Search NASA⌕ Search

SEARCH · Search NASA

Results for “Mix Testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,333 records · Page 74

Protable Analyzer Based on Microfluidic/Nanoengineered electrochemical Sensors for in Situ Characterization of Mixed Wastes

This project aimed on the development of compact microchip sensing devices for on-site monitoring of pollutants in contaminated DOE sites. As described in this report, we have made a substantial progress, and introduced effective routes for improving the on-site detection of toxic metals and for interfacing microfluidic (Lab-on-Chip) sensing devices with the real world. This activity has been very productive and has already been described in 12 research papers (published in major international journals). The resulting microchip sensor technology should allow testing for toxic metals and other major pollutants to be performed more rapidly, inexpensively, and reliably in a field setting. These new analytical capabilities resulted from the generous DOE support will facilitate the characterization and remediation of mixed waste contaminated sites.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ultem((R))/ZIF-8 mixed matrix hollow fiber membranes for CO2/N-2 separations

Organic-inorganic hybrid (mixed matrix) membranes can potentially extend the separation performance of traditional polymeric materials while maintaining processing convenience. Although many dense films studies have been reported, there have been few reported cases of these materials being successfully extended to asymmetric hollow fibers. In this work we report the first successful production of mixed matrix asymmetric hollow fiber membranes containing metal-organic-framework (MOF) ZIF-8 fillers. Specifically, we have incorporated ZIF-8 into a polyetherimide (Ultem((R)) 1000) matrix and produced dual-layer asymmetric hollow fiber membranes via the dry jet-wet quench method. The outer separating layer of these composite fibers contains 13 wt% (17 vol%) of ZIF-8 filler. These membranes have been tested over a range of temperatures and pressures for a variety of gas pairs. An increase in separation performance for the CO2/N-2 gas pairs was observed for both pure gas and mixed gas feeds. (C) 2012 Elsevier B.V. All rights reserved.

Dai, Y↗

NEW MATERIALS DEVELOPED TO MEET REGULATORY AND TECHNICAL REQUIREMENTS ASSOCIATED WITH IN-SITU DECOMMISSIONING OF NUCLEAR REACTORS AND ASSOCIATED FACILITIES

For the 2010 ANS Embedded Topical Meeting on Decommissioning, Decontamination and Reutilization and Technology, Savannah River National Laboratory's Mike Serrato reported initial information on the newly developed specialty grout materials necessary to satisfy all requirements associated with in-situ decommissioning of P-Reactor and R-Reactor at the U.S. Department of Energy's Savannah River Site. Since that report, both projects have been successfully completed and extensive test data on both fresh properties and cured properties has been gathered and analyzed for a total of almost 191,150 m{sup 3} (250,000 yd{sup 3}) of new materials placed. The focus of this paper is to describe the (1) special grout mix for filling the P-Reactor vessel (RV) and (2) the new flowable structural fill materials used to fill the below grade portions of the facilities. With a wealth of data now in hand, this paper also captures the test results and reports on the performance of these new materials. Both reactors were constructed and entered service in the early 1950s, producing weapons grade materials for the nation's defense nuclear program. R-Reactor was shut down in 1964 and the P-Reactor in 1991. In-situ decommissioning (ISD) was selected for both facilities and performed as Comprehensive Environmental Response, Compensations and Liability Act actions (an early action for P-Reactor and a removal action for R-Reactor), beginning in October 2009. The U.S. Department of Energy concept for ISD is to physically stabilize and isolate intact, structurally robust facilities that are no longer needed for their original purpose of producing (reactor facilities), processing (isotope separation facilities), or storing radioactive materials. Funding for accelerated decommissioning was provided under the American Recovery and Reinvestment Act. Decommissioning of both facilities was completed in September 2011. ISD objectives for these CERCLA actions included: (1) Prevent industrial worker exposure to radioactive or hazardous contamination exceeding Principal Threat Source Material levels; (2) Minimize human and ecological exposure to unacceptable risk associated with radiological and hazardous constituents that are or may be present; (3) Prevent to the extent practicable the migration of radioactive or hazardous contaminants from the closed facility to the groundwater so that concentrations in groundwater do not exceed regulatory standards; (4) Eliminate or control all routes of human exposure to radiological and chemical contamination; and (5) Prevent animal intruder exposure to radioactive and hazardous contamination.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Temperature control in a 30 stage, 5-cm Centrifugal Contactor Pilot Plant

Temperature profile testing was performed using a 30 stage 5-cm centrifugal contactor pilot plant. These tests were performed to evaluate the ability to control process temperature by adjusting feed solution temperatures. This would eliminate the need for complex jacketed heat exchanger installation on the centrifugal contactors. Thermocouples were installed on the inlet and outlets of each stage, as well as directly in the mixing zone of several of the contactor stages. Lamp oil, a commercially available alkane mixture of C14 to C18 chains, and tap water adjusted to pH 2 with nitric acid were the solution feeds for the temperature profile testing. Temperature data profiles for an array of total throughputs and contactor rpm values for both single-phase and two-phase systems were collected with selected profiles. The total throughput ranged from 0.5-1.4 L/min with rotor speeds from 3500-4000 rpm. Inlet solution temperatures ranging from ambient up to 50 °C were tested. Results of the two-phase temperature profile testing are detailed

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Algorithm and exploratory study of the Hall MHD Rayleigh-Taylor instability.

This report is concerned with the influence of the Hall term on the nonlinear evolution of the Rayleigh-Taylor (RT) instability. This begins with a review of the magnetohydrodynamic (MHD) equations including the Hall term and the wave modes which are present in the system on time scales short enough that the plasma can be approximated as being stationary. In this limit one obtains what are known as the electron MHD (EMHD) equations which support two characteristic wave modes known as the whistler and Hall drift modes. Each of these modes is considered in some detail in order to draw attention to their key features. This analysis also serves to provide a background for testing the numerical algorithms used in this work. The numerical methods are briefly described and the EMHD solver is then tested for the evolution of whistler and Hall drift modes. These methods are then applied to study the nonlinear evolution of the MHD RT instability with and without the Hall term for two different configurations. The influence of the Hall term on the mixing and bubble growth rate are analyzed.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

3-D simulations to investigate initial condition effects on the growth of Rayleigh-Taylor mixing

The effect of initial conditions on the growth rate of turbulent Rayleigh-Taylor (RT) mixing has been studied using carefully formulated numerical simulations. An integrated large-eddy simulation (ILES) that uses a finite-volume technique was employed to solve the three-dimensional incompressible Euler equations with numerical dissipation. The initial conditions were chosen to test the dependence of the RT growth parameters ({alpha}{sub b}, {alpha}{sub s}) on variations in (a) the spectral bandwidth, (b) the spectral shape, and (c) discrete banded spectra. Our findings support the notion that the overall growth of the RT mixing is strongly dependent on initial conditions. Variation in spectral shapes and bandwidths are found to have a complex effect of the late time development of the RT mixing layer, and raise the question of whether we can design RT transition and turbulence based on our choice of initial conditions. In addition, our results provide a useful database for the initialization and development of closures describing RT transition and turbulence.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Hanford Double Shell Waste Tank Corrosion Studies (Final Report FY2018)

For FY18, Savannah River National Laboratory (SRNL) focused on four main tasks in its study of corrosion of Hanford Double-Shell Tanks (DSTs). The New Limits task focused on the development of a pitting factor as a localized corrosion predictor. Electrochemical experiments were directed towards pitting factors between 1 and 2 (i.e., borderline conditions) and separating the effects of chloride and fluoride in the pitting factor equation. In addition, long term immersion testing experiments with partial and completely immersed coupons in solutions with a wide range of pitting factors were tested. Secondary liner studies continued this year with a new vapor corrosion inhibition (VCI) strategy in which ground water (GW) simulants at a specified concentration of commercial VCI were mixed. The specific concentrations were recommended by Cortec® and was compared with similar concentration of GW with calcium carbonate. The anodic drift task utilized a simulant corresponding to AN-107 waste tank chemistry. The chemistry was studied with three different surface conditions: mill-scale, partial mill-scale and ground to 600 grit to study the impact of different surfaces on the potential drift. The final task was focused on ammonia concentration determination of a vapor space corrosion (VSC) test vessel using Quartz-Enhanced Photoacoustic Spectroscopy (QEPAS) detector. A summary of each task is presented below.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Standard High Solids Vessel Design Non-Newtonian Simulant Qualification

The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is working to develop a Standard High Solids Vessel Design process vessel. To support testing of this new design, WTP engineering staff requested that a non-Newtonian simulant be developed that would represent the Most Adverse Design Condition (MADC), denoted as MADC-4, with respect to mixing performance as specified by WTP. The majority of the simulant requirements are specified in 24590-PTF-RPT-PE-16-001, Rev. 0, and a discussion of suggested non-Newtonian rheological parameters for the simulant was provided in WTP RPT-241, Rev. 0. This document describes the simulant composition that will satisfy the basis requirement along with ancillary testing to assess the rheological behavior of the simulant depending on the formulation approach used, simulant aging, and the effects of dilution. From this data, a simulant recipe to meet the basis is recommended. The simulant recipe was designed to meet a target rheology (as expressed by Bingham model parameters) of 34.5 ± 1.5 Pa [yield stress] and 33.5 ±1.5 cP [consistency] at 25 °C.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of dose prediction errors and optimization convergence errors of deliverable-based head-and-neck IMRT plans computed with a superposition/convolution dose algorithm

The purpose of this study is to evaluate dose prediction errors (DPEs) and optimization convergence errors (OCEs) resulting from use of a superposition/convolution dose calculation algorithm in deliverable intensity-modulated radiation therapy (IMRT) optimization for head-and-neck (HN) patients. Thirteen HN IMRT patient plans were retrospectively reoptimized. The IMRT optimization was performed in three sequential steps: (1) fast optimization in which an initial nondeliverable IMRT solution was achieved and then converted to multileaf collimator (MLC) leaf sequences; (2) mixed deliverable optimization that used a Monte Carlo (MC) algorithm to account for the incident photon fluence modulation by the MLC, whereas a superposition/convolution (SC) dose calculation algorithm was utilized for the patient dose calculations; and (3) MC deliverable-based optimization in which both fluence and patient dose calculations were performed with a MC algorithm. DPEs of the mixed method were quantified by evaluating the differences between the mixed optimization SC dose result and a MC dose recalculation of the mixed optimization solution. OCEs of the mixed method were quantified by evaluating the differences between the MC recalculation of the mixed optimization solution and the final MC optimization solution. The results were analyzed through dose volume indices derived from the cumulative dose-volume histograms for selected anatomic structures. Statistical equivalence tests were used to determine the significance of the DPEs and the OCEs. Furthermore, a correlation analysis between DPEs and OCEs was performed. The evaluated DPEs were within {+-}2.8% while the OCEs were within 5.5%, indicating that OCEs can be clinically significant even when DPEs are clinically insignificant. The full MC-dose-based optimization reduced normal tissue dose by as much as 8.5% compared with the mixed-method optimization results. The DPEs and the OCEs in the targets had correlation coefficients greater than 0.71, and there was no correlation for the organs at risk. Because full MC-based optimization results in lower normal tissue doses, this method proves advantageous for HN IMRT optimization.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

A path towards uncertainty assignment in an operational cloud-phase algorithm from ARM vertically pointing active sensors

Abstract. Knowledge of cloud phase (liquid, ice, mixed, etc.) is necessary to describe the radiative impact of clouds and their lifetimes, but is a property that is difficult to simulate correctly in climate models. One step towards improving those simulations is to make observations of cloud phase with sufficient accuracy to help constrain model representations of cloud processes. In this study, we outline a methodology using a basic Bayesian classifier to estimate the probabilities of cloud-phase class from Atmospheric Radiation Measurement (ARM) vertically pointing active remote sensors. The advantage of this method over previous ones is that it provides uncertainty information on the phase classification. We also test the value of including higher moments of the cloud radar Doppler spectrum than are traditionally used operationally. Using training data of known phase from the Mixed-Phase Arctic Cloud Experiment (M-PACE) field campaign, we demonstrate a proof of concept for how the method can be used to train an algorithm that identifies ice, liquid, mixed phase, and snow. Over 95 % of data are identified correctly for pure ice and liquid cases used in this study. Mixed-phase and snow cases are more problematic to identify correctly. When lidar data are not available, including additional information from the Doppler spectrum provides substantial improvement to the algorithm. This is a first step towards an operational algorithm and can be expanded to include additional categories such as drizzle with additional training data.

54 ENVIRONMENTAL SCIENCES↗

Strategies for obtaining long constant-pressure test times in shock tubes

Several techniques have been developed for obtaining long, constant-pressure test times in reflected shock wave experiments in a shock tube, including the use of driver inserts, driver gas tailoring, helium gas diaphragm interfaces, driver extensions, and staged driver gas filling. Here, we detail these techniques, including discussion on the most recent strategy, staged driver gas filling. Experiments indicate that this staged filling strategy increases available test time by roughly 20 % relative to single-stage filling of tailored driver gas mixtures, while simultaneously reducing the helium required per shock by up to 85 %. This filling scheme involves firstly mixing a tailored helium–nitrogen mixture in the driver section as in conventional driver filling and, secondly, backfilling a low-speed-of-sound gas such as nitrogen or carbon dioxide from a port close to the end cap of the driver section. Using this staged driver gas filling, in addition to the other techniques listed above, post-reflected shock test times of up to 0.102 s (102 ms) at 524 K and 1.6 atm have been obtained. Spectroscopically based temperature measurements in non-reactive mixtures have confirmed that temperature and pressure conditions remain constant throughout the length of these long test duration trials. Finally, these strategies have been used to measure low-temperature n-heptane ignition delay times.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

The Cost and Benefit of Enhancing Cybersecurity for Hybrid AC/DC Grids

As critical interfaces of AC grids and DC grids inside a hybrid AC/DC grid, the voltage-sourced-converter (VSC) has been demonstrated to be vulnerable to false data injection (FDI) cyber-attacks. As a result, the cyber-attack-induced AC grid frequency deviations and DC grid voltage deviations threaten the secure operation. Here, to enhance cybersecurity in a not only feasible but also cost-effective manner, this paper proposes a cost-benefit-based cyber-defense strategy for a hybrid AC/DC grid. First, this paper establishes a spatial-temporal dual cyber-attack evaluation model, in which the cyber-attack-induced frequency and voltage deviations are modelled in both a spatially and temporally dual manner. Then, the proposed cost-benefit-based cyber-defense strategy is modelled as a VSC commitment problem to achieve the trade-off between maximizing the cyber-defense benefits and minimizing the cyber-defense costs. The VSC commitment problem is then mathematically convexified into a mixed-integer second-order cone programming (MISOCP) problem, which could be efficiently solved in an event-triggered manner against unfolding cyber-attack events. Simulation results on a test hybrid AC/DC grid verified the feasibility and the cost-effectiveness of the proposed cyber-defense strategy.

cost-benefit analysis↗

Effective restoration strategies of interdependent power system and communication network

The power system is continuously evolving towards a smarter grid by adding intelligent electrical devices that leverage communication technologies to provide visualisation, control and automation. The integration of power system and communication network has brought challenges into the resilience of interdependent networks. Following an outage or blackout, system operators cannot only restore one network while simply ignoring the interconnection with the other network. Effective restoration strategies that involve co‐ordination between power system and communication network have become critical in enhancing the resilience. An optimisation‐based restoration strategy is developed to coordinate the restoration actions between two networks. The problem is modelled as a mixed integer linear programming problem, with the objective of activating every node in both networks with the minimum number of activation/energisation of branches. The developed strategies are tested on the modified IEEE 14‐bus system incorporating communication network. Simulation results demonstrate that the coordinated restoration strategies are effective and critical in the successful recovery of interdependent networks. The developed model could also provide insights in network design and planning to enhance the resilience of interdependent power system and communication network.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evaluating Transfer and Pumping of Slurries from Pulsed Jet Mixed Vessels

Due to gravity, solids in slurries will settle if density differences between the solids and liquid are positive (i.e., particle has a negative buoyant force) unless rheological properties and flow conditions are adequate to overcome the gravitational effects. The rate of settling depends on the force balance of the particle, which includes the surface forces associated with fluid rheology. Given the same fluid and solid properties, particles that are larger and denser tend to settle faster. When pumping slurry into a vessel at concentrations precluding hindered settling with insufficient mixing, particle and density distributions can result in preferential settling, creating stratification in the solids concentration within the vessel. For vessels with transfer line inlets located in the lower portion of the tank, the stratified solids concentration may be detrimental to the transfer system performance. Elevated concentrations of solids in the slurry entrained at the inlet to the transfer line can result in the effective viscosity or slurry bulk density exceeding the design limits of the pump. These conditions could result in plugging of the transfer line or onset of cavitation of the pumps because of excessive pressure drop. These conditions can be exacerbated with periodic inlet conditions existing at the transfer line inlet. Periodic conditions can result when vessel mixing is intermittent such as with pulsed jet mixers (PJM). The transfer line inlet conditions are impacted by the periodic nature of the PJM operations with respect to suspension of solids and their transport to the inlet of the transfer line. A scaling approach is presented, and corresponding test requirements are developed for assessing the prevention of plugging the pipeline. Line plugging mechanisms are addressed that do not include plugging due to steady-state high-density slurry entering the transfer line and reducing the net positive suction head available (NPSHA) at the pump inlet to below that required for pump operation. Items considered include the transition to reduced relative flow velocities, such that the critical pipe velocity for solids deposition, Ucd, is not maintained, and segregation of heavy solids during the transport. The recommended requirements to prevent plugging include: • Limits for viscosity and density for entrained slurry to prevent the pressure drop in the pipeline from exceeding pump capacity. • Limits for viscosity and density for entrained slurry to prevent the net positive suction head available (NPSHA) from falling below the net positive suction head required (NPSHR) for operating the pump. • Transfer line velocity and flow rate requirements to maintain solids in suspension, while avoiding line plugging that results from deposition of solids within the transfer line. This paper describes the development of the scaling and testing requirements to verify that proposed approaches for transfer and pump out are appropriately developed

periodic flow, mixing, pipeline plugging, scaling,↗

BLENDING STUDY FOR SRR SALT DISPOSITION INTEGRATION: TANK 50H SCALE-MODELING AND COMPUTER-MODELING FOR BLENDING PUMP DESIGN, PHASE 2

The Salt Disposition Integration (SDI) portfolio of projects provides the infrastructure within existing Liquid Waste facilities to support the startup and long term operation of the Salt Waste Processing Facility (SWPF). Within SDI, the Blend and Feed Project will equip existing waste tanks in the Tank Farms to serve as Blend Tanks where 300,000-800,000 gallons of salt solution will be blended in 1.3 million gallon tanks and qualified for use as feedstock for SWPF. Blending requires the miscible salt solutions from potentially multiple source tanks per batch to be well mixed without disturbing settled sludge solids that may be present in a Blend Tank. Disturbing solids may be problematic both from a feed quality perspective as well as from a process safety perspective where hydrogen release from the sludge is a potential flammability concern. To develop the necessary technical basis for the design and operation of blending equipment, Savannah River National Laboratory (SRNL) completed scaled blending and transfer pump tests and computational fluid dynamics (CFD) modeling. A 94 inch diameter pilot-scale blending tank, including tank internals such as the blending pump, transfer pump, removable cooling coils, and center column, were used in this research. The test tank represents a 1/10.85 scaled version of an 85 foot diameter, Type IIIA, nuclear waste tank that may be typical of Blend Tanks used in SDI. Specifically, Tank 50 was selected as the tank to be modeled per the SRR, Project Engineering Manager. SRNL blending tests investigated various fixed position, non-rotating, dual nozzle pump designs, including a blending pump model provided by the blend pump vendor, Curtiss Wright (CW). Primary research goals were to assess blending times and to evaluate incipient sludge disturbance for waste tanks. Incipient sludge disturbance was defined by SRR and SRNL as minor blending of settled sludge from the tank bottom into suspension due to blending pump operation, where the sludge level was shown to remain constant. To experimentally model the sludge layer, a very thin, pourable, sludge simulant was conservatively used for all testing. To experimentally model the liquid, supernate layer above the sludge in waste tanks, two salt solution simulants were used, which provided a bounding range of supernate properties. One solution was water (H{sub 2}O + NaOH), and the other was an inhibited, more viscous salt solution. The research performed and data obtained significantly advances the understanding of fluid mechanics, mixing theory and CFD modeling for nuclear waste tanks by benchmarking CFD results to actual experimental data. This research significantly bridges the gap between previous CFD models and actual field experiences in real waste tanks. A finding of the 2009, DOE, Slurry Retrieval, Pipeline Transport and Plugging, and Mixing Workshop was that CFD models were inadequate to assess blending processes in nuclear waste tanks. One recommendation from that Workshop was that a validation, or bench marking program be performed for CFD modeling versus experiment. This research provided experimental data to validate and correct CFD models as they apply to mixing and blending in nuclear waste tanks. Extensive SDI research was a significant step toward bench marking and applying CFD modeling. This research showed that CFD models not only agreed with experiment, but demonstrated that the large variance in actual experimental data accounts for misunderstood discrepancies between CFD models and experiments. Having documented this finding, SRNL was able to provide correction factors to be used with CFD models to statistically bound full scale CFD results. Through the use of pilot scale tests performed for both types of pumps and available engineering literature, SRNL demonstrated how to effectively apply CFD results to salt batch mixing in full scale waste tanks. In other words, CFD models were in error prior to development of experimental correction factors determined during this research, which provided a technique to use CFD models for salt batch mixing and transfer pump operations. This major scientific advance in mixing technology resulted in multi-million dollar cost savings to SRR. New techniques were developed for both experiment and analysis to complete this research. Supporting this success, research findings are summarized in the Conclusions section of this report, and technical recommendations for design and operation are included in this section of the report.

08 HYDROGEN↗

Alcock-Paczynski Blinding Scheme for the Ly-$α$ Forest Analysis

We present and validate a blinding method for the Lyman-$α$ (Ly$α$) forest analysis based on a modification of the Alcock-Paczynski test. In order to hide the background expansion history, the method employs a geometrical shift of each quasar (QSO) forest in wavelength space, once the quasar continuum has been fitted and the fluctuation field is extracted. The redshift positions for the QSO sample are also changed in a consistent manner. We show that the method remains effective when applied to real data, where contamination from metals and Lyman-$β$ is intrinsically mixed with the Lyman-$α$ forest. This limitation is primarily visible in the 1D correlation function, where other blinding strategies can mitigate the effect. To assess its effectiveness, the prescription is tested against a series of datasets of increasing complexity: from idealized low-noise mocks, to realistic DESI year one synthetic datasets, and finally to data from DESI first data release (DR1), using both the auto (Ly$α\times$Ly$α$) and cross (Ly$α\times$ QSO) correlations. We find that the method robustly shifts the BAO peak position from the 3D correlation functions to the expected value for cosmology changes of around 5% in the matter content, without altering the shape of the posteriors in the model parameters. In conclusion, this catalog-level blinding strategy is a viable method for cosmological inference with the Lyman-$α$ forest, particularly if a cross-analysis with other tracers using the same blinding strategy is pursued.

Perez-Sanchez, G. [Guanajuato U.] (ORCID:000900096↗

Design, Fabrication and Start-up of Test Facilities for the LAWPS Full-Scale IX Column Test and Engineering Scale Test - 17418

The U.S. Department of Energy (DOE), Office of River Protection's (ORP) primary mission is to retrieve and treat Hanford's tank waste and close the Tank Farms to protect the Columbia River. Mixed radioactive waste is stored in 177 underground tanks at the Hanford Site as reported in DOE/ORP 2003-02, Environmental Impact Statement for Retrieval, Treatment, and Disposal of Tank Waste and Closure of the Single Shell Tanks at the Hanford Site, Richland WA, Inventory and Source Term Data Package. The 177 underground tanks are estimated to contain about 56 million gallons of waste. The Low Activity Waste Pretreatment System (LAWPS) Project provides for the early production of immobilized low activity waste (ILAW) by feeding LAW directly from Tank Farms to the Hanford Waste Treatment Plant's (WTP's) LAW Facility, bypassing the Pretreatment Facility. Prior to the transfer of feed to the WTP LAW Vitrification Facility, tank supernatant waste will be pretreated in the LAWPS to meet the WTP LAW waste acceptance criteria. The LAWPS will also facilitate the return of secondary liquid wastes from the WTP LAW Vitrification Facility to the Tank Farms. In November of 2015 DOE's Tank Operations Contractor, Washington River Protection Solutions (WRPS), awarded a contract to the AECOM Team to design, fabricate and operate two test platforms to generate performance data at two different scales and demonstrate technology maturation. The first platform models the ion exchange (IX) columns at full scale, and the second platform models the integrated flowsheet (cross flow filter (CFF) and IX) at 1/9. scale. Both test platforms underwent shakedown and start-up testing in August 2016 and moved into actual testing and NQA-1 data generation shortly thereafter. This paper covers the engineering design, procurement, construction, installation, and acceptance testing of the test platforms (which are now operational) under an aggressive fast track schedule, and initial test data as available. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Testing Results from the Low Activity Waste Pretreatment System (LAWPS) Full-Scale Ion Exchange Column Test and Engineering Scale Integrated System Test - 18634

The U.S. Department of Energy (DOE), Office of River Protection's (ORP) primary mission is to retrieve and treat Hanford's tank waste and close the Tank Farms to protect the Columbia River. Mixed radioactive waste is stored in 177 underground tanks at the Hanford Site as reported in DOE/ORP 2003- 02, Environmental Impact Statement for Retrieval, Treatment, and Disposal of Tank Waste and Closure of the Single Shell Tanks at the Hanford Site, Richland WA, Inventory and Source Term Data Package. The 177 underground tanks are estimated to contain about 56 million gallons of waste. The Low Activity Waste Pretreatment System (LAWPS) Project provides for the early production of immobilized low activity waste (ILAW) by feeding LAW directly from Tank Farms to the Hanford Waste Treatment Plant's (WTP's) LAW Facility, bypassing the Pretreatment Facility. Prior to the transfer of feed to the WTP LAW Vitrification Facility, tank supernatant waste will be pretreated in the LAWPS to meet the WTP LAW waste acceptance criteria. The LAWPS will also facilitate the return of secondary liquid wastes from the WTP LAW Vitrification Facility to the Tank Farms. In November of 2015 DOE's Tank Operations Contractor, Washington River Protection Solutions (WRPS), awarded a contract to the AECOM team to design, fabricate and operate two test platforms to generate performance data at two different scales and demonstrate technology maturation. The first platform models the ion exchange (IX) columns at full scale, and the second platform models the integrated flowsheet (cross flow filter (CFF) and IX) at 1/9. scale. Overarching technical objectives of performing the full-scale ion exchange test and the engineering-scale integrated test are to: 1. Test interactions between unit process operations; 2. Test removal of non-radioactive cesium from process stream; 3. Test removal of undissolved solids from process stream; 4. Confirm operational flow rate range and stability; 5. Confirm volumetric throughput of waste stream over flow operating range; 6. Confirm range of process temperatures over planned operating range; 7. Establish system hydraulics and process criteria; 8. Coordinate key control and monitoring components; 9. Establish treated product chemistry meets requirements (cesium, solids, and pH); and 10. Test the hazard control strategy for a no flow condition through the IX column. Data collected during testing will be used by WRPS to validate the preliminary design, inform the final design of the permanent plant equipment, and demonstrate that the critical technology elements have advanced to a technology readiness level of 6 (prototypical system validation in a relevant environment). Testing on both platforms started in fall of 2016 generating NQA-1 data. This paper covers test results from the first five phases of testing on the 1/9. scale integrated test platform. A further three phases of testing are currently being executed, these including a 5.6 M sodium simulant containing foulant, a high viscosity simulant and finally a run performed with a lower Cs concentration (all earlier tests were spiked to 4 x Cs to reduce volume and cost). Results from these tests were not available at the time of writing available. Results are also presented from the full scale IX testing. Eight test were performed covering column loading, elution and regeneration; column loading, elution and regeneration with upflow displacement; IX column loading and gas migration; resin removal; solids accumulation; and IX column emergency recirculation and vent. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗