Search NASA⌕ Search

SEARCH · Search NASA

Results for “Resource scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,315 records · Page 73

Deadlock prediction via generalized dependency

Deadlocks are notorious bugs in multithreaded programs, causing serious reliability issues. However, they are difficult to be fully expunged before deployment, as their appearances typically depend on specific inputs and thread schedules, which require the assistance of dynamic tools. However, existing deadlock detection tools mainly focus on locks, but cannot detect deadlocks related to condition variables. This paper presents a novel approach to fill this gap. It extends the classic lock dependency to generalized dependency by abstracting the signal for the condition variable as a special resource so that communication deadlocks can be modeled as hold-and-wait cycles as well. It further designs multiple practical mechanisms to record and analyze generalized dependencies. In the end, this paper presents the implementation of the tool, called UnHang. Experimental results on real applications show that UnHang is able to find all known deadlocks and uncover two new deadlocks. Overall, UnHang only imposes around 3% performance overhead and 8% memory overhead, making it a practical tool for the deployment environment.

Zhou, Jinpeng↗

Sitewide Environmental Impact Statement Site 300 and Arroyo Mocho Lawrence Livermore National Laboratory Alameda and San Joaquin Counties, California (Mid-Term Report)

At the request of Lawrence Livermore National Security (LLNS), Nomad Ecology (Nomad) conducted sensitive botanical resource surveys, and vegetation mapping and classification of the 7,000-acre Lawrence Livermore National Laboratory (LLNL) Experimental Test Site (Site 300) and 17 acres surrounding the Arroyo Mocho pumping station and the access road to the pumping station (Arroyo Mocho). In addition to surveying for sensitive botanical resources, Nomad also compiled existing rare plant and vegetation data provided by LLNL from past monitoring and environmental impact evaluations. The results of these efforts will provide supporting information for a Site-wide Environmental Impact Statement (SWEIS). These surveys were conducted during the months of April – June, and August 2020. Rare plant surveys were scheduled for February and March 2020; however, February surveys were not initiated because the contract for this work was not finalized, and March surveys were cut short due to the timing of the Covid-19 shelter in place. February and March rare plant surveys are scheduled for 2021; therefore, the rare plant survey results in this report should be considered incomplete until the 2021 surveys are conducted. A total of 10 special status plant species were recorded within Site 300 and Arroyo Mocho. Of these 10, three were not previously recorded within the study areas, and include Hospital Canyon larkspur (Delphinium californicum subsp. interius), Jepson’s woolly sunflower (Eriophyllum jepsonii), and Michael’s rein orchid (Piperia michaelii), which all occur at Arroyo Mocho. Special status plant species known from these two sites total 23 rare plant occurrences (populations), which represent an estimated 50,929 rare plant individuals. This total of all special status plant species breaks down to one occurrence of a federally and/or state listed plant species (98 individuals), six occurrences of California Rare Plant Rank (CRPR) 1 & 2 species (49,010 individuals), and 16 occurrences of CRPR 3 & 4 species (1,821 individuals). A total of 35 vegetation communities were mapped at Site 300, of which 20 are considered Sensitive Natural Communities. A total of nine vegetation communities were mapped at Arroyo Mocho, of which two are considered Sensitive Natural Communities.

54 ENVIRONMENTAL SCIENCES↗

A Study of the Utilization of Advanced Composites in Fuselage Structures of Commercial Aircraft

A study was conducted to define the technology and data needed to support the introduction of advanced composites in the future production of fuselage structure in large transport aircraft. Fuselage structures of six candidate airplanes were evaluated for the baseline component. The MD-100 was selected on the basis of its representation of 1990s fuselage structure, an available data base, its impact on the schedule and cost of the development program, and its availability and suitability for flight service evaluation. Acceptance criteria were defined, technology issues were identified, and a composite fuselage technology development plan, including full-scale tests, was identified. The plan was based on composite materials to be available in the mid to late 1980s. Program resources required to develop composite fuselage technology are estimated at a rough order of magnitude to be 877 man-years exclusive of the bird strike and impact dynamic test components. A conceptual composite fuselage was designed, retaining the basic MD-100 structural arrangement for doors, windows, wing, wheel wells, cockpit enclosure, major bulkheads, etc., resulting in a 32 percent weight savings.

Watts, D. J.↗

Transitioning to Intel-based Linux Servers in the Payload Operations Integration Center

The MSFC Payload Operations Integration Center (POIC) is the focal point for International Space Station (ISS) payload operations. The POIC contains the facilities, hardware, software and communication interface necessary to support payload operations. ISS ground system support for processing and display of real-time spacecraft and telemetry and command data has been operational for several years. The hardware components were reaching end of life and vendor costs were increasing while ISS budgets were becoming severely constrained. Therefore it has been necessary to migrate the Unix portions of our ground systems to commodity priced Intel-based Linux servers. hardware architecture including networks, data storage, and highly available resources. This paper will concentrate on the Linux migration implementation for the software portion of our ground system. The migration began with 3.5 million lines of code running on Unix platforms with separate servers for telemetry, command, Payload information management systems, web, system control, remote server interface and databases. The Intel-based system is scheduled to be available for initial operational use by August 2004 The overall migration to Intel-based Linux servers in the control center involves changes to the This paper will address the Linux migration study approach including the proof of concept, criticality of customer buy-in and importance of beginning with POSlX compliant code. It will focus on the development approach explaining the software lifecycle. Other aspects of development will be covered including phased implementation, interim milestones and metrics measurements and reporting mechanisms. This paper will also address the testing approach covering all levels of testing including development, development integration, IV&V, user beta testing and acceptance testing. Test results including performance numbers compared with Unix servers will be included. need for a smooth transition while maintaining real-time support. An important aspect of the paper will involve challenges and lessons learned. product compatibility, implications of phasing decisions and tracking of dependencies, particularly non- software dependencies. The paper will also discuss scheduling challenges providing real-time flight support during the migration and the requirement to incorporate in the migration changes being made simultaneously for flight support. This paper will also address the deployment approach including user involvement in testing and the , This includes COTS product compatibility, implications of phasing decisions and tracking of dependencies, particularly non- software dependencies. The paper will also discuss scheduling challenges providing real-time flight support during the migration and the requirement to incorporate in the migration changes being made simultaneously for flight support.

Guillebeau, P. L.↗

PlanWorks: A Debugging Environment for Constraint Based Planning Systems

Numerous planning and scheduling systems employ underlying constraint reasoning systems. Debugging such systems involves the search for errors in model rules, constraint reasoning algorithms, search heuristics, and the problem instance (initial state and goals). In order to effectively find such problems, users must see why each state or action is in a plan by tracking causal chains back to part of the initial problem instance. They must be able to visualize complex relationships among many different entities and distinguish between those entities easily. For example, a variable can be in the scope of several constraints, as well as part of a state or activity in a plan; the activity can arise as a consequence of another activity and a model rule. Finally, they must be able to track each logical inference made during planning. We have developed PlanWorks, a comprehensive system for debugging constraint-based planning and scheduling systems. PlanWorks assumes a strong transaction model of the entire planning process, including adding and removing parts of the constraint network, variable assignment, and constraint propagation. A planner logs all transactions to a relational database that is tailored to support queries for of specialized views to display different forms of data (e.g. constraints, activities, resources, and causal links). PlanWorks was specifically developed for the Extensible Universal Remote Operations Planning Architecture (EUROPA(sub 2)) developed at NASA, but the underlying principles behind PlanWorks make it useful for many constraint-based planning systems. The paper is organized as follows. We first describe some fundamentals of EUROPA(sub 2). We then describe PlanWorks' principal components. We then discuss each component in detail, and then describe inter-component navigation features. We close with a discussion of how PlanWorks is used to find model flaws.

Daley, Patrick↗

An Augmented Ground Station Architecture for Spacecraft-Initiated Communication Service Requests

Spacecraft performing science and exploration missions have increasingly complex and event-driven objectives, making communication needs difficult to predict in advance. Additional flexibility is required in space communication provider networks to effectively meet time-varying demand. We envision a framework for automated resource allocation in which requests for communications service are initiated by spacecraft based on current mission needs. We propose an augmented ground station configuration featuring a wide field-of-view antenna to receive transmissions from spacecraft requesting high-rate communications. A software suite to automate the service fulfillment process, including interfacing with external scheduling systems such as NASA’s Near Space Network, is described. Experimental results characterizing the physical-layer link between the wide field-of-view antenna and a software-defined radio testbed on the International Space Station are presented. We also discuss long-duration software testing on a ground-based testbed. Taken together, these proof-of-concept results demonstrate the feasibility of the concept to improve the responsiveness of space communications.

user-initiated service↗

VIPER Mission Traverse Planning – Design, Strategies, and Dynamics

The Volatiles Investigation Polar Exploration Rover (VIPER) is a lunar polar volatiles prospecting mission developed through NASA’s Science Mission Directorate (SMD) Planetary Science Di-vision[1].VIPER is scheduled to land on Mons Mouton near the lunar South Pole in late 2024. VIPER’s primary mission goal is to characterize the distribution of water and volatiles across a range of thermal environments. This characterization aims to assist in understanding the origin of lunar polar volatiles and also help evaluate the In-Situ Resource Utilization (ISRU) potential of the lunar poles. The VIPER rover is a four-wheeled robotic vehicle weighing ~450 kg. It is solar-powered and teleoperated from Earth over a line-of-sight radio link. The rover can move at up to 20 cm/s on flat terrain. Accounting for commanding, localization, navigation, and obstacle-avoidance delays, however, the effective speed is closer to 1 cm/s. This effective speed is known as “Speed Made Good” (SMG), adopted from maritime culture, and kept as a key performance metric for VIPER oper-ations planning, execution, and evaluation. The mission duration is anticipated to be more than 90 Earth days and involves up to 20 km of driving. VIPER’s prospecting payload consists of spectrometers to detect volatiles and assess concentrations, context imagers, and a drill for sub-surface measurements down to one meter depth [2]. Mobility, combined with the prospecting and drill instrument suite, makes VIPER an analytically powerful resource mapper.

Volatiles Investigation Polar Exploration Rover (V↗

OMS event evaluator and scheduler

An Operations Management System (OMS) is being designed for Space Station Freedom to improve productivity, reliability, and safety while reducing operations and maintenance costs. Central to the concept is a short term plan containing mixes of man-readable and machine-executable procedures used in an environment of distributed processing and execution. An OMS event evaluator to check upcoming short-term plan events for validity of execution is under development. The first version checks time and resource constraints against operational conditions for current or expected stations. In work are the handling of environmental and other operational constraints, as well as detailed modeling of resources and station operational states. The Ada Program also has the ability to reschedule all or part of the events.

Eckelkamp, Richard E.↗

Delivery-Risk-Aware Flexibility Scheduling and Dispatch for Aggregated Flexible Loads

Flexible loads like smart thermostats and water heaters can shift energy consumption and provide flexibility to the grid. However, this flexibility is dependent on occupant behavior and can lead to delivery risk, which causes utilities and grid operations to consider them as unreliable for purposes of grid operation. To date, they have not been well integrated into wholesale electricity markets or ancillary service offerings. With proper consideration of uncertainty and risk, these resources can be one of the most cost-effective sources of flexibility. This work uses stochastic optimization to quantify and bid flexibility from a fleet of flexible resources while considering their delivery risk.

DER↗

Small Hydropower Interconnections: State Interconnection Processes

Small hydropower projects with rated power output between 0 to 20 MW have been the predominant source of hydropower growth over the past decade in the United States (DOE 2016; Johnson et al. 2018). However, interconnection to electricity distribution and transmission grids is a persistent barrier. Interconnection of an electricity generating unit is overseen by the distribution or transmission owner, who use interconnection standards and requirements that vary by state. The differences between standards in standards may affect the final cost, timeline, and success of a small hydropower project. Small hydropower project developers across the United States have found interconnection procedures to be fraught with cost surprises and schedule overruns. System operators have struggled to understand impacts to overburdened or rapidly evolving transmission and distribution grids. The results of these shortcomings have been stranded costs and unrealized small hydropower potential. Though regulatory actions and policy recommendations at the state level have increased the situational awareness of interconnection challenges, the remote locations of small hydropower resources and the relatively small revenues associated with energy production through small hydropower facilities continue to make interconnection processes and requirements confusing and costly. Noting these challenges, the U.S. Department of Energy Water Power Technologies Office enlisted Pacific Northwest National Laboratory (PNNL) and Oak Ridge National Laboratory (ORNL) to investigate the small hydropower interconnection landscape across the United States. The second in a series, this paper investigates the interconnection process in each state in the U.S. to compare their attributes. Subsequent papers in the series will analyze these interconnection processes (“Small Hydropower Interconnections: Analysis of Interconnection Processes”) and present best practices (“Small Hydropower Interconnections: Best Practices”) that will help overcome barriers to future small hydropower development. The first paper in the series examined the state of small hydropower projects in the United States (“Small Hydropower Interconnections: Small Hydropower in the United States”) to understand the industry characteristics.

13 HYDRO ENERGY↗

Los Angeles Air Force Base Vehicle-to-Grid Demonstration (Final Project Report)

Electrification of non-tactical vehicle fleets represents a key efficiency and energy security objective for the United States Department of Defense. To achieve electrification, the department targeted vehicle-to-grid services as a way to decrease the overall cost of operating the vehicle fleet and achieve rough parity with traditional internal combustion engine vehicle fleets. This report describes efforts to aggregate a fleet of bi-directional electric vehicles and charging stations to provide regulation up and regulation down in the California Independent System Operator ancillary services market. A 29-vehicle electric vehicle demonstration fleet, consisting of mixed purpose and duty vehicles such as sedans, pickups, vans, and medium-duty trucks, was deployed at the Los Angeles Air Force base. The fleet provided frequency regulation to the California Independent System Operator’s wholesale electricity market to determine the capability of recouping some of the additional costs of procuring electric vehicles and their supporting infrastructure. Lawrence Berkeley National Laboratory, with its partner Kisensum, LLC, developed the fleet scheduling, optimization, and control software to allow the vehicle fleet at the air force base to participate in the ancillary services markets. This report focuses on the control software and market interactions, the significant challenges faced and solutions devised to address them, and examines the potential of using the electric vehicle fleet as an energy storage resource for the base buildings, an application known as vehicle-tobuilding, in providing demand response and emergency backup power. The report discusses key findings related to providing frequency regulation to the California Independent System Operator market, electric vehicle fleet performance, compatibility of varying resource parameters of vehicle fleet aggregation, the need for automated methods for communicating hour-ahead energy bidding, challenges related to battery capacity and charge/discharge rates, and monthly settlement revenue.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

An overview of the GOLD experiment between the ETS-6 satellite and the table mountain facility

The Ground/Orbiter Lasercomm Demonstration (GOLD) is a demonstration of optical communications between the Japanese Engineering Test Satellite (ETS-VI) and an optical ground transmitting and receiving station at the Table Mountain Facility in Wrightwood, California. Laser transmissions to the satellite are performed for approximately 4 hours every third night when the satellite is at apogee above Table Mountain. The experiment requires the coordination of resources at the Communications Research Laboratory (CRL), JPL, the National Aeronautics and Space Development Agency (NASDA) Tsukuba tracking station, and NASA's Deep Space Network at Goldstone, California, to generate and transmit real-time commands and receive telemetry from the ETS-VI. Transmissions to the ETS-VI began in November 1995 and are scheduled to last into the middle of January 1996, when the satellite is expected to be eclipsed by the Earth's shadow for a major part of its orbit. The eclipse is expected to last for about 2 months, and during this period there will be limited electrical power available on board the satellite. NASDA plans to restrict experiments with the ETS-VI during this period, and no laser transmissions are planned. Posteclipse experiments are currently being negotiated. GOLD is a joint NASA-CRL experiment that is being conducted by JPL in coordination with CRL and NASDA.

Wilson, K. E.↗

SBUV/2 Long-Term Measurements of Solar Spectral Variability

The NOAA-11 SBUV/2 spectral solar data have been corrected for long-term instrument changes to produce a 5.5 year data record during solar cycle 22 (December 1988 - October 1994). Residual drifts in the data at long wavelengths are +/- 1% or less. At 200-205 nm, where solar variations drive stratospheric photochemistry, these data indicate long-term solar changes of 5-7% from the maximum of Cycle 22 in April 1991 through the end of the NOAA-11 data record. Comparisons of NOAA-11 data with UARS SUSIM and SOLSTICE for the period October 1991 - October 1994, when all 3 instruments were operating simultaneously, show that the observed long-term variations in 200-205 nm irradiance agree to within 2%. This result is consistent with predictions from the Mg-2 proxy index. The SBUV/2 instruments represent a valuable resource for long-term solar UV activity studies because of their overlapping data records. In addition to the NOAA-11 data presented here, the NOAA-9 SBUV/2 instrument began taking data in March 1985 and is still operating, providing a complete record of Cycle 22 behavior from a single instrument. Three additional SBUV/2 instruments are scheduled to be launched between 1997 and 2003, which should permit full coverage of solar cycle 23.

DeLand, Matthew T.↗

An Overview of the GOLD Experiment Between the ETS-6 Satellite and the Table Mountain Facility

The Ground/Orbiter Lasercomm Demonstration is a demonstration of optical communications between the Japanese Engineering Test Satellite (ETS-VI) and an optical ground transmitting and receiving station at the Table Mountain Facility in Wrightwood, California. Laser transmissions to the satellite are performed for approximately 4 hours every third night when the satellite is at apogee above Table Mountain. The experiment requires the coordination of resources at the Communications Research Laboratory (CRL), JPL, the National Aeronautics and Space Development Agency (NASDA) Tsukuba tracking station, and NASA's Deep Space Network at Goldstone, California, to generate and transmit real-time commands and receive telemetry from the ETS-VI. Transmissions to the ETS-VI began in November 1995 and are scheduled to last into the middle of January 1996, when the satellite is expected to be eclipsed by the Earth's shadow for a major part of its orbit. The eclipse is expected to last for about 2 months, and during this period there will be limited electrical power available on board the satellite. NASDA plans to restrict experiments with the ETS-VI during this period, and no laser transmissions are planned. Posteclipse experiments are currently being negotiated. GOLD is a joint NASA-CRL experiment that is being conducted by JPL in coordination with CRL and NASDA.

Wilson, K. E.↗

Integrated Campaign Probabilistic Cost, Schedule, Performance, and Value for Program Office Support

This paper describes an integrated assessment tool developed at NASA Langley Research Center that incorporates probabilistic analysis of life cycle cost, schedule, launch performance, on-orbit performance, and value across a series of planned space-based missions, or campaign. Originally designed as an aid in planning the execution of missions to accomplish the National Research Council 2007 Earth Science Decadal Survey, it utilizes Monte Carlo simulation of a series of space missions for assessment of resource requirements and expected return on investment. Interactions between simulated missions are incorporated, such as competition for launch site manifest, to capture unexpected and non-linear system behaviors. A novel value model is utilized to provide an assessment of the probabilistic return on investment. A demonstration case is discussed to illustrate the tool utility.

Cornelius, David↗

Nuclear aircraft carrier inactivation - Execution of waste management initiatives - 15565

After 6 years of planning efforts, in June 2013, Newport News Shipbuilding (NNS) began the execution phase of the inactivation of the USS Enterprise. The USS Enterprise decommissioning involves implementation of a new approach to defueling aircraft carriers, utilizing new processes for defueling and shipment of spent nuclear fuel and waste. During planning for this complex endeavor, NNS developed several process improvement initiatives including streamlining waste management processes and technology insertion using modeling and simulation (M and S) capabilities. One of the new approaches involves the establishment of a Waste Packaging Area (WPA) onboard the ship. The process assists with maximizing waste loading and shipments directly from the ship. Another waste management initiative includes the NNS/ Waste Vendor teaming effort to facilitate more efficient loading and shipment of inactivation waste. With execution underway, these initiatives are being put to the test to see if they can withstand the rigors of day-to-day production. NNS has implemented the use of the Modeling and Simulation (M and S) technology. During the planning phase, the M and S 3D Spatial Arrangement Tool was utilized to determine the optimal equipment layout within the new M-290 facility used for spent fuel packaging and ship-out and to determine the appropriate shipping container placement on the ship to maximize waste loading. The M and S technology proved to be a beneficial application resulting in continued utilization through the execution phase of the carrier inactivation. NNS is currently expanding the M-290 Facility Model to provide a visual representation of the facility, its processes, resources, and variable parameters that can be utilized as a decision support tool through simulation of the spent fuel packaging and ship-out process through the facility's life-cycle. NNS is also expanding the application of the waste management model to effectively predict waste forecast. The simulation model is linked with the defueling schedule which captures the operational elements of the waste flow process. The model extrapolates the data to provide waste generation output to assess the most efficient and cost effective path for radiological waste shipments offsite. The ability to conduct waste forecasting allows streamlining of the waste management process in support of complex defueling operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Eligibility Assessment of TA-52-1 and TA-52-11: The Ultra-High Temperature Reactor Experiment (UHTREX) Complex

The U.S. Department of Energy (DOE), National Nuclear Security Administration, Los Alamos Field Office (NA-LA) requests the State Historic Preservation Officer (SHPO) to concur with the eligibility determinations contained in this report for Buildings 1 and 11 in Technical Area 52 (TA-52) at Los Alamos National Laboratory (LANL or the Laboratory). Triad National Security LLC cultural resources staff have completed the evaluation of two buildings, called the UHTREX Complex, for inclusion in the National Register of Historic Places (Register). This complex includes the UHTREX Reactor Building (TA-52-1), and an associated Mechanical Assembly Building (TA-52-11). As part of LANL’s Footprint Reduction Program, both facilities of the UHTREX Complex are scheduled for characterization and demolition. In addition to evaluating their eligibility in the Register, the properties at TA-52 were assessed for potential adaptive reuse, long-term preservation, and public interpretation. Based on the findings in this assessment report, both TA-52-1 and TA-52-11 have been determined to not be eligible for inclusion in the Register. The history of the UHTREX Complex lacks association with exceptionally significant Cold War events of scientific developments. Both TA-52-1 and TA-52-11 lack the necessary internal historic integrity suitable for long-term preservation or public interpretation. And both facilities contain legacy radioactive contamination, which prohibits their reuse. In addition to its loss of integrity and context, TA-52- 11 has been determined ineligible due to its status as a support building of secondary or minor importance. In compliance with Section 106 and Section 110 of the National Historic Preservation Act of 1966, as amended, and with the Programmatic Agreement among the U.S. Department of Energy, National Nuclear Security Administration, Los Alamos Field Office, the New Mexico State Historic Preservation Office, and the Advisory Council on Historic Preservation Concerning Management of the Historic Properties at Los Alamos National Laboratory, Los Alamos, New Mexico, the SHPO is requested to concur with the eligibility determinations contained in this report for the UHTREX Complex in TA-52.

99 GENERAL AND MISCELLANEOUS↗

An Exercise in Technology Prioritization in a Competitive Environment

The proper prioritization of technologies within a technology development program is critical for success in a budget constrained environment. A large portfolio of diverse products at differing states of development all competing for program resources presents a need for a process by which a realistic need date can guide the development strategy for each technology. This paper will document an exercise to identify "mission pull" for each technology that can be used to identify the best projected need date for each. This date is then used to back out a development schedule with corresponding funding profile needed to meet the flight opportunity.

Stephens, Karen L.↗