Search NASA⌕ Search

SEARCH · Search NASA

Results for “Implementation Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,351 records · Page 75

Methods to Automate Assessing the Outage Risk and Technical Specification Compliance for Planned Work and Current Plant Conditions. Light Water Reactor Sustainability Program report

This research effort is a part of the Light Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by the Department of Energy. The LWRS Program is performed in close collaboration with industry R&D programs that provide the technical foundations for licensing and managing the long term, safe, and economical operation of current nuclear power plants (NPPs). The LWRS Program serves to help the United States (U.S.) nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of these NPPs and the extension of their current operating licenses. The Outage Risk Management Improvement Pilot Project seeks to improve the management of nuclear power plant outages. This is done through the development of tools to assist in evaluating pending activities against requirements to detect undesired interactions. Significant efforts are expended to manage the nuclear risk of an outage. The utilities conduct pre outage risk assessments, based on a very detailed review of the outage schedule, to identify where combinations of outage work and out of service equipment would result in degraded conditions with respect to nuclear safety or regulatory compliance. Probabilistic risk assessment studies are conducted to quantify incremental core damage frequency as a result of the outage activities and system unavailability. These studies are usually presented to site and fleet management, the site plant operational review committee, and the NPP’s independent Nuclear Safety Review Board for concurrence that the outage is planned safely and that reasonable measures have been taken to reduce the added risk of conducting the outage. During the outage, the plant configuration is monitored continuously to ensure that it conforms to the approved safety plan. Deviations must be assessed and approved by management committees and, in some cases, the plant operational review committee. In virtually all outage meetings and job briefings, the current nuclear safety status of the plant is communicated, including information on the specific equipment necessary to meet the requirements of the nuclear safety plan. In addition, the operations and outage organizations implement several layers of physical and administrative barriers to prevent unintended interaction with the systems and equipment credited for nuclear safety. In spite of all these efforts, nuclear safety challenges still occur too frequently during outages. While some of these are due to failures of equipment credited for safety, the majority occur because of human error. These typically involve some form of interaction between work activities and plant configuration changes. Some of them are very subtle and are extremely challenging to detect in advance. Nevertheless, they are not acceptable and represent clear opportunities to improve nuclear safety during outages. This particular report will provide a demonstration of the capabilities in the development of a predictive software platform for improving configuration control and accessing the plant risks associated with outage work protocols and illustrate how the software assists in strategies to minimize these interactions. In addition to maintaining nuclear safety, there are numerous administrative requirements that must be complied with during an outage. This report will discuss the use of logic modelling to monitor planned work against technical specification requirements for given plant conditions and to integrate these requirements with shutdown risk models, clearance order requirements and other plant condition requirements.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Evaluating Demand Response Impacts on Capacity Credit of Renewable Distributed Generation in Smart Distribution Systems

Environmental concerns and depletion of traditional energy lead to the booming development of renewable distributed generation (RDG) in the past decade. However, due to intermittent nature of renewable energy sources, to what extent RDG could provide capacity to power systems becomes a critical issue to the utility company when implementing long-term system strategic (generation expansion) planning. On the other hand, in a smart-grid frame, the popularization of different varieties of demand-side resources enables the system to operate at more flexible modes ever before. The potential variability in load demand not only introduces additional dynamics and uncertainties to the system, but could also affect the reliability benefits of RDG. Therefore, in practice, to effectively estimate the reliability value of RDG in power systems, the potential interaction between generation- and demand-side must be properly captured. In this paper, a study to assess the capacity credit (CC) of RDG in a context of distributed generation system is performed with consideration of the impacts of demand response (DR). A compound reliability model for DR is presented, which considers the uncertainties involved in both instant response and follow-on load recovery processes. On this basis, an assessment framework for the CC of RDG based on sequential Monte Carlo simulation is developed by which the inter-temporal characteristics of DR resources can be fully captured. The numerical study is implemented based on the IEEE-38 bus test case. The calculation results demonstrate that the CC of RDG would depend on a variety of factors, including penetration level, responsiveness of load demand and the correlations between RDG and DR availability. Also, it is shown that accounting for the underlying effect of DR is of absolute importance, otherwise the CC of RDG might be estimated erroneously in real practices.

capacity credit↗

Y-12 National Security Complex Biological Monitoring and Abatement Program Plan

This document provides the Biological Monitoring and Abatement Program (BMAP) Plan for East Fork Poplar Creek (EFPC), as required by the Y-12 National Security Complex (Y-12 Complex) National Pollutant Discharge Elimination System (NPDES) permit which became effective December 1, 2011. The BMAP was first developed in 1985 by staff in the Environmental Science Division at the Oak Ridge National Laboratory at the request of the Y-12 Complex. The multidisciplinary and quantitative biological monitoring approaches used for the BMAP were developed, from the beginning, in close consultation with Y-12 Complex Environmental Compliance staff, as well as the State of Tennessee and the Environmental Protection Agency. A draft BMAP Plan was submitted to the Tennessee Department of Environment and Conservation (TDEC) in May 2012 and was approved by TDEC with revision in December 2012. The TDEC’s Plan changes are incorporated in this final BMAP Plan issued in January 2013. The general approach to the 2013 BMAP Plan follows previous precedent, and addresses all BMAP-related NPDES permit requirements. The focus of the monitoring effort is on EFPC and comparable reference streams, including Brushy Fork and Hinds Creek. Two other stream systems near the Y-12 Complex, Bear Creek and McCoy Branch, are similarly monitored using BMAP and TDEC protocols as required in the permit; however, these streams are monitored by Comprehensive Environmental Response, Compensation, and Liability Act -funded programs and are only briefly summarized in this Plan. Three major tasks comprise the current program: fish bioaccumulation, benthic macroinvertebrate community, and fish community. A concomitant task, toxicity testing of storm drains, is also implemented at the Y-12 Complex and briefly described in the Plan. Each BMAP task differs slightly in the number of sites and frequency of sampling, depending on need as determined by previous monitoring. Sampling rationale and specific methods for each task are provided herein. A summary of program integration components, including data management, quality assurance, and reporting aspects, are also provided. The BMAP is an internationally recognized biological monitoring program that is a valuable case study for the U.S. Department of Energy (DOE) and the nation. First and foremost, the program evaluates Tennessee Water Quality Criteria (as required in the NPDES permit) by conducting studies to annually evaluate bioaccumulation of contaminants of concern, and the receiving streams’ biological integrity. The program has been successful in evaluating ecological effects and their causes, and has provided actionable information in the design and application of pollution abatement actions. Most importantly, the program design focuses on assessing spatial and temporal change, and has documented substantial ecological recovery in response to various facility actions. The program results have therefore become a key measure of how well the DOE facilities are doing relative to protecting the environment, and provide assurance to regulators and the public that stream conditions are improving. The DOE’s mission and environmental management in Oak Ridge will continue to evolve as the facilities modernize and various decontamination and decommissioning activities and pollution abatement actions are implemented. Many changes are expected at the Y-12 Complex in the next few years that have the potential to positively affect, or on a short-term basis negatively affect, the stream environment. The BMAP approach described here will continue to provide an important integrated measure of receiving stream conditions and ecological response to future facility actions.

Peterson, Mark J.↗

SU-E-T-760: Tolerance Design for Site-Specific Range in Proton Patient QA Process Using the Six Sigma Model

Purpose: To show how tolerance design and tolerancing approaches can be used to predict and improve the site-specific range in patient QA process in implementing the Six Sigma. Methods: In this study, patient QA plans were selected according to 6 site-treatment groups: head &neck (94 cases), spine (76 cases), lung (89 cases), liver (53 cases), pancreas (55 cases), and prostate (121 cases), treated between 2007 and 2013. We evaluated a model of the Six Sigma that determines allowable deviations in design parameters and process variables in patient-specific QA, where possible, tolerance may be loosened, then customized if it necessary to meet the functional requirements. A Six Sigma problem-solving methodology is known as DMAIC phases, which are used stand for: Define a problem or improvement opportunity, Measure process performance, Analyze the process to determine the root causes of poor performance, Improve the process by fixing root causes, Control the improved process to hold the gains. Results: The process capability for patient-specific range QA is 0.65 with only ±1 mm of tolerance criteria. Our results suggested the tolerance level of ±2–3 mm for prostate and liver cases and ±5 mm for lung cases. We found that customized tolerance between calculated and measured range reduce that patient QA plan failure and almost all sites had failure rates less than 1%. The average QA time also improved from 2 hr to less than 1 hr for all including planning and converting process, depth-dose measurement and evaluation. Conclusion: The objective of tolerance design is to achieve optimization beyond that obtained through QA process improvement and statistical analysis function detailing to implement a Six Sigma capable design.

60 APPLIED LIFE SCIENCES↗

Independent verification survey report for exposure units Z2-24, Z2-31, Z2-32, AND Z2-36 in zone 2 of the East Tennessee technology park Oak Ridge, Tennessee

The U.S. Department of Energy (DOE) Oak Ridge Office of Environmental Management selected Oak Ridge Associated Universities (ORAU), through the Oak Ridge Institute for Science and Education (ORISE) contract, to perform independent verification (IV) at Zone 2 of the East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee. ORAU has concluded IV surveys, per the project-specific plan (PSP) (ORAU 2013a) covering exposure units (EUs) Z2-24, -31, -32, and -36. The objective of this effort was to verify the target EUs comply with requirements in the Zone 2 Record of Decision (ROD) (DOE 2005), as implemented by using the dynamic verification strategy presented in the dynamic work plan (DWP) (BJC 2007); and confirm commitments in the DWP were adequately implemented, as verified via IV surveys and soil sampling.

54 ENVIRONMENTAL SCIENCES↗

U.S. Virgin Islands Petroleum Price-Spike Preparation

This NREL technical report details a plan for the U.S. Virgin Islands (USVI) to minimize the economic damage caused by major petroleum price increases. The assumptions for this plan are that the USVI will have very little time and money to implement it and that the population will be highly motivated to follow it because of high fuel prices. The plan's success, therefore, is highly dependent onbehavior change. This plan was derived largely from a review of the actions taken and behavior changes made by companies and commuters throughout the United States in response to the oil price spike of 2008. Many of these solutions were coordinated by or reported through the 88 local representatives of the U.S. Department of Energy's Clean Cities program. The National Renewable Energy Laboratoryprovides technical and communications support for the Clean Cities program and therefore serves as a de facto repository of these solutions. This plan is the first publication that has tapped this repository.

02 PETROLEUM↗

COMMERCIALIZATION DEMONSTRATION OF MID-SIZED SUPERCONDUCTING MAGNETIC ENERGY STORAGE TECHNOLOGY FOR ELECTRIC UTILITYAPPLICATIONS

As an outgrowth of the Technology Reinvestment Program of the 1990’s, an Agreement was formed between BWXT and the DOE to promote the commercialization of Superconducting Magnetic Energy Storage (SMES) technology. Business and marketing studies showed that the performance of electric transmission lines could be improved with this SMES technology by stabilizing the line thereby allowing the reserved stability margin to be used. One main benefit sought was to double the capacity and the amount of energy flow on an existing transmission line by enabling the use of the reserved stability margin, thereby doubling revenue. Also, electrical disturbances, power swings, oscillations, cascading disturbances and brown/black-outs could be mitigated and rendered innocuous; thereby improving power quality and reliability. Additionally, construction of new transmission lines needed for increased capacity could be delayed or perhaps avoided (with significant savings) by enabling the use of the reserved stability margin of the existing lines. Two crucial technical aspects were required; first, a large, powerful, dynamic, economic and reliable superconducting magnet, capable of oscillating power flow was needed; and second, an electrical power interface and control to a transmission line for testing, demonstrating and verifying the benefits and features of the SMES system was needed. A project was formed with the goals of commercializing the technology by demonstrating SMES technology for utility applications and to establish a domestic capability for manufacturing large superconducting magnets for both commercial and defense applications. The magnet had very low AC losses to support the dynamic and oscillating nature of the stabilizing power flow. Moreover, to economically interface to the transmission line, the magnet had the largest operating voltage ever made. The manufacturing of that design was achieved by establishing a factory with newly designed and acquired equipment, tooling, methods and skilled personnel. The final magnet system measured 14 feet in diameter, 10 feet in height, and weighed about 35 tons. The superconducting magnet and design technology was successfully implemented and demonstrated. The project was not successfully concluded however; as the critical planned final demonstration was not achieved. The utilities could not understand or clarify their future business needs and the regulatory requirements, because of the deregulation policies and practices of the country. Much uncertainty existed which prevented utilities from defining business plans, including asset allocation and cost recovery. Despite the technical successes and achievements, the commercial development could not be implemented and achieved. Thus, the demonstration of this enhancement to the utility’s transmission system and to the reliability of the nation’s electrical grid was not achieved. The factory was ultimately discontinued and the technology, equipment and product were placed in storage.

25 ENERGY STORAGE↗

Modeling EERE Deployment Programs

The purpose of this report is to compile information and conclusions gathered as part of three separate tasks undertaken as part of the overall project, “Modeling EERE Deployment Programs,” sponsored by the Planning, Analysis, and Evaluation office within the Department of Energy’s Office of Energy Efficiency and Renewable Energy (EERE). The purpose of the project was to identify and characterize the modeling of deployment programs within the EERE Technology Development (TD) programs, address improvements to modeling in the near term, and note gaps in knowledge where future research is needed.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Joint optimization of electric bus charging infrastructure, vehicle scheduling, and charging management

High upfront costs of vehicles and charging infrastructure as well as the lack of knowledge related to infrastructure planning and electric bus system operation are major obstacles to the implementation of battery electric buses (BEBs). To tackle the obstacles and promote BEB adoption, a comprehensive optimization framework was developed to address the combined charging infrastructure planning, vehicle scheduling, and charging management problem for BEB systems, with the goal to minimize the total cost of ownership. The problem was formulated as a mixed-integer non-linear problem. A genetic algorithm-based approach was then proposed to solve the problem. Last, three alternative scenarios based on a sub-transit network in Salt Lake City, Utah, were analyzed and compared with the optimal scenario results in the numerical experiments. Our comparison results demonstrate the effectiveness of the proposed model and solution algorithm in determining a cost-efficient planning strategy for BEB systems.

33 ADVANCED PROPULSION SYSTEMS↗

Dosimetric Comparison of Helical Tomotherapy and Linac-IMRT Treatment Plans for Head and Neck Cancer Patients

The rapid development and clinical implementation of external beam radiation treatment technologies continues. The existence of various commercially available technologies for intensity-modulated radiation therapy (IMRT) has stimulated interest in exploring the differential potential advantage one may have compared with another. Two such technologies, Hi-Art Helical Tomotherapy (HT) and conventional medical linear accelerator-based IMRT (LIMRT) have been shown to be particularly suitable for the treatment of head and neck cancers. In this study, 23 patients who were diagnosed with stages 3 or 4 head and neck cancers, without evidence of distance metastatic disease, were treated in our clinic. Treatment plans were developed for all patients simultaneously on the HT planning station and on the Pinnacle treatment planning system for step-and-shoot IMRT. Patients were treated only on the HT unit, with the LIMRT plan serving as a backup in case the HT system might not be available. All plans were approved for clinical use by a physician. The prescription was that patients receive at least 95% of the planning target volume (PTV), which is 66 Gy at 2.2 Gy per fraction. Several dosimetric parameters were computed: PTV dose coverage; PTV volume conformity index; the normalized total dose (NTD), where doses were converted to 2 Gy per fraction to organs at risk (OAR); and PTV dose homogeneity. Both planning systems satisfied our clinic's PTV prescription requirements. The results suggest that HT plans had, in general, slightly better dosimetric characteristics, especially regarding PTV dose homogeneity and normal tissue sparing. However, for both techniques, doses to OAR were well below the currently accepted normal tissue tolerances. Consequently, factors other than the dosimetric parameters studied here may have to be considered when making a choice between IMRT techniques.

61 RADIATION PROTECTION AND DOSIMETRY↗

Including Alternative Resources in State Renewable Portfolio Standards: Current Design and Implementation Experience

Currently, 29 states, the District of Columbia, and Puerto Rico have instituted a renewable portfolio standard (RPS). An RPS sets a minimum threshold for how much renewable energy must be generated in a given year. Each state policy is unique, varying in percentage targets, timetables, and eligible resources. This paper examines state experience with implementing renewable portfolio standards that include energy efficiency, thermal resources, and non-renewable energy and explores compliance experience, costs, and how states evaluate, measure, and verify energy efficiency and convert thermal energy. It aims to gain insights from the experience of states for possible federal clean energy policy as well as to share experience and lessons for state RPS implementation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

TH-E-18A-01: Developments in Monte Carlo Methods for Medical Imaging

Monte Carlo simulation methods are widely used in medical physics research and are starting to be implemented in clinical applications such as radiation therapy planning systems. Monte Carlo simulations offer the capability to accurately estimate quantities of interest that are challenging to measure experimentally while taking into account the realistic anatomy of an individual patient. Traditionally, practical application of Monte Carlo simulation codes in diagnostic imaging was limited by the need for large computational resources or long execution times. However, recent advancements in high-performance computing hardware, combined with a new generation of Monte Carlo simulation algorithms and novel postprocessing methods, are allowing for the computation of relevant imaging parameters of interest such as patient organ doses and scatter-to-primaryratios in radiographic projections in just a few seconds using affordable computational resources. Programmable Graphics Processing Units (GPUs), for example, provide a convenient, affordable platform for parallelized Monte Carlo executions that yield simulation times on the order of 10{sup 7} xray/ s. Even with GPU acceleration, however, Monte Carlo simulation times can be prohibitive for routine clinical practice. To reduce simulation times further, variance reduction techniques can be used to alter the probabilistic models underlying the x-ray tracking process, resulting in lower variance in the results without biasing the estimates. Other complementary strategies for further reductions in computation time are denoising of the Monte Carlo estimates and estimating (scoring) the quantity of interest at a sparse set of sampling locations (e.g. at a small number of detector pixels in a scatter simulation) followed by interpolation. Beyond reduction of the computational resources required for performing Monte Carlo simulations in medical imaging, the use of accurate representations of patient anatomy is crucial to the virtual generation of medical images and accurate estimation of radiation dose and other imaging parameters. For this, detailed computational phantoms of the patient anatomy must be utilized and implemented within the radiation transport code. Computational phantoms presently come in one of three format types, and in one of four morphometric categories. Format types include stylized (mathematical equation-based), voxel (segmented CT/MR images), and hybrid (NURBS and polygon mesh surfaces). Morphometric categories include reference (small library of phantoms by age at 50th height/weight percentile), patient-dependent (larger library of phantoms at various combinations of height/weight percentiles), patient-sculpted (phantoms altered to match the patient's unique outer body contour), and finally, patient-specific (an exact representation of the patient with respect to both body contour and internal anatomy). The existence and availability of these phantoms represents a very important advance for the simulation of realistic medical imaging applications using Monte Carlo methods. New Monte Carlo simulation codes need to be thoroughly validated before they can be used to perform novel research. Ideally, the validation process would involve comparison of results with those of an experimental measurement, but accurate replication of experimental conditions can be very challenging. It is very common to validate new Monte Carlo simulations by replicating previously published simulation results of similar experiments. This process, however, is commonly problematic due to the lack of sufficient information in the published reports of previous work so as to be able to replicate the simulation in detail. To aid in this process, the AAPM Task Group 195 prepared a report in which six different imaging research experiments commonly performed using Monte Carlo simulations are described and their results provided. The simulation conditions of all six cases are provided in full detail, with all necessary data on material composition, source, geometry, scoring and other parameters provided. The results of these simulations when performed with the four most common publicly available Monte Carlo packages are also provided in tabular form. The Task Group 195 Report will be useful for researchers needing to validate their Monte Carlo work, and for trainees needing to learn Monte Carlo simulation methods. In this symposium we will review the recent advancements in highperformance computing hardware enabling the reduction in computational resources needed for Monte Carlo simulations in medical imaging. We will review variance reduction techniques commonly applied in Monte Carlo simulations of medical imaging systems and present implementation strategies for efficient combination of these techniques with GPU acceleration. Trade-offs involved in Monte Carlo acceleration by means of denoising and “sparse sampling” will be discussed. A method for rapid scatter correction in cone-beam CT (<5 min/scan) will be presented as an illustration of the simulation speeds achievable with optimized Monte Carlo simulations. We will also discuss the development, availability, and capability of the various combinations of computational phantoms for Monte Carlo simulation of medical imaging systems. Finally, we will review some examples of experimental validation of Monte Carlo simulations and will present the AAPM Task Group 195 Report. Learning Objectives: Describe the advances in hardware available for performing Monte Carlo simulations in high performance computing environments. Explain variance reduction, denoising and sparse sampling techniques available for reduction of computational time needed for Monte Carlo simulations of medical imaging. List and compare the computational anthropomorphic phantoms currently available for more accurate assessment of medical imaging parameters in Monte Carlo simulations. Describe experimental methods used for validation of Monte Carlo simulations in medical imaging. Describe the AAPM Task Group 195 Report and its use for validation and teaching of Monte Carlo simulations in medical imaging.

60 APPLIED LIFE SCIENCES↗

Analysis of travel logistics for transportation of used nuclear fuel in the continental United States - 15179

The US DOE Office of Nuclear Energy is conducting planning activities within the Nuclear Fuels Storage and Transportation Planning Project (NFST) to lay the groundwork for implementing interim storage, including associated transportation, per the Administration's Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste, and to develop a foundation for a new nuclear waste management organization. Integrated waste management system architecture analyses are being conducted to support the future deployment of a comprehensive system for managing nuclear waste that consider all aspects of the back-end of the nuclear fuel cycle (transportation, storage, and disposal). One aspect of a potential future nuclear waste management strategy is the transportation of spent nuclear fuel to an away from reactor interim storage facility. Transportation routes from commercial nuclear reactor sites to various locations in the continental U.S. chosen as hypothetical locations for a future interim storage facility were evaluated using Stakeholder Tool for Assessing Radioactive Transportation (START). The objective of this evaluation was to identify and parameterize generic transportation routes for use in integrated waste management system analyses that include an interim storage facility, the associated uncertainty in these selections, and the uncertainty associated with different transportation route selection criteria. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implementation of optimum solar electricity generating system

Under the 10{sup th} Malaysian Plan, the government is expecting the renewable energy to contribute approximately 5.5% to the total electricity generation by the year 2015, which amounts to 98MW. One of the initiatives to ensure that the target is achievable was to establish the Sustainable Energy Development Authority of Malaysia. SEDA is given the authority to administer and manage the implementation of the feed-in tariff (FiT) mechanism which is mandated under the Renewable Energy Act 2011. The move to establish SEDA is commendable and the FiT seems to be attractive but there is a need to create awareness on the implementation of the solar electricity generating system (SEGS). In Malaysia, harnessing technologies related to solar energy resources have great potential for implementation. However, the main issue that plagues the implementation of SEGS is the intermittent nature of this source of energy. The availability of sunlight is during the day time, and there is a need for electrical energy storage system, so that there is electricity available during the night time as well. The meteorological condition such as clouds, haze and pollution affects the SEGS as well. The PV based SEGS is seems to be promising electricity generating system that can contribute towards achieving the 5.5% target and will be able to minimize the negative effects of utilizing fossil fuels for electricity generation on the environment. Malaysia is committed to Kyoto Protocol, which emphasizes on fighting global warming by achieving stabilization of greenhouse gas concentrations in the atmosphere at a level that would prevent dangerous anthropogenic interference with the climate system. In this paper, the technical aspects of the implementation of optimum SEGS is discussed, especially pertaining to the positioning of the PV panels.

14 SOLAR ENERGY↗

Evaluation of Data Catalog Software for Hanford Site Environmental Datasets

Environmental information and data underpin achievement of the U.S. Department of Energy (DOE) Office of Environmental Management (EM) mission at the Hanford Site. The Hanford Environmental Data Management (HEDM) Program is the DOE Richland Operations Office (RL) approach to develop and implement a formal program for managing environmental data and the associated records, materials, and systems at the Hanford Site. The current project, contract, organization, and contractor-specific efforts at managing environmental data sets are insufficient to provide orderly, long-term, site-wide access. A vital element to be created within the HEDM program plan is a catalog of data sources, called the Hanford Environmental Information and Data Index (HEIDI), that will enable long-term access and retrievability for the multiple independent sources of data that might otherwise be difficult to discover. This report compares leading open source and commercial data catalog platforms using criteria to assess the functionality needed to develop the HEIDI catalog of Hanford data sources that connects and exchanges data with established Hanford Local Area Network (HLAN) enterprise information technology systems. Proprietary platforms evaluated included ArcGIS Enterprise Sites, Junar, OpenDataSoft, and Socrata, and non-proprietary platforms included Energy Data eXchange (EDX), Comprehensive Knowledge Archive Network (CKAN), and DKAN (a Drupal-based open data portal based on CKAN). Capabilities supporting data discoverability, retrieval, and archival, as well as metadata standard requirements and integration into the HLAN were rated as either failing to meet requirements (F), meeting requirements (M), or exceeding requirements by delivering additional desired features (E). The lowest rating for any capability area was assigned as the overall rating for the platform. These findings enable DOE-RL and the contractors implementing the HEDM plan to focus on candidate tools likely to meet the requirements for implementing HEIDI. All of the platforms receiving an overall rating of ‘F’ were unable to be deployed on Hanford infrastructure or within dedicated cloud resources. A propriety software-as-a-service (SaaS) model of delivering a data catalog (e.g., found in software such as Junar and OpenDataSoft) favors consistency across customers at the expense of customization and configurable roles that are needed for Hanford work. Hosting data on a shared commercial platform places limits on dataset size (maximum of 240 Mb for OpenDataSoft), a significant limitation for HEIDI implementation. EDX, a government data catalog based on CKAN, received the ‘F’ rating due to an inability to incorporate authentication from HLAN into the system. Among platforms rated ‘M’ or ‘E’, only the Socrata platform had a SaaS delivery model. In contrast to other SaaS platforms, Socrata provided custom roles and gateways that allow local datasets to be incorporated into an online catalog. Socrata also complies with the Federal Risk and Authorization Management Program, a significant benefit for cloud-based management of Hanford data. The other platforms rated ‘M’ or ‘E’, ArcGIS Enterprise Sites, CKAN, and DKAN, provide fully self-hosted options, allowing for greater control and flexibility with the HEIDI catalog. These widely used tools have supportive communities of practice, extensive customization options, and demonstrated deployments that provide evidence that they can meet requirements, often deliver additional desired features, and work well with federal government systems. Completely customized alternatives built on a collection of applications were not evaluated because achieving similar performance to CKAN or DKAN requires substantial resources, especially in the absence of the active communities that have grown to support these tools. ArcGIS Enterprise Sites, Socrata, CKAN, and DKAN were evaluated as strong candidates for successful implementation with HEIDI.

54 ENVIRONMENTAL SCIENCES↗

Automated radiotherapy treatment plan integrity verification

Purpose: In our clinic, physicists spend from 15 to 60 min to verify the physical and dosimetric integrity of radiotherapy plans before presentation to radiation oncology physicians for approval. The purpose of this study was to design and implement a framework to automate as many elements of this quality control (QC) step as possible. Methods: A comprehensive computer application was developed to carry out a majority of these verification tasks in the Philips PINNACLE treatment planning system (TPS). This QC tool functions based on both PINNACLE scripting elements and PERL sub-routines. The core of this technique is the method of dynamic scripting, which involves a PERL programming module that is flexible and powerful for treatment plan data handling. Run-time plan data are collected, saved into temporary files, and analyzed against standard values and predefined logical rules. The results were summarized in a hypertext markup language (HTML) report that is displayed to the user. Results: This tool has been in clinical use for over a year. The occurrence frequency of technical problems, which would cause delays and suboptimal plans, has been reduced since clinical implementation. Conclusions: In addition to drastically reducing the set of human-driven logical comparisons, this QC tool also accomplished some tasks that are otherwise either quite laborious or impractical for humans to verify, e.g., identifying conflicts amongst IMRT optimization objectives.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

TU-G-BRD-01: Quantifying the Effectiveness of the Physics Pre-Treatment Plan Review for Detecting Errors in Radiation Therapy

Purpose: Physics pre-treatment plan review is crucial to safe radiation oncology treatments. Studies show that most errors originate in treatment planning, which underscores the importance of physics plan review. As a QA measure the physics review is of fundamental importance and is central to the profession of medical physics. However, little is known about its effectiveness. More hard data are needed. The purpose of this study was to quantify the effectiveness of physics review with the goal of improving it. Methods: This study analyzed 315 “potentially serious” near-miss incidents within an institutional incident learning system collected over a two-year period. 139 of these originated prior to physics review and were found at the review or after. Incidents were classified as events that: 1)were detected by physics review, 2)could have been detected (but were not), and 3)could not have been detected. Category 1 and 2 events were classified by which specific check (within physics review) detected or could have detected the event. Results: Of the 139 analyzed events, 73/139 (53%) were detected or could have been detected by the physics review; although, 42/73 (58%) were not actually detected. 45/73 (62%) errors originated in treatment planning, making physics review the first step in the workflow that could detect the error. Two specific physics checks were particularly effective (combined effectiveness of >20%): verifying DRRs (8/73) and verifying isocenter (7/73). Software-based plan checking systems were evaluated and found to have potential effectiveness of 40%. Given current data structures, software implementations of some tests such as isocenter verification check would be challenging. Conclusion: Physics plan review is a key safety measure and can detect majority of reported events. However, a majority of events that potentially could have been detected were NOT detected in this study, indicating the need to improve the performance of physics review.

60 APPLIED LIFE SCIENCES↗