2013 LIDAR Campaign at Buena Vista Wind Farm: An Examination of Hill "Speedup" Flows
In June 2013, two Laser and Detection Ranging (lidar) units (ZephIR 300, Natural Power, North Ledbury, England) were deployed at the Buena Vista Wind Farm in the Altamont Hills region of California until mid-August of that year. This was the third field campaign at Buena Vista for the 12-ERD-069 project, following a winter campaign in 2011-2012 and a summer campaign in 2012. The lidar data provided wind measurements at the base (“flatland” lidar) and along the slope (“hill” lidar) of a ridge to study the flow as it moved up and along the ridge towards turbine A08 under varying stability conditions. The lidars measured wind speed, direction and turbulence at ten measurement heights including ones equivalent to the turbine rotor-disk. Instrument placement is shown in Figures 1 and 2. The placement of the two lidars was based on wind direction measurements taken at the hill lidar location during summer of 2012. The predominant wind direction in 2013 was nearly identical to 2012 and the lidar locations proved optimal for capturing wind flow as it approached A08 from the southwest. SCADA data provided 10-minute nacelle wind speed and power data for the nearby turbines.