Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Readiness”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,315 records · Page 73

SICS: A Sensor-Based In-Line Control System for the Surfaces of Continuously Cast Slabs

The goal of this project was to develop and demonstrate a SICS test unit that meet the need of the steel industry for enhancing the continuous casting process for improved surface quality for the targeted benefits and that is composed of an In-line Imaging Module and a Hybrid Predictive Control Module. The In-line Imaging Module provides the real-time or near real-time Product Information to the Hybrid Predictive Control Module. The latter is able to fuse the Product Information with the Process Information. In order to support the goal, this project had the technical objectives for indexes such as inspection accuracy and in-line service life, based on the inspection coverage of the entire cast slab. The deployment of the SICS systems has the potential to provide benefits in reduction of energy waste, CO 2 emission, waste water amount, toxic waste, and so forth. It will help to uphold the competitiveness of the industry that employs approximately 150,000 people nationwide and consumes about 3% of the energy in the country. The Phase II project has been carried out in accordance to the proposed tasks and budget, based on the original and extended schedule. The R&D team designed and implemented the test unit for the full width coverage, installed the unit in a caster. The development work further included enhanced image processing, in-depth defect study and process control models. The function, operation, and maintenance of the SICS was thoroughly studied during the Phase II research. The experience indicates additional hardware and procedures are required to make the SICS a commercially ready product in operation and maintenance aspect. Such developments have been finished and the team is contacting potential customers for the first commercial installation of SICS. Additionally, OGT is exploring the possibility to team up with a US company that specializes in surface cleaning for slabs/blooms/billets such that the in-line surface inspection can be integrated with in-line surface clean up for the maximum benefit to the steel industry.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The Point-Focusing Thermal and Electric Applications Project - A progress report

The paper discusses the Point-Focusing Thermal and Electric Applications Project which encompasses three primary activities: (1) applications analysis and development, in which potential markets for small power systems (less than 10 MWe) are identified and characterized in order to provide requirements for design and information for activities relating to market development; (2) systems engineering and development, for analyses that will define the most appropriate small power system designs based on specific user requirements; and (3) experiment implementation and test, which deals with the design and placement of engineering experiments in various applications environments in order to test the readiness of the selected technology in an operational setting. Progress to date and/or key results are discussed throughout the text.

Marriott, A. T.↗

Taking Risk Assessment and Management to the Next Level: Program-Level Risk Analysis to Enable Solid Decision-Making on Priorities and Funding

A multi-level (facility and programmatic) risk assessment was conducted for the facilities in the Nevada National Security Site (NNSS) Readiness in Technical Base and Facilities (RTBF) Program and results were included in a new Risk Management Plan (RMP), which was incorporated into the fiscal year (FY) 2010 Integrated Plans. Risks, risk events, probability, consequence(s), and mitigation strategies were identified and captured, for most scope areas (i.e., risk categories) during the facilitated risk workshops. Risk mitigations (i.e., efforts in addition to existing controls) were identified during the facilitated risk workshops when the risk event was identified. Risk mitigation strategies fell into two broad categories: threats or opportunities. Improvement projects were identified and linked to specific risks they mitigate, making the connection of risk reduction through investments for the annual Site Execution Plan. Due to the amount of that was collected, analysis to be performed, and reports to be generated, a Risk Assessment/ Management Tool (RAMtool) database was developed to analyze the risks in real-time, at multiple levels, which reinforced the site-level risk management process and procedures. The RAMtool database was developed and designed to assist in the capturing and analysis of the key elements of risk: probability, consequence, and impact. The RAMtool calculates the facility-level and programmatic-level risk factors to enable a side-by-side comparison to see where the facility manager and program manager should focus their risk reduction efforts and funding. This enables them to make solid decisions on priorities and funding to maximize the risk reduction. A more active risk management process was developed where risks and opportunities are actively managed, monitored, and controlled by each facility more aggressively and frequently. risk owners have the responsibility and accountability to manage their assigned risk in real-time, using the RAMtool database.

Nelson, J. G.↗

On the Road to Achieving Safety Excellence at the Idaho Cleanup Project: The Initial Challenges, Solutions, and Positive Results of Striving to be the Best and Safest in the DOE Complex - 20518

When Fluor Idaho, LLC (Fluor Idaho) assumed the Idaho Cleanup Project Core contract (ICP Core) in mid-2016, it inherited the successful multi-faceted, employee-owned safety programs of two prior contractors supporting cleanup operations at the Idaho National Laboratory Site. Fluor Idaho incorporated the best of both safety programs along with Fluor Corporate's 106-year legacy of safety initiatives and successes. Fluor Idaho integrated the separate programs and cultures under a One Fluor approach - one project, one mission, One Fluor. Job changes, management changes, and procedures, processes, and system changes presented multiple challenges. Those challenges combined with the severe Winter of 2016/2017 resulted in numerous slips, trips, and falls first aids and reportable injuries. The road to safety excellence started off bumpy and stayed that way for some time. Since then, Fluor Idaho has successfully implemented several key initiatives including employee engagement; management engagement and time in the field; communications improvements; safety culture sustainment; injury/illness prevention; organizational learning; and DOE Voluntary Protection Program (VPP) readiness and preparation. Management became more engaged by making more workplace visits and increasing their supervision of 'life critical work' or complex activities. Additional training became mandatory for first-line supervisors and front-line workers. Most recently, Fluor Idaho increased its injury and illness prevention initiatives extensively. In the last year, things have turned around in a dramatic way. This shift is directly attributable to the significant number of initiatives launched in late 2017 and 2018. These initiatives addressed safety performance in the five key areas of the DOE VPP and promoted sustainability of the company's safety culture. The five key areas are: management leadership, employee involvement, work-site analysis, hazard prevention and control, and safety and health training. Employees and managers alike recommitted to making safety the highest value. The result of this laser-like focus on safety and accident and injury prevention is that injuries and first aids are a fraction of what they were. During FY 2019, employees worked more than 4.2 million hours without a serious injury or lost work-day and 1 million hours without a recordable injury. Fluor Idaho is proud of its safety trend. The company invested significant resources in improving its safety record, and that investment is paying off. Other contractors in the DOE Complex can learn and benefit from this discussion of the challenges Fluor Idaho faced, as well as its innovative safety initiatives that are producing results that are being recognized by our U.S. Department of Energy (DOE) customer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Breakup of loosely bound nuclei at intermediate energies for nuclear astrophysics and the development of a position sensitive microstrip detector system and its readout electronics using ASICs technologies

The work performed under this grant has led to the development of a detection system that will be used to measure reaction rates for proton or neutron capture reactions at stellar energies on radioactive ions far from stability. The reaction rates are needed to better understand the physics of nucleosynthesis in explosive stellar processes such as supernovae and x-ray burst events. The radioactive ions will be produced at the Radioactive Ion Beam Facility (RIBF) at RIKEN near Tokyo, Japan. During the course of this work, the group involved in this project has expanded by several institutions in Europe and Japan and now involves collaborators from the U.S., Japan, Hungary, Romania, Germany, Spain, Italy, China, and South Korea. As part of the project, a novel design based on large-area silicon detectors has been built and tested. The work has involved mechanical construction of a special purpose vacuum chamber, with a precision mounting system for the silicon detectors, development of a new ASICs readout system that has applications with a wide variety of silicon detector systems, and the development of a data acquisition system that is integrated into the computer system being used at RIBF. The parts noted above that are needed to carry out the research program are completed and ready for installation. Several approved experiments that will use this system will be carried out in the near future. The experimental work has been delayed due to a large increase in the cost and availability of electrical power for RIBF that occurred following the massive earthquake and tsunami that hit Japan in the spring of 2011. Another component of the research carried out with this grant involved developing the theoretical tools that are required to extract the information from the experiments that is needed to determine the stellar reaction rates. The tools developed through this part of the work will be made freely available for general use.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Development of a Production Ready Automated Wire Delivery System

The current development effort is a Phase 3 research study entitled "A Production Ready Automated Wire Delivery System", contract number NAS8-39933, awarded to Nichols Research Corporation (NRC). The goals of this research study were to production harden the existing Automated Wire Delivery (AWDS) motion and sensor hardware and test the modified AWDS in a range of welding applications. In addition, the prototype AWDS controller would be moved to the VME bus platform by designing, fabricating and testing a single board VME bus AWDS controller. This effort was to provide an AWDS that could transition from the laboratory environment to production operations. The project was performed in two development steps. Step 1 modified and tested an improved MWG. Step 2 developed and tested the AWDS single board VME bus controller. Step 3 installed the Wire Pilot in a Weld Controller with the imbedded VME bus controller.

Source record↗

The Astronaut Glove Challenge: Big Innovation from a (Very) Small Team

Many measurements were taken by test engineers from Hamilton Sundstrand, the prime contractor for the current EVA suit. Because the raw measurements needed to be converted to torques and combined into a final score, it was impossible to keep track of who was ahead in this phase. The final comfort and dexterity test was performed in a depressurized glove box to simulate real on-orbit conditions. Each competitor was required to exercise the glove through a defined set of finger, thumb, and wrist motions without any sign of abrasion or bruising of the competitor's hand. I learned a lot about arm fatigue! This was a pass-fail event, and both of the remaining competitors came through intact. After taking what seemed like an eternity to tally the final scores, the judges announced that I had won the competition. My glove was the only one to have achieved lower finger-bending torques than the Phase VI glove. Looking back, I see three sources of the success of this project that I believe also operate in other programs where small teams have broken new ground in aerospace technologies. These are awareness, failure, and trust. By remaining aware of the big picture, continuously asking myself, "Am I converging on a solution?" and "Am I converging fast enough?" I was able to see that my original design was not going to succeed, leading to the decision to start over. I was also aware that, had I lingered over this choice or taken time to analyze it, I would not have been ready on the first day of competition. Failure forced me to look outside conventional thinking and opened the door to innovation. Choosing to make incremental failures enabled me to rapidly climb the learning curve. Trusting my "gut" feelings-which are really an internalized accumulation of experiences-and my newly acquired skills allowed me to devise new technologies rapidly and complete both gloves just in time. Awareness, failure, and trust are intertwined: failure provides experiences that inform awareness and provide decision-making opportunities that build trust among team members and managers while opening minds to new pathways for development. All three are necessary for teams-large or small-to achieve big innovation.

Homer, Peter↗

Augmented Reality Tool for Operationally Relevant 3D Sensorimotor Assessments

This project will leverage existing capabilities of an augmented reality (AR) sensorimotor assessment tool. Currently, the tool mimics the capabilities of validated 2-dimensional (2D) assessments. While this modality is well-aligned with seated interactions with flight-deck displays, extravehicular activity (EVA) tasks will require full body mobility wherein astronauts reach and bend in a 3-dimensional (3D) space. These types of motions, naturally including head movements, are known to elicit experiences of disorientation. Thus, sensorimotor assessments that include these stimulations and larger movements are important for understanding astronaut readiness prior to initial EVAs. The proposed effort will extend the current 2D eye-hand coordination task in AR to a 3D task designed to evaluate dynamic balance and eye-hand-body coordination. The new module will extend the range of motion and interaction space such that it better aligns with operational task needs for astronaut readiness evaluation.

Sarah Catherine Moudy↗

Mission Architecture for the Green Propulsion Dual Mode Mission

Current spacecraft propulsion technologies are broadly divided into chemical and electric propulsion modes, each of which has unique advantages. It is common for both systems to have a place in interplanetary spacecraft, but the size, weight, and power required to carry two separate propulsion systems is extremely limiting for small spacecraft such as CubeSats. The upcoming NASA STMD-funded Green Propulsion Dual Mode (GPDM) mission will demonstrate on-orbit a novel dual-mode propulsion system known as the GPDM Propulsion System that uses the AF-M315E/ASCENT green monopropellant to feed both a chemical 100 mN monopropellant thruster and four electrospray thrusters. GPDM will fly a 6U CubeSat in low Earth orbit and perform orbit-raising and lowering maneuvers to characterize the performance of this dual-mode propulsion technology, enabling a new generation of future interplanetary small satellite explorers. The Georgia Institute of Technology Space Systems Design Laboratory (SSDL) is conducting the design, assembly, integration, testing, and mission operations of the GPDM host spacecraft, as well as the integration of the GPDM Propulsion System payload, designed by NASA’s Marshall Spaceflight Center (MSFC). The NASA Marshall Space Flight Center is overseeing the overall GPDM project as well as specific technology development activities of the GPDM Propulsion System, while electrospray thrusters are supplied by the MIT Space Propulsion Lab, with additional components supplied by MMA Design, Blue Canyon Technologies, Quasonix, Xiphos, and Rubicon Space Systems. The GPDM spacecraft will carry the GPDM Propulsion System into orbit and use a high-power S-band radio to enable real-time operations in low Earth orbit (LEO) via the NASA Tracking and Data Relay Satellite System (TDRSS). The mission is working towards a tentative launch readiness date of August 2025, in support of launch and operations commencing in January 2026. This paper describes GPDM’s overall mission concept of operations, spacecraft overview, and subsystem breakdown.

Green Propulsion Dual Mode↗

Seeing the Future of Spaceflight: Applications of Extended Reality (XR) Technologies

INTRODUCTION Advances in Earth Independent Medical Operations (EIMO) focused capabilities will be crucial for completing successful beyond low-earth-orbit (LEO) missions, where traditional Earth-based medical support and near real-time communication are limited, intermittent, or absent. In such restricted or limited communication environments, emerging extended reality (ER or XR) technologies may play a vital role in ensuring crew health and safety. Virtual Reality (VR), Augmented Reality (AR), and Mixed Reality (MR) are common terms used to describe technologies that "generate or modify" while “extended reality” (ER or XR) is often used as an umbrella term for these technologies. This review explores how such cutting-edge “extended reality” information delivery systems are currently applied across various disciplines within NASA. The review focuses on their capabilities, limitations, and prospective future applications as they pertain to Earth-Independent Medical Operations and its components of pre-mission planning, medical decision making, resource management, and task load management. METHODS/DESIGN The review began with a literature search to identify relevant disciplines (e.g., medical education, austere environments) where XR technologies have been studied to highlight areas where evidence is lacking. Previous and current NASA XR projects and applications, as well as commercial partnerships, such as those with Small Business Innovation Research (SBIR), were identified. Discussions with technical experts involved in the design, development, and application of these technologies allowed for classification based on their respective spaceflight applications. RESULTS AND CONCLUSION This review highlights current and emerging XR technologies that have been developed, tested, and implemented both terrestrially and in spaceflight by NASA, its international partners, the U.S. Armed Forces, and various relevant commercial entities. While these novel information delivery systems vary in their respective technology readiness levels (TRL), they have the potential to be implemented on Earth, in LEO, and during deep space exploration. These systems have the potential for impacting and optimizing many aspects of EIMO.

Yevgeniy Zhivotovskiy↗

Advancements in the H-Canyon Exhaust Ventilation System Inspections at the Savannah River Site - 16030

A facility safety envelope requires management of activities to ensure no unacceptable radiological or chemical hazards to the public, site worker and environment occur. While appropriate design and construction methods ensure an initial physical plant configuration, what actions must an operating Facility take to ensure the physical plant continues to meet a safety configuration throughout Facility life? While a physical walk down of the plant is a tried and true method to confirm conditions, what other methods must be used when a walk down is not possible? What inspection methods are used when balancing budget pressures against obtaining inspection data? The periodic inspections of the H-Canyon Exhaust Tunnel are performed remotely. The 2015 remote Tunnel inspection has been the most successful inspection to date. This presentation highlights the continued lessons learned with the most recent 2015 remote Tunnel inspection. These lessons learned are applicable to Facilities considering or performing remote inspections. The Recovery Crawler Project was tasked with determining if the 2014 Inspection Crawler could be retrieved, perform the retrieval if feasible and complete the inspection of the remaining sections of the exhaust tunnel that were not previously performed. The objectives for the project were met, the Inspection Crawler was deemed unusable and left in place and the Recovery Crawler performed the complete 143 meters (470 feet) of tunnel inspection and an additional 55 meters (180 feet) of exhaust tunnel inspection not previously completed. The remote inspection of a 60+ year operating Canyon Exhaust tunnel is a complex endeavor requiring close coordination of multiple organizations, adherence to Conduct of Operations, Radiological Safety, Worker Safety, etc. principles as well as alignment with Facility Safety Basis requirements. This paper discusses the challenges, actions required getting ready for the 2015 recovery and continued inspection and the hazards encountered performing the actual recovery/inspection. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of Smart Ventilation Control Algorithms for Humidity Control in High-Performance Homes in Humid U.S. Climates

Past field research and simulation studies have shown that high performance homes experience elevated indoor humidity levels for substantial portions of the year in humid climates. This is largely the result of lower sensible cooling loads, which reduces the moisture removed by the cooling system. These elevated humidity levels lead to concerns about occupant comfort, health and building durability. Use of mechanical ventilation at rates specified in ASHRAE Standard 62.2-2013 are often cited as an additional contributor to humidity problems in these homes. Past research has explored solutions, including supplemental dehumidification, cooling system operational enhancements and ventilation system design (e.g., ERV, supply, exhaust, etc.). This project’s goal is to develop and demonstrate (through simulations) smart ventilation strategies that can contribute to humidity control in high performance homes. These strategies must maintain IAQ via equivalence with ASHRAE Standard 62.2-2013. To be acceptable they must not result in excessive energy use. Smart controls will be compared with dehumidifier energy and moisture performance. This work explores the development and performance of smart algorithms for control of mechanical ventilation systems, with the objective of reducing high humidity in modern high performance residences. Simulations of DOE Zero-Energy Ready homes were performed using the REGCAP simulation tool. Control strategies were developed and tested using the Residential Integrated Ventilation (RIVEC) controller, which tracks pollutant exposure in real-time and controls ventilation to provide an equivalent exposure on an annual basis to homes meeting ASHRAE 62.2-2013. RIVEC is used to increase or decrease the real-time ventilation rate to reduce moisture transport into the home or increase moisture removal. This approach was implemented for no-, one- and two-sensor strategies, paired with a variety of control approaches in six humid climates (Miami, Orlando, Houston, Charleston, Memphis and Baltimore). The control options were compared to a baseline system that supplies outdoor air to a central forced air cooling (and heating) system (CFIS) that is often used in hot humid climates. Simulations were performed with CFIS ventilation systems operating on a 33% duty-cycle, consistent with 62.2-2013. The CFIS outside airflow rates were set to 0%, 50% and 100% of 62.2-2013 requirements to explore effects of ventilation rate on indoor high humidity. These simulations were performed with and without a dehumidifier in the model. Ten control algorithms were developed and tested. Analysis of outdoor humidity patterns facilitated smart control development. It was found that outdoor humidity varies most strongly seasonally—by month of the year—and that all locations follow the similar pattern of much higher humidity during summer. Daily and hourly variations in outdoor humidity were found to be progressively smaller than the monthly seasonal variation. Patterns in hourly humidity are driven by diurnal daily patterns, so they were predictable but small, and were unlikely to provide much control benefit. Variation in outdoor humidity between days was larger, but unpredictable, except by much more complex climate models. We determined that no-sensor strategies might be able to take advantage of seasonal patterns in humidity, but that real-time smart controls were required to capture variation between days. Sensor-based approaches are also required to respond dynamically to indoor conditions and variations not considered in our analysis. All smart controls face trade-offs between sensor accuracy, cost, complexity and robustness.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Real Time-Optimal Power Flow-Based Distributed Energy Resource Management System (DERMS)

This project aims to promote lab-proven clean energy technology to commercially scalable versions of the technology, integrate the technology with broader systems, provide extended performance data, and validate the manufacturability and reliability of the technology. The lab-proven technology, RT-OPF DERMS, was developed and validated through previous U.S. Department of Energy-funded efforts, including Advanced Research Projects Agency-Energy funding under the Network Optimized Distributed Energy Systems program and Holy-Cross Energy High Impact Project. In the Advanced Research Projects Agency-Energy Network Optimized Distributed Energy Systems project, the RT-OPF DERMS was developed and implemented in multiple hardware platforms, demonstrating its performance and capabilities in the lab and field environments. The technology was also evaluated and matured via a participation in the U.S. Department of Energy I-Corps program, whose goal is to pair teams of researchers with industry mentors for an intensive 2-month training in which the researchers define technology value propositions, conduct customer discovery interviews, and develop viable market pathways for their technologies. These activities indicate the high technology maturity and Technology Readiness Level of the RT-OPF DERMS.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Energy Technology Innovation Partnership Project Strategic Energy Plan for Washington County, Maine

This Strategic Energy Plan (SEP) for Washington County, Maine was developed through the U.S. Department of Energy's Energy Technology Innovation Partnership Project (ETIPP) to address local challenges related to electricity reliability, affordability, and safety. Grounded in a "relational infrastructure" approach, the plan recognizes that improved energy outcomes depend not only on physical grid investments but also on strengthened coordination and trust between utilities and communities. Using utility-provided reliability data, public datasets, and community input, the plan identifies key risks, including vegetation-related outages, high energy burden, and vulnerability among elderly and medically dependent populations. The SEP establishes three priority areas: hazard mitigation for energy infrastructure, outage safety and emergency readiness, and energy assistance and thermal safety. It outlines community-driven actions designed to complement utility-led system improvements, including targeted outreach, municipal coordination, and expanded access to energy programs. The plan also situates local conditions within broader state policy, market dynamics, and funding opportunities. Intended as a living document, this SEP provides a scalable framework for collaborative action to improve resilience, safety, and affordability in rural energy systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Modular Zero Energy. BrightBuilt Home

Kaplan Thompson Architects (KTA) has specialized in sustainable, energy-efficient buildings, and they have designed several custom, zero-energy homes in New England. These zero-energy projects have generally been high-end, custom homes with budgets that could accommodate advanced energy systems. In an attempt to make zero energy homes more affordable and accessible to a larger demographic, KTA explored modular construction as way to provide high-quality homes at lower costs. In the mid-2013, KTA formalized this concept when they launched BrightBuilt Home (BBH). The BBH mission is to offer a line of architect-designed, high-performance homes that are priced to offer substantial savings off the lifetime cost of a typical home and can be delivered in less time. For the past two years, CARB has worked with BBH and Keiser Homes (the primary modular manufacturer for BBH) to discuss challenges related to wall systems, HVAC, and quality control. In Spring of 2014, CARB and BBH began looking in detail on a home to be built in Lincolnville, ME by Black Bros. Builders. This report details the solution package specified for this modular plan and the challenges that arose during the project.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Near Surface Leakage Monitoring for the Verification and Accounting of Geologic Carbon Sequestration Using a Field Ready 14 C Isotopic Analyzer

Results for the development of a field ready multi-isotopic analyzer for 12 CO 2 , 13 CO 2 and 14 CO 2 and applications for carbon capture and storage (CCS) containment performance are described. A design goal of the field platform was to provide isotopic data with a high data rate, a standardized reference baseline and acceptable precision (e.g., ~ ±50 per mil D 14 CO 2 ) for detection and quantification of fossil-fuel CO 2 CCS leakage scenarios. The instrument platform was not designed to replace high precision accelerator mass spectrometry. An additional goal was to combine project scale isotopic data and associated fluxes with unique financial instruments linking CCS containment performance to a publicly traded security providing project revenue to stakeholders. While the primary goals of the project were attained additional work is needed for the instrument platform and deployment within a full scale CCS site that was not available during the project timeframe.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

ATDM ASD report for ECP October 2018

In October the team merged in updated ATDM/Trilinos configuration to include SPARC requirements. Assisted and worked on issues identified by the EMPIRE switchover to the ATDM/Trilinos configuration. Progress was made on automating dashboard triaging. Discovered and began addressing issues with mixed language calling with gcc-7.2 on Power8. Worked on new Python tool to filter CDASH reports to only show new issues. Completed ECP ST review. In October the team put an algorithm in place to prevent inverted elements in SPARC during refinement and worked on tests to morph mesher and should be ready for SGM integration soon. The team worked on solver rebalance and corrected issues. Complete SIMD work. Worked out next steps for solver improvements for EMPIRE. Adjusted some solver settings and to improve performance; strong scaling curves are flat instead of ascending etc. Worked on optimizing kernels for SPARC. Completed ECP ST reviews. The team worked on cleaning up branch for merge into SPARC master dev branch. Progress was made building scripts for catalyst builds on all HPC platforms of interest. Worked on adding TuckerMPl reader as plugin for catalyst. Completed ECP project review. Work has continued on NimbleSM, which now runs in a container and can be used modularly with an MPI code. The team also made progress on a qthreads version of NibleSM. Worked on build system issues within NimbleSM and Sierra for GPUs. Progressed on getting kookfied material models in NimbleSM. The team incorporated panel feedback form ECP project reviews into FY19 plans.

97 MATHEMATICS AND COMPUTING↗

Public attitudes toward programs of large-scale technological changes: Some reflections and policy prescriptions, appendix E

The question of how ready the public is for the implementation of large-scale programs of technological change is considered. Four vital aspects of the issue are discussed which include: (1) the ways in which the public mis-perceives the change process, (2) the ways in which recent history impacts on public attitudes, (3) the ways in which the public divides among itself, and (4) the fundamentals of public attitudes towards change. It is concluded that nothing is so critical in the 1970's to securing public approval for large-scale planned change projects as is securing the approval by change-agents of the public.

Shostak, A. B.↗