Search NASA⌕ Search

SEARCH · Search NASA

Results for “program costs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,333 records · Page 74

FAA global positioning system program

An overview of the FAA global positioning system (GPS) program is presented. The program's emphasis is on the potential applications of the system to civil aviation. The program is examined in relation to investigations of low cost equipment technology and potential improvements and/or modifications to the system. GPS program concerns such as the signal to noise ratio of the satellites, the system performance, and the cost/performance considerations are discussed. Requirements for an ideal receiver to be implemented into the GPS are summarized.

Buige, A.↗

Compendium of small class ELV capabilities, costs, and constraints

Both NASA and DARPA are investigating programs to provide flight demonstration opportunities for new commercially developed rockets. Development of such rockets will be decisive for the success of expendable launch vehicle (ELV) commercialization. The costs and capabilities associated with the various vehicles are discussed here, emphasizing the constraints on their development and widespread utilization. An overview is presented of related international launch vehicle development plans, and the market for small ELVs in the 1990s is discussed.

Poniatowski, Karen S.↗

Advanced Launch Development Program status

The Advanced Launch System is a joint NASA - Air Force program originally directed to define the concept for a modular family of launch vehicles, to continue development programs and preliminary design activities focused primarily on low cost to orbit, and to offer maturing technologies to existing systems. The program was restructed in the spring of 1990 as a result of funding reductions and renamed the Advanced Launch Development Program. This paper addresses the program's status following that restructuring and as NASA and the Air Force commence a period of deliberation over future space launch needs and the budgetary resources available to meet those needs. The program is currently poised to protect a full-scale development decision in the mid-1990's through the appropriate application of program resources. These resources are concentrated upon maintaining the phase II system contractor teams, continuing the Space Transportation Engine development activity, and refocusing the Advanced Development Program demonstrated activities.

Colgrove, Roger↗

LISA and NASA's Physics of the Cosmos Theme

In the past year, the LISA Project at NASA has completed a major review and has thoroughly reviewed its cost estimates. This talk will summarize the conclusions of the Beyond Einstein Program Assessment, and review the main conclusions of the cost estimation work done at NASA, including reduced mission concepts. Astro2010, the decadal review which sets priorities for astronomy and astrophysics projects in the U.S., is getting organized. Preparing for and participating in Astro2010 will be a crucial activity for the NASA side of the LISA Project in thc next 18 months.

Stebbins, Robin T.↗

FY2016 Propulsion Materials Annual Progress Report

The Propulsion Materials Program actively supports the energy security and reduction of greenhouse emissions goals of VTO by investigating and identifying the materials properties that are most essential for continued development of cost-effective, highly efficient, and environmentally friendly next-generation heavy and light-duty powertrains. The technical approaches available to enhance propulsion systems focus on improvements in both vehicle efficiency and fuel substitution, both of which must overcome the performance limitations of the materials currently in use. Propulsion Materials Program activities work with national laboratories, industry experts, and VTO powertrain systems (e.g., Advanced Combustion Engines and Fuels) teams to develop strategies that overcome materials limitations in future powertrain performance. The technical maturity of the portfolio of funded projects ranges from basic science to subsystem prototype validation. Projects within a Propulsion Materials Program activity address materials concerns that directly impact critical technology barriers within each of the above programs, including barriers that impact fuel efficiency, thermal management, emissions reduction, improved reliability, and reduced manufacturing costs. The program engages only the barriers that result from material property limitations and represent fundamental, high-risk materials issues.

33 ADVANCED PROPULSION SYSTEMS↗

FY2015 Propulsion Materials Annual Report

The Propulsion Materials Program actively supports the energy security and reduction of greenhouse emissions goals of VTO by investigating and identifying the materials properties that are most essential for continued development of cost-effective, highly efficient, and environmentally friendly next-generation heavy and light-duty powertrains. The technical approaches available to enhance propulsion systems focus on improvements in both vehicle efficiency and fuel substitution, both of which must overcome the performance limitations of the materials currently in use. Propulsion Materials Program activities work with national laboratories, industry experts, and VTO powertrain systems (e.g., Advanced Combustion Engines [ACE], Advanced Power Electronics and Electrical Machines [APEEM], and fuels) teams to develop strategies that overcome materials limitations in future powertrain performance. The technical maturity of the portfolio of funded projects ranges from basic science to subsystem prototype validation. Projects within a Propulsion Materials Program activity address materials concerns that directly impact critical technology barriers within each of the above programs, including barriers that impact fuel efficiency, thermal management, emissions reduction, improved reliability, and reduced manufacturing costs. The program engages only the barriers that result from material property limitations and represent fundamental, high-risk materials issues.

33 ADVANCED PROPULSION SYSTEMS↗

Launch Pad Flame Trench Refractory Materials

The launch complexes at NASA's John F. Kennedy Space Center (KSC) are critical support facilities for the successful launch of space-based vehicles. These facilities include a flame trench that bisects the pad at ground level. This trench includes a flame deflector system that consists of an inverted, V-shaped steel structure covered with a high temperature concrete material five inches thick that extends across the center of the flame trench. One side of the "V11 receives and deflects the flames from the orbiter main engines; the opposite side deflects the flames from the solid rocket boosters. There are also two movable deflectors at the top of the trench to provide additional protection to shuttle hardware from the solid rocket booster flames. These facilities are over 40 years old and are experiencing constant deterioration from launch heat/blast effects and environmental exposure. The refractory material currently used in launch pad flame deflectors has become susceptible to failure, resulting in large sections of the material breaking away from the steel base structure and creating high-speed projectiles during launch. These projectiles jeopardize the safety of the launch complex, crew, and vehicle. Post launch inspections have revealed that the number and frequency of repairs, as well as the area and size of the damage, is increasing with the number of launches. The Space Shuttle Program has accepted the extensive ground processing costs for post launch repair of damaged areas and investigations of future launch related failures for the remainder of the program. There currently are no long term solutions available for Constellation Program ground operations to address the poor performance and subsequent failures of the refractory materials. Over the last three years, significant liberation of refractory material in the flame trench and fire bricks along the adjacent trench walls following Space Shuttle launches have resulted in extensive investigations of failure mechanisms, load response, ejected material impact evaluation, and repair design analysis (environmental and structural assessment, induced environment from solid rocket booster plume, loads summary, and repair integrity), assessment of risk posture for flame trench debris, and justification of flight readiness rationale. Although the configuration of the launch pad, water and exhaust direction, and location of the Mobile Launcher Platform between the flame trench and the flight hardware should protect the Space Vehicle from debris exposure, loss of material could cause damage to a major element of the ground facility (resulting in temporary usage loss); and damage to other facility elements is possible. These are all significant risks that will impact ground operations for Constellation and development of new refractory material systems is necessary to reduce the likelihood of the foreign object debris hazard during launch. KSC is developing an alternate refractory material for the launch pad flame trench protection system, including flame deflector and flame trench walls, that will withstand launch conditions without the need for repair after every launch, as is currently the case. This paper will present a summary of the results from industry surveys, trade studies, life cycle cost analysis, and preliminary testing that have been performed to support and validate the development, testing, and qualification of new refractory materials.

Calle, Luz M.↗

HL-20 subsystem design

The NASA Langley Research Center has been developing a lifting-body configuration called the HL-20 for potential application as a personnel launch system orbiter that will provide the crew changeout at the Space Station Freedom. The objectives have been to provide an alternate manned access to space with a more cost-effective, efficient, reliable, and safer system for the routine transportation of people to LEO. The detailed study of this concept includes the subsystem design, flight software sizing, and mass properties that are discussed in this paper. The goals were to develop a subsystem complement to maximize operational efficiency with minimum development costs while using current technology. Subsystem selection and trade studies showed that current technology components will provide the required performance and operational effectiveness. Many of the selected components have Shuttle flight histories or considerable development heritage from other programs that will help minimize development costs.

Stone, H. W.↗

Feasibility study of an Integrated Program for Aerospace-vehicle Design (IPAD) system. Volume 6: Implementation schedule, development costs, operational costs, benefit assessment, impact on company organization, spin-off assessment, phase 1, tasks 3 to 8

A baseline implementation plan, including alternative implementation approaches for critical software elements and variants to the plan, was developed. The basic philosophy was aimed at: (1) a progressive release of capability for three major computing systems, (2) an end product that was a working tool, (3) giving participation to industry, government agencies, and universities, and (4) emphasizing the development of critical elements of the IPAD framework software. The results of these tasks indicate an IPAD first release capability 45 months after go-ahead, a five year total implementation schedule, and a total developmental cost of 2027 man-months and 1074 computer hours. Several areas of operational cost increases were identified mainly due to the impact of additional equipment needed and additional computer overhead. The benefits of an IPAD system were related mainly to potential savings in engineering man-hours, reduction of design-cycle calendar time, and indirect upgrading of product quality and performance.

Garrocq, C. A.↗

Composite Bus Structure for the SMEX/WIRE Satellite

In an effort to reduce the weight and optimize the structural design of the Small Explorer (SMEX) Wide-Field Infrared Explorer (WIRE) spacecraft, it has become desirable to change the material and construction from mechanically fastened aluminum structure to a fully bonded fiber-reinforced composite (FRC) structure. GSFC has developed the WIRE spacecraft structural bus design concept, including the instrument and launch vehicle requirements. The WIRE Satellite is the fifth of a series of SMEX satellites to be launched once per year. GSFC has chosen Composite Optics Inc. (COI) as the prime contractor for the development and procurement of the WIRE composite structure. The detailed design of the fully bonded FRC structure is based on COI's Short Notice Accelerated Production SATellite ("SNAPSAT") approach. SNAPSAT is a state of the art design and manufacturing technology for advanced composite materials which utilizes flat-stock detail parts bonded together to produce a final structural assembly. The structural design approach adopted for the WIRE structure provides a very viable alternative to both traditional aluminum construction as well as high tech. molded type composite structures. This approach to composite structure design is much less costly than molded or honeycomb sandwich type composite construction, but may cost slightly more than conventional aluminum construction on the subsystem level. However on the overall program level the weight saving achieved is very cost effective, since the primary objective is to allocate more mass for science payloads.

Rosanova, Giulio G.↗

Engine System Loads Analysis Compared to Hot-Fire Data

Early implementation of structural dynamics finite element analyses for calculation of design loads is considered common design practice for high volume manufacturing industries such as automotive and aeronautical industries. However with the rarity of rocket engine development programs starts, these tools are relatively new to the design of rocket engines. In the NASA MC-1 engine program, the focus was to reduce the cost-to-weight ratio. The techniques for structural dynamics analysis practices, were tailored in this program to meet both production and structural design goals. Perturbation of rocket engine design parameters resulted in a number of MC-1 load cycles necessary to characterize the impact due to mass and stiffness changes. Evolution of loads and load extraction methodologies, parametric considerations and a discussion of load path sensitivities are important during the design and integration of a new engine system. During the final stages of development, it is important to verify the results of an engine system model to determine the validity of the results. During the final stages of the MC-1 program, hot-fire test results were obtained and compared to the structural design loads calculated by the engine system model. These comparisons are presented in this paper.

Frady, Gregory P.↗

Assessing the Benefits of NASA Category 3, Low Cost Class C/D Missions

Category 3, Class C/D missions have the benefit of delivering worthwhile science at minimal cost which is increasingly important in NASA's constrained budget environment. Although higher cost Category 1 and 2 missions are necessary to achieve NASA's science objectives, Category 3 missions are shown to be an effective way to provide significant science return at a low cost. Category 3 missions, however, are often reviewed the same as the more risk averse Category 1 and 2 missions. Acknowledging that reviews are not the only aspect of a total engineering effort, reviews are still a significant concern for NASA programs. This can unnecessarily increase the cost and schedule of Category 3 missions. This paper quantifies the benefit and performance of Category 3 missions by looking at the cost vs. capability relative to Category 1 and 2 missions. Lessons learned from successful organizations that develop low cost Category 3, Class C/D missions are also investigated to help provide the basis for suggestions to streamline the review of NASA Category 3 missions.

Bitten, Robert E.↗

Practices for Demonstrating Energy Savings from Commercial PACE Projects

Nearly three-fourths of U.S. states have authorized local governments to use voluntary special assessments on commercial properties to finance energy improvements that boost economic development, create jobs, increase property values and advance energy goals. Commercial Property Assessed Clean Energy (C-PACE) financing allows building owners to repay the borrowed capital — from private or public sources — over time using their property as security. Berkeley Lab is supporting the Department of Energy’s Commercial PACE Working Group by developing a series of C-PACE issue briefs. The second brief in this series, Practices for Demonstrating Energy Savings from Commercial PACE Projects, looks at common practices for demonstrating energy savings to support state and local governments that sponsor C-PACE programs and want to track their energy impacts. This brief reviews: -The value proposition and trade-offs of conducting energy impact assessments for C-PACE programs; -Methods to quantify energy savings impacts from energy efficiency building improvements; and -Available resources and tools to support energy impact assessments. C-PACE programs may benefit from energy impact assessments for many reasons, including: -Validating the public benefits of the programs -Demonstrating that C-PACE can deliver participant benefits -Illustrating program impacts on public policy goals -Generating data to help improve program performance Many C-PACE programs are collecting data on project energy savings impacts, and these data can be leveraged to further support decision making and program implementation. Potential drawbacks to energy impact assessments may include added cost and burdens on property owners (e.g., the need to collect building energy consumption data). Where these burdens are considerable, they might slow program uptake. State and local governments can balance the benefits of energy impact assessments with the range of costs and accuracy inherent to available assessment methodologies. Additionally, depending on the policy context in the state or local government, a C-PACE program may be able to leverage existing efforts (e.g., building energy benchmarking programs) to reduce impact assessment costs, align with building owner practices and expectations, and efficiently assess program impact.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Space Shuttle Program description and status

The main reason for the development of the Space Shuttle is related to the aim to achieve a major reduction in the cost of placing a payload into space. Such a reduction is to be obtained by using a reusable in place of an expendable launch vehicle. Developments concerning launch vehicles show a steady reduction in launching expenses. From a cost of about $500,000 a pound in the late 1950's, launching expenses were reduced to $600 a pound for payloads on the Saturn V. With the Space Shuttle the cost will drop to approximately $150 a pound. The Space Shuttle Program is discussed, taking into account a system description, a typical mission profile, aspects of mission design, launch costs, and Space Shuttle characteristics. The Space Shuttle Program status is also examined, giving attention to orbital flight schedules, flight hardware tests, launch area facilities, the mission control center, and details of flight crew training.

Macleod, J. B.↗

Evaluation of NASA space grant consortia programs

The meaningful evaluation of the NASA Space Grant Consortium and Fellowship Programs must overcome unusual difficulties: (1) the program, in its infancy, is undergoing dynamic change; (2) the several state consortia and universities have widely divergent parochial goals that defy a uniform evaluative process; and (3) the pilot-sized consortium programs require that the evaluative process be economical in human costs less the process of evaluation comprise the effectiveness of the programs they are meant to assess. This paper represents an attempt to assess the context in which evaluation is to be conducted, the goals and limitations inherent to the evaluation, and to recommend appropriate guidelines for evaluation.

Eisenberg, Martin A.↗

Future Concepts for Realtime Data Interfaces for Control Centers

Existing methods of exchanging realtime data between the major control centers in the International Space Station program have resulted in a patchwork of local formats being imposed on each Mission Control Center. This puts the burden on a data customer to comply with the proprietary data formats of each data supplier. This has increased the cost and complexity for each participant, limited access to mission data and hampered the development of efficient and flexible operations concepts. Ideally, a universal format should be promoted in the industry to prevent the unnecessary burden of each center processing a different data format standard for every external interface with another center. With the broad acceptance of XML and other conventions used in other industries, it is now time for the Aerospace industry to fully engage and establish such a standard. This paper will briefly consider the components that would be required by such a standard (XML schema, data dictionaries, etc.) in order to accomplish the goal of a universal low-cost interface, and acquire broad industry acceptance. We will then examine current approaches being developed by standards bodies and other groups. The current state of CCSDS panel work will be reviewed, with a survey of the degree of industry acceptance. Other widely accepted commercial approaches will be considered, sometimes complimentary to the standards work, but sometimes not. The question is whether de facto industry standards are in concert with, or in conflict with the direction of the standards bodies. And given that state of affairs, the author will consider whether a new program establishing its Mission Control Center should implement a data interface based on those standards. The author proposes that broad industry support to unify the various efforts will enable collaboration between control centers and space programs to a wider degree than is currently available. This will reduce the cost for programs to provide realtime access to their data, hence reducing the cost of access to space, and benefiting the industry as a whole.

Kearney, Mike W., III↗

Visibility Studies

Studies conducted by the Environmental Studies Laboratory of the University of Utah embrace investigations of the effects of air pollutants on vegetation; air quality in arid and semi-arid regions surrounding energy developments; and the amount, size and type of particles in the atmosphere. In its visibility studies, the laboratory uses a computer program called RADTMO for Radiative Transfer Models. The program computes the characteristics of scattered radiation in the atmosphere including ozone concentration and aerosol density at various altitudes. Calculations provide information used in determining sky color intensity for visibility modeling under different atmospheric conditions. The laboratory was able to avoid the cost of developing a new computer program by using RADTMO for their calculations.

Source record↗

Test Planning Approach and Lessons

As NASA began technology risk reduction activities and planning for the next generation launch vehicle under the Space Launch Initiative (SLI), now the Next Generation Launch Technology (NGLT) Program, a review of past large liquid rocket engine development programs was performed. The intent of the review was to identify any significant lessons from the development testing programs that could be applied to current and future engine development programs. Because the primary prototype engine in design at the time of this study was the Boeing-Rocketdyne RS-84, the study was slightly biased towards LOX/RP-1 liquid propellant engines. However, the significant lessons identified are universal. It is anticipated that these lessons will serve as a reference for test planning in the Engine Systems Group at Marshall Space Flight Center (MSFC). Towards the end of F-1 and J-2 engine development testing, NASA/MSFC asked Rocketdyne to review those test programs. The result was a document titled, Study to Accelerate Development by Test of a Rocket Engine (R-8099). The "intent (of this study) is to apply this thinking and learning to more efficiently develop rocket engines to high reliability with improved cost effectivenes" Additionally, several other engine programs were reviewed - such as SSME, NSTS, STME, MC-1, and RS-83- to support or refute the R-8099. R-8099 revealed two primary lessons for test planning, which were supported by the other engine development programs. First, engine development programs can benefit from arranging the test program for engine system testing as early as feasible. The best test for determining environments is at the system level, the closest to the operational flight environment. Secondly, the component testing, which tends to be elaborate, should instead be geared towards reducing risk to enable system test. Technical risk can be reduced at the component level, but the design can only be truly verified and validated after engine system testing.

Parkinson, Douglas A.↗