Search NASA⌕ Search

SEARCH · Search NASA

Results for “hardware testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,315 records · Page 73

Orion Boiler Plate Airdrop Test System

On the 29th of February 2012 the Orion Capsule Parachute Assembly System (CPAS) project attempted to perform an airdrop test of a boilerplate test article for the second time. The first attempt (Cluster Development Test 2, July 2008) to deliver a similar boilerplate from a C-17 using the Low Velocity Air Drop (LVAD) technique resulted in the programmer parachute failing to properly inflate, the test article failing to achieve the desired test initiation conditions, and the test article a total loss. This paper will pick up where the CDT-2 failure investigation left off, describing the test technique that was adopted, and outline the modeling that was performed to gain confidence that the second attempt would be successful. The second boiler plate test (Cluster Development Test 3-3) was indeed a complete success and has subsequently been repeated several times, allowing the CPAS project to proceed with the full scale system level development testing required to integrate the hardware to the first Entry Flight Test vehicle as well as go into the Critical Design Review with minimum risk and a mature design.

Machin, Ricardo A.↗

Diffraction hardware testbed and model validation

Optical systems, which operate over a wide range of Fresnel numbers, are often times performance-limited by diffraction effects. In order to characterize such effects at the 40-100 picometer level, a diffraction testbed has been built which has the capability of measuring diffraction effects at this level. Concurrently, mathematical diffraction modeling tools have been developed that propagate an input wavefront through an optical train, while retaining amplitude and phase information at a grid resolution sufficient for yielding picometer-resolution diffraction test data. This paper contains a description of this diffraction hardware testbed, the diffraction modeling approach, and a comparison of the modeled and hardware test results, which then serves as validation of the diffraction modeling methodology.

optical↗

Automated Activation and Deactivation of a System Under Test

The MPLM Automated Activation/Deactivation application (MPLM means Multi-Purpose Logistic Module) was created with a three-fold purpose in mind: 1. To reduce the possibility of human error in issuing commands to, or interpreting telemetry from, the MPLM power, computer, and environmental control systems; 2. To reduce the amount of test time required for the repetitive activation/deactivation processes; and 3. To reduce the number of on-console personnel required for activation/ deactivation. All of these have been demonstrated with the release of the software. While some degree of automated end-item commanding had previously been performed for space-station hardware in the test environment, none approached the functionality and flexibility of this application. For MPLM activation, it provides mouse-click selection of the hardware complement to be activated, activates the desired hardware and verifies proper feedbacks, and alerts the user when telemetry indicates an error condition or manual intervention is required. For MPLM deactivation, the product senses which end items are active and deactivates them in the proper sequence. For historical purposes, an on-line log is maintained of commands issued and telemetry points monitored. The benefits of the MPLM Automated Activation/ Deactivation application were demonstrated with its first use in December 2002, when it flawlessly performed MPLM activation in 8 minutes (versus as much as 2.4 hours for previous manual activations), and performed MPLM deactivation in 3 minutes (versus 66 minutes for previous manual deactivations). The number of test team members required has dropped from eight to four, and in actuality the software can be operated by a sole (knowledgeable) system engineer.

Poff, Mark A.↗

NASA Handbook 7010: Direct Field Acoustic Testing

Instruments, spacecraft, antennas, reflectors, and other mechanical hardware have been undergoing acoustic qualification testing over the last decade using loudspeakers. This speaker-generated Direct Field Acoustic Test (DFAT) method offers cost, mobility, and schedule advantages over the conventional Reverberant Acoustic Field Test (RAFT) method. To develop most appropriate acoustic test program using the DFAT method for a flight project, flight project managers and their technical staffs will need overall guidance and technical rational for using DFAT to qualify flight hardware for acoustic environments. The NASA Chief Engineer Office had tasked JPL to prepare a NASA Handbook for DFAT Dynamics Testing. The handbook was completed and was released by NASA headquarters in 2015. The handbook provides advantages and disadvantages of such method of testing, key references and a series of recommended practices for test preparation and test performance. This paper will summarize key and important steps related to this method of acoustic testing.

Kolaini, Ali R↗

Advanced composite elevator for Boeing 727 aircraft, volume 2

Preliminary design activity consisted of developing and analyzing alternate design concepts and selecting the optimum elevator configuration. This included trade studies in which durability, inspectability, producibility, repairability, and customer acceptance were evaluated. Preliminary development efforts consisted of evaluating and selecting material, identifying ancillary structural development test requirements, and defining full scale ground and flight test requirements necessary to obtain Federal Aviation Administration (FAA) certification. After selection of the optimum elevator configuration, detail design was begun and included basic configuration design improvements resulting from manufacturing verification hardware, the ancillary test program, weight analysis, and structural analysis. Detail and assembly tools were designed and fabricated to support a full-scope production program, rather than a limited run. The producibility development programs were used to verify tooling approaches, fabrication processes, and inspection methods for the production mode. Quality parts were readily fabricated and assembled with a minimum rejection rate, using prior inspection methods.

Chovil, D. V.↗

Pressure fed thrust chamber technology program

This is the final report for the Pressure Fed Technology Program. It details the design, fabrication, and testing of subscale hardware which successfully characterized Liquid Oxygen Rocket Propulsion (LOX/RP) combustion for low cost pressure fed design. The innovative modular injector design is described in detail as well as hot-fire test results which showed excellent performance. The program summary identifies critical LOX/RP design issues that have been resolved in this testing, and details the low risk development requirements for low cost engines for future Expandable Launch Vehicles (ELV).

Dunn, Glen M.↗

ADEPT SR-1 Development and Testing

The Adaptable Deployable Entry and Placement Technology (ADEPT) Sounding Rocket One (SR-1) fight test will be the first sub-orbital flight of Nano-ADEPT. Nano-ADEPT is a deployable heatshield for secondary payload missions desiring to re-enter the Earth's atmosphere or deliver small science payloads to Mars or Venus. Two units have been built and tested in preparation of launch: one designated the "Spare" unit and one the "Flight" unit. The general development approach has been to perform all procedures on the Spare prior to performing them on Flight. This approach has served the project well, allowing for procedures to be rapidly developed and tested on spare hardware where mistakes are less consequential. Conversely, when schedule constraints have come up, the approach has allowed the project to rapidly pivot to an approach where Flight drives the critical path rather than Spare. This approach has enabled relatively rapid development of Flight where technical risk is balanced with schedule realism. This presentation will describe the various tests that have been performed on Nano-ADEPT Spare and Flight units to prepare for the sub-orbital flight. The purpose is to communicate the development approach we took for this low-cost, moderate-risk flight test and hopefully engage the EDL community in a wider discussion of risk-balanced approaches toward flight hardware development of secondary payload atmospheric entry systems.

Smith, Brandon↗

System-Level Testing of the Advanced Stirling Radioisotope Generator Engineering Hardware

To support future NASA deep space missions, a radioisotope power system utilizing Stirling power conversion technology was under development. This development effort was performed under the joint sponsorship of the Department of Energy and NASA, until its termination at the end of 2013 due to budget constraints. The higher conversion efficiency of the Stirling cycle compared with that of the Radioisotope Thermoelectric Generators (RTGs) used in previous missions (Viking, Pioneer, Voyager, Galileo, Ulysses, Cassini, Pluto New Horizons and Mars Science Laboratory) offers the advantage of a four-fold reduction in Pu-238 fuel, thereby extending its limited domestic supply. As part of closeout activities, system-level testing of flight-like Advanced Stirling Convertors (ASCs) with a flight-like ASC Controller Unit (ACU) was performed in February 2014. This hardware is the most representative of the flight design tested to date. The test fully demonstrates the following ACU and system functionality: system startup; ASC control and operation at nominal and worst-case operating conditions; power rectification; DC output power management throughout nominal and out-of-range host voltage levels; ACU fault management, and system command / telemetry via MIL-STD 1553 bus. This testing shows the viability of such a system for future deep space missions and bolsters confidence in the maturity of the flight design.

Deep space↗

Application of Background Oriented Schlieren for Altitude Testing of Rocket Engines

A series of experiments was performed to determine the feasibility of using the Background Oriented Schlieren, BOS, flow visualization technique to image a simulated, small, rocket engine, plume under altitude test conditions. Testing was performed at the NASA Glenn Research Centers Altitude Combustion Stand, ACS, using nitrogen as the exhaust gas simulant. Due to limited optical access to the facility test capsule, all of the hardware required to conduct the BOS were located inside the vacuum chamber. During the test series 26 runs were performed using two different nozzle configurations with pressures in the test capsule around 0.3 psia. No problems were encountered during the test series resulting from the optical hardware being located in the test capsule and acceptable resolution images were captured. The test campaign demonstrated the ability of using the BOS technique for small, rocket engine, plume flow visualization during altitude testing.

Background Oriented Schlieren↗

EASE/ACCESS ground processing at Kennedy Space Center

The Kennedy Space Center (KSC) Payload Management and Operations Directorate is responsible for the processing of Space Shuttle payloads. The KSC responsibilities begin prior to hardware arrival at the launch site and extend until the experiments are returned to the investigators after the flight. The KSC involvement with the integration and checkout of payloads begins with participation in experiment, Mission Peculiar Equipment (MPE), and integrated payload design reviews. This involvement also includes participation in assembly and testing of flight hardware at the appropriate design center, university, or private corporation. Once the hardware arrives at the launch site, KSC personnel install the experiments and MPE onto a carrier in the Operations and Checkout (O & C) building. Following integration, the payload is functionally tested and then installed into the orbiter. After the mission, the payload is removed from the orbiter, deintegrated in the O & C building, and the experiments are turned over to the mission manager. One of the many payloads process at KSC consisted of two space construction experiments: the Experimental Assembly of Structures in Extravehicular Activity (EASE) and the Assembly Concept for Construction of Erectable Space Structures (ACCESS). The details of EASE/ACCESS integration, testing, and deintegration are addressed and how this mission can serve as a guide for future space construction payloads is discussed.

Moates, Deborah J.↗

Investigation of performance deterioration of the CF6/JT9D high bypass ratio turbofan engines

The extent and magnitude of performance deterioration of the Pratt and Whitney JT9D, and the General Electric CF6 engine models is presented. Overall engine and contributing module performance deterioration with respect to flight cycles and/or time are analyzed. The overall engine performance deterioration analyses are based on data obtained from historical records, special engine tests, and tests for specific effects. Hardware inspection data from overhaul shops and special module tests are the basis for the modular performance deterioration data used in the analyses. Various damage mechanisms such as seal rubs, erosion, surface roughness and thermal distortion, and how they contribute to performance deterioration are included in the modular analyses. Results indicate that early performance deterioration occurring within the first few flights of these engines is less than 1 percent in cruise specific fuel consumption (SFC), that it is event oriented, and that it is the result of increased blade tip clearances. This performance deterioration gradually increases to about 2.5 to 3.0 percent (including the initial short term deterioration) after 2500 to 3000 flights where increased blade tip clearances, airfoil quality degradation, and thermal distortion are the contributing causes.

Ziemianski, J. A.↗

Sasquatch Footprint Tool

The Crew Exploration Vehicle Parachute Assembly System (CPAS) is the parachute system for NASA s Orion spacecraft. The test program consists of numerous drop tests, wherein a test article rigged with parachutes is extracted or released from an aircraft. During such tests, range safety is paramount, as is the recoverability of the parachutes and test article. It is crucial to establish an aircraft release point that will ensure that the article and all items released from it will land in safe locations. A new footprint predictor tool, called Sasquatch, was created in MATLAB. This tool takes in a simulated trajectory for the test article, information about all released objects, and atmospheric wind data (simulated or actual) to calculate the trajectories of the released objects. Dispersions are applied to the landing locations of those objects, taking into account the variability of winds, aircraft release point, and object descent rate. Sasquatch establishes a payload release point (e.g., where the payload will be extracted from the carrier aircraft) that will ensure that the payload and all objects released from it will land in a specified cleared area. The landing locations (the final points in the trajectories) are plotted on a map of the test range. Sasquatch was originally designed for CPAS drop tests and includes extensive information about both the CPAS hardware and the primary test range used for CPAS testing. However, it can easily be adapted for more complex CPAS drop tests, other NASA projects, and commercial partners. CPAS has developed the Sasquatch footprint tool to ensure range safety during parachute drop tests. Sasquatch is well correlated to test data and continues to ensure the safety of test personnel as well as the safe recovery of all equipment. The tool will continue to be modified based on new test data, improving predictions and providing added capability to meet the requirements of more complex testing.

Bledsoe, Kristin↗

Results from Testing of Two Rotary Percussive Drilling Systems

The developmental test program for the MSL (Mars Science Laboratory) rotary percussive drill examined the e ect of various drill input parameters on the drill pene- tration rate. Some of the input parameters tested were drill angle with respect to gravity and percussive impact energy. The suite of rocks tested ranged from a high strength basalt to soft Kaolinite clay. We developed a hole start routine to reduce high sideloads from bit walk. The ongoing development test program for the IMSAH (Integrated Mars Sample Acquisition and Handling) rotary percussive corer uses many of the same rocks as the MSL suite. An additional performance parameter is core integrity. The MSL development test drill and the IMSAH test drill use similar hardware to provide rotation and percussion. However, the MSL test drill uses external stabilizers, while the IMSAH test drill does not have external stabilization. In addition the IMSAH drill is a core drill, while the MSL drill uses a solid powdering bit. Results from the testing of these two related drilling systems is examined.

Kriechbaum, Kristopher↗

NASA's SPACE LAUNCH SYSTEM: Development and Progress

NASA is embarked on a new era of space exploration that will lead to new capabilities, new destinations, and new discoveries by both human and robotic explorers. Today, the International Space Station (ISS) and robotic probes are yielding knowledge that will help make this exploration possible. NASA is developing both the Orion crew vehicle and the Space Launch System (SLS) (Figure 1), that will carry out a series of increasingly challenging missions leading to human exploration of Mars. This paper will discuss the development and progress on the SLS. The SLS architecture was designed to be safe, affordable, and sustainable. The current configuration is the result of literally thousands of trade studies involving cost, performance, mission requirements, and other metrics. The initial configuration of SLS, designated Block 1, will launch a minimum of 70 metric tons (mT) (154,324 pounds) into low Earth orbit - significantly greater capability than any current launch vehicle. It is designed to evolve to a capability of 130 mT (286,601 pounds) through the use of upgraded main engines, advanced boosters, and a new upper stage. With more payload mass and volume capability than any existing rocket, SLS offers mission planners larger payloads, faster trip times, simpler design, shorter design cycles, and greater opportunity for mission success. Since the program was officially created in fall 2011, it has made significant progress toward launch readiness in 2018. Every major element of SLS continued to make significant progress in 2015. Engineers fired Qualification Motor 1 (QM-1) in March 2015 to test the 5-segment motor, including new insulation, joint, and propellant grain designs. More than 70 major components of test article and flight hardware for the Core Stage have been manufactured. Seven test firings have been completed with an RS-25 engine under SLS operating conditions. The test article for the Interim Cryogenic Propulsion Stage (ICPS) has also been completed. Major work continues in 2016 as the program continues both flight and development RS-25 engine testing, begins welding test article and flight core stage tanks, completes stage adapter manufacturing, and test fires the second booster qualification motor. This paper will discuss the program's key accomplishments to date and the challenging work ahead for what will be the world's most capable launch vehicle.

Honeycutt, John↗

Current State of NASA Continuously Rotating Detonation Cycle Engine Development

NASA is currently investigating continuous detonation cycle engines for the application of lander and interplanetary space exploration missions. The performance benefits of a detonation cycle engine may allow for a broader design trade space and more compact geometry required for future missions to the Moon and onwards towards Mars. However, the technology readiness level (TRL) within the US was found to be low with several major risk factors that require understanding prior to full engine system development. One area of uncertainty is the extreme heat loads expected during thermal steady state conditions. To achieve this, an announcement for collaborative opportunity (ACO) partnership between IN Space LLC and NASA Marshall Space Flight Center (MSFC) was established to explore integration of additive manufacturing (AM) processes and the high conductance copper-based alloys, GRCop-42 and GRCop-84. This work outlines the hot fire testing of a 7K lbf thrust class fully AM GRCop-alloy rotating detonation rocket engine (RDRE). Two annular thrust chamber configurations emulating a lander engine system were tested with LOx/GH2 and LOx/LCH4. In both configurations, select hardware was actively cooled using de-ionized water and regeneratively cooled using LCH4. All primary hardware survived long duration tests to thermal steady state up to 133 seconds in a single burn. In total, 18 starts and 802 seconds of duration were achieved with and without visual confirmation of waves present. The proportion of burned propellant, or level of complete combustion, was found to be high compared to the theoretically achievable mean chamber pressure in all cases.

Thomas Teasley↗

NASA Redox cell stack shunt current, pumping power, and cell performance tradeoffs

The NASA Redox energy storage system is under active technology development. The hardware undergoing laboratory testing is either 310 sq. cm. or 929 sq. cm. (0.33 sq. ft. or 1.0 sq. ft. per cell active area with up to 40 individual cells connected to make up a modular cell stack. This size of hardware allows rather accurate projections to be made of the shunt power/pump power tradeoffs. The modeling studies that were completed on the system concept are reviewed along with the approach of mapping the performance of Redox cells over a wide range of flow rates and depths of discharge of the Redox solutions. Methods are outlined for estimating the pumping and shunt current losses for any type of cell and stack combination. These methods are applicable to a variety of pumping options that are present with Redox systems. The results show that a fully developed Redox system has acceptable parasitic losses when using a fixed flow rate adequate to meet the worst conditions of current density and depth of discharge. These losses are reduced by about 65 percent if variable flow schedules are used. The exact value of the overall parasitics will depend on the specific system requirements of current density, voltage limits, charge, discharge time, etc.

Hagedorn, N.↗

Material Response Analysis of PICA-NuSil at the Hypersonic Materials Environmental Test System

Phenolic impregnated carbon ablator (PICA) is a thermal protection system (TPS) that gained heritage during the Stardust mission and is the baseline TPS material for expeditions to Mars (e.g., Mars Science Laboratory and Mars 2020).1 PICA is friable; therefore, a polysiloxane resin (NuSil CV-1144-0) is deposited onto the surface of flight hardware before assembly, test, and launch operations (ATLO) to mitigate particle shedding. Furthermore, the Mars Science Laboratory (MSL) and Mars 2020 heatshields were instrumented with an array of thermocouple plugs (MEDLI Integrated Sensor Plugs or MISP) designed to measure the in-depth thermal response of PICA during flight. Post-flight analysis of MISP data suggests that recession was lower than predicted, and NuSil is suspected as a reasonable cause. NuSil primarily consists of a copolymer blend of dimethyl and diphenyl-substituted polysiloxane resin. Four decades of research in the field of polymer-derived ceramics demonstrate that polysiloxane resins form oxidation-resistant silicon oxycarbide materials at pyrolysis temperatures as low as 800 °C. -2 Furthermore, silicon oxycarbide materials exhibit excellent thermal stability at relatively high-temperatures (< 1200 °C) but eventually decompose via carbothermal reduction. -3 Therefore, it is reasonable to suggest that NuSil forms an oxidation-resistant thermal barrier coating on the TPS surface and influences the material response during atmospheric entry. Evidence for this notion was observed during prior arc-jet testing at both the Aerodynamic Heating Facility (AHF) and the Panel Test Facility (PTF) at the NASA Ames Research Center. Articles of PICA were subjected to testing in airflow, and a temperature discontinuity was recorded at the surface of coupons coated with NuSil. A glassy coating was observed to form at the surface in shear flow configurations (wedge and panel) under moderate heat fluxes. Furthermore, state-of-the-art material response models have yet to account for the underlying physics and chemistry of the temperature discontinuity. To this end, a pathfinder test campaign was executed at the Hypersonic Materials Environmental Test System (HyMETS) to enhance the fundamental understanding of PICA-NuSil ablation phenomena and provide a preliminary data set to aid in the development of material response models.

PICA↗

Flight and Integrated Vehicle Testing: Laying the Groundwork for the Next Generation of Space Exploration Launch Vehicles

Integrated vehicle testing will be critical to ensuring proper vehicle integration of the Ares I crew launch vehicle and Ares V cargo launch vehicle. The Ares Projects, based at Marshall Space Flight Center in Alabama, created the Flight and Integrated Test Office (FITO) as a separate team to ensure that testing is an integral part of the vehicle development process. As its name indicates, FITO is responsible for managing flight testing for the Ares vehicles. FITO personnel are well on the way toward assembling and flying the first flight test vehicle of Ares I, th Ares I-X. This suborbital development flight will evaluate the performance of Ares I from liftoff to first stage separation, testing flight control algorithms, vehicle roll control, separation and recovery systems, and ground operations. Ares I-X is now scheduled to fly in summer 2009. The follow-on flight, Ares I-Y, will test a full five-segment first stage booster and will include cryogenic propellants in the upper stage, an upper stage engine simulator, and an active launch abort system. The following flight, Orion 1, will be the first flight of an active upper stage and upper stage engine, as well as the first uncrewed flight of an Orion spacecraft into orbit. The Ares Projects are using an incremental buildup of flight capabilities prior to the first operational crewed flight of Ares I and the Orion crew exploration vehicle in 2015. In addition to flight testing, the FITO team will be responsible for conducting hardware, software, and ground vibration tests of the integrated launch vehicle. These efforts will include verifying hardware, software, and grou handling interfaces. Through flight and integrated testing, the Ares Projects will identify and mitigate risks early the United States prepares to take its next giant leaps to the Moon and beyond.

Taylor, Jim↗