±0.97)% and (0.68±1.19)%, respectively. Mean dose discrepancies for all OARs is (0.64±1.00)%. 3D gamma (global, 3%/3 mm) analysis shows a mean passing rate of (97.8 ± 3.0)% for PTVs and (99.0±3.0)% for OARs. 3D gamma pasing rate for all voxels in CT has a mean value of (98.5±1.6)%. Conclusion: Mobius3D is a powerful tool to verify all modalities of radiation therapy treatments. Dose discrepancies calculated by this system are in good agreement with TPS. The use of reference beam data results in time savings and can be used to avoid the propagation of errors in original beam data into our QA system. GPU calculations permit enhanced collapsed cone calculations with reasonable calculation times.

60 APPLIED LIFE SCIENCES↗

SU-G-IeP4-06: Feasibility of External Beam Treatment Field Verification Using Cherenkov Imaging

Purpose: Cherenkov light emission has been shown to correlate with ionizing radiation (IR) dose delivery in solid tissue. In order to properly correlate Cherenkov light images with real time dose delivery in a patient, we must account for geometric and intensity distortions arising from observation angle, as well as the effect of monitor units (MU) and field size on Cherenkov light emission. To test the feasibility of treatment field verification, we first focused on Cherenkov light emission efficiency based on MU and known field size (FS). Methods: Cherenkov light emission was captured using a PI-MAX4 intensified charge coupled device(ICCD) system (Princeton Instruments), positioned at a fixed angle of 40° relative to the beam central axis. A Varian TrueBeam linear accelerator (linac) was operated at 6MV and 600MU/min to deliver an Anterior-Posterior beam to a 5cm thick block phantom positioned at 100cm Source-to-Surface-Distance(SSD). FS of 10×10, 5×5, and 2×2cm{sup 2} were used. Before beam delivery projected light field images were acquired, ensuring that geometric distortions were consistent when measuring Cherenkov field discrepancies. Cherenkov image acquisition was triggered by linac target current. 500 frames were acquired for each FS. Composite images were created through summation of frames and background subtraction. MU per image was calculated based on linac pulse delay of 2.8ms. Cherenkov and projected light FS were evaluated using ImageJ software. Results: Mean Cherenkov FS discrepancies compared to light field were <0.5cm for 5.6, 2.8, and 8.6 MU for 10×10, 5×5, and 2×2cm{sup 2} FS, respectably. Discrepancies were reduced with increasing field size and MU. We predict a minimum of 100 frames is needed for reliable confirmation of delivered FS. Conclusion: Current discrepancies in Cherenkov field sizes are within a usable range to confirm treatment delivery in standard and respiratory gated clinical scenarios at MU levels appropriate to standard MLC position segments.

60 APPLIED LIFE SCIENCES↗

A verification study of fatigue-based methods in API RP 1183 for estimating fatigue life of pipeline dents

Pipeline dents are mechanical damage caused by a third party in buried pipelines during construction or maintenance repair. Dents are recognized as a leading cause of pipeline failures for both liquid and gas transmission lines, and their assessment and management are critical to pipeline integrity. To meet the industry need, American Institute of Petroleum (API) in 2020 published a recommended practice (RP) 1183 – Assessment and Management of Pipeline Dents. This API code provides the pipeline industry “standard methods” for evaluating severity and fatigue life of pipeline dents with a single peak. This paper performed an initial verification study of fatigue-based methods prescribed in API RP 1183 for estimating fatigue life of pipeline dents. A brief review was first given to the dent fatigue-based methods, including three dent screening methods for estimating dent fatigue life in Sections 7.4.1, 7.4.2, and 7.4.3 of API 1183 and one dent assessment method for predicting fatigue life in Section 8.3.4. In order to verify these fatigue life prediction methods, a set of “standard examples” of dents provided in Annexes A.1 to A.5 of API RP 1183 were utilized in this study to calculate fatigue life, to determine restraint condition, and to evaluate both screening and assessment methods for single-peak dents. Through detailed calculations and comparisons, this study confirmed some specifications of API RP 1183, but also found some self-inconsistences and errors existing in this new API code. Furthermore, this includes the self-inconsistences between three screening methods and the self-inconsistence between the screening and assessment methods. On this basis, recommendations were made on how the operators should use API RP 1183, and what actions API should take to improve this code.

42 ENGINEERING↗

Suitability of markerless EPID tracking for tumor position verification in gated radiotherapy

Purpose: To maximize the benefits of respiratory gated radiotherapy (RGRT) of lung tumors real-time verification of the tumor position is required. This work investigates the feasibility of markerless tracking of lung tumors during beam-on time in electronic portal imaging device (EPID) images of the MV therapeutic beam. Methods: EPID movies were acquired at ∼2 fps for seven lung cancer patients with tumor peak-to-peak motion ranges between 7.8 and 17.9 mm (mean: 13.7 mm) undergoing stereotactic body radiotherapy. The external breathing motion of the abdomen was synchronously measured. Both datasets were retrospectively analyzed inPortalTrack, an in-house developed tracking software. The authors define a three-step procedure to run the simulations: (1) gating window definition, (2) gated-beam delivery simulation, and (3) tumor tracking. First, an amplitude threshold level was set on the external signal, defining the onset of beam-on/-off signals. This information was then mapped onto a sequence of EPID images to generate stamps of beam-on/-hold periods throughout the EPID movies in PortalTrack, by obscuring the frames corresponding to beam-off times. Last, tumor motion in the superior-inferior direction was determined on portal images by the tracking algorithm during beam-on time. The residual motion inside the gating window as well as target coverage (TC) and the marginal target displacement (MTD) were used as measures to quantify tumor position variability. Results: Tumor position monitoring and estimation from beam's-eye-view images during RGRT was possible in 67% of the analyzed beams. For a reference gating window of 5 mm, deviations ranging from 2% to 86% (35% on average) were recorded between the reference and measured residual motion. TC (range: 62%–93%; mean: 77%) losses were correlated with false positives incidence rates resulting mostly from intra-/inter-beam baseline drifts, as well as sudden cycle-to-cycle fluctuations in exhale positions. Both phenomena can lead to considerable deviations (with MTD values up to a maximum of 7.8 mm) from the intended tumor position, and in turn may result in a marginal miss. The difference between tumor traces determined within the gating window against ground truth trajectory maps was 1.1 ± 0.7 mm on average (range: 0.4–2.3 mm). Conclusions: In this retrospective analysis of motion data, it is demonstrated that the system is capable of determining tumor positions in the plane perpendicular to the beam direction without the aid of fiducial markers, and may hence be suitable as an online verification tool in RGRT. It may be possible to use the tracking information to enable on-the-fly corrections to intra-/inter-beam variations by adapting the gating window by means of a robotic couch.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Code Coverage Status of ARC Code-DIF3D

The Argonne Reactor Code (ARC) software system supports users in their fast reactor design goals by providing neutronic, thermal-hydraulic, and structural analysis capabilities. DIF3D plays a pivotal role in the ARC system as the primary homogenized assembly neutronic calculation methodology for fast reactor problems. Over its 40 years history, ARC software usage with DIF3D has been applied to numerous fast and thermal spectrum reactor analysis projects with good to excellent comparison against experiments. With continued improvement of computation resources, many of the geometry modeling capabilities in DIF3D that were primarily used in low order schemes are not really needed anymore. Today, the diffusion and transport capabilities of DIF3D-VARIANT are primarily used in the reactor design process with some scattered usage of DIF3D-FD and DIF3D-Nodal. In recent work, the DIF3D software verification was completed for DIF3D-FD and DIF3D-VARIANT on the geometry options used in the Versatile Test Reactor project. While we can be confident that these capabilities of DIF3D are well used and thus trusted, it does not demonstrate that all possible input options of DIF3D are actually working, but just those that were tested as part of VTR are and that they are correct. Thus, the purpose of the present work is to identify a set of test problems for DIF3D and assess the code coverage of DIF3D for those test problems. The goal is to document what parts of the existing DIF3D code are touched by the set of test problems and which are not. Because the verification work done on DIF3D-VARIANT and DIF3D-FD was focused on the most common uses of DIF3D for fast reactor analysis, the code coverage assessment of those capabilities is the highest priority. This will ensure that nothing is being missed by the existing verification test problems that DIF3D relies upon. The DIF3D-Nodal capability will also be inspected for code coverage as part of this work to further ensure that regular regression testing of DIF3D will trap any likely errors the end user might experience with the DIF3D software. The code coverage analysis of DIF3D was performed with the Code Coverage Tool of the Intel Fortran compiler which requires modifications to the compilation of DIF3D. The detailed coverage tables are given for each submodule of DIF3D separately, and for the submodules which are primarily developed for DIF3D, most of the source files could be at least partially touched. Most of the uncovered parts/files could be easily ignored, because they are either for error message and debugging output or obviously not needed by DIF3D. Out of the entire source codes of DIF3D, only a few uncovered modules deserve further investigation.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Code Coverage Status of the ARC Code DIF3D

The Argonne Reactor Code (ARC) software system supports users in their fast reactor design goals by providing neutronic, thermal-hydraulic, and structural analysis capabilities. DIF3D plays a pivotal role in the ARC system as the primary homogenized assembly neutronic calculation methodology for fast reactor problems. Over its 40 years history, ARC software usage with DIF3D has been applied to numerous fast and thermal spectrum reactor analysis projects with good to excellent comparison against experiments. With continued improvement of computation resources, many of the geometry modeling capabilities in DIF3D that were primarily used in low order schemes are not really needed anymore. Today, the diffusion and transport capabilities of DIF3D-VARIANT are primarily used in the reactor design process with some scattered usage of DIF3D-FD and DIF3D-Nodal. In recent work, the DIF3D software verification was completed for DIF3D-FD and DIF3D-VARIANT on the geometry options used in the Versatile Test Reactor project. While we can be confident that these capabilities of DIF3D are well used and thus trusted, it does not demonstrate that all possible input options of DIF3D are actually working, but just those that were tested as part of VTR are and that they are correct. Thus, the purpose of the present work is to identify a set of test problems for DIF3D and assess the code coverage of DIF3D for those test problems. The goal is to document what parts of the existing DIF3D code are touched by the set of test problems and which are not. Because the verification work done on DIF3D-VARIANT and DIF3D-FD was focused on the most common uses of DIF3D for fast reactor analysis, the code coverage assessment of those capabilities is the highest priority. This will ensure that nothing is being missed by the existing verification test problems that DIF3D relies upon. The DIF3D-Nodal capability will also be inspected for code coverage as part of this work to further ensure that regular regression testing of DIF3D will trap any likely errors the end user might experience with the DIF3D software. The code coverage analysis of DIF3D was performed with the Code Coverage Tool of the Intel Fortran compiler which requires modifications to the compilation of DIF3D. The detailed coverage tables are given for each submodule of DIF3D separately, and for the submodules which are primarily developed for DIF3D, most of the source files could be at least partially touched. Most of the uncovered parts/files could be easily ignored, because they are either for error message and debugging output or obviously not needed by DIF3D. Out of the entire source codes of DIF3D, only a few uncovered modules deserve further investigation.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Verification of gyrokinetic particle simulations of neoclassical tearing modes in fusion plasmas

Abstract The ability to simulate neoclassical tearing modes (NTMs) in the gyrokinetic toroidal code (GTC) has been developed and verified, in which ions are treated with a gyrokinetic model and electrons are treated as a resistive fluid. The simulation results demonstrate that the neoclassical bootstrap current effect can destabilize an otherwise stable classical tearing mode. In the cylindrical geometry, GTC simulations in the magnetohydrodynamic limit show quantitative agreement with the modified Rutherford theory, both in terms of the scaling law in the small island limit and in terms of the saturation level and pressure flattening effect in the large island limit. The toroidal effects are slightly destabilizing for the NTM, while the kinetic effects of thermal ions are stabilizing for the NTM and increase its excitation threshold.

Physics↗

The IAEA Coordinated Research Program on HTGR Uncertainty Analysis: Phase I Status and Initial Results

The continued development of High Temperature Gas Cooled Reactors (HTGRs) requires verification of HTGR design and safety features with reliable high fidelity physics models and robust, efficient, and accurate codes. One way to address the uncertainties in the HTGR analysis tools is to assess the sensitivity of critical parameters (such as the calculated maximum fuel temperature during loss of coolant accidents) to a few important input uncertainties. The input parameters were identified by engineering judgement in the past but are today typically based on a Phenomena Identification Ranking Table (PIRT) process. The input parameters can also be derived from sensitivity studies and are then varied in the analysis to find a spread in the parameter of importance. However, there is often no easy way to compensate for these uncertainties. In engineering system design, a common approach for addressing performance uncertainties is to add compensating margins to the system, but with passive properties credited it is not so clear how to apply it in the case of modular HTGR heat removal path. Other more sophisticated uncertainty modelling approaches, including Monte Carlo analysis, have also been proposed and applied. Ideally one wishes to apply a more fundamental approach to determine the predictive capability and accuracies of coupled neutronics/thermal-hydraulics and depletion simulations used for reactor design and safety assessment. Today there is a broader acceptance of the use of uncertainty analysis even in safety studies, and it has been accepted by regulators in some cases to replace the traditional conservative analysis. Therefore some safety analysis calculations may use a mixture of these approaches for different parameters depending upon the particular requirements of the analysis problem involved. Sensitivity analysis can for example be used to provide information as part of an uncertainty analysis to determine best estimate plus uncertainty results to the required confidence level. In order to address uncertainty propagation in analysis and methods in the HTGR community the IAEA initiated a Coordinated Research Project (CRP) on the HTGR Uncertainty Analysis in Modelling (UAM) that officially started in 2013. Although this project focuses specifically on the peculiarities of HTGR designs and its simulation requirements, many lessons can be learned from the LWR community and the significant progress already made towards a consistent methodology uncertainty analysis. In the case of LWRs the NRC has already in 1988 amended 10 CFR 50.46 to allow best-estimate (plus uncertainties) calculations of emergency core cooling system performance. The Nuclear Energy Agency (NEA) of the Organization for Economic Co-operation and Development (OECD) also established an Expert Group on "Uncertainty Analysis in Modelling" which finally led to the definition of the "Benchmark for Uncertainty Analysis in Modelling (UAM) for Design, Operation and Safety Analysis of LWRs". The CRP on HTGR UAM will follow as far as possible the on-going OECD Light Water Reactor UAM benchmark activity.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

SU-E-T-784: Using MLC Log Files for Daily IMRT Delivery Verification

Purpose: To verify daily intensity modulated radiation therapy (IMRT) treatments using multi-leaf collimator (MLC) log files. Methods: The MLC log files from a NovalisTX Varian linear accelerator were used in this study. The MLC files were recorded daily for all patients undergoing IMRT or volumetric modulated arc therapy (VMAT). The first record of each patient was used as reference and all records for subsequent days were compared against the reference. An in house MATLAB software code was used for the comparisons. Each MLC log file was converted to a fluence map (FM) and a gamma index (γ) analysis was used for the evaluation of each daily delivery for every patient. The tolerance for the gamma index was set to 2% dose difference and 2mm distance to agreement while points with signal of 10% or lower of the maximum value were excluded from the comparisons. Results: The γ between each of the reference FMs and the consecutive daily fraction FMs had an average value of 99.1% (ranged from 98.2 to 100.0%). The FM images were reconstructed at various resolutions in order to study the effect of the resolution on the γ and at the same time reduce the time for processing the images. We found that the comparison of images with the highest resolution (768×1024) yielded on average a lower γ (99.1%) than the ones with low resolution (192×256) (γ 99.5%). Conclusion: We developed an in-house software that allows us to monitor the quality of daily IMRT and VMAT treatment deliveries using information from the MLC log files of the linear accelerator. The information can be analyzed and evaluated as early as after the completion of each daily treatment. Such tool can be valuable to assess the effect of MLC positioning on plan quality, especially in the context of adaptive radiotherapy.

60 APPLIED LIFE SCIENCES↗

SU-E-T-68: A Quality Assurance System with a Web Camera for High Dose Rate Brachytherapy

Purpose: The purpose of this work was to develop a quality assurance (QA) system for high dose rate (HDR) brachytherapy to verify the absolute position of an 192Ir source in real time and to measure dwell time and position of the source simultaneously with a movie recorded by a web camera. Methods: A web camera was fixed 15 cm above a source position check ruler to monitor and record 30 samples of the source position per second over a range of 8.0 cm, from 1425 mm to 1505 mm. Each frame had a matrix size of 480×640 in the movie. The source position was automatically quantified from the movie using in-house software (built with LabVIEW) that applied a template-matching technique. The source edge detected by the software on each frame was corrected to reduce position errors induced by incident light from an oblique direction. The dwell time was calculated by differential processing to displacement of the source. The performance of this QA system was illustrated by recording simple plans and comparing the measured dwell positions and time with the planned parameters. Results: This QA system allowed verification of the absolute position of the source in real time. The mean difference between automatic and manual detection of the source edge was 0.04 ± 0.04 mm. Absolute position error can be determined within an accuracy of 1.0 mm at dwell points of 1430, 1440, 1450, 1460, 1470, 1480, 1490, and 1500 mm, in three step sizes and dwell time errors, with an accuracy of 0.1% in more than 10.0 sec of planned time. The mean step size error was 0.1 ± 0.1 mm for a step size of 10.0 mm. Conclusion: This QA system provides quick verifications of the dwell position and time, with high accuracy, for HDR brachytherapy. This work was supported by the Japan Society for the Promotion of Science Core-to-Core program (No. 23003)

60 APPLIED LIFE SCIENCES↗