Remediation of 130 mSv/hr. Soil Contamination Under a Hot Cell - 17301
Department of Energy (DOE) contractor CH2M HILL Plateau Remediation Company (CH2M) is currently engineering a system to safely remove and dispose of highly contaminated soil underneath Building 324 located adjacent to the Columbia River on the Hanford Site in Washington State. Cleaning up the waste site will allow for the eventual demolition of the building, which is a top priority for DOE and CH2M due to the proximity of the Columbia River and City of Richland. Building 324 at Hanford was originally constructed in 1966 and was operated for a number of years serving various missions. One of the missions involved development of treatment processes for liquid high activity waste. As of result of one particular mission, liquid high activity waste was spilled in one of the building's hot cells (known as 'B' Cell) and the liquid leaked from a breach in a sump and through construction joints in the hot cell floor and into the soil. Sampling efforts using borehole technology revealed significant under-building contamination with dose rates measuring has high as 130 mSv/hr (13,000 R/hr.). The Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) between the Washington State, Department of Ecology (Ecology), the U.S. Environmental Protection Agency and the DOE has established a 2021 milestone for demolition and removal of the Building 324. Before building demolition can be undertaken, the highly contaminated soil must be removed from beneath the hot cell while the hot cell structure remains in place to provide shielding and containment during the soil remediation. CH2M will fabricate and install remotely operated equipment that will remove debris and grout in the cell, the floor of the hot cell, and the contaminated soil beneath the hot cell and package that soil for disposal. To ensure that the structure remains intact and does not shift during soil removal, support for the building structure must also be constructed as a prerequisite for the planned work. CH2M will use a full-scale mock-up of the Building 324 B Cell and airlock area to assist in the testing of the remotely operated equipment and the training of the soil removal team in a contamination-free environment to ensure efficient and safe performance of the challenging work of the project. (authors)