Search NASA⌕ Search

SEARCH · Search NASA

Results for “OUTAGES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,333 records · Page 74

Progress on the Proton Power Upgrade at the Spallation Neutron Source

The Proton Power Upgrade Project at the Spallation Neutron Source (SNS) at Oak Ridge National Laboratory will double the proton power capability from 1.4 to 2.8 MW. This will be accomplished through an energy increase from 1.0 to 1.3 GeV and a beam current increase from 26 to 38 mA. The energy increase will be accomplished through the addition of 7 cryomodules to the linear accelerator (Linac). The beam current increase will be supported by upgrading several radio-frequency systems in the normal-conducting section of the Linac. Upgrades to the accumulator ring injection and extraction regions will accommodate the increase in beam energy. A new 2-MW-capable target and supporting systems will be developed and installed. Conventional facility upgrades include build-out of the existing klystron gallery and construction of a tunnel stub to facilitate future beam transport to the second target station. The project received approval to proceed with construction in October 2020. Procurements are in progress, and some installation activities have already occurred. Most of the installation will take place during three outages in 2022-2023. The project early finish is planned for 2025.

Barbier, Charlotte↗

NREL: Working Towards a Superlab 2.0 With ESnet and Other National Laboratories

We can currently link models and simulations across the national laboratory complex, but imagine connecting these models with equipment, devices, and scientists so they can work together as if side by side instead of thousands of miles apart. In a future like this, researchers could run experiments that leverage thousands of devices to model the millions of devices that make up our increasingly complex energy systems. With such resources, labs could simulate, for example, the electric grid of California and validate control strategies to best serve critical loads during outages caused by wildfires. The National Renewable Energy Laboratory's (NREL's) Advanced Research on Integrated Energy Systems (ARIES) platform is making that vision a reality, one step at a time.

ARIES↗

DISTRIBUTION TRANSFORMER ASSET MONITORING ON THE GRID EDGE USING SMART SENSOR DATA

As new loads such as rooftop photovoltaics, electric vehicles and other distributed energy resources become commonplace on the distribution grid, the stress on already aging assets begins to escalate. This increased loading and changing dynamics can exacerbate failure rates. While traditional monitoring efforts focus on transmission and generation assets, utilities are now beginning to pay close attention to distribution assets in order to increase reliability indices and reduce cost from unexpected outages. This research develops low-cost and scalable methods to monitoring the health of a critical distribution grid asset: the service transformer. Existing methods in literature are either invasive and thus difficult to implement or require the device to be tested offline in an expensive lab setting. Data from the ubiquitous smart meter as well as a novel Bluetooth based transformer monitor are leveraged to automatically notify the utility of deteriorating or damaged transformers. Voltage, temperature, and vibration are some of the signals measured and analyzed by the proposed algorithms to predict transformer failures. Furthermore, these algorithms are designed to keep the implementation and processing costs low by taking advantage of edge computing where possible.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Beyond Expected Values Evolving Metrics for Resource Adequacy Assessment

Resource adequacy analysis quantifies the likelihood of capacity shortfall on a power system in a probabilistic manner. Using a combination of statistical techniques and power system fundamentals, the analysis typically evaluates hundreds or thousands of stochastic random samples (replications) of varying load, generator outages, variable renewable energy availability, and other aspects of power system uncertainty. In this range of uncertainty, there are - at times - periods where the power system's available resources are insufficient to meet system demand, referred to as a shortfall event. Today's power systems' rapidly evolving generation mix is changing the types of data needed by system planners and regulators, which can often render traditional resource adequacy metrics insufficient for ensuring resource adequacy for tomorrow's grid. In this paper we provide a critical assessment of traditional measures of shortfall risk in power systems, discussing their shortcomings and how they compare to metrics used in other domains. From this analysis we propose four steps forward for improving power system resource adequacy risk metrics in the future.

ENERGY PLANNING, POLICY, AND ECONOMY↗

Data Mining and Machine Learning for Power System Monitoring, Understanding, and Impact Evaluation

This chapter presents results from the Big Data analysis framework to improve power system situational awareness and system reliability. For this purpose, a dataset with real-world phasor measurement unit data and historical transmission system outage data has been created and used to carry out the analysis. Several statistical analysis and machine learning methods have been developed and implemented for event and anomaly detection and modeling. Detection and analysis results for actual examples of power system events are presented. Finally, data-driven characterization and risk assessment methods for weather-related extremes in power systems are developed and demonstrated on the Bonneville Power Administration system. These applications demonstrate the capability of Machine Learning (ML) methods to monitor system abnormalities, to predict system events, and to characterize the impact of extreme events on power grid

data mining, power grid, machine learning, anomaly↗

Summary: Techno-Economic Analysis of Solar Photovoltaics and Battery Energy Storage at a Vietnam Industrial Park

The Clean Energy Investment Accelerator conducted a case study analysis of battery energy storage system (BESS) feasibility for an industrial park in Vietnam using the National Renewable Energy Laboratory's (NREL's) REopt platform (a distributed energy modeling and optimization tool) to evaluate how BESS may reduce electricity costs, increase utilization of onsite renewable energy generation, and improve resilience to utility grid outages. This presentation summarizes the analysis and key takeaways.

batteries↗

Lessons Learned From Techno-Economic Analysis of Solar Photovoltaics and Battery Energy Storage at a Vietnam Industrial Park

Through the Clean Energy Investment Accelerator (CEIA), engineers from the United States (U.S.) National Renewable Energy Laboratory (NREL) conducted a case study analysis evaluating the techno-economic feasibility of battery energy storage systems (BESS) at an industrial park in Vietnam. The analysis uses NREL's REopt platform, a distributed energy modeling and optimization tool, to identify the cost-optimal system sizing for BESS, in conjunction with onsite renewables such as solar photovoltaics (PV), to reduce electricity costs, increase onsite renewable energy generation utilization, and improve resilience to grid outages.

batteries↗

Distribution Grid Management in the Presence of Distributed Energy Resources

The global concerns over climate change, government policies, and incentives in support of distributed energy resources (DERs) are accelerating the growth of DERs in distribution networks. The growth in DER penetration levels can create various issues such as over/under voltages, reverse power flows, overloading, and protection miscoordination. State-of-the-art grid automation solutions such as advanced distribution management systems (ADMS) and distributed energy resource management systems (DERMS) can leverage the DERs to improve distribution grid operations. The ADMS offers advanced grid management functions such as Volt-VAR optimization (VVO), fault management, and outage management to the distribution operator to improve situational awareness and optimize network operations. The DERMS solutions aggregate the small-scale BTM DERs to provide grid services including demand response, voltage regulation, and situational awareness. In this presentation, distribution grid management approaches in the presence of DERs using ADMS and DERMS will be discussed.

ADMS↗

Fault Characterization and Diagnostics Supporting Condition-Based Operation and Maintenance of Gas Turbine Engines

Condition-Based Operation and Maintenance (CBOM) is the state-of-the-art in maintenance approaches for gas turbine engines. CBOM applies engine sensor information to the optimization of future operation and maintenance procedures; this technique reduces costs for engine operators by minimizing unplanned outages and catastrophic engine degradation. However, due to the complexities of gas turbine operation and the lack of available engine sensors, further development is required to fully realize the benefits of CBOM. In the turbine section, rotating components interact with high temperature flows, which creates intense thermal and mechanical stresses. As a result, there are numerous mechanisms of component degradation in the turbine section. Furthermore, turbine components – like stator vanes and rotor blades – are among the most expensive in the engine because they are complex to design and manufacture. For these reasons, this dissertation addresses two main questions: (i) which parameters or faults within the turbine section are most important to monitor, and (ii) how can these parameters or faults be monitored in an engine-relevant environment? Although many turbine parameters and faults have been investigated in the open literature, there are some faults that are still not well understood. Rotor-casing eccentricity, which causes a non-constant blade tip clearance around the annulus, has not been investigated in terms of its effects on turbine efficiency. Therefore, the first study in this dissertation quantifies overall and local turbine efficiency for varying levels of rotor-casing eccentricity. Results showed negligible variations to overall turbine efficiency, meaning rotor-casing eccentricity only becomes relevant to CBOM when its severity causes rotordynamic issues. Purge flow is critical to turbine hardware longevity because it prevents ingestion of hot main gas path (MGP) flow into the under-platform regions. Despite its importance, there are currently no methods for monitoring purge flow performance in an engine environment. Therefore, the second study in this dissertation develops a predictive model for sealing effectiveness using inputs from two fast-response pressure sensors. Results exhibited low prediction errors across a full range of purge flow rates, which supports the viability of the modelling approach for CBOM. The final two studies in this dissertation address blade coolant flow monitoring. This cooling flow is responsible for protecting the turbine blades from the MGP flow, which exits the combustor at temperatures greater than the blade melting point. These studies showed that temperature measurements on the blade surface can be used to accurately predict blade coolant flow rate, and that defining the candidate features relative to the coolant trajectory is important for maintaining accuracy as coolant flow rate degradation occurs. This work enables blade coolant flow monitoring, which is currently not possible through existing condition monitoring techniques.

condition-based, gas turbines, diagnostics,↗

Multi-Agent Reinforcement Learning for Distribution System Critical Load Restoration: Preprint

Grid resilience has become a critical topic recently because of the increasing occurrence of extreme events and the growing integration of intermittent renewable energy sources. To build a resilient distribution system, this paper develops a multi-agent reinforcement learning-based (MARL) method to coordinate distribution energy resources (DERs) dispatch, load pickup, and network reconfiguration for load restoration after a system outage. With the help of two types of control agents, namely critical load restoration (CLR) and coordination (COR) agents, system loads can be restored efficiently, given available resources. The effectiveness and superiority of the proposed algorithm are demonstrated through simulations and comparative studies on a real distribution feeder in Western Colorado.

distribution system↗

Extreme Weather Events and the Impact on PV Time Series Data

The impact of extreme weather events on PV performance was studied by comparing the National Oceanic and Atmospheric Administration database on severe weather with the PV Fleet database on continuous PV performance. We identified 170 systems that were immediately impacted by weather events. These severe weather events lead to a median loss of only 1% of annual production. However, flooding and high wind events were found to have an extremely long tail extending to 60 % loss showing that these discrete events can pose a substantial risk to PV systems. Besides the short-term impact of lost production due to outages, we also found a statistically significant increased performance loss rate (PLR) for high wind events comparing PLR before and after these weather events. In addition, hail events caused a higher PLR for 2 out of 3 systems. More data are required to better quantify the impact, but these first results illustrate the substantial risk these events pose short-and long-term.

degradation↗

A Tool for the Risk-Informed Management of Critical Mission Resilience

We describe a methodology and tool for the risk-informed management and planning of mission resilience. By mapping concepts of resilience onto the elements of a streamlined risk model we are able to tap the substantial portfolio of established risk concepts to provide rapid insights in the evaluation and high-level screening of prospective resilience enhancement measures. This provides a risk-informed, levelized basis for the comparison of disparate resilience solutions and the means of establishing preferences. The methodology begins with identification of critical missions met by a site, and establishment of the supporting physical assets. Scenarios that would result in failure of these assets are systematically identified. Each scenario comprises three elements: realization of a hazard or threat resulting in loss of resources (the current focus being on power, natural gas, and water) to the asset, failure of measures in place to protect the asset against those losses, and realization of the consequent impacts. These scenarios are quantified in terms of their probabilities of occurrence and the magnitude of the resultant consequences (mission outage time), allowing risk-prioritization to focus resilience enhancement considerations. What-If? analyses are conducted through adjusting elements of the risk calculation to reflect the deployment of prospective resilience measures, by which means the efficacies of each of those measures can be compared using common risk metrics across diverse resilience strategies. This paper will also describe the insights from example applications.

resilience, risk, risk assesment, energy, water↗

De-Risking Large-Scale PV Systems Through Data Analytics

Large-scale photovoltaic system performance analysis is being conducted within the US Department of Energy's-sponsored PV Fleet Performance Data Initiative. This collaboration with commercial PV system owners collects and evaluates PV field performance data, and provides reports on aggregated results. Drawing on over 2200 sites across the US and over 24,000 separate PV inverters we have collected in excess of 8.3 gigawatts (GW) of performance data, representing 6-7% of the entire US installed PV capacity. A mixture of utility-scale and large commercial systems are represented, averaging 4.1 megawatts (MW) in size and 5 years in age. Initial results show average system degradation rates at -0.75% / year, which is slightly higher than historically reported module-level values of -0.5%/year. We also found that the availability of systems averaged 97.7%, which is lower than the typical 99% uptime assumed by many project economic forecasts. Given these results, we compared monthly performance with expected production values, based on satellite weather data and a simple PVWatts performance model. We found that systems were performing within 10% of monthly expectation over 90% of the time, with a fleet average vs expected monthly value of 0.994. We also evaluated the impact of extreme weather events on system performance, and found a range of short-term and longer-term performance effects ranging from grid outage, system downtime, module damage and accelerated long-term degradation rate.

analysis↗

Digital radiographic systems detect boiler tube cracks

Boiler water wall leaks have been a major cause of steam plant forced outages. But conventional nondestructive evaluation techniques have a poor track record of detecting corrosion fatigue cracking on the inside surface of the cold side of waterwall tubing. EPRI is performing field trials of a prototype direct-digital radiographic system that promises to be a game changer. 8 figs.

20 FOSSIL-FUELED POWER PLANTS↗

Making the Optimal Decision in Selecting Protective Clothing

Protective Clothing plays a major role in the decommissioning and operation of nuclear facilities. Literally thousands of dress-outs occur over the life of a decommissioning project and during outages at operational plants. In order to make the optimal decision on which type of protective clothing is best suited for the decommissioning or maintenance and repair work on radioactive systems, a number of interrelating factors must be considered. This article discusses these factors as well as surveys of plants regarding their level of usage of single use protective clothing and should help individuals making decisions about protective clothing as it applies to their application. Individuals considering using SUPC should not jump to conclusions. The survey conducted clearly indicates that plants have different drivers. An evaluation should be performed to understand the facility's true drivers for selecting clothing. It is recommended that an interdisciplinary team be formed including representatives from budgets and cost, safety, radwaste, health physics, and key user groups to perform the analysis. The right questions need to be asked and answered by the company providing the clothing to formulate a proper perspective and conclusion. The conclusions and recommendations need to be shared with senior management so that the drivers, expected results, and associated costs are understood and endorsed. In the end, the individual making the recommendation should ask himself/herself: 'Is my decision emotional, or logical and economical?' 'Have I reached the optimal decision for my plant?'.

42 ENGINEERING↗

Packaging, Transportation, and Disposal Logistics for Large Radioactively Contaminated Reactor Decommissioning Components

The packaging, transportation and disposal of large, retired reactor components from operating or decommissioning nuclear plants pose unique challenges from a technical as well as regulatory compliance standpoint. In addition to the routine considerations associated with any radioactive waste disposition activity, such as characterization, ALARA, and manifesting, the technical challenges for large radioactively contaminated components, such as access, segmentation, removal, packaging, rigging, lifting, mode of transportation, conveyance compatibility, and load securing require significant planning and execution. In addition, the current regulatory framework, domestically in Titles 49 and 10 and internationally in TS-R-1, does not lend itself to the transport of these large radioactively contaminated components, such as reactor vessels, steam generators, reactor pressure vessel heads, and pressurizers, without application for a special permit or arrangement. This paper addresses the methods of overcoming the technical and regulatory challenges. The challenges and disposition decisions do differ during decommissioning versus component replacement during an outage at an operating plant. During decommissioning, there is less concern about critical path for restart and more concern about volume reduction and waste minimization. Segmentation on-site is an available option during decommissioning, since labor and equipment will be readily available and decontamination activities are routine. The reactor building removal path is also of less concern and there are more rigging/lifting options available. Radionuclide assessment is necessary for transportation and disposal characterization. Characterization will dictate the packaging methodology, transportation mode, need for intermediate processing, and the disposal location or availability. Characterization will also assist in determining if the large component can be transported in full compliance with the transportation and disposal regulations and criteria or if special authorizations must be granted to transport and/or dispose. The U.S. DOT routinely issues special permits for large components where compliance with regulatory or acceptance criteria is impractical or impossible to meet. Transportation and disposal safety must be maintained even under special permits or authorizations. For example, if transported un-packaged, performance analysis must still be performed to assess the ability of the large component's outer steel shell to contain the internal radioactive contamination under normal transportation conditions and possibly incidence normal to transportation. The dimensions and weight of a large component must be considered when determining the possible modes of transportation (rail, water, or highway). At some locations, rail and/or barge access is unavailable. Many locations that once had an active rail spur to deliver new construction materials and components have let the spur deteriorate to the point that repair and upgrade of the spur is no longer economically feasible. Barge slips that have not been used since new plant construction require significant repair and/or dredging. Short on-site haul routes must be assessed for surface and subsurface conditions, as well as longer off-site routes. Off-site routes require clearance approvals from the regulatory authorities or, in the case of rail transport, the rail lines. Significant engineering planning and analysis must be performed during the pre-mobilization. In conclusion, the packaging, transportation, and disposal of large, oversized radioactively contaminated components removed during plant decommissioning is complex. However, over the last 15 years, a 100 or more components have been safely and compliantly packaged and transported for processing and/or disposal.

42 ENGINEERING↗

Plant maintenance and plant life extension issue, 2008

The focus of the March-April issue is on plant maintenance and plant life extension. Major articles include the following: Exciting time to be at the U.S. NRC, by Dale Klein, Nuclear Regulatory Commission; Extraordinary steps to ensure a minimal environmental impact, by George Vanderheyden, UniStar Nuclear Energy, LLC.; Focused on consistent reduction of outages, by Kevin Walsh, GE Hitachi Nuclear Energy; On the path towards operational excellence, by Ricardo Perez, Westinghouse Electric Company; Ability to be refuelled on-line, by Ian Trotman, CANDU Services, Atomic Energy of Canada, Ltd.; ASCA Application for maintenance of SG secondary side, by Patrick Wagner, Wolf Creek Nuclear Operating Corporation, Phillip Battaglia and David Selfridge, Westinghouse Electric Company; and, An integral part of the landscape and lives, by Tyler Lamberts, Entergy Nuclear Operations, Inc. The Industry Innovation article is titled Steam generator bowl drain repairs, by John Makar and Richard Gimple, Wolf Creek Nuclear Operating Corporation.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Qualification of Innovative High Level Waste Pipeline Unplugging Technologies

In the past, some of the pipelines have plugged during high level waste (HLW) transfers resulting in schedule delays and increased costs. Furthermore, pipeline plugging has been cited by the 'best and brightest' technical review as one of the major issues that can result in unplanned outages at the Waste Treatment Plant causing inconsistent operation. As the DOE moves toward a more active high level waste retrieval, the site engineers will be faced with increasing cross-site pipeline waste slurry transfers that will result in increased probability of a pipeline getting plugged. Hence, availability of a pipeline unplugging tool/technology is crucial to ensure smooth operation of the waste transfers and in ensuring tank farm cleanup milestones are met. FIU had earlier tested and evaluated various unplugging technologies through an industry call. Based on mockup testing, two technologies were identified that could withstand the rigors of operation in a radioactive environment and with the ability to handle sharp 90 elbows. We present results of the second phase of detailed testing and evaluation of pipeline unplugging technologies and the objective is to qualify these pipeline unplugging technologies for subsequent deployment at a DOE facility. The current phase of testing and qualification comprises of a heavily instrumented 3-inch diameter (full-scale) pipeline facilitating extensive data acquisition for design optimization and performance evaluation, as it applies to three types of plugs atypical of the DOE HLW waste. Furthermore, the data from testing at three different lengths of pipe in conjunction with the physics of the process will assist in modeling the unplugging phenomenon that will then be used to scale-up process parameters and system variables for longer and site typical pipe lengths, which can extend as much as up to 19,000 ft. Detailed information resulting from the testing will provide the DOE end-user with sufficient data and understanding of the technology, and its limitations to aid in the benefit-cost analysis for management decision whether to deploy the technology or to abandon the pipeline as has been done in the past. In conclusion: The ultimate objective of this study is to qualify NuVision's unplugging technology for use at Hanford. Experimental testing has been conducted using three pipeline lengths and three types of blockages. Erosion rates have been obtained and pressure data is being analyzed. An amplification of the inlet pressure has been observed along the pipeline and is the key to determining up to what pipe lengths the technology can be used without surpassing the site pressure limit. In addition, we will attempt to establish what the expected unplugging rates will be at the longer pipe lengths for each of the three blockages tested. Detailed information resulting from the testing will provide the DOE end-user with sufficient data and understanding of the technology, and its limitations so that management decisions can be made whether the technology has a reasonable chance to successfully unplug a pipeline, such as a cross site transfer line or process transfer pipeline at the Waste Treatment Plant. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗