Search NASA⌕ Search

SEARCH · Search NASA

Results for “structural testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,315 records · Page 73

Measuring size dependent electrical properties from nanoneedle structures: Pt/ZnO Schottky diodes

This work reports the fabrication and testing of nanoneedle devices with well-defined interfaces that are amenable to a variety of structural and electrical characterization, including transmission electron microscopy. Single Pt/ZnO nanoneedle Schottky diodes were fabricated by a top down method using a combination of electro-polishing, sputtering, and focused ion beam milling. The resulting structures contained nanoscale planar heterojunctions with low ideality factors, the dimensions of which were tuned to study size-dependent electrical properties. The diameter dependence of the Pt/ZnO diode barrier height is explained by a joule heating effect and/or electronic inhomogeneity in the Pt/ZnO contact area.

36 MATERIALS SCIENCE↗

Quantum entropy as a harbinger of factorizability

Deeply inelastic scattering (DIS) is a powerful probe for investigating the QCD structure of hadronic matter and testing the standard model (SM). DIS can be described through QCD factorization theorems which separate contributions to the scattering interaction arising from disparate scales — e.g ., with nonperturbative matrix elements associated with long distances and a perturbative hard scattering kernel applying to short-distance parton-level interactions. The fundamental underpinnings of factorization may be recast in the quantum-theoretic terms of entanglement, (de)coherence, and system localization in a fashion which sheds complementary light on the dynamics at work in DIS from QCD bound states. In this Letter, we propose and quantitatively test such a quantum-information theoretic approach for dissecting factorization in DIS and its domain of validity; we employ metrics associated with quantum entanglement such as a differential quantum entropy and associated Kullback-Leibler (KL) divergences in numerical tests. We deploy these methods on an archetypal quark-spectator model of the proton, for which we monitor quantum decoherence in DIS as underlying model parameters are varied. On this basis, we demonstrate quantitatively how factorization-breaking effects may be imprinted on quantum entropies in a kinematic regime where leading-twist factorization increasingly receives large corrections from finite- Q 2 effects; our findings suggest potential applications of quantum simulation to QCD systems and their interactions.

Deep inelastic scattering↗

Testing ΛCDM cosmology at turnaround: where to look for violations of the bound?

In ΛCDM cosmology, structure formation is halted shortly after dark energy dominates the mass/energy budget of the Universe. A manifestation of this effect is that in such a cosmology the turnaround radius—the non-expanding mass shell furthest away from the center of a structure— has an upper bound. Recently, a new, local, test for the existence of dark energy in the form of a cosmological constant was proposed based on this turnaround bound. Before designing an experiment that, through high-precision determination of masses and —independently— turnaround radii, will challenge ΛCDM cosmology, we have to answer two important questions: first, when turnaround-scale structures are predicted to be close enough to their maximum size, so that a possible violation of the bound may be observable. Second, which is the best mass scale to target for possible violations of the bound. These are the questions we address in the present work. Using the Press-Schechter formalism, we find that turnaround structures have in practice already stopped forming, and consequently, the turnaround radius of structures must be very close to the maximum value today. We also find that the mass scale of ∼ 10{sup 13} M{sub ⊙} characterizes the turnaround structures that start to form in a statistically important number density today —and even at an infinite time in the future, since structure formation has almost stopped. This mass scale also separates turnaround structures with qualitatively different cosmological evolution: smaller structures are no longer readjusting their mass distribution inside the turnaround scale, they asymptotically approach their ultimate abundance from higher values, and they are common enough to have, at some epoch, experienced major mergers with structures of comparable mass; larger structures exhibit the opposite behavior. We call this mass scale the transitional mass scale and we argue that it is the optimal for the purpose outlined above. As a corollary, we explain the different accretion behavior of small and larger structures observed in already conducted numerical simulations.

79 ASTRONOMY AND ASTROPHYSICS↗

Testing CPT Invariance with Antiprotonic Helium Atoms

The structure of matter is related to symmetries at every level of study. CPT symmetry is one of the most important laws of field theory: it states the invariance of physical properties when one simultaneously changes the signs of the charge and of the spatial and time coordinates of free elementary particles. Although in general opinion CPT symmetry is not violated in Nature, there are theoretical attempts to develop CPT-violating models. The Antiproton Decelerator at CERN has been built to test CPT invariance. The ASACUSA experiment compares the properties of particles and antiparticles by studying the antiprotonic helium atom via laser spectroscopy and measuring the mass, charge and magnetic moment of the antiproton as compared to those of the proton.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Structural Analysis Approach for the Defense Programs Package 3 (DPP-3)

The Pacific Northwest National Laboratory (PNNL) is the design authority for a new Type B hazardous materials transportation package designated as the Defense Programs Package 3 (DPP-3) for the U.S. Department of Energy (DOE) National Nuclear Security Administration (NNSA). The DPP-3 has been developed using similar materials and fabrication methods employed in previous U.S. Nuclear Regulatory Commission (NRC), DOE, and NNSA certified packages. The DPP-3 design criteria are derived from the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (BPVC), NNSA guidance and NRC regulatory guides in order to safely and securely transport a variety of payloads. Final regulatory approval by the NNSA will require physical testing to demonstrate that the containment vessel (CV) remains leaktight after enduring the entire regulatory testing sequence prescribed in Title 10 of the Code of Federal Regulations Part 71 (10 CFR 71). In order to gain confidence that the DPP-3 will remain leaktight after testing, the DPP-3 has been structurally analyzed using the Finite Element Analysis (FEA) software LS-DYNA. The FEA analyses serve two general purposes: first, they aid in design and development of the package, and second, they advise as to which drop orientations are expected to cause the most damage during regulatory testing. This paper will discuss how the design criteria are incorporated into analytical techniques needed to evaluate the FEA structural simulation results for 10 CFR 71 conditions to give confidence the DPP-3 testing campaign will be successful.

Sakalaukus Jr., Peter J.↗

Model morphing and sequence assignment after molecular replacement

A procedure for model building is described that combines morphing a model to match a density map, trimming the morphed model and aligning the model to a sequence. A procedure termed ‘morphing’ for improving a model after it has been placed in the crystallographic cell by molecular replacement has recently been developed. Morphing consists of applying a smooth deformation to a model to make it match an electron-density map more closely. Morphing does not change the identities of the residues in the chain, only their coordinates. Consequently, if the true structure differs from the working model by containing different residues, these differences cannot be corrected by morphing. Here, a procedure that helps to address this limitation is described. The goal of the procedure is to obtain a relatively complete model that has accurate main-chain atomic positions and residues that are correctly assigned to the sequence. Residues in a morphed model that do not match the electron-density map are removed. Each segment of the resulting trimmed morphed model is then assigned to the sequence of the molecule using information about the connectivity of the chains from the working model and from connections that can be identified from the electron-density map. The procedure was tested by application to a recently determined structure at a resolution of 3.2 Å and was found to increase the number of correctly identified residues in this structure from the 88 obtained using phenix.resolve sequence assignment alone (Terwilliger, 2003 ▶) to 247 of a possible 359. Additionally, the procedure was tested by application to a series of templates with sequence identities to a target structure ranging between 7 and 36%. The mean fraction of correctly identified residues in these cases was increased from 33% using phenix.resolve sequence assignment to 47% using the current procedure. The procedure is simple to apply and is available in the Phenix software package.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Development and demonstration of a BISON–Griffin modeling framework for the design of targeted TRISO transient experiments in the Transient Reactor Test Facility

Uranium oxycarbide (UCO)-bearing tri-structural isotropic (TRISO) particle fuels are expected to be used in numerous U.S. commercial reactor applications within the next decade. Here, in this work, we reviewed historical particle fuel transient experiments to identify gaps in TRISO fuel performance transient testing. A BISON–Griffin modeling framework was then developed to conduct preliminary TRISO transient analyses and begin to address these gaps. The framework was demonstrated using limiting-case transient conditions from a prototypic high-temperature gas-cooled reactor (HTGR). It was then applied to develop a matrix of experiments that could be performed in the Transient Reactor Test Facility (TREAT) to (1) evaluate UCO-fueled particle performance at moderate and high heat rates, (2) assess whether historical testing involving UO 2 -fueled particles is applicable to modern UCO-fueled particles, (3) deconvolute the impacts of temperature and heat rate on particle transient response, and (4) collect the data needed for fuel performance model validation and/or further development.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Characterization of basin concrete in support of structural integrity demonstration for extended storage

Concrete core samples from C basin were characterized through material testing and analysis to verify the design inputs for structural analysis of the L Basin and to evaluate the type and extent of changes in the material condition of the concrete under extended service for fuel storage. To avoid the impact on operations, core samples were not collected from L area, but rather, several concrete core samples were taken from the C Basin prior to its closure. C basin was selected due to its similar environmental exposure and service history compared to L Basin. The microstructure and chemical composition of the concrete exposed to the water was profiled from the water surface into the wall to evaluate the impact and extent of exposure. No significant leaching of concrete components was observed. Ingress of carbonation or deleterious species was determined to be insignificant. No evidence of alkali-silica reactions (ASR) was observed. Ettringite was observed to form throughout the structure (in air voids or pores); however, the sulfur content was measured to be consistent with the initial concrete that was used to construct the facility. Similar ettringite trends were observed in the interior segments of the core samples. The compressive strength of the concrete at the mid-wall of the basin was measured, and similar microstructural analysis was conducted on these materials post compression testing. The microstructure was determined to be similar to near-surface segments of the core samples. The average strength was 4148 psi, which is well-above the design strength of 2500 psi. The analyses showed that phase alterations and minor cracking in a microstructure did not affect the design specification for the concrete.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Report on Development of Critical Field Testing and Site Characterization Techniques

Characterizing subsurface structures is crucial for used fuel disposition. It is necessary to apply the-state of-art geophysical techniques to ensure safe and cost-effective used fuel disposition. This report summarizes the most up-to-date geophysical techniques to achieve this goal, particularly for fault and fracture characterization. These techniques include non-invasive methods that are suitable for the early stage of site characterization, and invasive methods that can be applied when the sites are under development. These methods can provide subsurface mechanical and electrical properties, which can help determine surface structures and rock types. Particularly, these methods can determine various parameters of fault and fracture zones, such as the location, dip, width, and activeness.

Earth Sciences↗

Report on FY15 Two-Bar Thermal Ratcheting Test Results

Alloy 617 is a reference structural material for very high temperature components of advanced-gas cooled reactors with outlet temperatures in the range of 900-950°C. In order for designers to be able to use Alloy 617 for these high temperature components, Alloy 617 has to be approved for use in Section III (the nuclear section) of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code. A plan has been developed to submit a draft code for Alloy 617 to ASME Section III by 2015. However, the current rules in Subsection NH* for the evaluation of strain limits and creep-fatigue damage using simplified methods based on elastic analysis have been deemed inappropriate for Alloy 617 at temperatures above 1200°F(650°C). The rationale for this exclusion is that at higher temperatures it is not feasible to decouple plasticity and creep deformation, which is the basis for the current simplified rules. This temperature, 1200°F(650°C), is well below the temperature range of interest for this material in High Temperature Gas Cooled Reactor (HTGR) applications. The only current alternative is, thus, a full inelastic analysis which requires sophisticated material models which have been formulated but not yet verified. To address this issue, proposed code rules have been developed which are based on the use of elastic-perfectly plastic (EPP) analysis methods and which are expected to be applicable to very high temperatures. These newly proposed rules also address a long-term objective to provide an option for more simple, comprehensive and easily applied rules than the current so called “simplified” rules.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Predicting Rupture Pressure and Leak Rate of Alloy 600 U-bend Tubes with PWSCC and Comparing with Test Results (Technical Letter Report)

This report summarizes structural integrity work performed for the US NRC that predicts the structural integrity of steam generator (SG) tubes with flaws in the U-bend. The work covers model development and validation for U-bend tubes containing lab-induced primary water stress corrosion cracks (PWSCC). Limit load models for plastic collapse predicting ligament rupture pressure and leak rate of cracked U-bend tubes were developed and validated with pressure tests and finite element analyses (FEAs). Failure pressure and leak rate tests were conducted at room temperature on Alloy 600 U-bend tubes containing flaws located at various locations around the U-bend. Existing models for predicting structural integrity of straight tubes with well defined, rectangular, electro-discharge-machined (EDM) flaws were modified and used to predict the ligament rupture and unstable burst pressures as well as leak rates for the PWSCC flaws in the U-bend section.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Development of a 50 MW 30 GHz Gyroklystron Amplifier

DOE requires sources for testing of high gradient accelerator structures. A power of 50 MW is required at K and Ka band. The pulse length must be ~ 1 microsecond and the pulse repetition frequency at least 100 Hz. At least some applications may require phase stability not offered by a free running oscillator. CCR proposed to build a 50 MW 30 GHz gyrklystron amplifier. This approach would give the required phase stability. The frequency was at the second harmonic of the cycltron frequency and used the TE02 mode. This makes it possible to design a device without an inner conductor, and with a conventional (non-inverted) MIG. This minimizes cost and the risk due to mechanical alignment issues. A detailed design of the gyroklystron was produced. The design was based on simulations of the cavity(ies), electron gun, output coupler and output window. Two designs were produced. One was at the fundamental of the cyclotron frequency. Simulations predicted an output power of 72 MW with an efficiency of 48%. The other was at the second harmonic, producing 37 MW with an efficiency of 37%.

43 PARTICLE ACCELERATORS↗

Advances and Achievements in In Situ Analysis of Corrosion and Structure–Property Relationship in Mg Alloys

Every year, TMS Magnesium Committee carefully selects a special topic in magnesium (Mg) related research and development not only having the hottest subject from both academic and industrial perspectives but also demonstrating major achievements within this subject. Following last year’s topic on Mg microallying [1], this year’s focus is on in-situ methods and associated techniques in their broad definition spanning from laboratory- to large- scale facilities to process monitoring. The applications of in-situ techniques have a wide spectrum from the analysis of melts and liquid-solid transitions to solid-state phenomena during thermo-mechanical processing and heat treatments to surface interactions with various environments. Therefore, such works are of significant interest to scientists working in the area of Mg alloy development as well as to a much broader audience from both academia and industry. This interest is primarily caused by challenges in the analysis of structure-property relationship in Mg alloys, and even cursory glance of literature reveals sharp increase of publications relevant to this topic recently. For instance, very high reactivity of Mg as well as its well-known propensity to substantially alter structure upon unloading in mechanical testing makes it difficult to understand and thus to simulate correlation between microstructures observed in post-mortem analysis and physical processes during testing or fabrication. However, recent advances in in-situ analysis based on large-scale research facilities such as neutron scattering and synchrotron radiation sources as well as microscopy-based, acoustic emission, and other more traditional techniques allowed significant achievements. Apart from apparent development of relevant experimental techniques, a significant part of this success should also be attributed to increasing accessibility of the facilities and simplification of their use from a user perspective. The selection of articles in this special topic is quite far from comprehensive review covering all aspects of in-situ methods available for metallic materials development. However, this was not the purpose in any case. Instead, this selection is intended to present several studies on Mg alloys and Mg-based composites with the use of in-situ techniques. In addition, it overviews two techniques, ‘Acoustic Emission’ (AE) and ‘Ambient-Pressure X-ray Photoelectron Spectroscopy’ (AP-XPS), that are rather novel to the Mg community. These studies are supposed to give readers representative examples of such techniques potential and to help in navigating the spectrum of modern state-of-the-art analytical methods facilitating the development of Mg alloys. These articles are organized in the order corresponding to typical Mg alloy lifecycle from material preparation and solidification to thermo-mechanical processing and product fabrication to degradation.

36 MATERIALS SCIENCE↗

Template-Free Synthesis of Hollow-Structured Co 3 O 4 Nanoparticles as High-Performance Anodes for Lithium-Ion Batteries

We have developed a template-free procedure to synthesize Co 3 O 4 hollow-structured nanoparticles on a Vulcan XC-72 carbon support. The material was synthesized via an impregnation–reduction method followed by air oxidation. In contrast to spherical particles, the hollow-structured Co 3 O 4 nanoparticles exhibited excellent lithium storage capacity, rate capability, and cycling stability when used as the anode material in lithium-ion batteries. Electrochemical testing showed that the hollow-structured Co 3 O 4 particles delivered a stable reversible capacity of about 880 mAh/g (near the theoretical capacity of 890 mAh/g) at a current density of 50 mA/g after 50 cycles. Lastly, the superior electrochemical performance is attributed to its unique hollow structure, which combines nano- and microscale properties that facilitate electron transfer and enhance structural robustness.

25 ENERGY STORAGE↗

A Historical Evaluation of the U15 Complex, Nevada National Security Site, Nye County, Nevada

This report presents a historical evaluation of the U15 Complex on the Nevada National Security Site (NNSS) in southern Nevada. The work was conducted by the Desert Research Institute at the request of the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office and the U.S. Department of Defense, Defense Threat Reduction Agency. Three underground nuclear tests and two underground nuclear fuel storage experiments were conducted at the complex. The nuclear tests were Hard Hat in 1962, Tiny Tot in 1965, and Pile Driver in 1966. The Hard Hat and Pile Driver nuclear tests involved different types of experiment sections in test drifts at various distances from the explosion in order to determine which sections could best survive in order to design underground command centers. The Tiny Tot nuclear test involved an underground cavity in which the nuclear test was executed. It also provided data in designing underground structures and facilities to withstand a nuclear attack. The underground nuclear fuel storage experiments were Heater Test 1 from 1977 to 1978 and Spent Fuel Test - Climax from 1978 to 1985. Heater Test 1 was used to design the later Spent Fuel Test - Climax experiment. The latter experiment was a model of a larger underground storage facility and primarily involved recording the conditions of the spent fuel and the surrounding granite medium. Fieldwork was performed intermittently in the summers of 2011 and 2013, totaling 17 days. Access to the underground tunnel complex is sealed and unavailable. Restricted to the surface, four buildings, four structures, and 92 features associated with nuclear testing and fuel storage experiment activities at the U15 Complex have been recorded. Most of these are along the west side of the complex and next to the primary access road and are characteristic of an industrial mining site, albeit one with scientific interests. The geomorphological fieldwork was conducted over three days in the summer of 2011. It was discovered that major modifications to the terrain have resulted from four principal activities. These are road construction and maintenance, mining activities related to development of the tunnel complex, site preparation for activities related to the tests and experiments, and construction of drill pads and retention ponds. Six large trenches for exploring across the Boundary geologic fault are also present. The U15 Complex, designated historic district 143 and site 26NY15177, is eligible to the National Register of Historic Places under Criteria A, C, and D of 36 CFR Part 60.4. As a historic district and archaeological site eligible to the National Register of Historic Places, the Desert Research Institute recommends that the area defined for the U15 Complex, historic district 143 and site 26NY15117, be left in place in its current condition. The U15 Complex should also be included in the NNSS cultural resources monitoring program and monitored for disturbances or alterations.

54 ENVIRONMENTAL SCIENCES↗

A Historical Evaluation of the U15 Complex, Nevada National Security Site, Nye County, Nevada

This report presents a historical evaluation of the U15 Complex on the Nevada National Security Site (NNSS) in southern Nevada. The work was conducted by the Desert Research Institute at the request of the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office and the U.S. Department of Defense, Defense Threat Reduction Agency. Three underground nuclear tests and two underground nuclear fuel storage experiments were conducted at the complex. The nuclear tests were Hard Hat in 1962, Tiny Tot in 1965, and Pile Driver in 1966. The Hard Hat and Pile Driver nuclear tests involved different types of experiment sections in test drifts at various distances from the explosion in order to determine which sections could best survive in order to design underground command centers. The Tiny Tot nuclear test involved an underground cavity in which the nuclear test was executed. It also provided data in designing underground structures and facilities to withstand a nuclear attack. The underground nuclear fuel storage experiments were Heater Test 1 from 1977 to 1978 and Spent Fuel Test - Climax from 1978 to 1985. Heater Test 1 was used to design the later Spent Fuel Test - Climax experiment. The latter experiment was a model of a larger underground storage facility and primarily involved recording the conditions of the spent fuel and the surrounding granite medium. Fieldwork was performed intermittently in the summers of 2011 and 2013, totaling 17 days. Access to the underground tunnel complex is sealed and unavailable. Restricted to the surface, four buildings, four structures, and 92 features associated with nuclear testing and fuel storage experiment activities at the U15 Complex have been recorded. Most of these are along the west side of the complex and next to the primary access road and are characteristic of an industrial mining site, albeit one with scientific interests. The geomorphological fieldwork was conducted over three days in the summer of 2011. It was discovered that major modifications to the terrain have resulted from four principal activities. These are road construction and maintenance, mining activities related to development of the tunnel complex, site preparation for activities related to the tests and experiments, and construction of drill pads and retention ponds. Six large trenches for exploring across the Boundary geologic fault are also present. The U15 Complex, designated historic district 143 and site 26NY15177, is eligible to the National Register of Historic Places under Criteria A, C, and D of 36 CFR Part 60.4. As a historic district and archaeological site eligible to the National Register of Historic Places, the Desert Research Institute recommends that the area defined for the U15 Complex, historic district 143 and site 26NY15117, be left in place in its current condition. The U15 Complex should also be included in the NNSS cultural resources monitoring program and monitored for disturbances or alterations.

54 ENVIRONMENTAL SCIENCES↗

A Historical Evaluation of the U15 Complex, Nevada National Security Site, Nye County, Nevada

This report presents a historical evaluation of the U15 Complex on the Nevada National Security Site (NNSS) in southern Nevada. The work was conducted by the Desert Research Institute at the request of the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office and the U.S. Department of Defense, Defense Threat Reduction Agency. Three underground nuclear tests and two underground nuclear fuel storage experiments were conducted at the complex. The nuclear tests were Hard Hat in 1962, Tiny Tot in 1965, and Pile Driver in 1966. The Hard Hat and Pile Driver nuclear tests involved different types of experiment sections in test drifts at various distances from the explosion in order to determine which sections could best survive in order to design underground command centers. The Tiny Tot nuclear test involved an underground cavity in which the nuclear test was executed. It also provided data in designing underground structures and facilities to withstand a nuclear attack. The underground nuclear fuel storage experiments were Heater Test 1 from 1977 to 1978 and Spent Fuel Test - Climax from 1978 to 1985. Heater Test 1 was used to design the later Spent Fuel Test - Climax experiment. The latter experiment was a model of a larger underground storage facility and primarily involved recording the conditions of the spent fuel and the surrounding granite medium. Fieldwork was performed intermittently in the summers of 2011 and 2013, totaling 17 days. Access to the underground tunnel complex is sealed and unavailable. Restricted to the surface, four buildings, four structures, and 92 features associated with nuclear testing and fuel storage experiment activities at the U15 Complex have been recorded. Most of these are along the west side of the complex and next to the primary access road and are characteristic of an industrial mining site, albeit one with scientific interests. The geomorphological fieldwork was conducted over three days in the summer of 2011. It was discovered that major modifications to the terrain have resulted from four principal activities. These are road construction and maintenance, mining activities related to development of the tunnel complex, site preparation for activities related to the tests and experiments, and construction of drill pads and retention ponds. Six large trenches for exploring across the Boundary geologic fault are also present. The U15 Complex, designated historic district 143 and site 26NY15177, is eligible to the National Register of Historic Places under Criteria A, C, and D of 36 CFR Part 60.4. As a historic district and archaeological site eligible to the National Register of Historic Places, the Desert Research Institute recommends that the area defined for the U15 Complex, historic district 143 and site 26NY15117, be left in place in its current condition. The U15 Complex should also be included in the NNSS cultural resources monitoring program and monitored for disturbances or alterations.

54 ENVIRONMENTAL SCIENCES↗

A Historical Evaluation of the U15 Complex, Nevada National Security Site, Nye County, Nevada

This report presents a historical evaluation of the U15 Complex on the Nevada National Security Site (NNSS) in southern Nevada. The work was conducted by the Desert Research Institute at the request of the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office and the U.S. Department of Defense, Defense Threat Reduction Agency. Three underground nuclear tests and two underground nuclear fuel storage experiments were conducted at the complex. The nuclear tests were Hard Hat in 1962, Tiny Tot in 1965, and Pile Driver in 1966. The Hard Hat and Pile Driver nuclear tests involved different types of experiment sections in test drifts at various distances from the explosion in order to determine which sections could best survive in order to design underground command centers. The Tiny Tot nuclear test involved an underground cavity in which the nuclear test was executed. It also provided data in designing underground structures and facilities to withstand a nuclear attack. The underground nuclear fuel storage experiments were Heater Test 1 from 1977 to 1978 and Spent Fuel Test - Climax from 1978 to 1985. Heater Test 1 was used to design the later Spent Fuel Test - Climax experiment. The latter experiment was a model of a larger underground storage facility and primarily involved recording the conditions of the spent fuel and the surrounding granite medium. Fieldwork was performed intermittently in the summers of 2011 and 2013, totaling 17 days. Access to the underground tunnel complex is sealed and unavailable. Restricted to the surface, four buildings, four structures, and 92 features associated with nuclear testing and fuel storage experiment activities at the U15 Complex have been recorded. Most of these are along the west side of the complex and next to the primary access road and are characteristic of an industrial mining site, albeit one with scientific interests. The geomorphological fieldwork was conducted over three days in the summer of 2011. It was discovered that major modifications to the terrain have resulted from four principal activities. These are road construction and maintenance, mining activities related to development of the tunnel complex, site preparation for activities related to the tests and experiments, and construction of drill pads and retention ponds. Six large trenches for exploring across the Boundary geologic fault are also present. The U15 Complex, designated historic district 143 and site 26NY15177, is eligible to the National Register of Historic Places under Criteria A, C, and D of 36 CFR Part 60.4. As a historic district and archaeological site eligible to the National Register of Historic Places, the Desert Research Institute recommends that the area defined for the U15 Complex, historic district 143 and site 26NY15117, be left in place in its current condition. The U15 Complex should also be included in the NNSS cultural resources monitoring program and monitored for disturbances or alterations.

54 ENVIRONMENTAL SCIENCES↗