Search NASA⌕ Search

SEARCH · Search NASA

Results for “Resource scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,333 records · Page 74

A Lunar Surface System Supportability Technology Development Roadmap

This paper discusses the establishment of a Supportability Technology Development Roadmap as a guide for developing capabilities intended to allow NASA s Constellation program to enable a supportable, sustainable and affordable exploration of the Moon and Mars. Presented is a discussion of supportability, in terms of space facility maintenance, repair and related logistics and a comparison of how lunar outpost supportability differs from the International Space Station. Supportability lessons learned from NASA and Department of Defense experience and their impact on a future lunar outpost is discussed. A supportability concept for future missions to the Moon and Mars that involves a transition from a highly logistics dependent to a logistically independent operation is discussed. Lunar outpost supportability capability needs are summarized and a supportability technology development strategy is established. The resulting Lunar Surface Systems Supportability Strategy defines general criteria that will be used to select technologies that will enable future flight crews to act effectively to respond to problems and exploit opportunities in an environment of extreme resource scarcity and isolation. This strategy also introduces the concept of exploiting flight hardware as a supportability resource. The technology roadmap involves development of three mutually supporting technology categories, Diagnostics Test and Verification, Maintenance and Repair, and Scavenging and Recycling. The technology roadmap establishes two distinct technology types, "Embedded" and "Process" technologies, with different implementation and thus different criteria and development approaches. The supportability technology roadmap addresses the technology readiness level, and estimated development schedule for technology groups that includes down-selection decision gates that correlate with the lunar program milestones. The resulting supportability technology roadmap is intended to develop a set of technologies with widest possible capability and utility with a minimum impact on crew time and training and remain within the time and cost constraints of the Constellation program.

Oeftering, Richard C.↗

Deep reinforcement learning assisted co-optimization of Volt-VAR grid service in distribution networks

With the increasing penetration of distributed energy resources in distribution networks, Volt-VAR control and optimization (VVC/VVO) have become very important to ensure an acceptable quality of service to all customers. System operators can rely on slow-responding utility devices, including capacitor banks and on-load tap changing transformers, along with fast-responding battery and photovoltaic (PV) inverters for the VVC/VVO implementation. Because of variations in response time of these two classes of devices, and different control actions (discrete versus continuous), coordinated and optimal scheduling and operation have become of utmost importance. Here, this paper develops a look-ahead deep reinforcement learning (DRL)-based multi-objective VVO technique to improve the voltage profile of active distribution networks, decrease network and inverter power loss, and save the operational cost of the grid. It proposes a deep deterministic policy gradient (DDPG)-based approach to schedule the optimal reactive and/or active power set-points of fast-responding inverters, and a deep Q-network (DQN)-based DRL agent to schedule the discrete decisions variables of slow-responding assets. The reactive power output of PV and battery smart inverters are scheduled at 30-minute intervals and the capacitors’ commitment status is scheduled with several hour intervals. The proposed framework is validated on the modified IEEE 34-bus and 123-bus test cases with embedded PV and PV-plus-storage. To validate the efficacy of the proposed VVO, it is compared with several scenarios, including the base case without VVO, localized droop control of DERs, DDPG-only, and twin delayed DDPG (TD3) agent-based DRL techniques. The results justify the superior performance of the proposed method to improve the voltage profile, reduce network power loss, and minimize the look-ahead grid operational cost while minimizing the undesirable power losses in inverters as a result of power factor adjustments.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Resilient Disaster Recovery Logistics of Distribution Systems: Co-Optimize Service Restoration With Repair Crew and Mobile Power Source Dispatch

Repair crews (RCs) and mobile power sources (MPSs) are critical resources for distribution system (DS) outage management after a natural disaster. However, their logistics have not been well investigated. We propose a resilient scheme for disaster recovery logistics to co-optimize DS restoration with the dispatch of RCs and MPSs. A novel co-optimization model is formulated to route RCs and MPSs in the transportation network, schedule them in the DS, and reconfigure the DS for microgrid formation coordinately, etc. The model incorporates different timescales of DS restoration and RC/MPS dispatch, the coupling of transportation and power networks, etc. To ensure radiality of the DS with variable physical structure and MPS allocation, we also model topology constraints based on the concept of spanning forest. The model is convexified equivalently and linearized into a mixed-integer linear programming. To reduce its computation time, preprocessing methods are proposed to preassign a minimal set of repair tasks to depots and reduce the number of candidate nodes for MPS connection. Resilient recovery strategies thus are generated to enhance service restoration, especially by dynamic formation of microgrids that are powered by MPSs and topologized by repair actions of RCs and network reconfiguration of the DS. Case studies demonstrate the proposed methodology.

Disaster recovery logistics↗

The Use of the Hanford Onsite Packaging and Transportation Safety Program to Meet Cleanup Milestones Under the Hanford Site Cleanup 2015 Vision and the American Recovery and Reinvestment Act of 2009 - 12403

The Hanford Site presents unique challenges in meeting the U.S. Department of Energy Richland Operations Office (DOE-RL) 2015 Cleanup Vision. CH2M Hill Plateau Remediation Company (CHPRC), its subcontractors, and DOE-RL were challenged to retrieve, transport and remediate a wide range of waste materials. Through a collaborative effort by all Hanford Onsite Central Plateau Cleanup Team Members, disposition pathways for diverse and seemingly impossible to ship wastes were developed under a DOE Order 460.1C-compliant Hanford Onsite Transportation Safety Program. The team determined an effective method for transporting oversized compliant waste payloads to processing and disposition facilities. The use of the onsite TSD packaging authorizations proved to be vital to safely transporting these materials for processing and eventual final disposition. The American Recovery and Reinvestment Act of 2009 (ARRA) provided additional resources to expedite planning and execution of these important cleanup milestones. Through the innovative and creative use of the TSD, the Hanford Onsite Central Plateau Cleanup Team Members have developed and are executing an integrated project plan that enables the safe and compliant transport of a wide variety of difficult-to-transport waste items, accelerating previous cleanup schedules to meet cleanup milestones. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transferable Reinforcement Learning for Smart Homes: Preprint

To harness the great amount of untapped resources at the demand side, smart home technology plays a vital role in solving the "last mile" problem in smart grid. Reinforcement learning (RL), which has demonstrated an outstanding performance in solving many sequential decision-making problems, can be a great candidate to be used in smart home control. For instance, many studies have started investigating the load scheduling problem under dynamic pricing scheme. Based on those, this study aims at providing an affordable solution to encourage a higher smart home adoption rate. Specifically, we investigate combining transfer learning (TL) with RL to reduce the training cost of an optimal RL control policy. Given an optimal policy for a benchmark home, TL can jump-start the RL training of a policy for a new home, which has different appliances and user preferences. Simulation results show that by leveraging TL, RL training converges faster and requires much less computing time for new homes that are similar to the benchmark home. In all, this study proposes a cost-effective approach for training RL control policies for homes at scale, which ultimately reduces the controller's implementation costs, increases the adoption rate of RL controllers, and makes more homes grid-interactive.

ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION,↗

Persistent Assets in Zero-G and on Planetary Surfaces: Enabled by Modular Technology and Robotic Operations

Space operations are on the cusp of a revolutionary new operational paradigm that leverages modular systems and recurring robotic visits to “Persistent Assets” enabling asset maintenance, repair, and enhancement. A “Persistent Asset” is defined here as any zero-g or planetary surface system that benefits from in-space assembly (ISA) or multiple visits for servicing, repairs, and upgrades. This term is an extension of the term “Persistent Platform” used by Ms. Pam Melroy at the Defense Advanced Research Projects Agency to describe the vision of the Agency for a geosynchronous Earth orbiting platform. In this paper, the term “Persistent Asset” is introduced to encompass not only zero-g systems; such as telecommunication platforms, Earth observing science platform, Department of Defense platforms, and scientific telescope systems, but also planetary surface systems that support missions such as human outposts, science stations, and in-situ resource utilization systems. In contrast to the current state of the art, where space systems are typically launched as a single unit and operated without any further physical intervention after launch; future systems will be maintained, enhanced and reconfigured in-situ as new technology becomes available or mission needs change. Visits to the persistent asset can be regularly scheduled or dictated by funding constraints enabling a pay-as-you-go approach, which is largely independent of time-constraints and able to exploit launches of opportunity. In this paper, historical in-space assembly activities which relied heavily on astronaut extra-vehicular activity will be reviewed as well as early robotic assembly activities. These approaches will be contrasted with emerging modular approaches supporting realization of a new Persistent Asset operational paradigm. The paper will define attributes of the Persistent Asset paradigm and illustrate advantages by applying the paradigm to two relevant applications: 1) a large space telescope backing structure and 2) the backbone structure for a solar electric transport vehicle. Finally, recently developed unique Persistent Asset elements (modules, and interface approaches) will be described.

Doggett, William R.↗

Persistent Assets in Zero-G and on Planetary Surfaces: Enabled by Modular Technology and Robotic Operations

Space operations are on the cusp of a revolutionary new operational paradigm that leverages modular systems and recurring robotic visits to “Persistent Assets” enabling asset maintenance, repair, and enhancement. A “Persistent Asset” is defined here as any zero-g or planetary surface system that benefits from in-space assembly (ISA) or multiple visits for servicing, repairs, and upgrades. This term is an extension of the term “Persistent Platform” used by Ms. Pam Melroy at the Defense Advanced Research Projects Agency to describe the vision of the Agency for a geosynchronous Earth orbiting platform. In this paper, the term “Persistent Asset” is introduced to encompass not only zero-g systems; such as telecommunication platforms, Earth observing science platform, Department of Defense platforms, and scientific telescope systems, but also planetary surface systems that support missions such as human outposts, science stations, and in-situ resource utilization systems. In contrast to the current state of the art, where space systems are typically launched as a single unit and operated without any further physical intervention after launch; future systems will be maintained, enhanced and reconfigured in-situ as new technology becomes available or mission needs change. Visits to the persistent asset can be regularly scheduled or dictated by funding constraints enabling a pay-as-you-go approach, which is largely independent of time-constraints and able to exploit launches of opportunity. In this paper, historical in-space assembly activities which relied heavily on astronaut extra-vehicular activity will be reviewed as well as early robotic assembly activities. These approaches will be contrasted with emerging modular approaches supporting realization of a new Persistent Asset operational paradigm. The paper will define attributes of the Persistent Asset paradigm and illustrate advantages by applying the paradigm to two relevant applications: 1) a large space telescope backing structure and 2) the backbone structure for a solar electric transport vehicle. Finally, recently developed unique Persistent Asset elements (modules, and interface approaches) will be described.

William R Doggett↗

Earth resources instrumentation for the Space Station Polar Platform

The spacecraft and payloads of the Space Station Polar Platform program are described in a brief overview. Present plans call for one platform in a descending morning-equator-crossing orbit at 824 km and two or three platforms in ascending afternoon-crossing orbits at 542-824 km. The components of the NASA Earth Observing System (EOS) and NOAA payloads are listed in tables and briefly characterized, and data-distribution requirements and the mission development schedule are discussed. A drawing of the platform, a graph showing the spectral coverage of the EOS instruments, and a glossary of acronyms are provided.

Donohoe, Martin J.↗

Recovery Act: The use of real-time off-site observations as a methodology for increasing forecast skill in prediction of large wind power ramps one or more hours ahead of their impact on a wind plant

Improved forecasting performance immediately preceding wind ramp events is of preeminent concern to most wind energy companies, system operators, and balancing authorities. The value of near real-time hub height-level wind data and more general meteorological measurements to short-term wind power forecasting is well understood. For some sites, access to onsite measured wind data - even historical - can reduce forecast error in the short-range to medium-range horizons by as much as 50%. Unfortunately, valuable free-stream wind measurements at tall tower are not typically available at most wind plants, thereby forcing wind forecasters to rely upon wind measurements below hub height and/or turbine nacelle anemometry. Free-stream measurements can be appropriately scaled to hub-height levels, using existing empirically-derived relationships that account for surface roughness and turbulence. But there is large uncertainty in these relationships for a given time of day and state of the boundary layer. Alternatively, forecasts can rely entirely on turbine anemometry measurements, though such measurements are themselves subject to wake effects that are not stationary. The void in free-stream hub-height level measurements of wind can be filled by remote sensing (e.g., sodar, lidar, and radar). However, the expense of such equipment may not be sustainable. There is a growing market for traditional anemometry on tall tower networks, maintained by third parties to the forecasting process (i.e., independent of forecasters and the forecast users). This study examines the value of offsite tall-tower data from the WINDataNOW Technology network for short-horizon wind power predictions at a wind farm in northern Montana. The presentation shall describe successful physical and statistical techniques for its application and the practicality of its application in an operational setting. It shall be demonstrated that when used properly, the real-time offsite measurements materially improve wind ramp capture and prediction statistics, when compared to traditional wind forecasting techniques and to a simple persistence model.

17 WIND ENERGY↗

Light Water Reactor Sustainability Program Advanced Instrumentation, Information, and Control Systems Technologies Technical Program Plan for FY 2018

This report presents the Technical Program Plan for FY 2018 for the Department of Energy Light Water Reactor Sustainability Program – Advanced Instrumentation, Information, and Control (II&C) Systems Technologies research pathway. A summary of the vision and strategy is provided to explain how this program addresses key issues and barriers for implementing digital instrumentation and control technologies in domestic nuclear power plants. The report describes 20 pilot projects that have been formulated to develop and validate enabling technologies over a 16 year period that will result in digital alternatives to the legacy analog II&C systems in place today. This will allow much needed modernization of these systems to address reliability and obsolescence problems, as well as serve as a platform for substantial operational improvement. The report further describes key project resources and cooperative relationships, including the Electric Power Research Institute, the Nuclear Energy Institute (NEI), the Institute of Nuclear Power Operations (INPO)the Nuclear Energy Institute )NEI), the Institute of Nuclear Power Operations (INPO), the IFE Halden Reactor Project, the Nuclear Regulatory Commission, and industry suppliers, that are instrumental to the success of the program. The report also lists the schedule for all program products, including the titles and report numbers for all published reports under this program.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Investigation into Scalable and Detection-Enhanced Satellite Conjunction Assessment

Imaging opportunities (viewable conjunctions) of Resident Space Objects (RSOs) by satellites are not continuously discovered. We propose to continuously produce and report viewable conjunctions among objects in orbit. Viewable conjunctions are events in space and time when a satellite may favorably view a Resident Space Object (RSO). Favorability is defined by a set of constraints, e.g., solar illumination, distance between observer and target, orbital location for viewable event. Computing viewable conjunctions requires calculation of orbital propagation while considering constraints based on the state vectors of position, velocity, with covariance for both satellite and RSO. We propose two parallel lanes of effort: acceleration and research. The objective of acceleration is to avoid missed opportunities and reduce latency for satellite maneuver requests through continuous prediction and reporting of viewable conjunctions. The effort will begin by deploying currently available software on dedicated systems and continue with optimizing the code for high performance computing hardware. The research lane aims to expand RSO inspection and modeling capabilities. Among our current research ideas are spectral characterization of RSO materials and planning multiple observations to recover RSO 3D form. Computing resources at Oak Ridge National Laboratory (ORNL) are available for the acceleration work. Laika, Maxar conjunction prediction dashboard software, and Bluesim, Maxar orbital propagation software, are expected to be the first software in the acceleration lane. Laike and Bluesim are to be provided by the sponsor, and output will be made accessible through its dashboard. Deliverables will follow a gated schedule to the sponsor. ORNL will provide progressively more robust viewable conjunction assessments from both modelled and actual ephemerides.

97 MATHEMATICS AND COMPUTING↗

CESER I-Corps (Final Report)

Energy I-Corps is a U.S. Department of Energy (DOE) sponsored entrepreneurial training program for laboratory researchers aimed at accelerating the commercialization of lab-developed technologies. The program, developed and managed by DOE's Office of Technology Commercialization (OTC) in partnership with the National Laboratory of the Rockies (NLR), uses a customized curriculum built on the Lean Launch Methodology and delivers a rigorous 10- to 12-week training program to selected laboratory-based teams. The Energy I-Corps team at NLR worked with the DOE's OTC and Office of Cybersecurity, Energy Security, and Emergency Response (CESER) to develop and implement commercialization programming for awardees of the CESER Cybersecurity for Distributed Energy Resources Research, Development, and Demonstration Research Call, funded under Provision 40125(b) of the Infrastructure Investment and Jobs Act (IIJA). 40125(b) Projects were overseen by a technical monitor at the National Energy Technology Laboratory (NETL). The CESER Energy I-Corps Program is considered an Energy I-Corps "lite" or "mini" program, with a lighter lift to accommodate scheduling and funding per participant. This final report describes the CESER I-Corps program and provides recommendations on behalf of OTC to CESER to consider if CESER were to run an I-Corps program in future.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The Australian National Airborne Field Experiment 2005: Soil Moisture Remote Sensing at 60 Meter Resolution and Up

Spatially-distributed soil moisture observations have applications spanning a wide range of spatial resolutions from the very local needs of individual farmers to the progressively larger areas of interest to weather forecasters, water resource managers, and global climate modelers. To date, the most promising approach for space-based remote sensing of soil moisture makes use of passive microwave emission radiometers at L-band frequencies (1-2 GHz). Several soil moisture-sensing satellites have been proposed in recent years, with the European Space Agency's Soil Moisture Ocean Salinity (SMOS) mission scheduled to be launched first in a couple years. While such a microwave-based approach has the advantage of essentially allweather operation, satellite size limits spatial resolution to 10's of km. Whether used at this native resolution or in conjunction with some type of downscaling technique to generate soil moisture estimates on a finer-scale grid, the effects of subpixel spatial variability play a critical role. The soil moisture variability is typically affected by factors such as vegetation, topography, surface roughness, and soil texture. Understanding and these factors is the key to achieving accurate soil moisture retrievals at any scale. Indeed, the ability to compensate for these factors ultimately limits the achievable spatial resolution and/or accuracy of the retrieval. Over the last 20 years, a series of airborne campaigns in the USA have supported the development of algorithms for spaceborne soil moisture retrieval. The most important observations involved imagery from passive microwave radiometers. The early campaigns proved that the retrieval worked for larger and larger footprints, up to satellite-scale footprints. These provided the solid basis for proposing the satellite missions. More recent campaigns have explored other aspects such as retrieval performance through greater amounts of vegetation. All of these campaigns featured extensive ground truth collection over a range of grid spacings, to provide a basis for examining the effects of subpixel variability. However, the native footprint size of the airborne L-band radiometers was always a few hundred meters. During the recently completed (November, 2005) National Airborne Field Experiment (NAFE) campaign in Australia, a compact L-band radiometer was deployed on a small aircraft. This new combination permitted routine observations at native resolutions as high as 60 meters, substantially finer than in previous airborne soil moisture campaigns, as well as satellite footprint areal coverage. The radiometer, the Polarimetric L-band Microwave Radiometer (PLMR) performed extremely well and operations included extensive calibration-related observations. Thus, along with the extensive fine-scale ground truth, the NAFE dataset includes all the ingredients for the first scaling studies involving very-high-native resolution soil moisture observations and the effects of vegetation, roughness, etc. A brief overview of the NAFE will be presented, then examples of the airborne observations with resolutions from 60 m to 1 km will be shown, and early results from scaling studies will be discussed.

Kim, E. J.↗

COCPIT: Collaborative Activity Planning Software for Mars Perseverance Rover

Since landing on the Martian surface, the Perseverance rover has relied on a distributed team to generate commands for exploring its new environment each sol(Martian day). The team uses a complex suite of software tools to accomplish this challenging task in time for the next window of opportunity to send commands to the rover. A key piece of this software ecosystem is COCPIT (Component-based Campaign Planning, Implementation, and Tactical). COCPIT is part of the next generation of planning and scheduling software tools developed by NASA's Jet Propulsion Laboratory in partnership with NASA's Ames Research Center. COCPIT is a web-based application that allows users to collaboratively view and update the Perseverance rover's activity plans, continuously verify that the plan satisfies constraints, assign targets for directing scientific instruments, document science intent, and model power and data resources. Mars Surface Operations requires diverse expertise from team members within the Engineering, Science, Robotic, and Instrument Operations groups, distributed across North America and Europe. In order to improve efficiency and reduce risk, all teams are able to review and edit their activities simultaneously and see the effects on the plan in its entirety. As part of the Ground Data System (GDS) tool suite, COCPIT is responsible for the activity plan. It provides specialized views that allow operators to understand where there may be room for additional observations, see whether any planning constraints are being violated, and confirm that energy usage and data generation are within the defined limits. It contains details such as which filters a camera will use for a given observation, what the resolution of the images should be, where to store the data onboard, and how long the observation is expected to take. It predicts when specific data will be downlinked from the rover to a passing orbiter, so that the team knows when to expect that data on Earth for evaluation in future planning. Ultimately the information from the COCPIT plan is translated to sequences that will be bundled and radiated to Perseverance for execution. The COCPIT tool is used throughout all planning phases.

activity planning↗

COCPIT: Collaborative Activity Planning Software for Mars Perseverance Rover

Since landing on the Martian surface, the Perseverance rover has relied on a distributed team to generate commands for exploring its new environment each sol(Martian day). The team uses a complex suite of software tools to accomplish this challenging task in time for the next window of opportunity to send commands to the rover. A key piece of this software ecosystem is COCPIT (Component-based Campaign Planning, Implementation, and Tactical). COCPIT is part of the next generation of planning and scheduling software tools developed by NASA's Jet Propulsion Laboratory in partnership with NASA's Ames Research Center. COCPIT is a web-based application that allows users to collaboratively view and update the Perseverance rover's activity plans, continuously verify that the plan satisfies constraints, assign targets for directing scientific instruments, document science intent, and model power and data resources. Mars Surface Operations requires diverse expertise from team members within the Engineering, Science, Robotic, and Instrument Operations groups, distributed across North America and Europe. In order to improve efficiency and reduce risk, all teams are able to review and edit their activities simultaneously and see the effects on the plan in its entirety. As part of the Ground Data System (GDS) tool suite, COCPIT is responsible for the activity plan. It provides specialized views that allow operators to understand where there may be room for additional observations, see whether any planning constraints are being violated, and confirm that energy usage and data generation are within the defined limits. It contains details such as which filters a camera will use for a given observation, what the resolution of the images should be, where to store the data onboard, and how long the observation is expected to take. It predicts when specific data will be downlinked from the rover to a passing orbiter, so that the team knows when to expect that data on Earth for evaluation in future planning. Ultimately the information from the COCPIT plan is translated to sequences that will be bundled and radiated to Perseverance for execution. The COCPIT tool is used throughout all planning phases.

activity planning↗

COCPIT: Collaborative Activity Planning Software for Mars Perseverance Rover

Since landing on the Martian surface, the Perseverance rover has relied on a distributed team to generate commands for exploring its new environment each sol (Martian day). The team uses a complex suite of software tools to accomplish this challenging task in time for the next window of opportunity to send commands to the rover. A key piece of this software ecosystem is COCPIT (Component-based Campaign Planning, Implementation, and Tactical). COCPIT is part of the next generation of planning and scheduling software tools developed by NASA's Jet Propulsion Laboratory in partnership with NASA's Ames Research Center. COCPIT is a web-based application that allows users to collaboratively view and update the Perseverance rover's activity plans, continuously verify that the plan satisfies constraints, assign targets for directing scientific instruments, document science intent, and model power and data resources. Mars Surface Operations requires diverse expertise from team members within the Engineering, Science, Robotic, and Instrument Operations groups, distributed across North America and Europe. In order to improve efficiency and reduce risk, all teams are able to review and edit their activities simultaneously and see the effects on the plan in its entirety. As part of the Ground Data System (GDS) tool suite, COCPIT is responsible for the activity plan. It provides specialized views that allow operators to understand where there may be room for additional observations, see whether any planning constraints are being violated, and confirm that energy usage and data generation are within the defined limits. It contains details such as which filters a camera will use for a given observation, what the resolution of the images should be, where to store the data onboard, and how long the observation is expected to take. It predicts when specific data will be downlinked from the rover to a passing orbiter, so that the team knows when to expect that data on Earth for evaluation in future planning. Ultimately the information from the COCPIT plan is translated to sequences that will be bundled and radiated to Perseverance for execution. The COCPIT tool is used throughout all planning phases.

Kanefsky, Bob↗

Distributed optimization and control for autonomous distributed energy resource power dispatch and frequency regulation considering communication failures

Distributed energy resources (DERs) can significantly enhance grid flexibility by supplying power and secondary frequency regulation (SFR) services. Yet, their large number and dispersed nature limit the effectiveness of traditional centralized power dispatch and frequency control schemes, and expose the system to single-point communication failures. This paper presents a unified distributed optimization and control framework for DER power dispatch and SFR provision. A transmission-loss-aware distributed direct current optimal power flow is first formulated to optimize DER power dispatch and reserve scheduling. On top of this, a fully distributed control scheme for DER autonomous SFR provision is developed to allocate automatic generation control signals cost-effectively while ensuring robustness to communication link disruptions. The framework is validated on IEEE 14-bus and 39-bus transmission systems with large-scale distribution feeders using transmission-distribution dynamic co-simulation, demonstrating reliable and autonomous DER power dispatch and SFR provision under diverse operating conditions and communication contingencies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Tug fleet and ground operations schedules and controls. Volume 1: Executive summary

This study presents Tug Fleet and Ground Operations Schedules and Controls plan. This plan was developed and optimized out of a combination of individual Tug program phased subplans, special emphasis studies, contingency analyses and sensitivity analyses. The subplans cover the Tug program phases: (1) Tug operational, (2) Interim Upper Stage (IUS)/Tug fleet utilization, (3) and IUS/Tug payload integration, (4) Tug site activation, (5) IUS/Tug transition, (6) Tug acquisition. Resource requirements (facility, GSE, TSE, software, manpower, logistics) are provided in each subplan, as are appropriate Tug processing flows, active and total IUS and Tug fleet requirements, fleet management and Tug payload integration concepts, facility selection recommendations, site activation and IUS to Tug transition requirements. The impact of operational concepts on Tug acquisition is assessed and the impact of operating Tugs out of KSC and WTR is analyzed and presented showing WTR as a delta. Finally, cost estimates for fleet management and ground operations of the DDT&E and operational phases of the Tug program are given.

Source record↗