Search NASA⌕ Search

SEARCH · Search NASA

Results for “program areas”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,333 records · Page 74

Reintroduction of Lower Columbia River Chum Salmon into Duncan Creek, 2007 Annual Report.

The National Marine Fisheries Service (NMFS) listed Lower Columbia River (LCR) chum salmon as threatened under the Endangered Species Act (ESA) in March, 1999 (64 FR 14508, March 25, 1999). The listing was in response to the reduction in abundance from historical levels of more than one-half million returning adults to fewer than 10,000 present-day spawners. Harvest, habitat degradation, changes in flow regimes, riverbed movement and heavy siltation have been largely responsible for this decline. The timing of seasonal changes in river flow and water temperatures is perhaps the most critical factor in structuring the freshwater life history of this species. This is especially true of the population located directly below Bonneville Dam, where hydropower operations can block access to spawning sites, dewater redds, strand fry, cause scour or fill of redds and increase sedimentation of spawning gravels. Prior to 1997, only two chum salmon populations were recognized as genetically distinct in the Columbia River, although spawning had been documented in many Lower Columbia River tributaries. The first population was in the Grays River (RKm 34), a tributary of the Columbia River, and the second was a group of spawners utilizing the mainstem Columbia River just below Bonneville Dam (RKm 235) adjacent to Ives Island and in Hardy and Hamilton creeks. Using additional DNA samples, Small et al. (2006) grouped chum salmon spawning in the mainstem Columbia River and the Washington State tributaries into three groups: the Coastal, the Cascade and the Gorge. The Coastal group comprises those spawning in the Grays River, Skamokawa Creek and the broodstock used at the Sea Resources facility on the Chinook River. The Cascade group comprises those spawning in the Cowlitz (both summer and fall stocks), Kalama, Lewis, and East Fork Lewis rivers, with most supporting unique populations. The Gorge group comprises those spawning in the mainstem Columbia River from the I-205 Bridge up to Bonneville Dam and those spawning in Hamilton and Hardy creeks. Response to the federal ESA listing has been primarily through direct-recovery actions: reducing harvest, hatchery supplementation using local broodstock for populations at catastrophic risk, habitat restoration (including construction of spawning channels) and flow agreements to protect spawning and rearing areas. Both state and federal agencies have built controlled spawning areas. In 1998, the Washington Department of Fish and Wildlife (WDFW) began a chum salmon supplementation program using native stock on the Grays River. This program was expanded during 1999 - 2001 to include reintroduction into the Chinook River using eggs from the Grays River Supplementation Program. These eggs are incubated at the Grays River Hatchery, reared to release size at the Sea Resources Hatchery on the Chinook River, and the fry are released at the mouth of the Chinook River. Native steelhead, chum, and coho salmon are present in Duncan Creek, and are recognized as subpopulations of the Lower Gorge population, and are focal species in the Lower Columbia Fish Recovery Board (LCFRB) plan. Steelhead, chum and coho salmon that spawn in Duncan Creek are listed as Threatened under the ESA. Duncan Creek is classified by the LCFRB plan as a watershed for intensive monitoring (LCFRB 2004). This project was identified in the 2004 Federal Columbia River Power System (FCRPS) revised Biological Opinion (revised BiOp) to increase survival of chum salmon, 'BPA will continue to fund the program to re-introduce Columbia River chum salmon into Duncan Creek as long as NOAA Fisheries determines it to be an essential and effective contribution to reducing the risk of extinction for this ESU'. (USACE et al. 2004, page 85-86). The Governors Forum on Monitoring and Salmon Recovery and Watershed Health recommends one major population from each ESU have adult and juvenile monitoring. Duncan Creek chum salmon are identified in this plan to be intensively monitored. Planners recommended that a combination of natural and hatchery production would be the most likely way to produce the most rapid sustainable improvement in chum runs. Specifically, it was assumed that improving habitat conditions would promote efficient natural production, and that the most rapid way to rebuild the run would be to combine releases of an appropriate stock into the improved habitat. WDFW's recovery strategy for LCR chum salmon, as outlined in the WDFW Grays River and Washougal Hatchery Genetic Management Plans (HGMP), is as follows. First, determine if remnant populations of chum salmon exist in LCR tributaries. Second, if such populations exist, develop stock-specific recovery plans involving habitat restoration that include the creation of spawning refugias, supplementation where necessary, and a habitat and fish monitoring and evaluation plan.

13 HYDRO ENERGY↗

Reaction-Based Reactive Transport Modeling of Iron Reduction and Uranium Immobilization at Area 2 of the NABIR Field Research Center

This report summarizes research conducted in conjunction with a project entitled “Reaction-Based Reactive Transport Modeling of Iron Reduction and Uranium Immobilization at Area 2 of the NABIR Field Research Center”, which was funded through the Integrative Studies Element of the former NABIR Program (now the Environmental Remediation Sciences Program) within the Office of Biological and Environmental Research. Dr. William Burgos (The Pennsylvania State University) was the overall PI/PD for the project, which included Brian Dempsey (Penn State), Gour-Tsyh (George) Yeh (Central Florida University), and Eric Roden (formerly at The University of Alabama, now at the University of Wisconsin) as separately-funded co-PIs. The project focused on development of a mechanistic understanding and quantitative models of coupled Fe(III)/U(VI) reduction in FRC Area 2 sediments. The work builds on our previous studies of microbial Fe(III) and U(VI) reduction, and was directly aligned with the Scheibe et al. ORNL FRC Field Project at Area 2.

54 ENVIRONMENTAL SCIENCES↗

Advancing Offshore Wind Resource Characterization Using Buoy-based Observations

As countries continue to implement sustainable and renewable energy goals, the need for affordable low-carbon technologies, including those related to offshore wind energy, is accelerating. The U.S. federal government recognizes the environmental and economic benefits of offshore wind development and is taking the necessary steps to overcome critical challenges facing the industry to realize these benefits. The U.S. Department of Energy (DOE) is investing in buoy-mounted lidar systems to facilitate offshore measurement campaigns that will advance our understanding of the offshore environment and provide the observational data needed for model validation, particularly at hub height where offshore observations are particularly lacking. On behalf of the DOE, Pacific Northwest National Laboratory manages a Lidar Buoy Program that facilitates meteorological and oceanographic data collection using validated methods to support the U.S. offshore wind industry. Since being acquired in 2014, two DOE lidar buoys have been deployed on the U.S. east and west coasts; and their data represent the first publicly available multi-seasonal hub height data to be collected in U.S. waters. In addition, the buoys have undergone performance testing, significant upgrades, and a lidar validation campaign to ensure the accuracy and reliability of the lidar data needed to support wind resource characterization and model validation. The Lidar Buoy Program is providing valuable offshore data to the wind energy community, while focusing data collection on areas of acknowledged high priority.

offshore wind energy, lidar buoy, wind resource ch↗

LWR codes capability to address SFR BDBA scenarios: Modeling of the ABCOVE tests

The sound background built-up in LWR source term analysis in case of a severe accident, make it worth to check the capability of LWR safety analysis codes to model accident SFR scenarios, at least in some areas. This paper gives a snapshot of such predictability in the area of aerosol behavior in containment. To do so, the AB-5 test of the ABCOVE program has been modeled with 3 LWR codes: ASTEC, ECART and MELCOR. Through the search of a best estimate scenario and its comparison to data, it is concluded that even in the specific case of in-containment aerosol behavior, some enhancements would be needed in the LWR codes and/or their application, particularly with respect to consideration of particle shape. Nonetheless, much of the modeling presently embodied in LWR codes might be applicable to SFR scenarios. These conclusions should be seen as preliminary as long as comparisons are not extended to more experimental scenarios. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Proceedings of the TOUGH Symposium 2009

Welcome to the TOUGH Symposium 2009. Within this volume are the Symposium Program for eighty-nine papers to be presented in both oral and poster formats. The full papers are available as pdfs linked from the Symposium Program posted on the TOUGH Symposium 2009 website http://esd.lbl.gov/newsandevents/events/toughsymposium09/program.html Additional updated information including any changes to the Program will also be available at the website. The papers cover a wide range of application areas and reflect the continuing trend toward increased sophistication of the TOUGH codes. A CD containing the proceedings papers will be published immediately following the Symposium and sent to all participants. As in the prior Symposium, selected papers will be invited for submission to a number of journals for inclusion in Special Issues focused on applications and developments of the TOUGH codes. These journals include, Transport in Porous Media, Geothermics, Energy Conversion and Management, Journal of Nuclear Science and Technology, and the Vadose Zone Journal.

54 ENVIRONMENTAL SCIENCES↗

Design, Installation, and Initial Commissioning of the MTA Beamline

A new experimental area designed to develop, test and verify muon ionization cooling apparatus using the 400-MeV Fermilab Linac proton beam has been fully installed and is presently being commissioned. Initially, this area was used for cryogenic tests of liquid-hydrogen absorbers for the MUCOOL R&D program and, now, for high-power beam tests of absorbers, high-gradient rf cavities in the presence of magnetic fields (including gas-filled cavities), and other prototype muon-cooling apparatus. The experimental scenarios being developed for muon facilities involve collection, capture, and cooling of large-emittance, high-intensity muon beams--{approx}10{sup 13} muons, so that conclusive tests of the apparatus require full Linac beam, which is 1.6 x 10{sup 13} p/pulse. To support the muon cooling facility, this new primary beamline extracts and transports beam directly from the Linac to the test facility. The design concept for the MuCool facility is taken from an earlier proposal [1], but modifications were necessary to accommodate high-intensity beam, cryogenics, and the increased scale of the cooling experiments. Further, the line incorporates a specialized section and utilizes a different mode of operation to provide precision measurements of Linac beam parameters. This paper reports on the technical details of the MuCool beamline for both modes.

43 PARTICLE ACCELERATORS↗

High Performance Computing - Power Application Programming Interface Specification. Version 1.1 [DRAFT]

Measuring and controlling the power and energy consumption of high performance computing systems by various components in the software stack is an active research area [13, 3, 5, 10, 4, 21, 19, 16, 7, 17, 20, 18, 11, 1, 6, 14, 12]. Implementations in lower level software layers are beginning to emerge in some production systems, which is very welcome. To be most effective, a portable interface to measurement and control features would significantly facilitate participation by all levels of the software stack. We present a proposal for a standard power Application Programming Interface (API) that endeavors to cover the entire software space, from generic hardware interfaces to the input from the computer facility manager.

97 MATHEMATICS AND COMPUTING↗

Subtask 1.3 – Integrated Carbon Capture and Storage for North Dakota Ethanol Production

The Energy & Environmental Research Center (EERC), in partnership with Red Trail Energy, LLC (RTE), a North Dakota ethanol producer; the North Dakota Industrial Commission (NDIC) Renewable Energy Program (REP); and the U.S. Department of Energy (DOE), conducted a feasibility and implementation study for a commercial carbon capture and storage (CCS) effort. This subtask provided technical support and developed recommended practices of how small-scale industrial CO2 emitters (<1,000,000 tonnes of CO2 emitted annually) may economically deploy CCS. The 64-million-gallon dry mill RTE ethanol facility, emitting an average 180,000 tonnes of CO2 annually, was the subject of the case study. The positive outcome of this research, which shows technical and economic potential for ethanol–CCS in North Dakota, has resulted in RTE acquiring an approved Permit to Drill on December 2, 2019, for a stratigraphic test well in early 2020, a necessary step toward a North Dakota CO2 Storage Facility Permit (SFP) for the RTE CCS effort. Outcomes include 1) validating the Broom Creek Formation as a regional target for CCS, 2) determining the full carbon life cycle of an industrial fuel production facility with CCS, 3) developing a field implementation plan (FIP) for small-scale CCS, and 4) determining the validity and pathway for using CCS to meet low-carbon fuel (LCF) standards. The technical team included the EERC, RTE, Trimeric Corporation, Schlumberger Carbon Services, and Computer Modelling Group (CMG). Findings from activities conducted November 2016 – May 2020 are summarized as follows. Several key steps have been accomplished toward validating the Broom Creek Formation as a CO2 injection and storage target at the RTE CCS site, including verification of the presence and structure of sandstone layers that may comprise the potential CO2 storage reservoir and the several thousand feet of overlying confining zone. Work included site characterization using existing data, interpretation of seismic data within the study area, and geologic modeling simulation of CO2 injection. Interpreted results estimate 3000 feet of confining zone between the Broom Creek Formation (storage target) and the lowermost underground source of drinking water (e.g., the Fox Hills Formation). The thickness of the Broom Creek injection target varies 230–420 ft within the survey area. Results were used to inform the location of a stratigraphic test well and associated characterization test program. No impediments were identified within the targeted CO2 storage complex that would prevent the project from moving forward. A stratigraphic test well is the next step to validate these results and to acquire remaining data necessary to develop a North Dakota CO2 SFP application. The EERC generated full carbon life cycle estimates for CCS integration with the RTE ethanol facility. Results indicated that an average 40% reduction in CO2 emissions is possible through CCS implementation. Approximately half of the carbon in the overall life cycle for a dry mill ethanol plant is generated through the fermentation process and emitted to the atmosphere; this is the CO2 stream targeted for CCS. The remaining carbon is attributed to corn feedstock farming (diesel, fertilizer), energy for fuel processing (natural gas, electricity), and transportation (diesel) of the fuel product. Life cycle carbon estimates are also affected by the anticipated energy consumption of a potential capture facility, which depend on the type of CO2 product generated. For example, a 30%–40% net CO2 emission reduction is estimated if a liquefied CO2 facility were incorporated compared to a 40%–50% net CO2 reduction if a supercritical “injection-grade” CO2 product is generated; i.e., more energy is required to further refine the CO2 stream, affecting the full carbon life cycle estimates. A CCS FIP was developed and initiated at the RTE CCS site, resulting in the development of several guidance documents: a CO2 Capture Process Design Package, a North Dakota CO2 geologic Storage Permits Template, and a Public Outreach Package for CCS in North Dakota. General FIP components include CO2 capture system, pipeline and well designs; monitoring, verification, and accounting (MVA) plans; geologic characterization and testing programs; and permitting and outreach plans. Vendor bids were also acquired for the CO2 liquefaction facility. Near-surface characterization (groundwater and soil gas sampling) and geologic characterization (seismic survey) were initiated to inform development of a UIC Class VI-compliant MVA plan compliant with a North Dakota CO2 SFP. Designs (well and geologic testing) were completed for a stratigraphic test well compliant with a North Dakota CO2 SFP. In addition, the outreach plan was executed, including community open houses, meetings with city/county/state officials, and development of public materials. Although other entities continued to mature incentive programs in 2019–2020, California and the Internal Revenue Service (IRS) currently provide the most advanced economic opportunities for CCS integrated with fuel production. The California Low-Carbon Fuel Standard (LCFS) adopted a CCS Protocol in January 2019, allowing submittal of a design-based pathway (DBP) application for an approved temporary (not certified) carbon intensity value for a fully engineered facility. An ethanol–CCS DBP application to the California LCFS Program (officially approved February 28, 2020) was developed to show that the RTE CCS effort meets LCFS requirements. The approved DBP provides confidence to advance the project and supports potential investments. Other entities continue to mature incentive programs. The IRS issued guidance in February 2020 that addresses the definition of beginning of construction and revenue procedure on partnerships for the Enhancement of Carbon Dioxide Sequestration Credit (a.k.a. Section 45Q) CCS tax credit program; the IRS anticipates issuing further guidance on issues such as secure geologic storage, utilization qualifications, and recapture of claimed credits. Maturing incentive programs coupled with workable permitting regulations provide confidence to advance CCS projects in North Dakota and support financial investment to proceed with designing, constructing, and implementing CCS projects at small-scale fuel production facilities. The largest hurdles for CCS implementation at small-scale industrial systems are often business/economic-related (i.e., not technical). Market uncertainty already exists for agriculture-based alternative fuels such as corn ethanol, for which production has increased by ~33%, and prices have correspondingly lowered since 2015. Passing the Section 45Q tax credit program improves economic feasibility for CCS but may require external investors for a small business to achieve maximum benefits. Public–private partnerships with NDIC and DOE have resulted in foundational technical and regulatory knowledge, growing stakeholder confidence, and a pathway to implementation that enables similar industrial CCS projects in the region to advance. This subtask was funded through the EERC–DOE Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by NDIC and RTE. The authors would also like to thank CMG, ESRI, IHS, Neuralog, and Schlumberger for allowing the use of their software packages in support of this work.

42 ENGINEERING↗

High Temperature Additive Architectures for 65% Efficiency (Final Report)

GE Power (GEP) proposed a development program that targets advanced high temperature additive components that contribute towards the DOE’s goal for advanced gas turbines that are capable of 65%, or greater, efficiency in combined cycle application. GEP proposed to leverage state-of-the-art additive manufacturing to develop novel and innovative component airfoil and end wall architectures that provide cooling flow savings while maintaining the component durability expected in today’s gas turbines. The objective of this program was to develop advanced component designs and architectures enabled by additive manufacturing, and the materials systems and additive manufacturing technology required for these designs. This Phase I program leveraged existing design and analysis knowledge and techniques for additive materials and methods and utilized extensive analytical evaluations to develop and refine designs for advanced turbine hot gas path (HGP) components. The design will be the basis for development and testing in a potential Phase II program. The goal of this Phase I program was to establish a feasible conceptual design for advanced additive turbine hot section components along with a technology maturation plan involving testing to address risk areas and needed validation. It was approached through two primary elements: 1) conceptual design and analysis of wall architectures, advanced airfoil cooling concepts, and advanced system-level concepts, and 2) investigation of additive modalities and associated materials systems. The Phase I program has concluded with the down-select of a primary design concept for a potential Phase II program.

36 MATERIALS SCIENCE↗

Shoal, Nevada Site Fact Sheet

The Shoal Site is situated on 2,560 acres of withdrawn federal lands located within the north-central portion of the Sand Springs Range in Churchill County, Nevada. The town of Fallon is the largest populated area in the region and is about 30 miles northwest of the site. The region around the Shoal Site is sparsely populated; military installations, recreation, ranching, and mining provide the dominant commercial interests. The Project Shoal underground nuclear test was part of the Vela Uniform program sponsored jointly by the U.S Department of Defense and U.S. Atomic Energy Commission (AEC), a predecessor agency of the U.S. Department of Energy (DOE). Vela Uniform was a research and development program directed toward locating, detecting, and identifying underground detonations. The objective of Project Shoal was to detonate a nuclear device underground in an active seismic area to improve the United States' ability to detect, identify, and locate underground nuclear detonations.

54 ENVIRONMENTAL SCIENCES↗

Environmental Restoration of Corrective Action Unit 408: Bomblet Target Area, Tonopah Test Range, Nevada (Funded by the American Reinvestment and Recovery Act)

The mission of the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Environmental Restoration Program is to address the environmental impacts of weapons testing conducted on the Nevada National Security Site and the Nevada Test and Training Range. The large physical size of these sites, along with limits on funding and other resources available for remediation efforts, means that environmental restoration activities must be prioritized and accomplished incrementally over time. The remediation of a bomblet target area on the Tonopah Test Range (TTR), which is located within the Nevada Test and Training Range, was originally planned in 2007 but was not carried out until funding became available in the summer of 2009 through the American Reinvestment and Recovery Act. This activity was implemented in accordance with the Federal Facility Agreement and Consent Order established between NNSA/NSO and the Nevada Division of Environmental Protection. This activity which was complete by the end of Fiscal Year 2010, involved the excavation of disposal pits suspected of containing submunitions and the surface clearance of submunitions on seven target areas amounting to approximately 6.7 square kilometers of land at the TTR. The TTR was used by Sandia National Laboratories from the late 1960s through the mid-1980s to conduct research into the deployment of submunitions. Although there were efforts to identify, collect, and dispose various amounts of unexploded ordnance on the TTR in the past, no comprehensive effort to remediate the entire flightline area for submunitions was undertaken before this project.

54 ENVIRONMENTAL SCIENCES↗

Building a Culture of Equitable Access and Success for Marginalized Members in Today&#x27;s Particle Physics Community

Diversity, Equity, Inclusion, and Accessibility (DEIA) are not only called for to ensure morality and justice in our society, they also support ongoing and future excellence in particle physics. Over the past decade, the particle physics community has devised programs to support DEIA along multiple axes, and the way we think about measuring and implementing these initiatives has evolved. DEIA in physics is a broad topic, so in this paper we focus on the experiences of marginalized communities and outline ways different stakeholders can build a culture of equitable access for the success of marginalized individuals. Specifically, we identify urgent needs in the following areas: (1) We need to acquire a better understanding of the status quo, both quantitatively and qualitatively, to assess the effectiveness of existing programs and to develop best practices; (2) we need to develop effective and inclusive ways to engage marginalized communities; (3) we need to create infrastructure to better support members of marginalized communities, on an academic, financial and personal level; (4) we need to create an environment conducive to equitable access and success by establishing community expectations, fostering inclusion in social interactions, and holding individuals and institutions accountable; and (5) we need to establish a mechanism to monitor progress in the area of DEIA, including the implementation of the recommendations enumerated in this paper and others during the Snowmass 2021 process.

Assamagan, Kétévi A.↗

Strengthening Retrofit Markets for Comprehensive Savings in Multifamily Buildings (Interim Final Report)

Energy efficiency is vitally important in Maine. Nearly 70% of Maine households rely on fuel oil as their primary energy source for home heating, a higher share than in any other state. Coupled with the state's long, cold winters, Maine's dependence on oil renders homeowners particularly vulnerable to fluctuating fuel costs. With $\$$4.5 million in seed funding from the Energy Department's Better Buildings Neighborhood Program, the Governor's Energy Office (GEO), through Efficiency Maine Trust (the Trust), is spurring Maine landlords to lower their monthly energy bills and improve comfort for their tenants during the state's cold winter months and increasingly warmer summers. Maine's aging multifamily housing stock can be expensive to heat and costly to maintain. It is not unusual to find buildings with little or no insulation, drafty windows, and significant air leaks, making them ideal candidates for energy efficiency upgrades. Maine modeled its Multifamily Efficiency Program (MEP) after the state's highly successful Home Energy Savings Program (HESP) for single-family homes. HESP provided cash incentives and financing opportunities to owners of one-to four-unit structures, which resulted in thousands of energy assessments and whole-house energy upgrades in 225 communities. Maine's new MEP multifamily energy efficiency upgrade and weatherization initiative focuses on small to medium-sized (i.e., five to 20 units) apartment buildings. The program's energy efficiency upgrades will provide at least 20% energy savings for each upgraded multifamily unit. The Trust’s MEP relies on a network of approved program partners who help move projects through the pipeline from assessment to upgrade. MEP has two components: benchmarking and development of an Energy Reduction Plan (ERP). Using the ENERGY STAR® Portfolio Manager benchmarking tool, MEP provides an assessment of current energy usage in the building, establishes a baseline for future energy efficiency improvements, and enables tracking and monitoring of future energy usage at the building— all at no cost to the building owner. The ERP is developed by a program partner using either the Trust’s approved modeling or prescriptive tools; it provides detailed information about the current energy related conditions in the building and recommends energy efficiency, health, and safety improvements. The Trust's delivery contractor provides quality assurance and controls throughout the process. Through this effort, MEP's goal is to establish a self-sustaining, market-driven program, demonstrating the value of energy efficiency to other building owners. The increasing value of properties across the state will help incentivize these owners to continue upgrades after the grant period has ended. Targeting urban areas in Maine with dense clusters of multifamily units—such as Portland, Lewiston- Auburn, Bangor, and Augusta—MEP engaged a variety of stakeholder groups early on to design its multifamily program. Through direct emails and its website, program officials invited lending institutions, building professionals, engineering firms, equipment distributors, and local property owners associations to attend open meetings around the state to learn about the goals of the multifamily program and to help define its parameters. These meetings helped program administrators understand the diversity of the customer base: some owners are individuals with a single building, while other owners are groups of people or management companies with an entire portfolio of multifamily buildings. The diversity of the customer base notwithstanding, owners see MEP as an opportunity to make gains in their respective properties. Consistently high turnouts at stakeholder meetings fueled greater customer interest as awareness of the program spread through word of mouth. The program also gained traction by utilizing the program partner networks and building on the legacy of the Trust’s successful HESP for single-family residences. MEP offers significant incentives for building owners to participate in the upgrade program. Wholebuilding benchmarking services are available to most multifamily housing buildings free of charge. The service provides the building owner with an assessment of the building's current energy efficiency as compared to other multifamily buildings on a national scale, establishes a baseline to measure future improvements, and enables owners to track monthly energy consumption using the ENERGY STAR Portfolio Manager. Once the benchmarking process is complete, the program links building owners with approved program partners (e.g., energy professionals, home performance contractors) to identify and implement specific energy-saving opportunities in the building. Program partners can also provide project quotes with estimated financing incentives and payback period calculations that enable building owners to make informed decisions. What's more, the Trust provides two financial incentives for successful completion of program milestones. The first is a per-unit incentive for completion of an approved ERP (i.e., $\$$100 per unit if a prescriptive path is followed, and $\$$200 per unit for a modeled ERP). Upon final inspection of the installed project scope of work, an incentive of $\$$1,400 per unit or 50% of installed cost—whichever is less—is paid. The Trust originally established a $\$$1 million loan-loss reserve fund (LLRF) to further enhance financing opportunities for qualified multifamily building owners. This funding mechanism was designed to connect building owners with lenders that retain the mortgages for their properties and encourages the lenders to offer financing for energy efficiency improvements. However, there has been no interest in the LLRF and therefore the LLRF has been reduced. Ultimately, MEP plans to build an online tool for building owners to assess opportunities to make upgrades in their multifamily units. The tool will include a performance rating system to provide a way for building owners to more easily understand energy use in their building, and how it could be improved with energy efficiency upgrades. Prospective tenants will also be able to use the rating system to make informed decisions about where to rent. Furthermore, the rating can be incorporated into real estate listings as a way for prospective home buyers and the real estate financial community to evaluate a home's operating costs. The Trust’s MEP has identified the state's most experienced energy professionals, vendors, suppliers, and contractors that install energy efficiency equipment in the multifamily sector to be qualified program partners. To be eligible for partnership, energy assessment professionals and contractors are required to have demonstrated experience in the multifamily sector and hold associated professional certifications, such as Building Operator Certification (BOC), Certified Energy Manager (CEM), Professional Engineer (PE), or Building Performance Institute (BPI) Multifamily Building Analyst. Widespread program interest has enabled the Trust to redirect funds that might otherwise be needed for program promotion to building capacity through contractor training. In addition to boosting professional training and certification opportunities, MEP teaches its partners how to market the multifamily program to prospective multifamily homeowners.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

RESULTS OF GROUNDWATER MONITORING FOR THE 183-H SOLAR EVAPORATION BASINS AND 300 AREA PROCESS TRENCHES JANUARY THRU JUNE 2008

This is one of a series of reports on Resource Conservation and Recovery Act of 1976 (RCRA) monitoring at the 183-H solar evaporation basins and the 300 Area process trenches. It fulfills the requirement of Washington Administrative Code (WAC) 173-303-645(11)(g), 'Release from Regulated Units', to report twice each year on the effectiveness of the corrective action program. This report covers the period from January through June 2008. The current objective of corrective action monitoring the 183-H basins is simply to track trends. Although there is short-term variability in contaminant concentrations, trends over the past 10 years are downward. The current Hanford Facility RCRA Permit (Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste [Permit No. WA 7890008967]) and monitoring plan remain adequate for the objective of tracking trends. The objective of groundwater monitoring at the 300 Area process trenches is to demonstrate the effectiveness of the corrective action program by examining the trend of the constituents of interest to confirm that they are attenuating naturally. The overall concentration of uranium in network wells remained above the 30 {micro}g/L drinking water standard in the three downgradient wells screened at the water table. Fluctuations of uranium concentration are caused by changes in river stage. The concentration of cis-1,2-dichloroethene remained above the 70 {micro}g/L drinking water standard in one well (399-1-16B). Concentrations are relatively steady at this well and are not affected by river stage. Trichloroethene and tetrachloroethene concentrations were below detection limits in all wells during the reporting period.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Community Solar Potential Analysis for Lawrence, Massachusetts

This report was prepared as part of the U.S. Department of Energy's Communities Local Energy Action Program (Communities LEAP) pilot competitive technical assistance for the Lawrence Massachusetts Stakeholder Coalition (LSC). In accordance with Technical Assistance Area 1 (Community Solar Analysis) and in coordination with the LSC, the UMass Clean Energy Extension (CEE) research team conducted a high-level geographic information system (GIS) evaluation of potential community solar (CS) development sites within Lawrence, and its three bordering towns of Andover, North Andover, and Methuen.

14 SOLAR ENERGY↗

Measurement of the Neutron Magnetic Form Factor at Large Momentum Transfer Using the Super-Bigbite Apparatus in Jefferson Lab Hall-A

The nucleon elastic electromagnetic form factors help us study the electromagnetic structure of the nucleon, benchmark theoretical models, and improve our understanding of non-perturbative quantum chromodynamics and confinement. The Nobel Prize-winning electron-nucleon scattering experiments by Robert Hofstadter and collaborators in the 1950s at Stanford High Energy Physics Lab were the first nucleon form factor measurements performed using leptonic probes. The Super Bigbite Spectrometer (SBS) program at Hall-A of Jefferson Lab represents the latest efforts to measure nucleon form factors. This ambitious program aims to significantly extend the current data set in terms of square momentum transfer (Q2) with high precision. The advent of novel detector technologies, like Gas Electron Multipliers (GEM), which provide excellent position resolution (< 100 ?m) while withstanding high background particle rates (several hundred MHz/cm2) over a large active area, has paved the way for open-geometry, moderate solid angle spectrometers, which are central to all form factor experiments in the SBS program. The first experimental run group in SBS ran successfully between September 2021 and February 2022, collecting data for the measurement of the magnetic form factor of the neutron Gn M at five squared momentum-transfer values: 3.0, 4.5, 7.5, 9.8, and 13.5 (GeV /c)2. This extends the existing high-precision data for Gn M by about a factor of four. The ratio technique was used, which involved the simultaneous measurement of exclusive quasielastic scattering of D(e,e?n)p and D(e,e?p)n from a deuterium target. Pre-preliminary results for D(e,e?n)p and D(e,e?p)n quasi-elastic ratio, and the neutron magnetic form factor Gn M , for Q2 points 3.0, 9.8, and 13.5 (GeV /c)2 are presented.

Mudiyanselage, Anuruddha Rathnayake↗

Artificial Intelligence Application to D and D - 20492

As aging facilities across the DOE complex await decommissioning, there is an ongoing need to understand any changes in the structural conditions. Many of these facilities were built over 50 years ago and, in some cases, these facilities have gone beyond the expected operational lifetime. Many facilities have been placed in a state of 'cold and dark,' sitting unused and awaiting decommissioning. Especially challenging are the aging facilities that provide unique operational/production capabilities to support critical DOE missions and cannot be shut down. In any of these scenarios, the structural integrity of these facilities may become compromised as time passes. It is critical that adequate inspections be performed on a continual basis and that the data collected undergoes sufficient analysis to support timely identification of any new or worsening structural issues as well as prompt needed maintenance and repairs to maintain the facilities in a safe condition. In recent days, Artificial Intelligence (AI) [1] and its application to various domains are growing at fast speed. FIU is performing research in this area and exploring the associated technologies to solve nuclear decommissioning problems. Artificial intelligence refers to the capability of a program to autonomously act, react and adapt to the working environment. AI enables the machine to behave like humans and perform the cognitive functions such as 'learning' and 'problem solving'. AI systems gradually moving from traditional approaches (algorithms and expert systems) towards more efficient and advanced technologies (machine learning [1] and deep learning [2] [3]). AI is the study of algorithms and statistical models that is being used by computers to perform specific tasks without using explicit instructions. FIU is working to develop a pilot-scale infrastructure to implement structural health monitoring using AI technologies with focus on machine learning, deep learning. This research is focused on Computer Vision/Image Classification area of AI applications. This can also be expanded to other areas of AI related to Object Recognition and Character Recognition in images. In addition to utilizing existing data sets, FIU will collect and investigate image and video data using FIU test-bed mockups to monitor structural health of the facility. Resulting data will be processed and analyzed using machine learning/deep learning technologies. The proposed pilot system is intended to serve as a starting point to engage the DOE field sites on related data sets and their decision making needs. It is anticipated that proposed machine learning/deep learning technologies can be effectively employed using anomaly detection to solve EM challenges in surveillance and maintenance of the D and D facilities. FIU will work with research stakeholders to identify applications at various sites and other DOE facilities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nuclear Rocket Facility Decommissioning Project: Controlled Explosive Demolition of Neutron Activated Shield Wall

Located in Area 25 of the Nevada Test Site (NTS), the Test Cell A (TCA) Facility was used in the early to mid-1960s for the testing of nuclear rocket engines, as part of the Nuclear Rocket Development Program, to further space travel. Nuclear rocket testing resulted in the activation of materials around the reactors and the release of fission products and fuel particles in the immediate area. Identified as Corrective Action Unit 115, the TCA facility was decontaminated and decommissioned (D&D) from December 2004 to July 2005 using the Streamlined Approach for Environmental Restoration (SAFER) process, under the ''Federal Facility Agreement and Consent Order''. The SAFER process allows environmental remediation and facility closure activities (i.e., decommissioning) to occur simultaneously provided technical decisions are made by an experienced decision maker within the site conceptual site model, identified in the Data Quality Objective process. Facility closure involved a seven-step decommissioning strategy. Key lessons learned from the project included: (1) Targeted preliminary investigation activities provided a more solid technical approach, reduced surprises and scope creep, and made the working environment safer for the D&D worker. (2) Early identification of risks and uncertainties provided opportunities for risk management and mitigation planning to address challenges and unanticipated conditions. (3) Team reviews provided an excellent mechanism to consider all aspects of the task, integrated safety into activity performance, increase team unity and ''buy-in'' and promoted innovative and time saving ideas. (4) Development of CED protocols ensured safety and control. (5) The same proven D&D strategy is now being employed on the larger ''sister'' facility, Test Cell C.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗