Search NASA⌕ Search

SEARCH · Search NASA

Results for “integrated testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,297 records · Page 72

Rapid Cycle Amine 4.0 System Development

Carbon dioxide (CO2) and humidity control is a key function of the spacesuit Portable Life Support Subsystem (PLSS). The latest spacesuit design utilizes a pressure swing bed containing a solid amine sorbent to scrub CO2 and humidity produced by the crewmember from the ventilation loop. The solid amine sorbent removes CO2 and humidity from the ventilation loop through a chemisorption mechanism. Simultaneously, CO2 and humidity are desorbed to vacuum via the two-bed pressure swing system during operation. This continuous regeneration allows for longer Extravehicular Activity (EVA) times while minimizing maintenance, consumables, and power usage. This concept has been in development for over 20 years, during which many prototypes and design iterations have been fabricated and evaluated. This paper discusses the recent Rapid Cycle Amine (RCA) design, development, and testing that has been done to advance the technology. The most recent fabrication is the RCA 3.0. It was delivered to NASA Johnson Space Center in 2015 and has since been tested at the component level and at the integrated PLSS level. The purpose of the component level testing was to understand CO2 removal capacity, end-of-life performance, and establish a baseline performance prior to integrated testing. The RCA 3.0 was integrated into the Exploration Extravehicular Mobility Unit (xEMU) PLSS for a comprehensive Design Verification Test (DVT) series. The integrated testing provided the benefit of characterizing the impact performance degradation has on the system. Many of the RCA requirements were developed through analysis, based on the limitations of the PLSS and, in some cases, assumptions about the system and flow behavior. Integrated testing was an opportunity to validate those requirements and assumptions. While the RCA 3.0 was being tested, the next design iteration, RCA 4.0, was under development. The RCA 4.0 preliminary design phase began in late-2019 and shortly after the Preliminary Design Review, the critical design phase began in 2021. The design work has concluded with the completion of a Pre-Manufacturing Review in 2022. This paper provides an overview of the RCA 4.0 system design, summarizes the results of integrated RCA 3.0 testing, and discusses the pertinence of driving requirements such as mass, volume, and power consumption.

Kelsey Bloom↗

Design and Testing of a Prototype Lunar or Planetary Surface Landing Research Vehicle (LPSLRV)

This handbook describes a two-semester senior design course sponsored by the NASA Office of Education, the Exploration Systems Mission Directorate (ESMD), and the NASA Space Grant Consortium. The course was developed and implemented by the Mechanical and Aerospace Engineering Department (MAE) at Utah State University. The course final outcome is a packaged senior design course that can be readily incorporated into the instructional curriculum at universities across the country. The course materials adhere to the standards of the Accreditation Board for Engineering and Technology (ABET), and is constructed to be relevant to key research areas identified by ESMD. The design project challenged students to apply systems engineering concepts to define research and training requirements for a terrestrial-based lunar landing simulator. This project developed a flying prototype for a Lunar or Planetary Surface Landing Research Vehicle (LPSRV). Per NASA specifications the concept accounts for reduced lunar gravity, and allows the terminal stage of lunar descent to be flown either by remote pilot or autonomously. This free-flying platform was designed to be sufficiently-flexible to allow both sensor evaluation and pilot training. This handbook outlines the course materials, describes the systems engineering processes developed to facilitate design fabrication, integration, and testing. This handbook presents sufficient details of the final design configuration to allow an independent group to reproduce the design. The design evolution and details regarding the verification testing used to characterize the system are presented in a separate project final design report. Details of the experimental apparatus used for system characterization may be found in Appendix F, G, and I of that report. A brief summary of the ground testing and systems verification is also included in Appendix A of this report. Details of the flight tests will be documented in a separate flight test report. This flight test report serves as a complement to the course handbook presented here. This project was extremely ambitious, and achieving all of the design and test objectives was a daunting task. The schedule ran slightly longer than a single academic year with the complete design closure not occurring until early April. Integration and verification testing spilled over into late May and the first flight did not occur until mid to late June. The academic year at Utah State University ended on May 8, 2010. Following the end of the academic year, testing and integration was performed by the faculty advisor, paid research assistants, and volunteer student help

Murphy, Gloria A.↗

Development of an Ion Thruster and Power Processor for New Millennium's Deep Space 1 Mission

The NASA Solar Electric Propulsion Technology Applications Readiness Program (NSTAR) will provide a single-string primary propulsion system to NASA's New Millennium Deep Space 1 Mission which will perform comet and asteroid flybys in the years 1999 and 2000. The propulsion system includes a 30-cm diameter ion thruster, a xenon feed system, a power processing unit, and a digital control and interface unit. A total of four engineering model ion thrusters, three breadboard power processors, and a controller have been built, integrated, and tested. An extensive set of development tests has been completed along with thruster design verification tests of 2000 h and 1000 h. An 8000 h Life Demonstration Test is ongoing and has successfully demonstrated more than 6000 h of operation. In situ measurements of accelerator grid wear are consistent with grid lifetimes well in excess of the 12,000 h qualification test requirement. Flight hardware is now being assembled in preparation for integration, functional, and acceptance tests.

Sovey, James S.↗

Space Data Systems Applications in the iPAS Pathfinder Laboratory

The iPAS is an integrated hardware/software test and evaluation environment, in support of current and future spacecraft development The iPAS has two main elements. A common avionics, hardware, and software architecture that can be applied over various missions. A common testbed framework that supports integrated hardware/software testing for a variety of applications. The iPAS includes the following (non-flight qualified) components: Core Flight Software (from GSFC). Commercially available Proton and S950 Flight Computer boards. Power and propulsion systems based on representative flight hardware. A realistic flight deck based on the Multi-Purpose Crew Vehicle (MPCV), including realistic flight controls and displays. A Space Data System based on CCSDS protocols.

Rich, Tom↗

Lessons learned from CIRFT testing on SNF vibration integrity study

A cyclic integrated reversible-bending fatigue tester (CIRFT) was developed to support U.S. NRC and DOE Used Fuel Disposition Campaign studies on high burn-up (HBU) spent nuclear fuel (SNF) transportation during normal conditions of transport (NCT). Two devices were developed; the first CIRFT was successfully installed and operated in the ORNL hot-cells in September 2013. Since hot cell testing commenced several HBU SNF samples from both Zr-4 and M5 clads were investigated. The second CIRFT device was developed in February 2014, and has been used to test clad/fuel surrogate rods (stainless steel with alumina pellet inserts). The second CIRFT machine has also been used for sensor development and test sensitivity analyses, as well as loading boundary condition parameter studies. The lessons learned from CIRFT testing will be presented in this paper.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Zero to Integration in Eight Months, the Dawn Ground Data System Engineering Challange

The Dawn Project has presented the Ground Data System (GDS) with technical challenges driven by cost and schedule constraints commonly associated with National Aeronautics and Space Administration (NASA) Discovery Projects. The Dawn mission consists of a new and exciting Deep Space partnership among: the Jet Propulsion Laboratory (JPL), responsible for project management and flight operations; Orbital Sciences Corporation (OSC), spacecraft builder and responsible for flight system test and integration; and the University of California, at Los Angeles (UCLA), responsible for science planning and operations. As a cost-capped mission, one of Dawn s implementation strategies is to leverage from both flight and ground heritage. OSC's ground data system is used for flight system test and integration as part of the flight heritage strategy. Mission operations, however, are to be conducted with JPL s ground system. The system engineering challenge of dealing with two heterogeneous ground systems emerged immediately. During the first technical interchange meeting between the JPL s GDS Team and OSC's Flight Software Team, August 2003, the need to integrate the ground system with the flight software was brought to the table. This need was driven by the project s commitment to enable instrument engineering model integration in a spacecraft simulator environment, for both demonstration and risk mitigation purposes, by April 2004. This paper will describe the system engineering approach that was undertaken by JPL's GDS Team in order to meet the technical challenge within a non-negotiable eight-month schedule. Key to the success was adherence to an overall systems engineering process and fundamental systems engineering practices: decomposition of the project request into manageable requirements; definition of a structured yet flexible development process; integration of multiple ground disciplines and experts into a focused team effort; in-process risk management; and aggregation of the intermediate products to an integrated final product. In addition, this paper will highlight the role of lessons learned from the integration experience. The lessons learned from an early GDS deployment have served as the foundation for the design and implementation of the Dawn Ground Data System.

systems engineering↗

A Risk Analysis Tool for Estimating the Risk of Electrical Failures Due to Human Induced Defects

Aerospace electrical systems are required to withstand and adequately operate in extremely harsh environments that include, for example, high radiation exposure, temperature extremes, intense vibrational stress and drastic temperature cycling. The nature of aerospace electronics also demands high reliability since, with very few exceptions, there is no chance for hardware servicing or repairs. Common risk mitigation techniques for this type of situation are to perform a Reliability Analysis of the system throughout the development cycle, and to use electrical components that are regarded as “high reliability” because of additional controls and requirements applied in their design, manufacturing and testing. Unfortunately, studies have shown that even though these techniques are used, many systems fail to meet mission requirements well before the predicted lifetimes. This paper presents the analysis of failures of electrical parts, experienced during various stages of system development, at NASA Goddard Space Flight Center, Greenbelt MD, between the years 2001 and 2013. These components were subjected to qualification, screening and testing in which the goal was to ensure that the components would survive the stresses of the mission. The analysis categorizes failures by part type and failure mechanisms. One of the results of the analysis was the realization that a surprising proportion of failures experienced during system integration and testing were caused by human error (i.e. human induced defect). Further analysis included the determination of root failure mechanisms and any influencing factors contributing to these failures. The major causes of these defects were attributed to electrostatic damage (ESD), electrical overstress (EOS), mechanical overstress (MOS), and thermal overstress (TOS). Finally, the study proposes a risk analysis tool which incorporates these major causes for the failures, termed error-producing conditions (EPCs), and a proportionality factor representing the number of each type of failure that has occurred at the facility under study. These factors are quantified and used to communicate the risk of human induced defects for the assembly, integration and testing of space hardware based on the system’s electrical parts list. The new risk identification can trigger risk-mitigating actions more effectively, based on the presence of component categories or other hazardous conditions that have a history of failure due to human error.

Majewicz, Peter J.↗

Zero to Integration in Eight Months, the Dawn Ground Data System Engineering Challenge

The Dawn Project has presented the Ground Data System (GDS) with technical challenges driven by cost and schedule constraints commonly associated with National Aeronautics and Space Administration (NASA) Discovery Projects. The Dawn mission consists of a new and exciting Deep Space partnership among: the Jet Propulsion Laboratory (JPL), manages the project and is responsible for flight operation; Orbital Sciences Corporation (OSC), is the spacecraft builder and is responsible for flight system test and integration; and the University of California, at Los Angeles (UCLA), is responsible for science planning and operations. As a cost-capped mission, one of Dawn's implementation strategies is to leverage from both flight and ground heritage. OSC's ground data system is used for flight system test and integration as part of the flight heritage strategy. Mission operations, however, are to be conducted with JPL's ground system. The system engineering challenge of dealing with two heterogeneous ground systems emerged immediately. During the first technical interchange meeting between the JPL's GDS Team and OSC's Flight Software Team, August 2003, the need to integrate the ground system with the flight software was brought to the table. This need was driven by the project's commitment to enable instrument engineering model integration in a spacecraft simulator environment, for both demonstration and risk mitigation purposes, by April 2004. This paper will describe the system engineering approach that was undertaken by JPL's GDS Team in order to meet the technical challenge within a non-negotiable eight-month schedule. Key to the success was adherence to fundamental systems engineering practices: decomposition of the project request into manageable requirements; integration of multiple ground disciplines and experts into a focused team effort; definition of a structured yet flexible development process; definition of an in-process risk reduction plan; and aggregation of the intermediate products to an integrated final product. In addition, this paper will highlight the role of lessons learned from the integration experience. The lessons learned from an early GDS deployment have served as the foundation for the design and implementation of the Dawn Ground Data System.

Ground Data System (GDS)↗

NASA Space Launch System Completes Key Hot Fire Test and Begins Vehicle Integration

NASA and its commercial and international partners are on the way back to the Moon. Significant progress towards that goal was made in 2021, including on the agency’s Space Launch System (SLS) rocket – a key part of the Artemis initiative. The SLS core stage for the Artemis I mission – the first launch of SLS and an uncrewed Orion capsule – completed its Green Run test series in early 2021 and was successfully mated with the SLS twin solid rocket boosters on the mobile launcher at Kennedy Space Center (KSC). The launch vehicle stage adapter, interim cryogenic propulsion stage, and the Orion stage adapter structural test article and Orion spacecraft mass simulator were also stacked. The flight Orion spacecraft and Orion stage adapter are being prepared for stacking and launch, targeted for late 2021 following a wet dress rehearsal at Launch Complex 39B. SLS hardware for Artemis II, which will be the first flight of crew on Orion and SLS, is also in work. Work progressed on core stage components, booster segments, and other hardware for Artemis III and future missions. This paper will detail the progress made.

John Honeycutt↗

NASA Space Launch System Completes Key Hot Fire Test and Begins Vehicle Integration

The Moon is again in reach. NASA and its commercial and international partners are on the way back. The team is working to land the first woman and the first person of color on the planetary body. NASA and its partners made significant progress towards that goal in the latter half of 2020 and the first half of 2021, including on the agency’s Space Launch System (SLS) rocket – a key part of the Artemis program. The SLS core stage for the Artemis I mission – the first launch of SLS and an uncrewed Orion capsule – completed the Green Run test series and was successfully mated with the SLS twin solid rocket boosters on the mobile launcher at Kennedy Space Center (KSC). All of the major systems for Artemis I are at KSC for assembly, integration, and launch, targeted for late 2021. Work also continued on SLS hardware for Artemis II, which will be the first flight of crew on Orion and SLS. Work progressed on core stage components, booster segments, and other hardware for Artemis III and future missions. This paper will detail the progress made.

John Honeycutt↗

Design and Lessons Learned on the Development of a Cryogenic Pupil Select Mechanism Used in the Testing and Calibration of the Integrated Science Instrument Module (ISIM) on the James Webb Space Telescope (JWST)

Calibration and testing of the instruments on the Integrated Science Instrument Module (ISIM) of the James Webb Space Telescope (JWST) is being performed by the use of a cryogenic, full-field, optical simulator that was constructed for this purpose. The Pupil Select Mechanism (PSM) assembly is one of several mechanisms and optical elements that compose the Optical Telescope Element SIMulator, or OSIM. The PSM allows for several optical elements to be inserted into the optical plane of OSIM, introducing a variety of aberrations, distortions, obscurations, and other calibration states into the pupil plane. The following discussion focuses on the details of the design evolution, analysis, build, and test of this mechanism along with the challenges associated with creating a sub arc-minute positioning mechanism operating in an extreme cryogenic environment. In addition, difficult challenges in the control system design will be discussed including the incorporation of closed-loop feedback control into a system that was designed to operate in an open-loop fashion.

Testing↗

Design and Lessons Learned on the Development of a Cryogenic Pupil Select Mechanism used in the Testing and Calibration of the Integrated Science Instrument Module (ISIM) on the James Webb Space Telescope (JWST)

Calibration and testing of the instruments on the Integrated Science Instrument Module (ISIM) of the James Webb Space Telescope (JWST) is being performed by the use of a cryogenic, full-field, optical simulator that was constructed for this purpose. The Pupil Select Mechanism (PSM) assembly is one of several mechanisms and optical elements that compose the Optical Telescope Element SIMulator, or OSIM. The PSM allows for several optical elements to be inserted into the optical plane of OSIM, introducing a variety of aberrations, distortions, obscurations, and other calibration states into the pupil plane. The following discussion focuses on the details of the design evolution, analysis, build, and test of this mechanism along with the challenges associated with creating a sub arc-minute positioning mechanism operating in an extreme cryogenic environment. In addition, difficult challenges in the control system design will be discussed including the incorporation of closed-loop feedback control into a system that was designed to operate in an open-loop fashion.

Mitchell, Alissa↗

Managing Flagship Missions to Reduce Cost and Schedule

Flagship missions are highly complex with highly nested systems. This level of complexity poses unique management problems as complexity influences risk which, in turn, affects cost and schedule. Establishing a strong technical and programmatic leadership team is critical to mission success. Developing and using a mission architecture is critical to informing the management organization, product ownership, interface and integration relationships, schedule organization, and integration and test paths. In highly nested systems, the mission phasing can be significantly out of sync with product phasing. Targeted technology development prior to Phase A is critical to reducing risk. Early architecture, concept design, and requirements development is critical to reducing risk. Modular design; pathfinders; parallel manufacturing and integration and test paths; and properly handling institutional requirements across interfaces are all management techniques that can be applied to reduce risk. NASA’s large strategic missions, sometimes referred to as flagship missions, are designed to provide answers to some of the most compelling scientific questions being asked. These types of missions are a series of highly nested subsystems that pose unique management problems when compared to more traditional instrument and spacecraft designs. They typically have an overall architecture that is very complex and nested; they typically require a tremendous amount of technology development; they typically involve many contractors and subcontractors with many associated contracts; and they typically involve staff from all over the world. Successful management of a flagship requires the balance between science requirements, engineering and technology capabilities, and resource constraints. Mismanaging these flagship missions can and will lead to significant cost and schedule growth, both of which are detrimental to NASA’s overall reputation which, in turn, is detrimental to the development of future flagship missions. While many of the same management principles used on smaller instruments and spacecraft are relevant, managing flagship missions requires an evolution of those current best practices to better address the specific needs and additional complexity and vastness of these missions. This paper explores how to leverage lessons learned from previous flagship missions to better manage flagship missions in the future.

Hylan, Jason↗

The development and flight test evaluation of an integrated propulsion control system for the HiMAT research airplane

The Highly Maneuverable Aircraft Technology airplane is a .44-scale version of an advanced fighter design. It is remotely piloted from a ground cockpit and is powered by a J85-GE-21 turbojet engine. The engine is electronically controlled by a digital computer onboard the airplane to operate at selected engine operation modes. The HiMAT design and development philosophy emphasized high-risk, low-cost and minimum testing, and also required that no single failure would cause loss of the vehicle. This philosophy generated unique requirements for design, computer simulation methods, specialized test techniques, and support systems which are discussed in this paper.

Baer-Riedhart, J. L.↗

Sister Rod Destructive Examinations (FY2021) Appendix F: Cyclic Integrated Reversible-Bending Fatigue Tests

As a part of DOE NE High Burnup Spent Fuel Data Project, Oak Ridge National Laboratory (ORNL) is performing destructive examinations (DEs) of high burnup (HBU) (>45 GWd/MTU) spent nuclear fuel (SNF) rods from the North Anna Nuclear Power Station operated by Dominion Energy. The SNF rods, called sister rods or sibling rods, are all HBU and include four different kinds of fuel rod cladding: standard Zircaloy-4 (Zirc-4), low-tin (LT) Zirc-4, ZIRLO, and M5. This appendix documents the status of the ORNL Phase 1 DE activities related to tests of the sister rods using the Cyclic Integrated Reversible-Bending Fatigue Tester (CIRFT) in Phase 1 of the sister rod test program.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Sister Rod Destructive Examinations (FY22) Appendix F: Cyclic Integrated Reversible-Bending Fatigue Tests

This report documents work performed under the Spent Fuel and Waste Disposition’s Spent Fuel and Waste Science and Technology program for the US Department of Energy (DOE) Office of Nuclear Energy (NE). This work was performed to fulfill Level 3 Milestone M3SF-22OR010201046, “Draft FY2022 ORNL Report on High Burnup Sibling Pin Testing Results,” within work package SF-22OR01020104 and is an update to the work reported in M2SF-22OR010201047, M2SF-21OR010201032, M2SF-19ORO010201026 and M2SF-19OR010201028. As a part of DOE NE High Burnup Spent Fuel Data Project, Oak Ridge National Laboratory (ORNL) is performing destructive examinations (DEs) of high burnup (HBU) (>45 GWd/MTU) spent nuclear fuel (SNF) rods from the North Anna Nuclear Power Station operated by Dominion Energy. The SNF rods, called sister rods or sibling rods, are all HBU and include four different kinds of fuel rod cladding: standard Zircaloy-4 (Zirc-4), low-tin (LT) Zirc-4, ZIRLO, and M5. The DEs are being conducted to obtain a baseline of the HBU rods’ condition before dry storage and are focused on understanding overall SNF rod strength and durability. Composite fuel and defueled cladding will be tested to derive material properties. Although the data generated can be used for multiple purposes, one primary goal for obtaining the post-irradiation examination data and the associated measured mechanical properties is to support SNF dry storage licensing and relicensing activities by (1) addressing identified knowledge gaps and (2) enhancing the technical basis for post-storage transportation, handling, and subsequent disposition. This appendix documents the status of the ORNL Phase 1 DE activities related to tests of the sister rods using the Cyclic Integrated Reversible-Bending Fatigue Tester (CIRFT) in Phase 1 of the sister rod test program.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technology advancement of the static feed water electrolysis process

A program to advance the technology of oxygen- and hydrogen-generating subsystems based on water electrolysis was studied. Major emphasis was placed on static feed water electrolysis, a concept characterized by low power consumption and high intrinsic reliability. The static feed based oxygen generation subsystem consists basically of three subassemblies: (1) a combined water electrolysis and product gas dehumidifier module; (2) a product gas pressure controller and; (3) a cyclically filled water feed tank. Development activities were completed at the subsystem as well as at the component level. An extensive test program including single cell, subsystem and integrated system testing was completed with the required test support accessories designed, fabricated, and assembled. Mini-product assurance activities were included throughout all phases of program activities. An extensive number of supporting technology studies were conducted to advance the technology base of the static feed water electrolysis process and to resolve problems.

Schubert, F. H.↗

Attitude and articulation control system testing for Project Galileo

A type of facility required to integrate and test a complex autonomous spacecraft subsystem is presented, using the attitude and articulation control subsystem (AACS) of Project Galileo as an example. The equipment created for testing the AACS at both the subsystem and spacecraft system levels is described, including a description of the support equipment (SE) architecture in its two main configurations, closed loop simulation techniques, the user interface to the SE, and plans for the use of the facility beyond the test period. This system is capable of providing a flight-like functional environment through the use of accurate real-time models and carefully chosen points of interaction, and flexible control capability and high visibility to the test operator.

Rasmussen, R. D.↗