Search NASA⌕ Search

SEARCH · Search NASA

Results for “program costs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,315 records · Page 73

DC-9 Flight Demonstration Program with Refanned JT8D Engines: Performance and Analysis - Volume 3

The JT8D-109 engine has a sea level static, standard day bare engine takeoff thrust of 73,840 N. At sea level standard day conditions the additional thrust of the JT8D-109 results in 2,040 kg additional takeoff gross weight capability for a given field length. Range loss of the DC-9 Refan airplane for long range cruise was determined. The Refan airplane demonstrated stall, static longitudinal stability, longitudinal control, longitudinal trim, minimum control speeds, and directional control characteristics similar to the DC-9-30 production airplane and complied with airworthiness requirements. Cruise, climb, and thrust reverser performance were evaluated. Structural and dynamic ground test, flight test and analytical results substantiate Refan Program requirements that the nacelle, thrust reverser hardware, and the airplane structural modifications are flightworthy and certifiable and that the airplane meets flutter speed margins. Estimated unit cost of a DC-9 Refan retrofit program is 1.338 million in mid-1975 dollars with about an equal split in cost between airframe and engine.

Source record↗

New Fiber Materials with Sorption Capacity at 5.0 g-U/kg Adsorbent under Marine Testing Conditions

The Fuel Resources program of the Fuel Cycle Research and Development program of the Office of Nuclear Energy (NE) has focused on assuring that nuclear fuel resources are available in the United States for a long term. An immense source of uranium is seawater, which contains an estimated amount of 4.5 billion tonnes of dissolved uranium. Extraction of the uranium resource in seawater can provide a price cap and ensure centuries of uranium supply for future nuclear energy production. NE initiated a multidisciplinary program with participants from national laboratories, universities, and research institutes to enable technical breakthroughs related to uranium recovery from seawater. The goal is to develop advanced adsorbents to make the seawater uranium recovery technology a cost competitive, viable technology. Under this program, Oak Ridge National Laboratory (ORNL) has developed several novel adsorbents, which enhanced the uranium capacity 4-5 times from the state-of-the art Japanese adsorbents. Uranium exists uniformly at a concentration of ~3.3 ppb in seawater. Because of the vast volume of the oceans, the total estimated amount of uranium in seawater is approximately 1000 times larger than its amount in terrestrial resources. However, due to the low concentration, a significant challenge remains for making the extraction of uranium from seawater a commercially viable alternative technology. The biggest challenge for this technology to overcome to efficiently reduce the extraction cost is to develop adsorbents with increased uranium adsorption capacity. Two major approaches were investigated for synthesizing novel adsorbents with enhanced uranium adsorption capacity. One method utilized conventional radiation induced graft polymerization (RIGP) to synthesize adsorbents on high-surface area trunk fibers and the other method utilized a chemical grafting technique, atom-transfer radical polymerization (ATRP). Both approaches have shown promising uranium extraction capacities: RIGP adsorbent achieved 5.00 ± 0.15 g U/kg-ads., while ATRP adsorbent achieved 6.56 ± 0.33 g U/kg-ads., after 56 days of seawater exposure. These achieved values are the highest adsorption capacities ever reported for uranium extraction from seawater. The study successfully demonstrated new fiber materials with sorption capacity at 5.0 g-U/kg adsorbent under marine testing conditions. Further optimization, investigation of other new materials as well as deepening our understanding will develop adsorbents that have even higher uranium adsorption capacity, increased selectivity, and faster kinetics.

36 MATERIALS SCIENCE↗

Study of utilization of advanced composites in fuselage structures of large transports

The effort required by the transport aircraft manufacturers to support the introduction of advanced composite materials into the fuselage structure of future commercial and military transport aircraft is investigated. Technology issues, potential benefits to military life cycle costs and commercial operating costs, and development plans are examined. The most urgent technology issues defined are impact dynamics, acoustic transmission, pressure containment and damage tolerance, post-buckling, cutouts, and joints and splices. A technology demonstration program is defined and a rough cost and schedule identified. The fabrication and test of a full-scale fuselage barrel section is presented. Commercial and military benefits are identified. Fuselage structure weight savings from use of advanced composites are 16.4 percent for the commercial and 21.8 percent for the military. For the all-composite airplanes the savings are 26 percent and 29 percent, respectively. Commercial/operating costs are reduced by 5 percent for the all-composite airplane and military life cycle costs by 10 percent.

Jackson, A. C.↗

Flattening the Radial Temperature Profile across the Transformational Challenge Reactor Core

The Transformational Challenge Reactor (TCR) program is demonstrating an agile development approach to advanced nuclear reactor design, which has traditionally utilized a linear design process. In leveraging artificial intelligence, additive manufacturing, advanced materials, and cutting-edge modeling and simulation, the TCR program aims to minimize the high cost and lengthy deployment timelines now standard in the nuclear industry. Within a relatively short period of time, a robust and mature advanced gas-cooled reactor was iteratively designed under the TCR program, using these cutting-edge technologies. The TCR is a 3 MWt gas-cooled microreactor fueled with uranium nitride (UN) tristructural isotropic (TRISO) fuel particles. Though manufactured via traditional means, these UN TRISO particles are loaded into additively manufactured silicon carbide (SiC) cans [4]. Once loaded with TRISO particles, the SiC cans are densified using a chemical vapor infiltration process. The additively manufactured SiC enables significantly more freedom in the design of the fuel form than could ever be achieved using traditionally manufactured SiC. The helium coolant, pressurized to 5 MPa, enters the core at 300°C and nominally exits it at 500°C. Typically, the most thermally limiting components in any reactor design are the fuel assemblies in the core center. To provide a wide thermal margin in these central fuel assemblies, the flow may be biased toward the center of the core to more effectively cool these fuel assemblies with more power deposition and flatten the core’s radial temperature distribution. An analytical fluid model of the TCR core was developed to explore methods for biasing the flow away from the cooler outer fuel assemblies and towards the hotter inner ones. Higher-fidelity models developed in STAR-CCM+ 2020.3.1, a computational fluid dynamics code, were then utilized to verify the analytical model’s findings.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Space shuttle/payload interface analysis (study 2.4). Volume 2: Space shuttle traffic analysis

The transfer is reported of the capability to perform capture/cost analyses to MSFC. Space shuttle performance and direct costs, tug characteristics, reliability, and cost data were provided by NASA. The launch vehicle, mission models, payloads, and computer programs are discussed along with capture/cost analysis, and cost estimates. For Vol. 1, see N74-12493.

Plough, J. A.↗

NASA Standing Review Board Handbook

This handbook provides guidance based on best practices for the planning, preparation, review, reporting, and closeout of Standing Review Board (SRB) activities. Revision C updates the Revision B version of the SRB Handbook published in 2016 to incorporate updates to NASA Procedural Requirements (NPR) 7120.5F, NASA Space Flight Program and Project Management Requirements. These updates include: - Changing the Dissenting Opinion process to the Formal Dissent process, which retains the current process augmented with an expedited escalation path. - Updates to requirements for establishing an Agency Baseline Commitment (ABC) and for performing Joint Cost and Schedule Confidence Level (JCL) analyses for tightly coupled programs. - Additional requirements for performing a JCL analysis for single-project programs and projects over $1B Life-Cycle Cost (LCC). - Use of initial capability cost estimates instead of LCC estimates in specific, identified instances for single-project programs and projects that plan continuing operations and production, including integration of capability upgrades, with an unspecified Phase E end point. These single-project programs and projects define an initial capability during Phase A and develop an initial capability cost that establishes the ABC at Key Decision Point (KDP) C. Initial capability is the first operational mission flight (or as defined in the KDP B Review Plan) and is documented in the KDP B Decision Memorandum. Initial capability cost includes operations cost for the initial capability. The Phase E cost estimate for continuing operations and production is established separately as part of the Operational Readiness Review (ORR) and KDP E for the 5 years after initial capability and subsequently updated and documented annually for the next 5-year period. Upgrades during Phase E that meet the Agency criteria for a major project for external reporting are treated as projects for the purposes of establishing their own development ABC outside the Phase E cost estimate. The Phase E cost estimate is updated to include production and operations costs associated with these upgrades. Development, production, and operations costs of other (i.e., non-major) upgrades are included in the Phase E cost estimate. (See NPR 7120.5, Sections 2.4.1.5 and 2.4.1.6 and the NASA Space Flight Program and Project Management Handbook (PM Handbook), Section 5.5.4 for additional information.) The scope of the SRB’s assessment with respect to initial capability, Phase E cost estimate, and major upgrades for these single-project programs and projects is defined in the Terms of Reference (ToR).

Kevin Michael Gilligan↗

The solar power satellite concept - A space program perspective

The Space Shuttle will reduce the cost of transportation to space from thousands of dollars per pound to hundreds of dollars per pound. Studies of future systems indicate that these costs may be further reduced to tens of dollars per pound by using large space freighters, which would be required to build solar power satellites. It is pointed out that the Space Shuttle will provide a versatile tool in the 1980's to support the exploration of the solar power satellite concept as well as other space programs of the future. Three apparently different applications, related to materials processing in space, advanced satellite communications, and solar power satellites, have a number of common requirements. These include the need for large solar power arrays in space and/or the need to construct large systems in space. Consequently, a space program which includes development of the techniques for large power supplies and structural systems provides the basis for selecting and implementing any or all of these promising applications.

Kraft, C. C., Jr.↗

Issues in NASA program and project management

This volume is the sixth in an ongoing series on aerospace project management at NASA. Articles in this volume cover evolution of NASA cost estimating; SAM 2; National Space Science Program: strategies to maximize science return; and human needs, motivation, and results of the NASA culture surveys. A section on resources for NASA managers rounds out the publication.

Hoban, Francis T.↗

Issues in NASA program and project management

This volume is the ninth in an ongoing series on aerospace project management at NASA. Articles in this volume cover evolution of NASA cost estimating; SAM 2; National Space Science Program: strategies to maximize science return; and human needs, motivation, and results of the NASA culture surveys. A section on resources for NASA managers rounds out the publication.

Hoban, Francis T.↗

Low-cost point-focus solar concentrator, phase 1

The results of the preliminary design study for the low cost point focus solar concentrator (LCPFSC) development program are presented. A summary description of the preliminary design is given. The design philosophy used to achieve a cost effective design for mass production is described. The concentrator meets all design requirements specified and is based on practical design solutions in every possible way.

Nelson, E. V.↗

An Exploratory Study of Cost Engineering in Axiomatic Design: Creation of the Cost Model Based on an FR-DP Map

Large complex projects cost large sums of money throughout their life cycle for a variety of reasons and causes. For such large programs, the credible estimation of the project cost, a quick assessment of the cost of making changes, and the management of the project budget with effective cost reduction determine the viability of the project. Cost engineering that deals with these issues requires a rigorous method and systematic processes. This paper introduces a logical framework to a&e effective cost engineering. The framework is built upon Axiomatic Design process. The structure in the Axiomatic Design process provides a good foundation to closely tie engineering design and cost information together. The cost framework presented in this paper is a systematic link between the functional domain (FRs), physical domain (DPs), cost domain (CUs), and a task/process-based model. The FR-DP map relates a system s functional requirements to design solutions across all levels and branches of the decomposition hierarchy. DPs are mapped into CUs, which provides a means to estimate the cost of design solutions - DPs - from the cost of the physical entities in the system - CUs. The task/process model describes the iterative process ot-developing each of the CUs, and is used to estimate the cost of CUs. By linking the four domains, this framework provides a superior traceability from requirements to cost information.

Lee, Taesik↗

Commercially Hosted Government Payloads: Lessons from Recent Programs

In a commercially hosted operational mode, a scientific instrument or operational device is attached to a spacecraft but operates independently from the spacecraft s primary mission. Despite the expected benefits of this arrangement, there are few examples of hosted payload programs actually being executed by government organizations. The lack of hosted payload programs is largely driven by programmatic challenges, both real and perceived, rather than by technical challenges. Partly for these reasons, NASA has not sponsored a hosted payload program, in spite of the benefits and visible community interest in doing so. In the interest of increasing the use of hosted payloads across the space community, this paper seeks to alleviate concerns about hosted payloads by identifying these programmatic challenges and presenting ways in which they can be avoided or mitigated. Despite the challenges, several recent hosted payload programs have been successfully completed or are currently in progress. This paper presents an assessment of these programs, with a focus on acquisition, costs, schedules, risks, and other programmatic aspects. The hosted payloads included in this study are the Federal Aviation Administration's Wide Area Augmentation System (WAAS) payloads, United States Coast Guard's Automatic Identification System (AIS) demonstration payload, Department of Defense's IP Router In Space (IRIS) demonstration payload, the United States Air Force's Commercially Hosted Infrared Payload (CHIRP), and the Australian Defence Force's Ultra High Frequency (UHF) payload. General descriptions of each of these programs are presented along with issues that have been encountered and lessons learned from those experiences. A set of recommended approaches for future hosted payload programs is presented, with a focus on addressing risks or potential problem areas through smart and flexible contracting up front. This set of lessons and recommendations is broadly applicable to future hosted payload programs, whether they are technology demonstrations, communications systems, or operational sensors. Additionally, we present a basic cost model for commercial access to space for hosted payloads as a function of payload mass

Andraschko, Mark A.↗

Mission to Planet Earth Strategic Enterprise Plan 1996-2002

Mission to Planet Earth's (MTPE's) first Strategic Enterprise Plan, issued in May 1995, defined the Agency's major goals and objectives as well as constraints. This update of the Strategic Enterprise Plan identifies the following major changes: a focused Science Research Plan that integrates space-based and in situ observational critical science to address critical science uncertainties; a technology infusion plan to reduce the cost of future missions; a series of flight opportunities to infuse new science into the overall program; and a tighter coupling between NASA and NOAA to reduce costs and to improve the overall program. Three important new initiatives are also under development and are described briefly in this plan: MTPE Education Strategy, MTPE Commercial Strategy, and an emerging concept for an Integrated Global Observing Strategy. This first update to the MTPE Strategic Enterprise Plan captures these new developments, and takes a significant step forward in planning this complex Earth system science endeavor. The plan and other information on MTPE may be viewed via the Internet at http://www.hq.nasa.gov/office/mtpe/.

Source record↗

Application of composite materials to turbofan engine fan exit guide vanes

A program was conducted by NASA with the JT9D engine manufacturer to develop a lightweight, cost effective, composite material fan exit guide vane design having satisfactory structural durability for commerical engine use. Based on the results of a previous company supported program, eight graphite/epoxy and graphite-glass/epoxy guide vane designs were evaluated and four were selected for fabrication and testing. Two commercial fabricators each fabricated 13 vanes. Fatigue tests were used to qualify the selected design configurations under nominally dry, 38 C (100 F) and fully wet and 60 C (140 F) environmental conditions. Cost estimates for a production rate of 1000 vanes per month ranged from 1.7 to 2.6 times the cost of an all aluminum vane. This cost is 50 to 80 percent less than the initial program target cost ratio which was 3 times the cost of an aluminum vane. Application to the JT9D commercial engine is projected to provide a weight savings of 236 N (53 lb) per engine.

Smith, G. T.↗

Satellite Ocean Color Validation Using Merchant Ships

A collaborative measurement program for evaluating satellite-derived ocean color has been developed based on ships of opportunity (merchant, oceanographic) and specific instrumentation, the SIMBAD radiometer. The purpose of the measurement program is to complement, in a cost-effective way, dedicated evaluation experiments at sea, which are expensive, cannot be carried out over the full range of expected oceanic and atmospheric conditions, and generally provide a few match-ups. Ships participate in the program on a volunteer basis or at a very small cost, and measurement procedures do not interfere with other ship activities. The SIMBAD radiometer is a portable, easy-to-operate instrument that measures the basic ocean color variables, namely aerosol optical thickness and water-leaving radiance, in typical spectral bands of ocean-color sensors, i.e., 443, 490, 560, 670, and 870 nm. Measuring these variables at the time of satellite overpass is usually sufficient to verify satellite-derived ocean color and to evaluate atmospheric correction algorithms. Any ordinary crew can learn quickly how to make measurements. Importantly, the ship is not required to stop, making it possible to collect data along regular routes traveled by merchant ships in the world's oceans.

Frouin, Robert↗

The Role and Training of NASA Astronauts in the Post-Shuttle Era

In May 2010 the National Research Council (NRC) was asked by NASA to address several questions related to the Astronaut Corps. The NRC's Committee on Human Spaceflight Crew Operations was tasked to: 1. How should the role and size of the activities managed by the Johnson Space Center Flight Crew Operations Directorate change following space shuttle retirement and completion of the assembly of the International Space Station (ISS)? 2. What are the requirements for crew-related ground-based facilities after the Space Shuttle program ends? 3. Is the fleet of aircraft used for training the Astronaut Corps a cost-effective means of preparing astronauts to meet the requirements of NASA's human spaceflight program? Are there more cost-effective means of meeting these training requirements? Although the future of NASA's human spaceflight program has garnered considerable discussion in recent years, and there is considerable uncertainty about what that program will involve in the coming years, the committee was not tasked to address whether or not human spaceflight should continue, or what form it should take. The committee's task restricted it to studying those activities managed by the Flight Crew Operations Directorate, or those closely related to its activities, such as crew-related ground-based facilities and the training aircraft.

Source record↗

Preparing for the High Frontier: The Role and Training of NASA Astronauts in the Post- Space Shuttle Era

In May 2010, the National Research Council (NRC) was asked by NASA to address several questions related to the Astronaut Corps. The NRC s Committee on Human Spaceflight Crew Operations was tasked to answer several questions: 1. How should the role and size of the activities managed by the Johnson Space Center Flight Crew Operations Directorate change after space shuttle retirement and completion of the assembly of the International Space Station (ISS)? 2. What are the requirements for crew-related ground-based facilities after the Space Shuttle program ends? 3. Is the fleet of aircraft used for training the Astronaut Corps a cost-effective means of preparing astronauts to meet the requirements of NASA s human spaceflight program? Are there more cost-effective means of meeting these training requirements? Although the future of NASA s human spaceflight program has garnered considerable discussion in recent years and there is considerable uncertainty about what the program will involve in the coming years, the committee was not tasked to address whether human spaceflight should continue or what form it should take. The committee s task restricted it to studying activities managed by the Flight Crew Operations Directorate or those closely related to its activities, such as crew-related ground-based facilities and the training aircraft.

Source record↗

SMART Scale An Innovative Program Accelerating the Energy Efficiency Market

Small business is a major component of the American economy. More than half of all private sector workers in this country are employed by small businesses and nearly two-thirds of the new jobs generated in the last ten years were created in this sector. Studies have shown that buildings of less than 50,000 square feet represent 94% of the commercial sector and half of all non-residential floor space in the United States. The future of the American economy relies on a vibrant, robust, and profitable small business community. Small and mid-sized businesses (SMB) can increase their profitability by reducing their operating costs through energy efficiency. The SMART Scale program delivers deep retrofits that maximize energy and cost savings for the SMB market and can be adapted throughout the country in markets of all sizes. For the past 14 years, Ecology Action has been perfecting a Direct Install (DI) program for the SMB market that offers this sector the type of sophisticated, comprehensive energy saving opportunities that were previously available only to large commercial and industrial customers. The DI 2.0 model that Ecology Action has administered for several public and investor-owned California utilities, and most recently for the Sacramento Municipal Utilities District (SMUD), provides the template for a successful retrofit program that can address the unique barriers faced by the SMB sector and achieve a greater impact than traditional DI programs. The impressive results produced by the DI 2.0 program prompted the US Department of Energy to award Ecology Action a $2 million grant in 2013 to create, demonstrate and roll out a replicable model for delivering deep retrofits to small commercial buildings. The grant enabled Ecology Action to build on the success of DI 2.0 by incorporating improvements into the model, market-testing it and designing a costeffective method of achieving significant energy savings for small businesses across the country.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗