Search NASA⌕ Search

SEARCH · Search NASA

Results for “accelerated testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,333 records · Page 74

Description and initial operating performance of the Langley 6-inch expansion tube using heated helium driver gas

A general description of the Langley 6-inch expansion tube is presented along with discussion of the basic components, internal resistance heater, arc-discharge assemblies, instrumentation, and operating procedure. Preliminary results using unheated and resistance-heated helium as the driver gas are presented. The driver-gas pressure ranged from approximately 17 to 59 MPa and its temperature ranged from 300 to 510 K. Interface velocities of approximately 3.8 to 6.7 km/sec were generated between the test gas and the acceleration gas using air as the test gas and helium as the acceleration gas. Test flow quality and comparison of measured and predicted expansion-tube flow quantities are discussed.

Moore, J. A.↗

The Longitudinal Stability of Flying Boats as Determined by Tests of Models in the NACA Tank II : Effect of Variations in Form of Hull on Longitudinal Stability

Data taken from tests at constant speed to establish trim limits of stability, tests at accelerated speeds to determine stable limits of center of gravity shift, and tests at decelerated speeds to obtain landing characteristics of several model hull forms were used to establish hull design effect on longitudinal stability of porpoising. Results show a reduction of dead rise angle as being the only investigated factor reducing low trim limit. Various methods of reducing afterbody interference increased upper trim limit

Olson, Roland E.↗

Product Reliability Trends, Derating Considerations and Failure Mechanisms with Scaled CMOS

As microelectronics is scaled into the deep sub-micron regime, space and aerospace users of advanced technology CMOS are reassessing how scaling effects impact long-term product reliability. The effects of electromigration (EM), time-dependent-dielectric-breakdown (TDDB) and hot carrier degradation (HCI and NBTI) wearout mechanisms on scaled technologies and product reliability are investigated, accelerated stress testing across several technology nodes is performed, and FA is conducted to confirm the failure mechanism(s).

CMOS integrated circuits↗

Mars 2020 Perseverance Rover SHERLOC Instrument Isolation System

The NASA Jet Propulsion Laboratory (JPL) successfully landed the Mars 2020 Perseverance Rover at Jezero Crater on the Martian surface. Perseverance’s main mission objective is to cache Martian rock and regolith samples in hermetically sealed tubes to be brought back to Earth by future missions. To achieve this goal the rover is equipped with a 2-meter-long Robotic Arm (RA) which manipulates the Turret to interact with the surface. The Turret is comprised of science instruments and tools that enable surface sampling and science. The backbone of the Turret hardware is the Rotary Percussive Coring Drill. The science instruments, which are directly mounted to the structural housing of this drill, must be able to withstand not only the launch and entry, descent and landing (EDL) loads of the vehicle but also the dynamic percussive environment, induced by the drill throughout surface operations. This paper discusses the technical hardware design, development and testing of a vibration isolation system to protect the Scanning Habitable Environments with Raman and Luminescence for Organics and Chemicals (SHERLOC) Instrument from these dynamic environments. The hardware design aspect of this problem was limited by both size and mass constraints. The Turret is tightly configured and the physical space in which hardware can reside is restricted due to multiple axes of surface interaction points. Another driving requirement is the extreme range of thermal non-operational environment from -135C to +90C. This, in addition to SHERLOC being a heavier instrument than previously integrated on a turret, made the use of isolation systems employed on previous rover missions problematic. The final design incorporates custom wire mesh springs preloaded within titanium hexapod struts equipped with flexure ends. Custom versions of commercially available wire mesh springs were designed and tested. These custom springs differed in dimension, density and stiffness from the off the shelf options. The newly designed springs went through various stages of flight acceptance testing. Detailed physics-based modeling to understand what loads the isolation system would experience was used to define the test conditions for the springs and entire isolation subsystem. The testing program developed around this was extensive to fully characterize the isolation performance over cleanliness levels, temperature and life. Another major aspect of this work was developing a method of replicating the drill’s percussive environment for performance and life testing of Turret mounted hardware. Attaching the instrument to an operating drill for testing was not a viable option. A method of using a Highly Accelerated Life Test (HALT) table was developed and applied across the project as the most representative and tunable option to physically simulate this new environment. This method, along with launch environment random vibration testing, was used to build an entire dynamic qualification and flight hardware test program. The results of the design, modeling, testing and analysis of the SHERLOC Isolation System is described throughout the following paper.

Krafchak, Todd↗

Design and Technology Maturation of the Stratospheric Projectile Experiment of Entry Dynamics

The supersonic and transonic dynamic stability of blunt-body reentry vehicles currently poses large risks in all of NASA’s ongoing entry missions (MSR SRL, MSR EES, and Dragonfly). These projects have allocated millions of dollars to testing and modeling efforts to buy down risk by using the current state-of-the-art (SoA) facilities at NASA’s disposal. While these facilities have heritage in supplying dynamics data to reentry missions, their availability is severely limited – particularly with the high number of concur-rent projects requesting simultaneous testing– and are costly when considering the science density per dollar. None of the current SoA facility methodologies allow the test model to have the dynamics fully develop through a flight relevant free-stream profile and as such require extrapolations with resultant high uncertainties in order to relate the test dynamics to flight expectations. SPEED is a NASA Ames Center Innovation Fund (CIF) project that is developing a highly tailorable and cost-effective test methodology to better assess the dynamic stability of blunt-body reentry vehicles via a stratospheric balloon flight. This is accomplished by dropping a suite of instrumented capsules from a stratospheric balloon to gain a statistically relevant dataset of scaled reentry vehicles in mission relevant free-flight conditions. This presentation will walk through how the test methodology is being implemented specifically for the Mars Sample Return (MSR) Earth Entry System (EES) geometry in an awarded Flight Opportunities Program (FOP) test flight in early CY24. SPEED Application to MSR: SPEED consists of three main mechanical systems: the Drop Platform, the Projectile, and the test Capsule. SPEED is being developed as a set of guidelines and recommendations for how to test with the proposed Concept of Operations (Conops) since the specific design parameters will vary depending on the specific project’s reference trajectory and entry vehicle design. As such, this presentation will walk through the development time-line as shown in Fig. 2. This is meant to serve as a blueprint for further missions as desired. Mechanical and Avionics Design. The SPEED test platform designed for the MSR-EES capsule geometry with nominal entry parameters has the ability to carry 10 Capsules to altitude instrumented with: 1. 3-Axis Accelerometer 2. IMU 3. Gyroscope 4. Magnetometer 5. Pressure Transducer cruciform 6. Uplook and Horizon Cameras To package the avionics/instrumentation suite, the capsule is approximately 1’ in diameter with the Outer Mold Line (OML) centroid-scaled from the full EES design. The internal volume is gutted and custom-shaped to fit the desired instrumentation suite, as well as to allow for the positioning of ballast mass such that the Center of Gravity is analogous to the flight vehicle. All structural components in the Capsule and Projectile are 3D printed, which significantly reduces the cost of each flight unit to around $1500 including all instrumentation, avionics, and structural components. Flight Conops. The test Capsule is accelerated to the desired altitude and Mach number while stowed in the Projectile, a missile-like vehicle consisting of steel ballast in the nose, a low-drag OML, and an Ejection Mechanism to reliably release the Capsule into the free-flow supersonic conditions. For the MSR-EES design, the capsule employs ~3kg of ballast mass at the nose to accelerate the 1.25kg test Capsule to ~Mach 1.7 at 23km altitude. This requires an initial release altitude of 40km, the quoted limit of a 80kg payload by the FOP-contracted balloon provider. Once the Ejection Mechanism avionics detect the proper conditions, the spring-loaded Ejection Mechanism will release and – guided by the sabot – expose the test Capsule to the desired test conditions for ~5 seconds of free-flight in the supersonic/transonic regimes. Dynamics in the subsonic regime will also be captured with the instrumentation suite with post-flight recovery operations aimed at recovering the high-G-load capable SD cards after the planned hard impact landings. Testing and Development: In the few months the SPEED project has worked the development of MSR-EES flight test, the team has performed lab and drone based testing which this presentation will overview. After the first design phase, the team fabricated Engineering Demonstration Units (EDUs) of all subsystems to perform validation testing shown in Fig. 5. After validation was completed on the subsystem level, a drone-drop test was performed at the recreational flight ceiling of 400ft altitude to assess the SPEED systems in a flight environment. Parameters such as in-flight stability, hard impact landing performance, and avionics performance were quantified and qualified. The FY23 CIF will culminate in a helicopter drop test aboard an Air National Guard Blackhawk. This will prepare the team for the CY24 FOP stratospheric balloon flight that should provide the final verification to begin offering the test platform for mission support. Focus of Presentation: This presentation will outline the technology maturation path of the SPEED implementation to the MSR-EES capsule baseline as well as the details regarding the mechanical system, avionics and instrumentation, and flight operations. Note that a complementary presentation is being submitted for a methodology overview of the SPEED test platform, introducing the testing technique and benefits as well as the full application space of the technology.

pitch damping coefficient↗

Accelerator driven gamma and fast neutron radiography test-bed at Lawrence Livermore National Laboratory

Accelerator driven fusion gammas and fast neutrons could provide unique radiography capabilities due to their ability to produce both high and low energy mono-energetic gammas and neutrons compared with broadband bremsstrahlung based x-ray sources. The possibility of simultaneously obtaining both gamma and neutron radiographs using one source could allow complex objects composed of a large range of low to high Z materials to be imaged. In this paper we review a 4 MV RFQ accelerator driven radiography test-bed at LLNL designed to study the physics involved in applying these dual output fusion reactions for radiography applications. First experimental neutron images from a carbon target are presented.

43 PARTICLE ACCELERATORS↗

STANDARDIZATION OF CEBAF 12 GEV UPGRADE CAVITY TESTING

CEBAF 12GeV upgrade project includes 80 new 7-cell cavities to form 10 cryomodules. Each cavity underwent RF qualification at 2.07K using a high power accelerating gradient test and an HOM survey in Jefferson Lab's Vertical Testing Area (VTA) before cavity string assembly. In order to ensure consistently high quality data, updated cavity testing procedures and analysis were implemented and used by a group of VTA operators. For high power tests, a cavity testing procedure was developed and used in conjunction with a LabVIEW program to collect the test data. Additionally while the cavity was at 2.07K, an HOM survey was performed using a network analyzer and a combination of Excel and Mathematica programs. Data analysis was standardized and an online logbook, Pansophy, was used for data storage and mining. The Pansophy system allowed test results to be easily summarized and searchable across all cavity tests. In this presentation, the CEBAF 12GeV upgrade cavity testing procedure, method for data analysis, and results reporting results will be discussed.

43 PARTICLE ACCELERATORS↗

A 12 GHz RF Power Source for the CLIC Study

The CLIC RF frequency has been changed in 2008 from the initial 30 GHz to the European X-band 11.9942 GHz permitting beam independent power production using klystrons for CLIC accelerating structure testing. A design and fabrication contract for five klystrons at that frequency has been signed by different parties with SLAC. France (IRFU, CEA Saclay) is contributing a solid state modulator purchased in industry and specific 12 GHz RF network components to the CLIC study. RF pulses over 120 MW peak at 230 ns length will be obtained by using a novel SLED-I type pulse compression scheme designed and fabricated by IAP, Nizhny Novgorod, Russia. The X-band power test stand is being installed in the CLIC Test Facility CTF3 for independent structure and component testing in a bunker, but allowing, in a later stage, for powering RF components in the CTF3 beam lines. The design of the facility, results from commissioning of the RF power source and the expected performance of the Test Facility are reported.

43 PARTICLE ACCELERATORS↗

Assessing the Causes of Encapsulant Delamination in PV Modules

Delamination of the encapsulant is one of the most prevalent PV module field failures. This paper will present examples of various types of delaminations that have been observed in the field. It will then discuss the development of accelerated stress tests designed to duplicate those field failures and thus provide tools for avoiding them in the future.

14 SOLAR ENERGY↗

Lifetime Tests on a High Ohms/Square Metalized High Crystalline Polypropylene Film Capacitor with Application to a Marx Modulator

This paper presents accelerated lifetime tests on a polypropylene film capacitor. Experimental parameters (20% droop, 5 Hz repetition rate) simulate anticipated operating conditions encountered in the SLAC P2 Marx. Elevated film electric field stress is utilized as the acceleration parameter. Results indicate that, for the particular film of interest, a film stress of {approx}290 V/{mu}m corresponds to a 10{sup 5} hour lifetime. In addition, the voltage scaling exponent for this film is 13.1.

43 PARTICLE ACCELERATORS↗

Reliability Assessment of Cooling Fans for PV Inverters: Testing, Modeling, and Case Studies

The reliability of photovoltaic (PV) inverters is critical for long-term solar system performance, with cooling fan failures frequently leading to costly downtime. While much research exists on general cooling fan reliability, little attention has been given to fans operating within PV inverters and their unique environmental challenges. Here, this article proposes a comprehensive methodology to address this gap. First, a failure mode and effects analysis is performed on fans to identify the key failure mechanisms in PV applications, their corresponding stressors, and the models necessary for lifetime prediction. Second, an accelerated life test is designed and conducted to collect valuable experimental data for PV inverter fans in a reasonable amount of time. Third, a mathematical conversion of dynamic mission profiles into effective constant stress levels is derived. Fourth, case studies are given, showcasing lifetime estimates that account for geographic variations in mission profile data. The results demonstrate that this integrated approach leads to an accurate reliability assessment for PV inverter cooling fans.

accelerated life testing (ALT)↗

Note: Absolute calibration of two DRZ phosphor screens using ultrashort electron bunch

This article gives the absolute calibration of two types phosphor screens (DRZ) that were used to detect and characterize electron bunches driven by laser-plasma accelerator. The test was performed with picoseconds electron bunch at a radio frequency linear electron accelerator in Tsinghua University. The photons emitted from DRZ screens showed good linear responses to the charge of incident electron bunch and cosine angular distribution in space. An energy conversional efficiency of effective scintillant matter was also calculated.

43 PARTICLE ACCELERATORS↗

Preliminary Evaluation of Driver Fuel Plates and Reduced Sodium Temperature to Increase Fast Test Reactor Experimental Neutron Irradiation Capabilities

All sodium-cooled fast test reactors operated so far have used essentially the same fuel geometrical ar-rangement, namely cylindrical fuel pins assembled into a triangular array in hexagonal fuel assemblies. Fuel compositions and dimensions may vary but the overall geometrical pattern remains identical. Fur-thermore, most sodium-cooled reactors have operated, and still operate, with core-average inlet and outlet sodium temperatures of, respectively, 350-400°C and 500-550°C. The present preliminary study revisits the standard fuel assembly geometry as well as operating tempera-tures to evaluate potential impact on fast test reactor neutron irradiation capabilities. The reference fuel is U-20Pu-10Zr. Pin (reference) and plate geometries are considered together with two sets of core-average sodium inlet/outlet temperatures: 350/500°C (reference) and 200/400°C. More prototypic environments could be obtained inside ad-hoc irradiation testing vehicles that are independent from the reactor primary coolant. Everything else being the same, fuel temperature is significantly lower in plates than in pins. Therefore, plates could in principle accommodate higher plutonium content, thus, reducing the need for uranium enrichment or allowing the use of lower quality plutonium (U-xPu-10Zr thermal conductivity and solidus temperature decrease as x increases, hence, necessitating additional thermal margins). For the reference pin configuration, lowering the inlet/outlet sodium temperatures from the reference 350/500°C down to 200/400°C provides additional thermal margins that can be used to increase the peak fast flux from about 4.5 × 10 15 n/cm 2 -s to 6 ×10 15 n/cm 2 -s for the same core power of 300 MW. Assuming 300 Equivalent Fuel Power Days (EFPD) of operation per calendar year, a (steel) test article could accu-mulate up to 75 dpa/year. The use of fuel plates provides even more thermal margins which may allow the peak fast flux to reach values as high as 8 × 10 15 n/cm 2 -s for both sets of inlet/outlet temperatures. In this environment, a test article could accumulate up to 95 dpa/year assuming 300 EFPD/year, hence greatly accelerating irradiation testing. Allowing a fast test reactor to operate over a wide range of inlet/outlet temperatures could add significant flexibility to its neutron irradiation capabilities. Steel present in the driver fuel assemblies is not expected to accumulate more than 90 displacements per atom (dpa) over its lifetime. Hence, steel alloys that are not suited for very high dpa but can operate over a wide range of temperatures (from low to high) would be appropriate for this application. Finally, because pin and plate assemblies fit on the same grid plate, a fast test reactor could in principle start-up with standard fuel pin assemblies and, later on, move to a plate-type Mark-II fuel to further in-crease its neutron irradiation capabilities while potentially reducing the level of uranium enrichment needed.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

CdS thin film solar cells for terrestrial power

The development of very low cost long lived Cu2S/CdS thin film solar cells for large scale energy conversion is reported. Excellent evaporated metal grid patterns were obtained using a specially designed aperture mask. Vacuum evaporated gold and copper grids of 50 lines per inch and 1 micron thickness were adequate electrically for the fine mesh contacting grid. Real time roof top sunlight exposure tests of encapsulated CdS cells showed no loss in output after 5 months. Accelerated life testing of encapsulated cells showed no loss of output power after 6 months of 12 hour dark-12 hour AMI illumination cycles at 40 C, 60 C, 80 C and 100 C temperatures. However, the cells changed their basic parameters, such as series and shunt resistance and junction capacitance.

Shirland, F. A.↗

Failure Modes in Capacitors When Tested Under a Time-Varying Stress

Power-on failure has been the prevalent failure mechanism for solid tantalum capacitors in decoupling applications. A surge step stress test (SSST) has been previously applied to identify the critical stress level of a capacitor batch to give some predictability to the power-on failure mechanism [1]. But SSST can also be viewed as an electrically destructive test under a time-varying stress (voltage). It consists of rapidly charging the capacitor with incremental voltage increases, through a low resistance in series, until the capacitor under test is electrically shorted. When the reliability of capacitors is evaluated, a highly accelerated life test (HALT) is usually adopted since it is a time-efficient method of determining the failure mechanism; however, a destructive test under a time-varying stress such as SSST is even more time efficient. It usually takes days or weeks to complete a HALT test, but it only takes minutes for a time-varying stress test to produce failures. The advantage of incorporating a specific time-varying stress profile into a statistical model is significant in providing an alternative life test method for quickly revealing the failure mechanism in capacitors. In this paper, a time-varying stress that mimics a typical SSST has been incorporated into the Weibull model to characterize the failure mechanism in different types of capacitors. The SSST circuit and transient conditions for correctly surge testing capacitors are discussed. Finally, the SSST was applied for testing Ta capacitors, polymer aluminum capacitors (PA capacitors), and multi-layer ceramic (MLC) capacitors with both precious metal electrodes (PME) and base metal electrodes (BME). The test results are found to be directly associated with the dielectric layer breakdown in Ta and PA capacitors and are independent of the capacitor values, the way the capacitors were built, and the capacitors manufacturers. The test results also show that MLC capacitors exhibit surge breakdown voltages much higher than the rated voltage and that the breakdown field is inversely proportional to the dielectric layer thickness. The SSST data can also be used to comparatively evaluate the voltage robustness of capacitors for decoupling applications.

Liu, David (Donhang)↗

A Thermal Runaway Failure Model for Low-Voltage BME Ceramic Capacitors with Defects

Reliability of base metal electrode (BME) multilayer ceramic capacitors (MLCCs) that until recently were used mostly in commercial applications, have been improved substantially by using new materials and processes. Currently, the inception of intrinsic wear-out failures in high quality capacitors became much greater than the mission duration in most high-reliability applications. However, in capacitors with defects degradation processes might accelerate substantially and cause infant mortality failures. In this work, a physical model that relates the presence of defects to reduction of breakdown voltages and decreasing times to failure has been suggested. The effect of the defect size has been analyzed using a thermal runaway model of failures. Adequacy of highly accelerated life testing (HALT) to predict reliability at normal operating conditions and limitations of voltage acceleration are considered. The applicability of the model to BME capacitors with cracks is discussed and validated experimentally.

reliability↗

Mini-99 Experiment Design and Target Assembly

Qualification of nuclear fuels requires an understanding of a myriad of fuel performance variables, which requires time-consuming irradiations in test reactors. Accelerating burnup accumulation to reduce the irradiation time has historically been accomplished by increasing the 235 U enrichment in integral fuel tests, which inherently couples the fuel’s temperature and fission heat generation. Separate effects irradiation testing of nuclear fuel, using the MiniFuel target in the Oak Ridge National Laboratory’s (ORNL’s) High Flux Isotope Reactor (HFIR), offers an approach for decoupling fuel temperature and fission rate by reducing the quantity of the fuel and relying primarily on gamma heating in the surrounding components to drive fuel temperatures. However, if the fission rate is high enough, the fuel temperature will still vary over time as the fission heating changes, primarily due to poor heat conduction between the fuel and the surrounding components. This work details the design, analysis, and fabrication of a MiniFuel target which utilizes sodium bonding to improve the heat rejection from the fuel specimen, enabling the testing of higher 235 U enrichments (~8wt.%) to further accelerate burnup accumulation without prohibitively large temperature variations throughout the course of the irradiation.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Fermilab Cryogenic Test Facilities

Fermi National Accelerator Laboratory (Fermilab) has multiple cryogenic test facilities, undertaking testing of superconducting magnets, Superconducting Radio Frequency (SRF) cavities, SRF cryomodules and other helium cryogenic components. The test areas within Fermilab include: Meson Cryogenic Test facility (Meson), Industrial Building 1 (IB-1), Heavy Assembly Building/Illinois Accelerator Research Center (HAB/IARC), New Muon Lab, (NML) and the Cryomodule Test Facility (CMTF). Meson and HAB/IARC utilize repurposed Tevatron era reciprocating engine based cryogenic refrigerator systems, whereas CMTF and IB-1 utilize gas bearing turbine based coldboxes. Each of these test areas support the various Fermilab projects and collaborations including the Linear Coherent Light Source II (LCLS-II), Proton Improvement Plan II (PIP-II), High Luminosity Large Hadron Collider (HL-LHC), and Mu2e. This paper outlines the diverse and extensive cryogenic test capabilities within Fermilab.

43 PARTICLE ACCELERATORS↗