Search NASA⌕ Search

SEARCH · Search NASA

Results for “Data Management Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,333 records · Page 74

Historical and projected future runoff over the Mekong River basin

The Mekong River (MR) crosses the borders and connects six countries, including China, Myanmar, Laos, Thailand, Cambodia, and Vietnam. It provides critical water resources and supports natural and agricultural ecosystems, socioeconomic development, and the livelihoods of the people living in this region. Understanding changes in the runoff of this important international river under projected climate change is critical for water resource management and climate change adaptation planning. However, research on long-term runoff dynamics for the MR and the underlying drivers of runoff variability remains scarce. Here, we analyse historical runoff variations from 1971 to 2020 based on runoff gauge data collected from eight hydrological stations along the MR. With these runoff data, we then evaluate the runoff simulation performance of five global hydrological models (GHMs) forced by four global climate models (GCMs) under the Inter-Sectoral Impact Model Intercomparison Project (ISIMIP). Furthermore, based on the best simulation combination, we quantify the impact of future climate change on river runoff changes in the MR. The result shows that the annual runoff in the MR has not changed significantly in the past 5 decades, while the establishment of dams and reservoirs in the basin visibly affected the annual runoff distribution. The ensemble-averaged result of the Water Global Assessment and Prognosis version 2 (WaterGAP2; i.e. GHM) forced by four GCMs has the best runoff simulation performance. Under Representative Concentration Pathways (RCPs; i.e. RCP2.6, RCP6.0 and RCP8.5), the runoff of the MR is projected to increase significantly (p<0.05); e.g. 3.81 ± 3.47 m 3 s -1 a -1 (9 ± 8 % increase in 100 years) at the upper reach under RCP2.6 and 16.36 ± 12.44 m 3 s -1 a -1 (13 ±10 % increase in 100 years) at the lower reach under RCP6.0. In particular, under the RCP6.0 scenario, the increase in annual runoff is most pronounced in the middle and lower reaches, due to increased precipitation and snowmelt. Under the RCP8.5 scenario, the runoff distribution in different seasons varies obviously, increasing the risk of flooding in the wet season and drought in the dry season.

54 ENVIRONMENTAL SCIENCES↗

Application of ERTS-1 imagery to state wide land information system in Minnesota

The author has identified the following significant results. To update and refine existing state-wide land resource information systems, the Minnesota State Planning Agency is assessing the feasibility of extracting resource information from ERTS-1 imagery. Work has centered on a comparative analysis of Minnesota Land Management Information System (MLMIS) and ERTS-1 land use classes. The associated problems of determining appropriate data cell size and optimal seasonal timing have also been addressed. Using ERTS-1 images, dominant land use is classified as follows: urban, forest, agriculture, extractive, transportation, water, and wetlands. Preliminary analysis suggests that with appropriate changes in operational definitions these general classes can be further refined for the benefit of MLMIS users. Additional detail appears most feasible extractive classes.

Sizer, J. E.↗

Real-time artificial intelligence issues in the development of the adaptive tactical navigator

Adaptive Tactical Navigation (ATN) is a laboratory prototype of a knowledge based system to provide navigation system management and decision aiding in the next generation of tactical aircraft. ATN's purpose is to manage a set of multimode navigation equipment, dynamically selecting the best equipment to use in accordance with mission goals and phase, threat environment, equipment malfunction status, and battle damage. ATN encompasses functions as diverse as sensor data interpretation, diagnosis, and planning. Real time issues that were identified in ATN and the approaches used to address them are addressed. Functional requirements and a global architecture for the ATN system are described. Decision making with time constraints are discussed. Two subproblems are identified; making decisions with incomplete information and with limited resources. Approaches used in ATN to address real time performance are described and simulation results are discussed.

Green, Peter E.↗

Advanced data management design for autonomous telerobotic systems in space using spaceborne symbolic processors

The use of computers in autonomous telerobots is reaching the point where advanced distributed processing concepts and techniques are needed to support the functioning of Space Station era telerobotic systems. Three major issues that have impact on the design of data management functions in a telerobot are covered. It also presents a design concept that incorporates an intelligent systems manager (ISM) running on a spaceborne symbolic processor (SSP), to address these issues. The first issue is the support of a system-wide control architecture or control philosophy. Salient features of two candidates are presented that impose constraints on data management design. The second issue is the role of data management in terms of system integration. This referes to providing shared or coordinated data processing and storage resources to a variety of telerobotic components such as vision, mechanical sensing, real-time coordinated multiple limb and end effector control, and planning and reasoning. The third issue is hardware that supports symbolic processing in conjunction with standard data I/O and numeric processing. A SSP that currently is seen to be technologically feasible and is being developed is described and used as a baseline in the design concept.

Goforth, Andre↗

Operational Methodology for the International Space Station (ISS) High Rate Communications Outage Recorder (HCOR)

The HCOR will be used onboard the ISS to record digital data during Ku-band Loss of Signal (LOS) periods. This recorded data will be played back to the ground during Ku-band Acquisition of Signal (AOS) periods. The Data Management (DM) Team at the Payload Operations and Integration Center is the primary operator of this complex recorder. The record and playback capabilities - along with the memory management functions - are presented in this paper. To illustrate how the DM Team plans to manage the record, playback and memory management tasks of operating the HCOR, an operational scenario for a ninety-minute orbit is presented.

Mixson, C. David↗

Mission planning and execution within the mission data system

Not only has the number of launched spacecraft per year exploded over the past few years, but also spacecraft are getting progressively more complex, as flyby missions give way to remote orbiters, which in turn give way to rovers and other in situ explorers. To address the software issues in this expanding mission set, JPL started the Mission Data System (MDS) project, an effort to make flight software engineering more straightforward and less prone to error through the eplicit modeling of spacecraft state. This paper presents how MDS performs mission planning and execution in the context of explicitly managing spacecraft state.

MDS↗

Lessons Learned Study Final Report for the Exploration Systems Mission Directorate

This report is the final product of a 90-day study performed for the Exploration Systems Mission Directorate. The study was to assemble lessons NASA has learned from previous programs that could help the Exploration Systems Mission Directorate pursue the Exploration vision. It focuses on those lessons that should have the greatest significance to the Directorate during the formulation of program and mission plans. The study team reviewed a large number of lessons learned reports and data bases, including the Columbia Accident Investigation Board and Rogers Commission reports on the Shuttle accidents, accident reports from robotic space flight systems, and a number of management reviews by the Defense Sciences Board, Government Accountability Office, and others. The consistency of the lessons, findings, and recommendations validate the adequacy of the data set. In addition to reviewing existing databases, a series of workshops was held at each of the NASA centers and headquarters that included senior managers from the current workforce as well as retirees. The full text of the workshop reports is included in Appendix A. A lessons learned website was opened up to permit current and retired NASA personnel and on-site contractors to input additional lessons as they arise. These new lessons, when of appropriate quality and relevance, will be brought to the attention of managers. The report consists of four parts: Part 1 provides a small set of lessons, called the Executive Lessons Learned, that represent critical lessons that the Exploration Systems Mission Directorate should act on immediately. This set of Executive Lessons and their supporting rationale have been reviewed at length and fully endorsed by a team of distinguished NASA alumni; Part 2 contains a larger set of lessons, called the Selected Lessons Learned, which have been chosen from the lessons database and center workshop reports on the basis of their specific significance and relevance to the near-term work of the Exploration Directorate. These lessons frequently support the Executive lessons but are more general in nature; Part 3 consists of the reports of the center workshops that were conducted as part of this activity. These reports are included in their entirety (approximately 200 pages) in Appendix G and have significance for specific managers; Part 4 consists of the remainder of the lessons that have been selected by this effort and assembled into a database for the use of the Explorations Directorate. The database is archived and hosted in the Lessons Learned Knowledge Network, which provides a flexible search capability using a wide variety of search terms. Finally, a spreadsheet lists databases searched and a bibliography identifies reports that have been reviewed as sources of lessons for this task. NASA has been presented with many learning opportunities. We have conducted numerous programs, some extremely successful and others total failures. Most have been documented with a formal lessons learned activity, but we have not always incorporated these learning opportunities into our normal modes of business. For example, the Robbins Report of 2001 clearly indicates that many project failures of the past two decades were the result of violating well documented best practices, often in direct violation of management instructions and directives. An overarching lesson emerges: that disciplined execution in accordance with proven best practices is the greatest single contributor to a successful program. The Lessons Learned task team offers a sincere hope that the lessons presented herein will be helpful to the Exploration Systems Directorate in charting and executing their course. The success of the Directorate and of NASA in general depends on our collective ability to move forward without having to relearn the lessons of those who have gone before.

Van Laak, Jim↗

Unmanned Aircraft Systems Traffic Management (UTM) Safely Enabling UAS Operations in Low-Altitude Airspace

Unmanned Aircraft System (UAS) Traffic Management (UTM) Enabling Civilian Low-Altitude Airspace and Unmanned Aircraft System Operations What is the problem? Many beneficial civilian applications of UAS have been proposed, from goods delivery and infrastructure surveillance, to search and rescue, and agricultural monitoring. Currently, there is no established infrastructure to enable and safely manage the widespread use of low-altitude airspace and UAS operations, regardless of the type of UAS. A UAS traffic management (UTM) system for low-altitude airspace may be needed, perhaps leveraging concepts from the system of roads, lanes, stop signs, rules and lights that govern vehicles on the ground today, whether the vehicles are driven by humans or are automated. What system technologies is NASA exploring? Building on its legacy of work in air traffic management for crewed aircraft, NASA is researching prototype technologies for a UAS Traffic Management (UTM) system that could develop airspace integration requirements for enabling safe, efficient low-altitude operations. While incorporating lessons learned from the today's well-established air traffic management system, which was a response that grew out of a mid-air collision over the Grand Canyon in the early days of commercial aviation, the UTM system would enable safe and efficient low-altitude airspace operations by providing services such as airspace design, corridors, dynamic geofencing, severe weather and wind avoidance, congestion management, terrain avoidance, route planning and re-routing, separation management, sequencing and spacing, and contingency management. One of the attributes of the UTM system is that it would not require human operators to monitor every vehicle continuously. The system could provide to human managers the data to make strategic decisions related to initiation, continuation, and termination of airspace operations. This approach would ensure that only authenticated UAS could operate in the airspace. In its most mature form, the UTM system could be developed using autonomicity characteristics that include self-configuration, self-optimization and self-protection. The self-configuration aspect could determine whether the operations should continue given the current andor predicted windweather conditions. NASA envisions concepts for two types of possible UTM systems. The first type would be a Portable UTM system, which would move from between geographical areas and support operations such as precision agriculture and disaster relief. The second type of system would be a Persistent UTM system, which would support low-altitude operations and provide continuous coverage for a geographical area. Either system would require persistent communication, navigation, and surveillance (CNS) coverage to track, ensure, and monitor conformance. What is NASA doing to test the technologies? NASA's near-term goal is the development and demonstration of a possible future UTM system that could safely enable low-altitude airspace and UAS operations. Working alongside many committed government, industry and academic partners, NASA is leading the research, development and testing that is taking place in a series of activities called Technology Capability Levels (TCL), each increasing in complexity. UTM TCL1 concluded field testing in August 2015 and is undergoing additional testing at an FAA site.

UTM Low-altitude↗

Eelgrass (Zostera marina L.) Restoration in Puget Sound: Development of a Site Suitability Assessment Process

The restoration of eelgrass (Zostera marina L.), a critical ecosystem component and ‘vital sign’ indicator of ecosystem health, is a high priority in Puget Sound, Washington, United States. In 2011, the state set a restoration target to increase eelgrass area by 4,200 ha, a 20%) increase over the present 21,500 ha by 2020. In a region as large and complex as Puget Sound, locating areas to restore eelgrass effectively and efficiently is challenging. We developed a modeling and screening process to identify and test potential restoration sites. The spatially explicit analysis of habitat suitability incorporated information from predictive models of hydrodynamics and eelgrass biomass, shoreline manager input, historical and current eelgrass area, substrate, stressors, test plantings, and monitoring of light, temperature, and survival. We evaluated 2,630 sites from which we identified 6,292 ha of highly to very highly suitable conditions for potential eelgrass habitat, which provides ample area for restoring eelgrass to meet the 20% target. Test plantings were successful at four of nine areas, and indicated significant site-specific data needs to improve predictive capability. We summarized the results of our analysis on maps of habitat suitability for the majority of the ~3,220 km of shoreline in Puget Sound, which serve as a starting point for restoration site selection and planning. Overall, our approach provides a foundation for identifying and testing potential restoration sites, and highlights information needs and potential management actions to reduce stressors and increase eelgrass cover to meet the challenging restoration goal.

eelgrass model, Puget Sound, restoration sites, Zo↗

Development of a Hydrogen Energy System as a Grid Frequency Management Tool

The Hawai‘i Natural Energy Institute (HNEI) is conducting research to assess the technical potential of using an electrolyzer-based hydrogen (H2) production and storage system as a grid demand response tool using battery data from a 200 MW grid to show the kind of response required. The hydrogen produced by the electrolyzer is used for transportation. A 65 kg/day hydrogen energy system (HES) consisting of a PEM electrolyzer, 35 bar buffer tank, 450 bar compressor, and associated chiller systems was purchased and installed at the Hawaii Natural Energy Laboratory Hawaii Authority (NELHA) to demonstrate long-term durability of the electrolyzer under cyclic operation required for frequency regulation on an island grid system. The excess hydrogen was stored for use by three fuel-cell buses to be operated at Hawai‘i Volcanoes National Park (HAVO) and by the County of Hawai‘i Mass Transit Agency (MTA). This paper describes the site selection and equipment commissioning, plus a comprehensive test plan that was developed to characterize the performance and durability of the electrolyzer under dynamic load conditions. The controls were modified for the operating envelope and dynamic limits of the electrolyzer. While the data showed these modifications significantly improved the system response time, it is not fast enough to match a BESS response time for grid frequency management. The electrolyzer can only be used for slower acting changes (1 to 0.5 Hz). A potential solution is to design an electrolyzer/BESS hybrid system and develop a modeling program to find the optimum mix of battery and electrolyzer to provide the maximum grid regulation services at minimum cost.

08 HYDROGEN↗

Calendar Year 2010 Groundwater Monitoring Report, U.S. Department Of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

This report contains the groundwater and surface water monitoring data that were obtained during calendar year (CY) 2010 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee. The CY 2010 monitoring data were obtained from wells, springs, and surface water sampling locations in three hydrogeologic regimes at Y-12 (Figure A.1). The Bear Creek Hydrogeologic Regime (Bear Creek Regime) encompasses a section of Bear Creek Valley (BCV) between the west end of Y-12 and the west end of the Bear Creek Watershed (directions are in reference to the Y-12 grid system). The Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime) encompasses the Y-12 industrial facilities and support structures in BCV. The Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime) encompasses a section of Chestnut Ridge directly south of Y-12. Section 2 of this report provides background information pertinent to groundwater and surface water quality monitoring in each hydrogeologic regime, including the topography and bedrock geology, surface water drainage, groundwater system, and extent of groundwater contamination. The CY 2010 groundwater and surface water monitoring data in this report were obtained from sampling and analysis activities implemented under the Y-12 Groundwater Protection Program (GWPP) managed by Babcock & Wilcox Technical Services Y-12, LLC (B&W Y-12) and from sampling and analysis activities implemented under several monitoring programs managed by Bechtel Jacobs Company LLC (BJC). Cooperative implementation of the monitoring programs directed by the Y-12 GWPP and BJC (i.e., coordinating sample collection and sharing data) ensures that the CY 2010 monitoring results fulfill requirements of all the applicable monitoring drivers with no duplication of sampling and analysis efforts. Section 3 of this report contains a summary of information regarding the groundwater and surface water sampling and analysis activities implemented under the Y-12 GWPP including sampling locations and frequency; quality assurance (QA)/quality control (QC) sampling; sample collection and handling; field measurements and laboratory analytes; data management and data quality objective (DQO) evaluation; and groundwater elevation monitoring. However, this report does not include equivalent QA/QC or DQO evaluation information regarding the groundwater and surface water sampling and analysis activities associated with the monitoring programs implemented by BJC. Such details are deferred to the respective programmatic plans and reports issued by BJC (see Section 3.0). Collectively, the groundwater and surface water monitoring data obtained during CY 2010 by the Y-12 GWPP and BJC address DOE Order 450.1A (Environmental Protection Program) requirements for monitoring groundwater and surface water quality in areas: (1) which are, or could be, affected by operations at Y-12 (surveillance monitoring); and (2) where contaminants from Y-12 are most likely to migrate beyond the boundaries of the ORR (exit pathway/perimeter monitoring). Section 4 of this report presents a summary evaluation of the monitoring data with regard to the respective objectives of surveillance monitoring and exit pathway/perimeter monitoring, based on the analytical results for the principal groundwater contaminants at Y-12: nitrate, uranium, volatile organic compounds (VOCs), gross alpha activity, and gross beta activity. Section 5 of this report summarizes the most pertinent findings regarding the principal contaminants, along with recommendations proposed for ongoing groundwater and surface water quality monitoring performed under the Y-12 GWPP.

54 ENVIRONMENTAL SCIENCES↗

The Pilot Land Data System: Report of the Program Planning Workshops

An advisory report to be used by NASA in developing a program plan for a Pilot Land Data System (PLDS) was developed. The purpose of the PLDS is to improve the ability of NASA and NASA sponsored researchers to conduct land-related research. The goal of the planning workshops was to provide and coordinate planning and concept development between the land related science and computer science disciplines, to discuss the architecture of the PLDs, requirements for information science technology, and system evaluation. The findings and recommendations of the Working Group are presented. The pilot program establishes a limited scale distributed information system to explore scientific, technical, and management approaches to satisfying the needs of the land science community. The PLDS paves the way for a land data system to improve data access, processing, transfer, and analysis, which land sciences information synthesis occurs on a scale not previously permitted because of limits to data assembly and access.

Source record↗

Ground Control Annual Plan for the Waste Isolation Pilot Plant (Rev. 9)

This Ground Control Annual Plan (GCAP) is a guidance document for short- and long-term planning for the Washington TRU Solutions LLC (WTS) underground ground control operations. Because ground conditions are dynamic, the data collected for the plan and the evaluation of these data are most useful when used or considered immediately after collection. Use of the data becomes more difficult and less certain with time. This plan is updated annually, and each successive document supersedes the previous document. The data, evaluations, and support plans may be updated more frequently. This document is not intended to be used as a final plan for construction. Detailed plans and work instructions are developed specifically for that purpose.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ground Control Annual Plan for the Waste Isolation Pilot Plant (Rev. 10)

This Ground Control Annual Plan (GCAP) is a guidance document for short- and long-term planning for the Washington TRU Solutions LLC (WTS) underground ground control operations. Because ground conditions are dynamic, the data collected for the plan and the evaluation of these data are most useful when used or considered immediately after collection. Use of the data becomes more difficult and less certain with time. This plan is updated annually, and each successive document supersedes the previous document. The data, evaluations, and support plans may be updated more frequently. This document is not intended to be used as a final plan for construction. Detailed plans and work instructions are developed specifically for that purpose.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NOVA-NREL Optimal Vehicle Acquisition Analysis (Brochure)

Federal fleet managers face unique challenges in accomplishing their mission - meeting agency transportation needs while complying with Federal goals and mandates. Included in these challenges are a variety of statutory requirements, executive orders, and internal goals and objectives that typically focus on petroleum consumption and greenhouse gas (GHG) emissions reductions, alternative fuel vehicle (AFV) acquisitions, and alternative fuel use increases. Given the large number of mandates affecting Federal fleets and the challenges faced by all fleet managers in executing day-to-day operations, a primary challenge for agencies and other organizations is ensuring that they are as efficient as possible in using constrained fleet budgets. An NREL Optimal Vehicle Acquisition (NOVA) analysis makes use of a mathematical model with a variety of fleet-related data to create an optimal vehicle acquisition strategy for a given goal, such as petroleum or GHG reduction. The analysis can helps fleets develop a vehicle acquisition strategy that maximizes petroleum and greenhouse gas reductions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

C-Band Airport Surface Communications System Standards Development, Phase I

This document is being provided as part of ITT's NASA Glenn Research Center Aerospace Communication Systems Technical Support (ACSTS) contract NNC05CA85C, Task 7: "New ATM Requirements--Future Communications, C-Band and L-Band Communications Standard Development." The proposed future C-band (5091- to 5150-MHz) airport surface communication system, referred to as the Aeronautical Mobile Airport Communications System (AeroMACS), is anticipated to increase overall air-to-ground data communications systems capacity by using a new spectrum (i.e., not very high frequency (VHF)). Although some critical services could be supported, AeroMACS will also target noncritical services, such as weather advisory and aeronautical information services as part of an airborne System Wide Information Management (SWIM) program. AeroMACS is to be designed and implemented in a manner that will not disrupt other services operating in the C-band. This report defines the AeroMACS concepts of use, high-level system requirements, and architecture; the performance of supporting system analyses; the development of AeroMACS test and demonstration plans; and the establishment of an operational AeroMACS capability in support of C-band aeronautical data communications standards to be advanced in both international (International Civil Aviation Organization, ICAO) and national (RTCA) forums. This includes the development of system parameter profile recommendations for AeroMACS based on existing Institute of Electrical and Electronics Engineering (IEEE) 802.16e- 2009 standards

Hall, Edward↗

Grand Valley Ecological Forecasting II: Forecasting Trends in Pinyon-Juniper and Sagebrush Habitat Relative to Wildfire, Drought, Beetle Disturbance, and Treatment Impact for Management Planning

Disturbances and landcover change in pinyon-juniper and sagebrush ecosystems are exacerbated by environmental conditions such as variability in climate characteristics. Our DEVELOP team partnered with the National Park Service (NPS) in Colorado National Monument and the Bureau of Land Management (BLM) in McInnis Canyons and Dominguez-Escalante National Conservation Areas to investigate disturbances to land cover. NPS partners were interested in identifying areas at risk of pinyon-juniper die-off or encroachment by invasive species. The BLM partners prioritized identifying areas suitable for fire reduction and prevention treatment. To address these concerns, we forecasted landcover change in the Grand Valley region of Colorado using NASA Earth observation data from Landsat 5 Thematic Mapper (TM), Landsat 7 Enhanced Thematic Mapper (ETM+), Landsat 8 Operational Land Imager (OLI), and Moderate Resolution Imaging Spectroradiometer (MODIS) aboard Terra and Aqua. We collected and analyzed these data in conjunction with Term I of this project. We found that the primary drivers of forecasted landcover change in the study area were aspect and elevation. Our forecasted land cover maps, created using the Idrisi TerrSet Land Change Modeler, indicated that by 2040, ecosystems within partner management areas will likely see tree encroachment on shrublands. These maps addressed the needs of our partners by showing potential habitat suitability trends, which will inform management planning.

Bill Curtiss↗

Modelling the Effects of Wetland Restoration on Coastal Hydrology: A Case Study of Elkhorn Slough Watershed, California

ABSTRACT Coastal wetlands, some of the most productive ecosystems on Earth, provide critical ecosystem services, including support of biodiversity, carbon sequestration and flood protection. In recent decades, these ecosystems have experienced extensive coastal wetland loss. Coastal wetland restoration provides a beacon of hope, offering a chance to reclaim these important habitats. However, even with billions of dollars invested worldwide in restoring coastal wetlands, we still lack comprehensive knowledge about the effectiveness of these restoration efforts in recovering wetland ecosystem functions and how future climate change may affect these efforts. The ability to evaluate how these ecosystems will function in the future is vital for examining current investments and developing future protection and management plans. We selected Elkhorn Slough, a tidal estuary, in California, to investigate the impact of wetland restoration and sea level rise (SLR) on coastal hydrology using the process‐based coastal hydrologic model, Advanced Terrestrial Simulator (ATS), informed by site‐specific data. We designed a novel modelling workflow for incorporating wetland restoration features into land cover and soil properties for the model parameterization. The validation results demonstrate a strong agreement between modelled and observed data. We studied the characteristics of coastal watershed hydrology, then focused on the surface water dynamics at two wetland sites within Elkhorn Slough, a reference site and a restored site. Our simulation results indicate that the restored site successfully maintains surface elevation, resulting in reduced surface inundation. We also examined the impact of wetland restoration under expected SLR over the next few decades. The low‐lying Yampah Marsh, the reference site, is likely to be inundated due to future SLR when highest tides arrive, while a higher percentage of Hester Marsh, the restored site, would retain marsh vegetation in coming decades, regardless of tidal conditions. Our study provides important information for examining the outcome of restoration practices that include surface elevation in tidal wetlands under climate changes.

advanced terrestrial simulator↗