At least 1,315 records · Page 73

Space Shuttle Orbiter audio subsystem

The selection of the audio multiplex control configuration for the Space Shuttle Orbiter audio subsystem is discussed and special attention is given to the evaluation criteria of cost, weight and complexity. The specifications and design of the subsystem are described and detail is given to configurations of the audio terminal and audio central control unit (ATU, ACCU). The audio input from the ACCU, at a signal level of -12.2 to 14.8 dBV, nominal range, at 1 kHz, was found to have balanced source impedance and a balanced local impedance of 6000 + or - 600 ohms at 1 kHz, dc isolated. The Lyndon B. Johnson Space Center (JSC) electroacoustic test laboratory, an audio engineering facility consisting of a collection of acoustic test chambers, analyzed problems of speaker and headset performance, multiplexed control data coupled with audio channels, and the Orbiter cabin acoustic effects on the operational performance of voice communications. This system allows technical management and project engineering to address key constraining issues, such as identifying design deficiencies of the headset interface unit and the assessment of the Orbiter cabin performance of voice communications, which affect the subsystem development.

Stewart, C. H.↗

Dispersed storage and generation case studies

Three installations utilizing separate dispersed storage and generation (DSG) technologies were investigated. Each of the systems is described in costs and control. Selected institutional and environmental issues are discussed, including life cycle costs. No unresolved technical, environmental, or institutional problems were encountered in the installations. The wind and solar photovoltaic DSG were installed for test purposes, and appear to be presently uneconomical. However, a number of factors are decreasing the cost of DSG relative to conventional alternatives, and an increased DSG penetration level may be expected in the future.

Bahrami, K.↗

Adaptation of the Advanced Spray Combustion Code to Cavitating Flow Problems

A very important consideration in turbopump design is the prediction and prevention of cavitation. Thus far conventional CFD codes have not been generally applicable to the treatment of cavitating flows. Taking advantage of its two-phase capability, the Advanced Spray Combustion Code is being modified to handle flows with transient as well as steady-state cavitation bubbles. The volume-of-fluid approach incorporated into the code is extended and augmented with a liquid phase energy equation and a simple evaporation model. The strategy adopted also successfully deals with the cavity closure issue. Simple test cases will be presented and remaining technical challenges will be discussed.

Liang, Pak-Yan↗

Building Multi-Discipline, Multi-Format Digital Libraries Using Clusters and Buckets

Our objective was to study the feasibility of extending the Dienst protocol to enable a multi-discipline, multi-format digital library. We implemented two new technologies: cluster functionality and publishing buckets. We have designed a possible implementation of clusters and buckets, and have prototyped some aspects of the resultant digital library. Currently, digital libraries are segregated by the disciplines they serve (computer science, aeronautics, etc.), and by the format of their holdings (reports, software, datasets, etc.). NCSTRL+ is a multi-discipline, multi-format digital library (DL) prototype created to explore the feasibility of the design and implementation issues involved with created a unified, canonical scientific and technical information (STI) DL. NCSTRL+ is based on the Networked Computer Science Technical Report Library (NCSTRL), a World Wide Web (WWW) accessible DL that provides access to over 80 university departments and laboratories. We have extended the Dienst protocol (version 4.1.8), the protocol underlying NCSTRL, to provide the ability to cluster independent collections into a logically centralized DL based upon subject category classification, type of organization, and genre of material. The concept of buckets provides a mechanism for publishing and managing logically linked entities with multiple data formats.

Nelson, Michael L.↗

Magnetized Target Fusion

Magnetized target fusion (MTF) is under consideration as a means of building a low mass, high specific impulse, and high thrust propulsion system for interplanetary travel. This unique combination is the result of the generation of a high temperature plasma by the nuclear fusion process. This plasma can then be deflected by magnetic fields to provide thrust. Fusion is initiated by a small traction of the energy generated in the magnetic coils due to the plasma's compression of the magnetic field. The power gain from a fusion reaction is such that inefficiencies due to thermal neutrons and coil losses can be overcome. Since the fusion reaction products are directly used for propulsion and the power to initiate the reaction is directly obtained from the thrust generation, no massive power supply for energy conversion is required. The result should be a low engine mass, high specific impulse and high thrust system. The key is to successfully initiate fusion as a proof-of-principle for this application. Currently MSFC is implementing MTF proof-of-principle experiments. This involves many technical details and ancillary investigations. Of these, selected pertinent issues include the properties, orientation and timing of the plasma guns and the convergence and interface development of the "pusher" plasma. Computer simulations of the target plasma's behavior under compression and the convergence and mixing of the gun plasma are under investigation. This work is to focus on the gun characterization and development as it relates to plasma initiation and repeatability.

Steven T. Griffin↗

Highlights of the ASPE 2004 Winter Topical Meeting on Free-Form Optics: Design, Fabrication, Metrology, Assembly

We present highlights from the American Society for Precision Engineering's 2004 winter topical meeting entitled Free-Form Optics: Design, Fabrication, Metrology, Assembly. We emphasize those papers that are most relevant to astronomical optics. Optical surfaces that transcend the bounds of rotational symmetry have been implemented in novel optical systems with fantastic results since the release of Polaroid's first instant camera. Despite these successes, free-form optics have found only a few niche applications and have yet to enter the mainstream. The purpose of this meeting is to identify the state of the art of free-form optics design, fabrication, metrology and assembly and to identify the technical and logistical challenges that inhibit their widespread use. Issues that will be addressed include: What are free-form optics? How can optical systems be made better with free-form optics? How can designers use free-form optics? How can free-form optics be fabricated? How can they be measured? How are free-form optical systems assembled? Control of multi-axis systems.

Ohl, Raymond G.↗

REVIEW Of COMPUTERIZED PROCEDURE GUIDELINES FOR NUCLEAR POWER PLANT CONTROL ROOMS

Computerized procedures (CPs) are recognized as an emerging alternative to paper-based procedures for supporting control room operators in nuclear power plants undergoing life extension and in the concept of operations for advanced reactor designs. CPs potentially reduce operator workload, yield increases in efficiency, and provide for greater resilience. Yet, CPs may also adversely impact human and plant performance if not designed and implemented properly. Therefore, it is important to ensure that existing guidance is sufficient to provide for proper implementation and monitoring of CPs. In this paper, human performance issues were identified based on a review of the behavioral science literature, research on computerized procedures in nuclear and other industries, and a review of industry experience with CPs. The review of human performance issues led to the identification of a number of technical gaps in available guidance sources. To address some of the gaps, we developed 13 supplemental guidelines to support design and safety. This paper presents these guidelines and the case for further research.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Pile Fuel Cladding Silo Deflector Plate Removal Project Using Long Reach Tooling and Suspended Abrasive Water Jet Cutting System - 17541

The Pile Fuel Cladding Silo (PFCS) at the Sellafield decommissioning, reprocessing and nuclear waste management facility in the UK was constructed in the late 1940-s and used for the storage of Intermediate Level Waste (ILW) arising from the Windscale Piles, Calderhall and Chapelcross Reactors until the 1960's. The PFCS is 21 metres high and comprises 6 identical tall compartments with the waste added to the silo via a charge-hole at the top of each compartment; each compartment is split by a central dividing wall that runs from the base of the silo to a few metres below the underside of the silo roof. A deflector plate assembly (DPA) supported on two horizontal beams is located between the top of the dividing wall and the roof and allowed the waste to spread as it fell into the silo and prevent excessive mounding. Sellafield Ltd is currently engaged in an overall programme of works to remove the waste for storage within modern ILW containers. Prior to the commencement of these works the Deflector Plate Assemblies (DPA) and beam structures within the silos are required to be removed to allow access for the waste retrievals equipment through the side of the silo at the point where the DPAs are situated. James Fisher Nuclear (JFN) and Sellafield Ltd have developed a system using suspended water jet cutting equipment combined with custom long reach tooling, installed through penetrations made in the side of the silo, to enable the remote size reduction of the DPA and beams within each compartment. The use of a low pressure suspended water jet cutting system has enabled a single water/abrasive hose to be routed down a tool deployment pole and allowed long hose lengths up to 80 m from pump to nozzle enabling siting of equipment on a congested and difficult access site. The use of lightweight, yet high strength, carbon fibre poles within the tools has enabled the deployment of tool end effectors at distances of up to 6.5 m from the compartment walls using a relatively small 60 mm diameter pole. This maximised articulation of the pole within the 300 mm wall penetrations to reach all areas of the DPA. Capability of the operators to install the tooling and size reduce DPA and beam assemblies have been demonstrated through the training on a Full Scale Test Rig (FSTR). The FSTR was integral to the development of the equipment and techniques and to providing assurance to the client that the project was technically achievable given the tight building restraints and safety issues. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The effect of tumor size and location on efficacy and safety of US- and CT- guided percutaneous microwave ablation in renal cell carcinomas

Purpose: To evaluate the effect of size and central location of the tumor on safety and efficacy of percutaneous CEUS- and CT-guided MWA in biopsy-proven renal cell carcinomas (RCCs). Materials and methods: In this IRB-approved retrospective study, 69 biopsy-proven renal tumors in 56 patients, who underwent MWA in our institution from January 2013 to March 2017, were evaluated. Data collection included demographics, tumor characteristics, procedural protocols, and follow-up visits within 6 months post procedure. Primary outcomes were assessed by technical success (TS), local tumor progression (LTP), and complications. The Kaplan–Meier analysis was used for survival rate. Results: Overall technical success was achieved for all 69 lesions (92.8% primary TS, 100% overall). Median nephrometry score was 8 (4–11) and median tumor size was 2.5 cm (0.8–7). Five lesions which required second ablation had significantly higher median tumor size 4 cm (P = 0.039) with the same nephrometry score. Renal function remained stable with no significant change in eGFR before or after ablation. The LTP rate was 5.8%. The most recurrent tumors were clear cell (50%) followed by papillary tumors (25%). The complication rate was 5.8% with minor complications (hematoma and pain) and no major issues. There was no significant association between nephrometry score and technical success, recurrence, or complication rates. Overall and tumor-specific survival rates were 96.7% and 100% at 11.9 months. Conclusions: Image-guided MWA appears to be a safe and effective treatment regardless of nephrometry score and tumor location with high technical success, low recurrence, and complication rates.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Xe-100 Pebble Bed Small Modular Reactor: Solving Critical Challenges to Enable the Xe-100 Pebble Bed Advanced Reactor Concept (ARC) (Final Scientific and Technical Report)

This is the final progress report for the Department of Energy (DOE) – X Energy, LLC cooperative agreement DENE0008472. This report provides a high-level summary of the work performed during the entire period of performance, running from July 1, 2016 – June 30, 2022. This span of time covers the original 5-year award and a one year no-cost extension. There were four tasks within this project: (1) project management, (2) reactor design furtherance, (3) fuel development, and (4) Nuclear Regulatory Commission (NRC) engagement. Detailed reporting during execution of the project was provided by a total of 23 quarterly reports, 42 X-energy technical reports, and voluntary monthly update presentations. Other technical work products include 2 white papers and 2 Topical Report submitted to the Nuclear Regulatory Commission, 15 Potential Inventions documented, 4 patents issued, 3 patents pending, 8 peer reviewed journal articles, and 2 Oak Ridge National Laboratory Technical Manuscripts. All the X Energy milestones/deliverables were met early or on time and are archived in the DOE Office of Nuclear Energy’s Program Information Control System: Nuclear Energy under Fiscal Year 2016, Work Breakdown Structure 2.07 – X-Energy. All other work products are available to DOE upon request.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Utility-Scale Future, Continuum Magazine: Clean Energy Innovation at NREL, Spring 2011, Issue 1 Vol. 1

This quarterly magazine is dedicated to stepping beyond the technical journals to reveal NREL's vital work in a real-world context for our stakeholders. Continuum provides insights into the latest and most impactful clean energy innovations, while spotlighting those talented researchers and unique facilities that make it all happen. This edition focuses on creating a utility-scale future.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

WMU Power Generation Study Task 2.0 Corn Cob Co-Combustion Study: Final Report

Much attention has been focused on renewable energy use in large-scale utilities and very small scale distributed energy systems. However, there is little information available regarding renewable energy options for midscale municipal utilities. The Willmar Municipal Utilities Corn Cob-Coal Co-Combustion Project was initiated to investigate opportunities available for small to midscale municipal utilities to "go green". The overall goal of the Project was to understand the current renewable energy research and energy efficiency projects that are or have been implemented at both larger and smaller scale and determine the applicability to midscale municipal utilities. More specific objectives for Task 2.0 of this project were to determine the technical feasibility of co-combusting com cobs with coal in the existing WMU boiler, and to identify any regulatory issues that might need to be addressed if WMU were to obtain a significant portion of its heat from such co-combustion. This report addresses the issues as laid out in the study proposal. The study investigated the feasibility of and demonstrated the technical effectiveness of co-combusting corn cobs with coal in the Willmar Municipal Utilities stoker boiler steam generation power plant. The results of the WMU Co-Combustion Project will serve as a model for other midscale utilities who wish to use corn cobs to generate renewable electrical energy. As a result of the Co-Combustion Project, the WMU plans to upgrade their stoker boiler to accept whole corn cobs as well as other types of biomass, while still allowing the fuel delivery system to use 100% coal as needed. Benefits of co-combustion will include: energy security, reduced Hg and CO 2 air emissions, improved ash chemistry, potential future carbon credit sales, an immediate positive effect on the local economy, and positive attention focused on the WMU and the City of Willmar. The first step in the study was to complete a feasibility analysis. The feasibility analysis anticipated only positive results from the combustion of corn cobs with coal in the WMU power plant boiler, and therefore recommended that the project proceed. The study proceeded with a review of the existing WMU Power Plant configuration; cob fuel analyses; an application for an Air Quality Permit from the Minnesota Pollution Control Agency to conduct the co-combustion test burns; identification of and a site visit to a similar facility in Iowa; an evaluation of cob grinding machines; and agreements with a corn grower, a cob harvester, and the City of Willmar to procure, harvest, and store cobs. The WMU power plant staff constructed a temporary cob feed system whereby the cobs could be injected into the #3 Boiler firebox, at rates up to 40% of the boiler total heat input. Test burns were conducted, during which air emissions were monitored and fuel and ash samples analyzed. The results of the test burns indicated that the monitored flue gas quality improved slightly during the test burns. The WMU was able to determine that modifications to the #3 Boiler fuel feed system to accept com cobs on a permanent basis would be technically feasible and would enable the WMU to generate electricity from renewable fuels on a dispatchable basis.

09 BIOMASS FUELS↗

Coherent Elastic Neutrino Nucleus Scattering

Coherent Elastic Neutrino Nucleus Scattering (CENNS) has yet to be observed since its first prediction in 1974. The CENNS cross-section is precisely known in the Standard Model (SM). It is considerably larger than the other neutrino interaction channels at MeV energies. If measured at its predicted value, CENNS can be a very powerful tool for future neutrino oscillation experiments. Alternatively, any deviation from the very robust SM prediction could be a window to beyond-SM physics. The discovery of CENNS requires an intense source of low energy neutrinos, and a large-scale low energy threshold detector, both of which complement and build on existing programs at Fermilab. The Booster Neutrino Beamline (BNB) at Fermilab is a surprisingly powerful source of pion decay-at-rest ($\pi$DAR) neutrinos. The energy spectrum and flux of neutrinos in the backward direction (far-off-axis) of the BNB is excellent for a CENNS discovery measurement. At the closest practical location, the $\pi$DAR neutrino flux at BNB would be about a fifth of the neutrino flux of Spallation Neutron Source (SNS at Oak Ridge). The BNB site is preferable in almost every other aspect, however. First, the beam duty factor of BNB (2.5x10 -5 ) is about a factor of four better, which will help to reduce ambient backgrounds. Second, the potential experiment site, close to the BNB target, allows optimal placement of the detectors, with minimal sitting issues. The CENNS experiment would be completely parasitic to any running of the BNB. It would require no changes to the beamline, and place no additional requirements on the running mode or times. The $\pi$DAR neutrinos from the BNB are a by-product of running the beamline for MicroBooNE, and will be available for the foreseeable future. The CENNS detector would be a ton-scale single-phase Liquid Argon (LAr) detector, placed inside a water shield with an active cosmic ray veto. The low energy threshold and low background detector technology is already well developed thanks to work over the last decade in Dark Matter detector physics. Moreover, Fermilab is equipped with very strong technical and engineering resources in liquid argon detector development. One issue that must be addressed prior to the development of a full CENNS proposal is the question of whether the beam-related fast neutron background is low enough that it can be practically shielded.

Brice, S. J.↗

Development of Solar Grade (SoG) Silicon

The rapid growth of the photovoltaics (PV) industry is threatened by the ongoing shortage of suitable solar grade (SoG) silicon. Until 2004, the PV industry relied on the off spec polysilicon from the electronics industry for feedstock. The rapid growth of PV meant that the demand for SoG silicon predictably surpassed this supply. The long-term prospects for PV are very bright as costs have come down, and efficiencies and economies of scale make PV generated electricity ever more competitive with grid electricity. However, the scalability of the current process for producing poly silicon again threatens the future. A less costly, higher volume production technique is needed to supply the long-term growth of the PV industry, and to reduce costs of PV even further. This long-term need was the motivation behind this SBIR proposal. Upgrading metallurgical grade (MG) silicon would fulfill the need for a low-cost, large-scale production. Past attempts to upgrade MG silicon have foundered/failed/had trouble reducing the low segregation coefficient elements, B, P, and Al. Most other elements in MG silicon can be purified very efficiently by directional solidification. Thus, in the Phase I program, Crystal Systems proposed a variety of techniques to reduce B, P, and Al in MG silicon to produce a low cost commercial technique for upgrading MG silicon. Of the variety of techniques tried, vacuum refining and some slagging and additions turned out to be the most promising. These were pursued in the Phase II study. By vacuum refining, the P was reduced from 14 to 0.22 ppmw and the Al was reduced from 370 ppmw to 0.065 ppmw. This process was scaled to 40 kg scale charges, and the results were expressed in terms of half-life, or time to reduce the impurity concentration in half. Best half-lives were 2 hours, typical were 4 hours. Scaling factors were developed to allow prediction of these results to larger scale melts. The vacuum refining required the development of new crucibles, as well as liners and coatings to allow the vacuum to be achieved. These developments also hold the promise of lower cost ingot growth, because several of these developments led to a reusable crucible. Liners and coatings were tested on 37 runs, under a variety of conditions. Although many of these did not fulfill the requirements of the program, several were very successful, particularly in allowing the crucible to be reused several times. The most interesting result was with slags and additives used to reduce P and Al. Although slags have been much studied with little success in removing P and B effectively, certain modeling suggested a particular type of slagging might be effective. This was tried, and found to be highly effective for P and surprisingly effective for B, as well. The best results indicate that > 99% of the P was removed, and > 75% of the B was removed by a slagging treatment. An operability issue involving separation of the slag and silicon was the final technical problem preventing the full-scale use of this technique, and there has been progress on this front. A slagging/additive technique is highly promising, because the rates of equilibration are very high, and this is a rapid technique that scales very well to large volumes with little increase in time. Materials of containment and slag/metal separation are issues that are continuing to be developed.

14 SOLAR ENERGY↗

Overview of Variable Renewable Energy Regulatory Issues: A Clean Energy Regulators Initiative Report

This CERI report aims to provide an introductory overview of key regulatory issues associated with the deployment of renewable energy -- particularly variable renewable energy (VRE) sources such wind and solar power. The report draws upon the research and experiences from various international contexts, and identifies key ideas that have emerged from the growing body of VRE deployment experience and regulatory knowledge. The report assumes basic familiarity with regulatory concepts, and although it is not written for a technical audience, directs the reader to further reading when available. VRE deployment generates various regulatory issues: substantive, procedural, and public interest issues, and the report aims to provide an empirical and technical grounding for all three types of questions as appropriate.

14 SOLAR ENERGY↗

External Technical Reviews in the Environmental Management Program

The Environmental Management (EM) program believes strongly in reducing the technical risk of its projects and has initiated External Technical Reviews (ETR) as one of several steps to ensure the timely resolution of engineering and technology issues. EM's Office of Engineering and Technology is leading the ETR process and is working closely with Federal Project Directors to review such issues as technology development, systems integration, design, operations, maintenance, and nuclear safety. EM has completed several successful reviews using expert engineers and scientists from private industry and academia over the last two years. Additional external technical reviews will be conducted to support key project decisions and will be a mainstay of the EM program. The purpose of an ETR is to reduce technical risk and uncertainty. These independent reviews provide pertinent information for EM to assess technical risk associated with projects and develop strategies for reducing the technical risk, and provide technical information needed to support critical project decisions. Technical risk reduction increases the probability of successful implementation of technical scope. In general, an ETR assesses technical bases, technology development, and technical risk identification and handling strategies. The three key objectives of every ETR are: - To determine if the technology, process, system, or design under review will meet project objectives and requirements, - To identify any issues (show-stoppers) preventing successful implementation of the technology, process, system, or design under review, and - To identify issues or data needed to support critical or other project or program decisions. The specific objectives of ETRs may vary, but generally include: - Determining if technical objectives are well known and defined; - Determining if alternatives have been identified and effectively evaluated; - Determining if technology development is well planned and executed; - Determining the adequacy of quality assurance and scientific investigation; - Determining if technical bases are substantial and adequately documented; - Validating the technical basis and appropriateness of the technology, process, system, or design to technical risk reduction; - Determining if the technology can be deployed and implemented. In conclusion, ETRs have proven to be a valuable tool for reducing technical risk and uncertainty in EM projects. An ETR Process Guide is currently being developed that will provide a standard review and reporting process for all EM ETRs. EM plans to conduct ETRs in the future to support key project decisions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DECOVALEX-2019 (Task C Final Report)

The DECOVALEX Project is an on-going international research collaboration, established in 1992, to advance the understanding and modeling of coupled Thermal (T), Hydrological (H), Mechanical (M) and Chemical (C) processes in geological in geological systems. This document is the final report of Task C which was proposed and coordinated by the Japan Atomic Energy Agency (JAEA), presenting the technical definitions of the problems studied, approaches applied, achievements made and outstanding issues for future research. DECOVALEX-2019 Task C aims to develop modelling and prediction methods using numerical simulation based on the water-filling experiment to examine the post-driftclosure environment recovery processes. Three research teams, JAEA, Sandia National Laboratories in the United States (SNL), and the Technical University of Liberec in the Czech Republic (TUL) were challenged to simulate the observed environmental changes. The Task consisted of following three main steps. The simulation targets were the water pressure drawdown/recovery and the variation of water chemistry during the tunnel excavation and closure, as observed in the monitoring boreholes and the CTD.

58 GEOSCIENCES↗