Search NASA⌕ Search

SEARCH · Search NASA

Results for “Launch Processing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,333 records · Page 74

Initial Navigation Alignment of Optical Instruments on GOES-R

Post-launch alignment errors for the Advanced Baseline Imager (ABI) and Geospatial Lightning Mapper (GLM) on GOES-R may be too large for the image navigation and registration (INR) processing algorithms to function without an initial adjustment to calibration parameters. We present an approach that leverages a combination of user-selected image-to-image tie points and image correlation algorithms to estimate this initial launch-induced offset and calculate adjustments to the Line of Sight Motion Compensation (LMC) parameters. We also present an approach to generate synthetic test images, to which shifts and rotations of known magnitude are applied. Results of applying the initial alignment tools to a subset of these synthetic test images are presented. The results for both ABI and GLM are within the specifications established for these tools, and indicate that application of these tools during the post-launch test (PLT) phase of GOES-R operations will enable the automated INR algorithms for both instruments to function as intended.

geolocation↗

The Nimbus 6 data catalog. Volume 6: Data orbits 4339 through 5155

Satellite operations from launch through 14 July (orbit 425) consisted of engineering evaluation of all spacecraft systems. As a result of that effort, data reception, accountability and processing were intermittent during that period. During orbit 4905 (12 June), Nimbus 6 successfully completed one year operations. A summary of the documentation for each Nimbus 6 Data Catalog volume is presented. The pitch of the Nimbus 6 satellite has been made to alternate between +2.0 degrees, +0.6 degrees, and 0.0 degrees since launch. A positive pitch angle of 0.6 degrees moves the nadir-looking position 11.5 kilometers ahead of the subsatellite point. A positive pitch angle of 2.0 degrees moves the nadir-looking position 38.3 kilometers ahead of the subsatellite point. At these pitch angles, a scanner-type instrument no longer scans the earth along a great circle arc through the subpoint, but scans along the small circle formed by the intersection of the scan plane with the earth. Since the plane of the small circle is tilted with respect to the nominal scan plane, points on the arc are displaced farther from the great circle as the scan angle increases. As noted above, a pitch angle of 0.6 degrees causes a displacement of 11.5 kilometers at nadir, but when the scanner turns 45 degrees away from nadir the displacement increases slightly to 12.8 kilometers. Similarly, for a 2.0 degree pitch the displacement is 38.3 kilometers at nadir and increases to 42.6 kilometers at a 45 degree scan angle. Thus, although the instrument records in lines normal to the orbit plane (in the absence of yaw) the perpendicular displacement from the perfect-attitude scan line is not uniform across the scan line.

Source record↗

The Plankton, Aerosol, Cloud, Ocean Ecosystem (Pace) Mission Overview: From Concept to Launch

Abstract for Technical Review: The Plankton, Aerosol, Cloud, ocean Ecosystem (PACE) mission is a strategic climate continuity mission that was defined in the 2010 document Responding to the Challenge of Climate and Environmental Change: NASA’s Plan for Climate-Centric Architecture for Earth Observations and Applications from Space (referred to as the “Climate Initiative”). Launched in February 2024, the PACE mission represents NASA’s next investment in ocean biology, clouds, and aerosol data records. PACE will extend the high quality ocean ecological, ocean biogeochemical, cloud, and aerosol particle data records begun by NASA in the 1990s, building on the exceptional heritages of the Sea-Viewing Wide Field-of-View Sensor (SeaWiFS), the Moderate Resolution Imaging Spectroradiometer (MODIS), the Multi-angle Imaging SpectroRadiometer (MISR), and the Visible Infrared Imaging Radiometer Suite (VIIRS). NASA Headquarters directed the mission development and implementation to the NASA Goddard Space Flight Center (GSFC) with guidance to utilize a Design-to-Cost (DTC) process. Mission studies were conducted to define appropriate approaches within and across elements while maximizing science capabilities at a high cost confidence. Mission baseline requirements development is also embedded within the DTC process, as these requirements were not established at the onset of the mission concept development. The PACE project office at NASA’s GSFC was responsible for the satellite development, launch and commissioning. The NASA Headquarters PACE Program Science office is responsible for supporting the science data processing system and assembling competed community science teams, which includes field-based vicarious calibration and data product validation efforts to support the PACE Project Science team. The PACE observatory is comprised of three instruments, the Ocean Color Instrument (OCI) and two polarimeters, the Hyper-Angular Rainbow Polarimeter 2 (HARP2) and the Spectro-Polarimeter for Exploration (SPEXone) and the PACE spacecraft. The observatory has been commissioned and is performing on-orbit science data collection operations. Summary for Program: The Plankton, Aerosol, Cloud, ocean Ecosystem (PACE) mission is a strategic climate continuity mission that was defined in the 2010 document Responding to the Challenge of Climate and Environmental Change: NASA’s Plan for Climate-Centric Architecture for Earth Observations and Applications from Space (referred to as the “Climate Initiative”). Launched in February 2024 under the leadership of the NASA Goddard Space Flight Center (GSFC), the PACE mission represents NASA’s next investment in ocean biology, clouds, and aerosol data records. PACE will extend the high quality ocean ecological, ocean biogeochemical, cloud, and aerosol particle data records begun by NASA in the 1990s. The PACE observatory is comprised of the Ocean Color Instrument (OCI), the Hyper-Angular Rainbow Polarimeter 2 (HARP2) and the Spectro-Polarimeter for Exploration (SPEXone), along with the PACE spacecraft.

Robert H Estep, Jr↗

Mission Overview and Status from Concept to Launch

The Plankton, Aerosol, Cloud, ocean Ecosystem (PACE) mission is a strategic climate continuity mission that was defined in the 2010 document Responding to the Challenge of Climate and Environmental Change: NASA’s Plan for Climate-Centric Architecture for Earth Observations and Applications from Space (referred to as the “Climate Initiative”). Launched in February 2024, the PACE mission represents NASA’s next investment in ocean biology, clouds, and aerosol data records. PACE will extend the high quality ocean ecological, ocean biogeochemical, cloud, and aerosol particle data records begun by NASA in the 1990s, building on the exceptional heritages of the Sea-Viewing Wide Field-of-View Sensor (SeaWiFS), the Moderate Resolution Imaging Spectroradiometer (MODIS), the Multi-angle Imaging SpectroRadiometer (MISR), and the Visible Infrared Imaging Radiometer Suite (VIIRS). NASA Headquarters directed the mission development and implementation to the NASA Goddard Space Flight Center (GSFC) with guidance to utilize a Design-to-Cost (DTC) process. Mission studies were conducted to define appropriate approaches within and across elements while maximizing science capabilities at a high cost confidence. Mission baseline requirements development is also embedded within the DTC process, as these requirements were not established at the onset of the mission concept development. The PACE project office at NASA’s GSFC was responsible for the satellite development, launch and commissioning. The NASA Headquarters PACE Program Science office is responsible for supporting the science data processing system and assembling competed community science teams, which includes field-based vicarious calibration and data product validation efforts to support the PACE Project Science team. The PACE observatory is comprised of three instruments, the Ocean Color Instrument (OCI) and two polarimeters, the Hyper-Angular Rainbow Polarimeter 2 (HARP2) and the Spectro-Polarimeter for Exploration (SPEXone) and the PACE spacecraft. The observatory has been commissioned and is performing on-orbit science data collection operations. Summary for Program: The Plankton, Aerosol, Cloud, ocean Ecosystem (PACE) mission is a strategic climate continuity mission that was defined in the 2010 document Responding to the Challenge of Climate and Environmental Change: NASA’s Plan for Climate-Centric Architecture for Earth Observations and Applications from Space (referred to as the “Climate Initiative”). Launched in February 2024 under the leadership of the NASA Goddard Space Flight Center (GSFC), the PACE mission represents NASA’s next investment in ocean biology, clouds, and aerosol data records. PACE will extend the high quality ocean ecological, ocean biogeochemical, cloud, and aerosol particle data records begun by NASA in the 1990s. The PACE observatory is comprised of the Ocean Color Instrument (OCI), the Hyper-Angular Rainbow Polarimeter 2 (HARP2) and the Spectro-Polarimeter for Exploration (SPEXone), along with the PACE spacecraft.

Robby Estep↗

Development of a Modeling Framework to Support Control Investigations of Sailcraft Missions A First Cut: ABLE Sailcraft Dynamics Model

Solar Sailcraft, the stuff of dreams of the H.G. Wells generation, is now a rapidly maturing reality. The promise of unlimited propulsive power by harnessing stellar radiation is close to realization. Currently, efforts are underway to build, prototype and test two configurations. These sails are designed to meet a 20m sail requirement, under guidance of the In-Space Propulsion (ISP) technology program office at MSFC. While these sails will not fly , they are the first steps in improving our understanding of the processes and phenomena at work. As part of the New Millennium Program (NMP) the ST9 technology validation mission hopes to launch and fly a solar sail by 2010 or sooner. Though the Solar Sail community has been studying and validating various concepts over two decades, it was not until recent breakthroughs in structural and material technology, has made possible to build sails that could be launched. With real sails that can be tested (albeit under earth conditions), the real task of engineering a viable spacecraft has finally commenced. Since it is not possible to accurately or practically recreate the actual operating conditions of the sailcraft (zero-G, vacuum and extremely low temperatures), much of the work has focused on developing accurate models that can be used to predict behavior in space, and for sails that are 6-10 times the size of currently existing sails. Since these models can be validated only with real test data under "earth" conditions, the process of modeling and the identification of uncertainty due to model assumptions and scope need to be closely considered. Sailcraft models that exist currently, are primarily focused on detailed physical representations at the component level, these are intended to support prototyping efforts. System level models that cut across different sail configurations and control concepts while maintaining a consistent approach are non-existent. Much effort has been focused on the areas of thrust performance, solar radiation prediction, and sail membrane behavior vis-a-vis their reflective geometry, such as wrinkling/folding/furling as it pertains to thrust prediction. A parallel effort has been conducted on developing usable models for developing attitude control systems (ACS), for different sail configurations in different regimes. There has been very little by way of a system wide exploration of the impact of the various control schemes, thrust prediction models for different sail configurations being considered.

Sarathy, Sriprakash↗

Systems engineering and integration: Cost estimation and benefits analysis

Space Transportation Avionics hardware and software cost has traditionally been estimated in Phase A and B using cost techniques which predict cost as a function of various cost predictive variables such as weight, lines of code, functions to be performed, quantities of test hardware, quantities of flight hardware, design and development heritage, complexity, etc. The output of such analyses has been life cycle costs, economic benefits and related data. The major objectives of Cost Estimation and Benefits analysis are twofold: (1) to play a role in the evaluation of potential new space transportation avionics technologies, and (2) to benefit from emerging technological innovations. Both aspects of cost estimation and technology are discussed here. The role of cost analysis in the evaluation of potential technologies should be one of offering additional quantitative and qualitative information to aid decision-making. The cost analyses process needs to be fully integrated into the design process in such a way that cost trades, optimizations and sensitivities are understood. Current hardware cost models tend to primarily use weights, functional specifications, quantities, design heritage and complexity as metrics to predict cost. Software models mostly use functionality, volume of code, heritage and complexity as cost descriptive variables. Basic research needs to be initiated to develop metrics more responsive to the trades which are required for future launch vehicle avionics systems. These would include cost estimating capabilities that are sensitive to technological innovations such as improved materials and fabrication processes, computer aided design and manufacturing, self checkout and many others. In addition to basic cost estimating improvements, the process must be sensitive to the fact that no cost estimate can be quoted without also quoting a confidence associated with the estimate. In order to achieve this, better cost risk evaluation techniques are needed as well as improved usage of risk data by decision-makers. More and better ways to display and communicate cost and cost risk to management are required.

Dean, ED↗

Design Process of a Pressure Transducer Vibration Fixture

This paper details the iterative design cycle of a fixture used to mount two types of pressure transducers for vibration testing which allows for functional testing without the removal of the transducers. The objective of the fixture is to prove that the pressure transducers can survive vibrations induced during launch. This would increase the Technology Readiness Level of the pressure transducers which is a requirement for the Lunar Advanced Volatile Analysis subsystem preliminary design review. During the design process, additive manufacturing is considered as a manufacturing method of the fixture as a way to investigate the use of additive manufacturing for the final flight version of the Fluid Sub System manifold. It is ultimately shown that the added ability to perform functional testing and optimization for additive manufacturing made the fixture less than ideal for vibration testing. It is determined that the best option is to design and manufacture a traditional vibration fixture without the ability to perform functional testing of components while attached and a separate part to investigate the application of additive manufacturing to the Fluid Subsystem manifold.

Gilstrap, Andrew↗

The X-33 Flight Test Challenge

Low cost access to space has eluded present launch system technologies. Our objective is to reduce the cost of putting a payload into space from $10,000 per pound to $1000 per pound. In July 1996, a cooperative agreement was initiated between the Lockheed Martin Skunk Works and NASA to help accomplish this goal. The X-33 is the first step in the process to make low cost space access a reality. The X-33 is a suborbital, hypersonic lifting body, proof of concept of a reusable launch vehicle. The X-33 flight test program will validate technologies such as a metallic thermal protection system, Linear Aerospike Engines, use of tanks and struts as fundamental structural elements, as well as quick turnaround time. Flight testing will begin in July 2000, with launches originating from Edwards Air Force Base and initial landings at Michael Army Airfield in Utah. Data collected from these flight tests will aid in the decision to build an economically viable single stage to orbit reusable launch vehicle. This paper will explore the technical challenges facing the X-33 Flight Test Team.

Borden, David↗

Reliability and Probabilistic Risk Assessment - How They Play Together

PRA methodology is one of the probabilistic analysis methods that NASA brought from the nuclear industry to assess the risk of LOM, LOV and LOC for launch vehicles. PRA is a system scenario based risk assessment that uses a combination of fault trees, event trees, event sequence diagrams, and probability and statistical data to analyze the risk of a system, a process, or an activity. It is a process designed to answer three basic questions: What can go wrong? How likely is it? What is the severity of the degradation? Since 1986, NASA, along with industry partners, has conducted a number of PRA studies to predict the overall launch vehicles risks. Planning Research Corporation conducted the first of these studies in 1988. In 1995, Science Applications International Corporation (SAIC) conducted a comprehensive PRA study. In July 1996, NASA conducted a two-year study (October 1996 - September 1998) to develop a model that provided the overall Space Shuttle risk and estimates of risk changes due to proposed Space Shuttle upgrades. After the Columbia accident, NASA conducted a PRA on the Shuttle External Tank (ET) foam. This study was the most focused and extensive risk assessment that NASA has conducted in recent years. It used a dynamic, physics-based, integrated system analysis approach to understand the integrated system risk due to ET foam loss in flight. Most recently, a PRA for Ares I launch vehicle has been performed in support of the Constellation program. Reliability, on the other hand, addresses the loss of functions. In a broader sense, reliability engineering is a discipline that involves the application of engineering principles to the design and processing of products, both hardware and software, for meeting product reliability requirements or goals. It is a very broad design-support discipline. It has important interfaces with many other engineering disciplines. Reliability as a figure of merit (i.e. the metric) is the probability that an item will perform its intended function(s) for a specified mission profile. In general, the reliability metric can be calculated through the analyses using reliability demonstration and reliability prediction methodologies. Reliability analysis is very critical for understanding component failure mechanisms and in identifying reliability critical design and process drivers. The following sections discuss the PRA process and reliability engineering in detail and provide an application where reliability analysis and PRA were jointly used in a complementary manner to support a Space Shuttle flight risk assessment.

Safie, Fayssal M.↗

Future timing accuracy requirements and procedures for data processing

Timing accuracy requirements for satellite experiment data are discussed. Although time accuracies of 100 milliseconds were sufficient when OSO-3, 4, 5 were launched in the mid-60s, time accuracies of 100 microseconds are necessary for OSO-8, HEAO-A, and Seasat, and it is thought likely that accuracies of 10 microseconds will become routine in the 1980s. An approach to the problem of identifying the sources of spacecraft timing errors - from the onboard counters to the final tagging of data - is considered.

Smith, G. A.↗

Friction Plug Welding of 2195 Al-Cu-Li for Manned Space Launch Vehicles

Friction Plug Welding (FPW) is currently being studied for use on the Space Transportation System's Super Light weight External Tank. This process has demonstrated the potential to solve on of Al-Li 2195's most challenging aspects repair welding. The current weld repair process is successful, but is labor intensive and inconsistent. Technology advances in FPW and tooling designs will be presented. The results of plug welding optimization, production implementation, considerations and cost benefit analysis are discussed. Among the tests to be discussed are tensile, surface crack tension, simulated service, liquid oxygen compatibility results and methods of repairing plug repairs. Tool design, computerized process control equipment and database record retention and analyses may also be addressed.

Takeshita, Riki P.↗

Launch Architecture Impact on Ascent Abort and Crew Survival

A study was performed to assess the effect of booster configuration on the ascent abort process. A generic abort event sequence was created and booster related risk drivers were identified. Three model boosters were considered in light of the risk drivers: a solid rocket motor configuration, a side mount combination solid and liquid configuration, and a stacked liquid configuration. The primary risk drivers included explosive fireball, overpressure, and fragment effects and booster-crew module re-contact. Risk drivers that were not specifically booster dependent were not addressed. The solid rocket configuration had the most benign influence on an abort while the side mount architecture provided the most challenging abort environment.

Mathias, Donovan L.↗

A Strategy to Integrate Probabilistic Risk Assessment into Design and Development Processes for Aerospace Based pon Mars Exploration Rover Experiences

This paper will discuss the Probabilistic Risk Assessment (PRA) effort and its involvement with related activities during the development of the Mars Exploration Rover (MER). The Rovers were launched 2003.June.10 (Spirit) and 2003.July.7 (Opportunity), and both have proven very successful. Although designed for a 90-day mission, the Rovers have been operating for over two earth years. This paper will review aspects of how the MER project integrated PRA into the design and development process. A companion paper (Development of the Mars Exploration Rover PRA) will describe the MER PRA and design changes from those results.

Probabilistic Risk Assessment (PRA)↗

Anvil Tool in the Advanced Weather Interactive Processing System

Meteorologists from the 45th Weather Squadron (45 WS) and Spaceflight Meteorology Group (SMG) have identified anvil forecasting as one of their most challenging tasks when predicting the probability of violations of the lightning Launch Commit Criteria and Space Shuttle Flight Rules. As a result, the Applied Meteorology Unit (AMU) created a graphical overlay tool for the Meteorological Interactive Data Display Systems (MIDDS) to indicate the threat of thunderstorm anvil clouds, using either observed or model forecast winds as input. In order for the Anvil Tool to remain available to the meteorologists, the AMU was tasked to transition the tool to the Advanced Weather interactive Processing System (AWIPS). This report describes the work done by the AMU to develop the Anvil Tool for AWIPS to create a graphical overlay depicting the threat from thunderstorm anvil clouds. The AWIPS Anvil Tool is based on the previously deployed AMU MIDDS Anvil Tool. SMG and 45 WS forecasters have used the MIDDS Anvil Tool during launch and landing operations. SMG's primary weather analysis and display system is now AWIPS and the 45 WS has plans to replace MIDDS with AWIPS. The Anvil Tool creates a graphic that users can overlay on satellite or radar imagery to depict the potential location of thunderstorm anvils one, two, and three hours into the future. The locations are based on an average of the upper-level observed or forecasted winds. The graphic includes 10 and 20 nm standoff circles centered at the location of interest, in addition to one-, two-, and three-hour arcs in the upwind direction. The arcs extend outward across a 30 degree sector width based on a previous AMU study which determined thunderstorm anvils move in a direction plus or minus 15 degrees of the upper-level (300- to 150-mb) wind direction. This report briefly describes the history of the MIDDS Anvil Tool and then explains how the initial development of the AWIPS Anvil Tool was carried out. After testing was performed by SMG, 45 WS, and AMU, a number of needed improvements were identified. A bug report document was created that showed the status of each bug and desired improvement. This report lists the improvements that were made to increase the accuracy and user-friendliness of the tool. Final testing was carried out and documented and then the final version of the software and Users Guide was provided to SMG and the 45 WS. Several possible future improvements to the tool are identified that would increase the flexibility of the tool. This report contains a brief history of the development of the Anvil Tool in MIDDS, and then describes the transition and development of software to AWIPS.

Barrett, Joe, III↗

Standard Materials and Processes Requirements for Spacecraft

This NASA Technical Standard is directed toward materials and processes (M&P) used in the design, fabrication, and testing of space program flight hardware for NASA, including but not limited to crewed, uncrewed, robotic, launch vehicle, lander, in-space and surface systems, and spacecraft program/project hardware elements. All spaceflight hardware is covered by the M&P requirements of this document, including vendor-designed, off-the-shelf, and vendor-furnished items. M&P used in interfacing ground support equipment (GSE), test equipment, hardware processing equipment, hardware packaging, and hardware shipment is covered by the M&P requirements of this NASA Technical Standard only to the extent required to prevent damage to or contamination of spaceflight hardware (see section 4). M&P used in NASA aircraft and aircraft operations are not covered by the M&P requirements of this document.

Materials↗

Detonation on a tabletop: Nitromethane with high time and space resolution

Nitromethane (NM), a flammable liquid, has been a model system for the shock-to-detonation transition in homogeneous condensed-phase explosives for over 50 years, but we do not understand the fast processes at the molecular scale in the detonation front at the molecular scale. That is largely because prior studies triggered detonations in bomb-sized charges with input shock durations and times-to detonation that were typically microseconds, which made it impossible to observe the faster processes in real time. Here, we studied NM shocked with 4 ns duration input pulses using a tabletop apparatus with laser-launched flyer plates and arrays of tiny disposable optical cuvettes, where the pressure and temperature were probed in real time (1 ns) with photon Doppler velocimetry, optical pyrometry, and high-speed video. Using a 4 ns shock with an input pressure close to the von Neumann spike pressure of 19 GPa, we achieved the minimum time-to-detonation, about 12 ns, where the time-to-detonation is controlled by fundamental molecular processes. We demonstrated the reproducibility of our detonations and showed that they had the same properties as in bomb-sized charges: our detonation velocity, von Neumann spike and Chapman-Jouguet pressures, temperatures, and reaction zone lengths were the same as in bomb-sized charges. Being able to trigger realistic reproducible detonations from a short pulse makes it possible to investigate molecular and fluid dynamics in the detonation by measuring transient responses in real time. Lastly, we found that it took 6 ns for the temperature to reach 3430 K. The high pressure was observed at about 8 ns, when there was a volume explosion to nearly twice the von Neumann spike pressure before settling down to a steady detonation .

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Embodied Carbon Reduction in New Construction: Reference Guide

The U.S. Department of Energy launched the Advanced Building Construction (ABC) Initiative in 2019 to modernize and streamline building renovation and construction processes that facilitate the integration of high-performance and low-carbon solutions in the U.S. building stock. There are four attributes of ABC that are the focus of the Initiative: affordable, fast, appealing, and low carbon. Substantial improvements have been made to reduce operational carbon emissions of buildings through efficiency and electrification. However, to achieve low-carbon new construction buildings, increased efforts to reduce the embodied carbon of buildings are needed. Embodied carbon emissions in buildings come primarily from the manufacturing of building envelope materials such as concrete, steel, lumber, and glass, among others. Recent studies show that construction and renovation of buildings account for 5% of energy use and 10% of carbon emissions globally.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Mission Control Center (MCC) System Specification for the Shuttle Orbital Flight Test (OFT) Timeframe

System specifications to be used by the mission control center (MCC) for the shuttle orbital flight test (OFT) time frame were described. The three support systems discussed are the communication interface system (CIS), the data computation complex (DCC), and the display and control system (DCS), all of which may interfere with, and share processing facilities with other applications processing supporting current MCC programs. The MCC shall provide centralized control of the space shuttle OFT from launch through orbital flight, entry, and landing until the Orbiter comes to a stop on the runway. This control shall include the functions of vehicle management in the area of hardware configuration (verification), flight planning, communication and instrumentation configuration management, trajectory, software and consumables, payloads management, flight safety, and verification of test conditions/environment.

Source record↗