Search NASA⌕ Search

SEARCH · Search NASA

Results for “Crew Performance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,315 records · Page 73

Simulation for STS flight crew training

Training activities for flights of the Space Shuttle Orbiter are performed in the most complicated flight simulation facility yet assembled. The Shuttle Mission Simulator (SMS) provides training for the entire mission from prelaunch to postlanding. An extensive pilot-cues environment is provided in which visual, aural, and motion cues are presented. The planning and execution of training on the simulator must take into account the complexity of the Shuttle systems, the complexity of the procedures and crew interface on the Shuttle, and the complexity of the mission, itself. The major points of this training program are highlighted.

Hughes, F. E.↗

Vehicle processing operations database

The Vehicle Processing Operations Data base (VPOD) has been designed and constructed to enable the collection and preliminary analysis of data relative to the processing of planetary exploration vehicles in low Earth orbit. VPOD has the capability to hierarchically store the events, assemblies, and equipment data needed for performing vehicle processing analysis, to whatever level of detail available. This permits some analysis to be performed even during the very early phases of vehicle and mission design. As more data about the events, assemblies, or equipment become available, the analysis can then be refined using the increased level of detail. VPOD output is based on a mission defined by selecting from the VPOD Events data base the events that are required to perform the desired tasks. The outputs available include total crew time, crew skill requirements, equipment needed, assemblies worked per event, to any available level of detail. The VPOD design is structured to interface with an operations simulation capability which is currently in the requirements definition phase. The simulator will use information from the VPOD to perform operations analysis for missions being conducted in low Earth orbit. VPOD information, along with information from the science missions operations data base and a Space Station configuration data base, will be used by the simulator to provide a capability to study total system operations and resources requirements.

Ganoe, George G.↗

Vehicle and Mission Design Options for the Human Exploration of Mars/Phobos Using "Bimodal" NTR and LANTR Propulsion

The nuclear thermal rocket (NTR) is one of the leading propulsion options for future human missions to Mars because of its high specific impulse (lsp~850-1000 s) capability and its attractive engine thrust-to-weight ratio (~3-10). To stay within the available mass and payload volume limits of a “Magnum” heavy lift vehicle, a high performance propulsion system is required for trans-Mars injection (TMI). An expendable TMI stage, powered by three 15 thousand pounds force (klbf) NTR engines is currently under consideration by NASA for its Design Reference Mission (DRM). However, because of the miniscule burnup of enriched uranium-235 during the Earth departure phase (~10 grams out of 33 kilograms in each NTR core), disposal of the TMI stage and its engines after a single use is a costly and inefficient use of this high performance stage. By reconfiguring the engines for both propulsive thrust and modest power generation (referred to as “bimodal” operation), a robust, multiple burn, “power-rich” stage with propulsive Mars capture and reuse capability is possible. A family of modular “bimodal” NTR (BNTR) vehicles are described which utilize a common “core” stage powered by three 15 klbf BNTRs that produce 50 kWe of total electrical power for crew life support, an active refrigeration / reliquification system for long term, zero-boiloff liquid hydrogen (LH 2 ) storage, and high data rate communications. An innovative, spine-like “saddle truss” design connects the core stage and payload element and is open underneath to allow supplemental “in-line” propellant tanks and contingency crew consumables to be easily jettisoned to improve vehicle performance. A “modified” DRM using BNTR transfer vehicles requires fewer transportation system elements, reduces IMLEO and mission risk, and simplifies space operations. By taking the next logical step—use of the BNTR for propulsive capture of all payload elements into Mars orbit—the power available in Mars orbit grows to 150 kWe compared to 30 kWe for the DRM. Propulsive capture also eliminates the complex, higher risk aerobraking and capture maneuver which is replaced by a simpler reentry using a standardized, lower mass “aerodescent” shell. The attractiveness of the “all BNTR” option is further increased by the substitution of the lightweight, inflatable “TransHab” module in place of the heavier, hard-shell hab module. Use of TransHab introduces the potential for propulsive recovery and reuse of the BNTR / Earth return vehicle (ERV). It also allows the crew to travel to and from Mars on the same BNTR transfer vehicle thereby cutting the duration of the ERV mission in half—from ~4.7 to 2.5 years. Finally, for difficult Mars options, such as Phobos rendezvous and sample return missions, volume (not mass) constraints limit the performance of the “all LH 2 ” BNTR stage. The use of “LOX-augmented” NTR (LANTR) engines, operating at a modest oxygen-to-hydrogen mixture ratio (MR) of 0.5, helps to increase “bulk” propellant density and total thrust during the TMI burn. On all subsequent burns, the bimodal LANTR engines operate on LH 2 only (MR=0) to maximize vehicle performance while staying within the mass limits of two Magnum launches.

Nuclear thermal rocket↗

Vehicle and Mission Design Options for the Human Exploration of Mars/Phobos Using "Bimodal" NTR and LANTR Propulsion

The nuclear thermal rocket (NTR) is one of the leading propulsion options for future human missions to Mars because of its high specific impulse (Isp-850-1000 s) capability and its attractive engine thrust-to-weight ratio (approximately equal 3-10). To stay within the available mass and payload volume limits of a "Magnum" heavy lift vehicle, a high performance propulsion system is required for trans-Mars injection (TMI). An expendable TMI stage, powered by three 15 thousand pounds force (klbf) NTR engines is currently under consideration by NASA for its Design Reference Mission (DRM). However, because of the miniscule burnup of enriched uranium-235 during the Earth departure phase (approximately 10 grams out of 33 kilograms in each NTR core), disposal of the TMI stage and its engines after a single use is a costly and inefficient use of this high performance stage. By reconfiguring the engines for both propulsive thrust and modest power generation (referred to as "bimodal" operation), a robust, multiple burn, "power-rich" stage with propulsive Mars capture and reuse capability is possible, A family of modular "bimodal" NTR (BNTR) vehicles are described which utilize a common "core" stage powered by three 15 klbf BNTRs that produce 50 kWe of total electrical power for crew life support, an active refrigeration / reliquification system for long term, "zero-boiloff" liquid hydrogen (LH 2 ) storage, and high data rate communications. An innovative, spine-like "saddle truss" design connects the core stage and payload element and is open underneath to allow supplemental "in-line" propellant tanks and contingency crew consumables to be easily jettisoned to improve vehicle performance. A "modified" DRM using BNTR transfer vehicles requires fewer transportation system elements, reduces IMLEO and mission risk, and simplifies space operations. By taking the next logical step--use of the BNTR for propulsive capture of all payload elements into Mars orbit--the power available in Mars orbit grows to 150 kWe compared to 30 kWe for the DRM. Propulsive capture also eliminates the complex, higher risk aerobraking and capture maneuver which is replaced by a simpler reentry using a standardized, lower mass "aerodescent" shell. The attractiveness of the "all BNTR" option is further increased by the substitution of the lightweight, inflatable "TransHab" module in place of the heavier, hard-shell hab module. Use of TransHab introduces the potential for propulsive recovery and reuse of the BNTR/ERV. It also allows the crew to travel to and from Mar on the same BNTR transfer vehicle thereby cutting the duration of the ERV mission in half--from approximately 4.7 to 2.5 years. Finally, for difficult Mars options, such as Phobos rendezvous and sample return missions, volume (not mass) constraints limit the performance of the "all LH 2 " BNTR stage. The use of "LOX-augmented" NTR (LANTR) engines, operating at a modest oxygen-to-hydrogen mixutre ratio (MR) of 0.5, helps to increase "bulk" propellant density and total thrust during the TMI burn. On all subsequent burns, the bimodal LANTR engines operate on LH 2 only (MR=0) to maximize vehicle performance while staying within the lift capability of two Magnum launches.

Nuclear thermal rocket↗

Integrated Systems Health Management for Space Exploration

Integrated Systems Health Management (ISHM) is a system engineering discipline that addresses the design, development, operation, and lifecycle management of components, subsystems, vehicles, and other operational systems with the purpose of maintaining nominal system behavior and function and assuring mission safety and effectiveness under off-nominal conditions. NASA missions are often conducted in extreme, unfamiliar environments of space, using unique experimental spacecraft. In these environments, off-nominal conditions can develop with the potential to rapidly escalate into mission- or life-threatening situations. Further, the high visibility of NASA missions means they are always characterized by extraordinary attention to safety. ISHM is a critical element of risk mitigation, mission safety, and mission assurance for exploration. ISHM enables: In-space maintenance and repair; a) Autonomous (and automated) launch abort and crew escape capability; b) Efficient testing and checkout of ground and flight systems; c) Monitoring and trending of ground and flight system operations and performance; d) Enhanced situational awareness and control for ground personnel and crew; e) Vehicle autonomy (self-sufficiency) in responding to off-nominal conditions during long-duration and distant exploration missions; f) In-space maintenance and repair; and g) Efficient ground processing of reusable systems. ISHM concepts and technologies may be applied to any complex engineered system such as transportation systems, orbital or planetary habitats, observatories, command and control systems, life support systems, safety-critical software, and even the health of flight crews. As an overarching design and operational principle implemented at the system-of-systems level, ISHM holds substantial promise in terms of affordability, safety, reliability, and effectiveness of space exploration missions.

Uckun, Serdar↗

At the intersection of automation and culture

The crash of an automated passenger jet at Nagoya, Japan, in 1995, is used as an example of crew error in using automatic systems. Automation provides pilots with the ability to perform tasks in various ways. National culture is cited as a factor that affects how a pilot and crew interact with each other and equipment.

NASA Discipline Space Human Factors↗

Artificial Intelligence: Powering Human Exploration of the Moon and Mars

Artificial Intelligence (AI) is a growing field of computa- tional science techniques designed to mimic functions per- formed by people. Advancements in autonomy will depend on a portfolio of AI technologies. Automated planning and scheduling is a venerable field of study in AI, and is needed for a variety of mission planning functions. Plan execution technology is less well studied, but important for auton- omy and robotics. Specialized forms of automated reason- ing and machine learning are key technologies to enable fault management. Over the past decade, the NASA Au- tonomous Systems and Operations (ASO) project has devel- oped and demonstrated numerous autonomy enabling tech- nologies employing AI techniques. Our work has employed AI in three distinct ways to enable autonomous mission op- erations capabilities. Crew Autonomy gives astronauts tools to assist in the performance of each of these mission oper-ations functions. Vehicle System Management uses AI tech- niques to turn the astronaut's spacecraft into a robot, allow- ing it to operate when astronauts are not present, or to reduce astronaut workload. AI technology also enables Autonomous Robots as crew assistants or proxies when the crew are not present. When these capabilities are used to enable astro- nauts to operate autonomously, they must be integrated with user interfaces, introducing numerous human factors con- siderations; when these capabilities are used to enable vehi- cle system management, they must be integrated with flight software, and run on embedded processors under the control of real-time operating systems.We first describe human spaceflight mission operations capabilities. The remainder of the paper will describe the ASO project, and the development and demonstration per- formed by ASO since 2011. We will describe the AI tech- niques behind each of these demonstrations, which include a variety of symbolic automated reasoning and machine learn- ing based approaches. Finally, we conclude with an assess- ment of future development needs for AI to enable NASA's future Exploration missions.

Mission Operations↗

Performance of the Two-Level Targeting Algorithm on Artemis I

Artemis is NASA’s campaign to explore the Moon and beyond. Artemis I, the un-crewed exoLEO test flight, was completed in 2022. This paper will summarize the performance of the onboard targeting algorithm, the two-level targeter (TLT), during the flight. The function of the TLT is to autonomously recompute the burn targets for the upcoming burn (or multiple burns) in response to navigation and vehicle dispersions, providing a solution that meets all of the trajectory constraints. Although the TLT has been utilized previously as a ground-based planning tool, the Artemis I mission is the first time it has been flown onboard. The lessons learned from TLT performance during Artemis I will help to inform the further development of the algorithm for future Artemis missions.

Sara S Scarritt↗

Vulnerability of manned spacecraft to crew loss from orbital debris penetration

Orbital debris growth threatens the survival of spacecraft systems from impact-induced failures. Whereas the probability of debris impact and spacecraft penetration may currently be calculated, another parameter of great interest to safety engineers is the probability that debris penetration will cause actual spacecraft or crew loss. Quantifying the likelihood of crew loss following a penetration allows spacecraft designers to identify those design features and crew operational protocols that offer the highest improvement in crew safety for available resources. Within this study, a manned spacecraft crew survivability (MSCSurv) computer model is developed that quantifies the conditional probability of losing one or more crew members, P(sub loss/pen), following the remote likelihood of an orbital debris penetration into an eight module space station. Contributions to P(sub loss/pen) are quantified from three significant penetration-induced hazards: pressure wall rupture (explosive decompression), fragment-induced injury, and 'slow' depressurization. Sensitivity analyses are performed using alternate assumptions for hazard-generating functions, crew vulnerability thresholds, and selected spacecraft design and crew operations parameters. These results are then used to recommend modifications to the spacecraft design and expected crew operations that quantitatively increase crew safety from orbital debris impacts.

Williamsen, J. E.↗

An Alternative Approach to Human Servicing of Crewed Earth Orbiting Spacecraft

As crewed spacecraft have grown larger and more complex, they have come to rely on spacewalks, or Extravehicular Activities (EVA), for mission success and crew safety. Typically, these spacecraft maintain all of the hardware and trained personnel needed to perform an EVA on-board at all times. Maintaining this capability requires volume and up-mass for storage of EVA hardware, crew time for ground and on-orbit training, and on-orbit maintenance of EVA hardware. This paper proposes an alternative methodology, utilizing launch on-need hardware and crew to provide EVA capability for space stations in Earth orbit after assembly complete, in the same way that one would call a repairman to fix something at their home. This approach would reduce ground training requirements, save Intravehicular Activity (IVA) crew time in the form of EVA hardware maintenance and on-orbit training, and lead to more efficient EVAs because they would be performed by specialists with detailed knowledge and training stemming from their direct involvement in the development of the EVA. The on-orbit crew would then be available to focus on the immediate response to the failure as well as the day-to-day operations of the spacecraft and payloads. This paper will look at how current unplanned EVAs are conducted, including the time required for preparation, and offer alternatives for future spacecraft. As this methodology relies on the on-time and on-need launch of spacecraft, any space station that utilized this approach would need a robust transportation system including more than one launch vehicle capable of carrying crew. In addition, the fault tolerance of the space station would be an important consideration in how much time was available for EVA preparation after the failure. Each future program would have to weigh the risk of on-time launch against the increase in available crew time for the main objective of the spacecraft.

Mularski, John R.↗

Operating displays - new concept: high performance displays - 118

New control rooms in Nuclear Power Plants using digital Distributed Control System (DCS) operated with software displays, are providing thousands of signals to the operating crew. When an event happens, the Flood of information provided to operators could obscure the initiator event increasing the operator response time, work load and complicating the selection of the actions to be performed. There are some initiatives that are trying to minimize the 'avalanche effect' as the alarm engineering filtering and prioritization or diagnostic displays. Likewise, new control rooms are lost the availability to know the plant status just with a quick glance to the panel indicators. Regarding Small Modular Reactors, where in some cases four operators should monitor and control twelve reactors, these problems are even more significant. The challenge is to find a solution, based on current digital systems, that supply information to operators in order to prevent events and take early actions to minimize or avoid any unexpected incident. In order to minimize human errors, Tecnatom has developed a specific set of displays, called 'High Performance Displays' (HPD) based on objectives, work environment limitation, and non-anticipated events. These displays are being design following the HFE standards: applying the NUREG-0711 elements to identify the information that they have to content and the NUREG-0700 to design the interface. The function of these displays is monitoring the plant situation in a way that the operators are able to recognize any potential event at a simple glance but controlling thousands of signals through pattern recognition, symmetries, regular polygons and colors. The objective of the HPD is to provide an integrated function minimizing the tunnel effect and reduce the workload during the diagnosis phase. Moreover, HPD enhance operators to take the right actions to anticipate the response to any event, even avoiding it, if possible This paper analyzes how HPD's have been design as well as presents the results of a preliminary validation of their capabilities. The preliminary validation is a reduce validation in a full scope simulator running two representative scenarios of abnormal and emergency operation. The analysis is focused on the first stage of the event, i.e. the detection phase, HPD's have been installed in a generic full scope simulator of a nuclear power plant, digital controlled. Both scenarios have been performed by two different operator crews. The first operator shift has worked with the conventional human machine interface, that is, displays similar to the ones currently installed in existing nuclear power plant with digital control. The second crew, reproduce the same scenarios but with HPD available. The studio collects preliminary data in order to compare results, draw lesson learned from the experience to improve HPD design, and find solutions in terms of reducing human errors, human workload, and increase the availability of the plant. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Methodology issues concerning the accuracy of kinematic data collection and analysis using the ariel performance analysis system

Kinematics, the study of motion exclusive of the influences of mass and force, is one of the primary methods used for the analysis of human biomechanical systems as well as other types of mechanical systems. The Anthropometry and Biomechanics Laboratory (ABL) in the Crew Interface Analysis section of the Man-Systems Division performs both human body kinematics as well as mechanical system kinematics using the Ariel Performance Analysis System (APAS). The APAS supports both analysis of analog signals (e.g. force plate data collection) as well as digitization and analysis of video data. The current evaluations address several methodology issues concerning the accuracy of the kinematic data collection and analysis used in the ABL. This document describes a series of evaluations performed to gain quantitative data pertaining to position and constant angular velocity movements under several operating conditions. Two-dimensional as well as three-dimensional data collection and analyses were completed in a controlled laboratory environment using typical hardware setups. In addition, an evaluation was performed to evaluate the accuracy impact due to a single axis camera offset. Segment length and positional data exhibited errors within 3 percent when using three-dimensional analysis and yielded errors within 8 percent through two-dimensional analysis (Direct Linear Software). Peak angular velocities displayed errors within 6 percent through three-dimensional analyses and exhibited errors of 12 percent when using two-dimensional analysis (Direct Linear Software). The specific results from this series of evaluations and their impacts on the methodology issues of kinematic data collection and analyses are presented in detail. The accuracy levels observed in these evaluations are also presented.

Wilmington, R. P.↗

An Alternative Approach to Human Servicing of Manned Earth Orbiting Spacecraft

As manned spacecraft have grown larger and more complex, they have come to rely on spacewalks or Extravehicular Activities (EVA) for both mission success and crew safety. Typically these spacecraft maintain all of the hardware and trained personnel needed to perform an EVA on-board at all times. Maintaining this capability requires volume and up-mass for storage of EVA hardware, crew time for ground and on-orbit training, and on-orbit maintenance of EVA hardware . This paper proposes an alternative methodology to utilize launch-on-need hardware and crew to provide EVA capability for space stations in Earth orbit after assembly complete, in the same way that most people would call a repairman to fix something at their home. This approach would not only reduce ground training requirements and save Intravehicular Activity (IVA) crew time in the form of EVA hardware maintenance and on-orbit training, but would also lead to more efficient EVAs because they would be performed by specialists with detailed knowledge and training stemming from their direct involvement in the development of the EVA. The on-orbit crew would then be available to focus on the immediate response to the failure as well as the day-to-day operations of the spacecraft and payloads. This paper will look at how current ISS unplanned EVAs are conducted, including the time required for preparation, and offer alternatives for future spacecraft utilizing lessons learned from ISS. As this methodology relies entirely on the on-time and on-need launch of spacecraft, any space station that utilized this approach would need a robust transportation system including more than one launch vehicle capable of carrying crew. In addition the fault tolerance of the space station would be an important consideration in how much time was available for EVA preparation after the failure. Each future program would have to weigh the risk of on-time launch against the increase in available crew time for the main objective of the spacecraft.

Mularski, John↗

Phase 111A Crew Interface Specifications Development for Inflight Maintenance and Stowage Functions

This report presents the findings and data products developed during the Phase IIIA Crew Interface Specification Study for Inflight Maintenance and Stowage Functions, performed by General Electric for the NASA, Johnson Space Center with a set of documentation that can be used as definitive guidelines to improve the present process of defining, controlling and managing flight crew interface requirements that are related to inflight maintenance (including assembly and servicing) and stowage functions. During the Phase IIIA contract period, the following data products were developed: 1) Projected NASA Crew Procedures/Flight Data File Development Process. 2) Inflight Maintenance Management Process Description. 3) Preliminary Draft, General Specification, Inflight Maintenance Management Requirements. 4) Inflight Maintenance Operational Process Description. 5) Preliminary Draft, General Specification, Inflight Maintenance Task and Support Requirements Analysis. 6) Suggested IFM Data Processing Reports for Logistics Management The above Inflight Maintenance data products have been developed during the Phase IIIA study after review of Space Shuttle Program Documentation, including the Level II Integrated Logistics Requirements and other DOD and NASA data relative to Payloads Accommodations and Satellite On-Orbit Servicing. These Inflight Maintenance data products were developed to be in consonance with Space Shuttle Program technical and management requirements.

Carl, John G.↗

Small Fast Spectrum Reactor Designs Suitable for Direct Nuclear Thermal Propulsion

Advancement of U.S. scientific, security, and economic interests through a robust space exploration program requires high performance propulsion systems to support a variety of robotic and crewed missions beyond low Earth orbit. Past studies, in particular those in support of both the Strategic Defense Initiative (SDI) and Space Exploration Initiative (SEI), have shown nuclear thermal propulsion systems provide superior performance for high mass high propulsive delta-V missions. The recent NASA Design Reference Architecture (DRA) 5.0 Study re-examined mission, payload, and transportation system requirements for a human Mars landing mission in the post-2030 timeframe. Nuclear thermal propulsion was again identified as the preferred in-space transportation system. A common nuclear thermal propulsion stage with three 25,000-lbf thrust engines was used for all primary mission maneuvers. Moderately lower thrust engines may also have important roles. In particular, lower thrust engine designs demonstrating the critical technologies that are directly extensible to other thrust levels are attractive from a ground testing perspective. An extensive nuclear thermal rocket technology development effort was conducted from 1955-1973 under the Rover/NERVA Program. Both graphite and refractory metal alloy fuel types were pursued. Reactors and engines employing graphite based fuels were designed, built and ground tested. A number of fast spectrum reactor and engine designs employing refractory metal alloy fuel types were proposed and designed, but none were built. The Small Nuclear Rocket Engine (SNRE) was the last engine design studied by the Los Alamos National Laboratory during the program. At the time, this engine was a state-of-the-art graphite based fuel design incorporating lessons learned from the very successful technology development program. The SNRE was a nominal 16,000-lbf thrust engine originally intended for unmanned applications with relatively short engine operations and the engine and stage design were constrained to fit within the payload volume of the then planned space shuttle. The SNRE core design utilized hexagonal fuel elements and hexagonal structural support elements. The total number of elements can be varied to achieve engine designs of higher or lower thrust levels. Some variation in the ratio of fuel elements to structural elements is also possible. Options for SNRE-based engine designs in the 25,000-lbf thrust range were described in a recent (2010) Joint Propulsion Conference paper. The reported designs met or exceeded the performance characteristics baselined in the DRA 5.0 Study. Lower thrust SNRE-based designs were also described in a recent (2011) Joint Propulsion Conference paper. Recent activities have included parallel evaluation and design efforts on fast spectrum engines employing refractory metal alloy fuels. These efforts include evaluation of both heritage designs from the Argonne National Laboratory (ANL) and General Electric Company GE-710 Programs as well as more recent designs. Results are presented for a number of not-yet optimized fast spectrum engine options.

33 ADVANCED PROPULSION SYSTEMS↗

CDTI: Crew Function Assessment

Man machine interaction often requires the operator to perform a sterotyped scan of instruments to monitor and/or control a system. Situations in which this type of behavior exists, such as instrument flight, scan pattern has been shown to be altered by imposition of simultaneous verbal tasks. The relationship between pilot visual scan of instruments and mental workload was described. A verbal loading task of varying difficulty caused pilots to stare at the primary instrument as the difficulty increased and to shed looks at instruments of less importance. The verbal loading task affected rank ordering of scanning sequences. The behavior of pilots with widely varying skill levels suggested that these effects occur most strongly at lower skill levels and are less apparent at high skill levels. Graphical interpretation of the hypothetical relationship between skill, workload, and performance is introduced and modeling results are presented to support this interpretation.

Tole, J. R.↗

Psychosocial value of space simulation for extended spaceflight

There have been over 60 studies of Earth-bound activities that can be viewed as simulations of manned spaceflight. These analogs have involved Antarctic and Arctic expeditions, submarines and submersible simulators, land-based simulators, and hypodynamia environments. None of these analogs has accounted for all the variables related to extended spaceflight (e.g., microgravity, long-duration, heterogeneous crews), and some of the stimulation conditions have been found to be more representative of space conditions than others. A number of psychosocial factors have emerged from the simulation literature that correspond to important issues that have been reported from space. Psychological factors include sleep disorders, alterations in time sense, transcendent experiences, demographic issues, career motivation, homesickness, and increased perceptual sensitivities. Psychiatric factors include anxiety, depression, psychosis, psychosomatic symptoms, emotional reactions related to mission stage, asthenia, and postflight personality, and marital problems. Finally, interpersonal factors include tension resulting from crew heterogeneity, decreased cohesion over time, need for privacy, and issues involving leadership roles and lines of authority. Since future space missions will usually involve heterogeneous crews working on complicated objectives over long periods of time, these features require further study. Socio-cultural factors affecting confined crews (e.g., language and dialect, cultural differences, gender biases) should be explored in order to minimize tension and sustain performance. Career motivation also needs to be examined for the purpose of improving crew cohesion and preventing subgrouping, scapegoating, and territorial behavior. Periods of monotony and reduced activity should be addressed in order to maintain morale, provide meaningful use of leisure time, and prevent negative consequences of low stimulation, such as asthenia and crew member withdrawal. Leadership roles and lines of authority need to be studied further to understand the factors leading to status leveling, leadership competition, and role confusion. Finally, the relationship between crews and ground personnel should be characterized in order to minimize the displacement of anger and tension to the outside, to counter the effects of inter-group miscommunications, and to develop support strategies that can help to counter in-group/out-group conflicts. Ground-based space simulations still have a role to play in terms of understanding the impact of these factors and ways of dealing with them. In particular, issues involving language, cultural differences, gender biases, career motivation, monotonous conditions, use of free time, leadership, lines of authority, and the relationship between crews and outside monitoring personnel need to be further characterized and examined under controlled conditions. Until such time as these factors can be studied directly in space, simulations provide an opportunity to learn more about these psychosocial issues and to plan ways of minimizing their negative consequences during actual space missions.

NASA Discipline Number 00-00↗

Performance Evaluation of Pressure Transducers for Water Impacts

The Orion Multi-Purpose Crew Vehicle is being designed for water landings. In order to benchmark the ability of engineering tools to predict water landing loads, test programs are underway for scale model and full-scale water impacts. These test programs are predicated on the reliable measurement of impact pressure histories. Tests have been performed with a variety of pressure transducers from various manufacturers. Both piezoelectric and piezoresistive devices have been tested. Effects such as thermal shock, pinching of the transducer head, and flushness of the transducer mounting have been studied. Data acquisition issues such as sampling rate and anti-aliasing filtering also have been studied. The response of pressure transducers have been compared side-by-side on an impulse test rig and on a 20-inch diameter hemisphere dropped into a pool of water. The results have identified a range of viable configurations for pressure measurement dependent on the objectives of the test program.

Vassilakos, Gregory J.↗