Search NASA⌕ Search

SEARCH · Search NASA

Results for “Program management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,351 records · Page 75

Implementing computer-based procedures: thinking outside the paper margins - 236

In the past year there has been increased interest from the nuclear industry in adopting the use of electronic work packages and computer-based procedures (CBPs) in the field. The goal is to incorporate the use of technology in order to meet the Nuclear Promise requirements of reducing costs, and improving efficiency and decreasing human error rates in plant operations. Researchers, together with the nuclear industry, have been investigating the benefits of an electronic work package system and specifically CBPs would have over current paper-based procedure practices. There are several classifications of CBPs ranging from a straight copy of the paper-based procedure in PDF format to a more intelligent dynamic CBP. A CBP system offers a vast variety of potential improvements, such as context driven job aids, integrated human performance tools (e.g., place-keeping and correct component verification), and dynamic step presentation. However, the implementation of a CBP system does not automatically improve the quality of procedures. Utilities should review, standardize format and update current procedure content before transitioning to a computerized process. Implementation of a CBP system can be a time to break out of traditional procedure writing processes and create new processes and procedures that take advantage of the capabilities a CBP system. This paper summarizes INL research findings related to challenges with implementing a CBP system and provides suggestions to take into consideration. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Progress in the Verification and Validation Efforts for START: A Spent Fuel Routing Tool

The U.S. Department of Energy’s (DOE) Office of Nuclear Energy (DOE-NE) is planning for an integrated waste management approach to transport, store, and dispose of spent nuclear fuel (SNF) and other high-level radioactive waste (HLW) as part of the Integrated Waste Management (IWM) program [1]. In support of this effort, the Stakeholder Tool for Assessing Radioactive Transportation (START) is being developed within the IWM program [2, 3]. This is a web-based decision support tool that can be used to analyze geospatial data related to the transportation of SNF and HLW. START is designed as a web-based application using an ArcGIS server through which the user can select the origin and destination of the route [4]. This is followed by selection of the mode of transportation of choice based on user preference. Some of the modes available to the user include rail, heavy haul truck, and barge. The option of utilizing more than one mode of transportation (intermodal transportation) is also implemented in START. A few examples of intermodal transportation include barge to rail, and heavy haul truck to rail. It must be noted that some routes might not have access to all modes of transportation, depending on the infrastructure availability at the origin and destination sites. Users can also select any stops or barriers they would like to introduce in the routes. This is followed by selection of the routing criteria of interest. Three primary routing options available to the user include minimum population, minimum distance, and minimum time. Apart from that, a few other options include accounting for a weighted average of the three aforementioned routing options. The next step involves the selection of the buffer distance of interest which includes the two choices available of 800 m and 2500 m, respectively. Finally, an option to select any prohibited rail carriers that the user does not wish to use is available. After making these selections, a route is ready to be created.

Gadey, Harish Reddy↗

Decarbonization Technology Snapshot: Heat Pump Water Heaters

Heat pump water heaters use electricity to move heat from one place to another instead of generating heat directly. In many cases they replace gas-fired water heaters and are significantly more energy efficient, reducing on-site Scope 1 emissions and often resulting in reduced total emissions.

building decarbonization↗

Utility Energy Service Contract Guide: A Resource for Contracting Officers Working on UESC Projects

A Utility Energy Service Contract (UESC) is a limited-source contract between a federal agency and serving utility for energy management services including energy and water efficiency improvements and demand-reduction services. In a UESC, the Contracting Officer (CO) will lead the acquisition effort, supported by technically knowledgeable staff working closely with the utility, to assess potential, investigate technical and economic feasibility, and ensure a fair and reasonable price for design and implementation of the project. The UESC Guide is a compilation of samples and templates developed as a resource to help COs implement Task Orders (TOs) for UESCs under existing U.S. General Services Administration (GSA) Areawide Contracts (AWC). All samples and templates provided in this guide were derived from actual UESC project contract documents and will be available for download on FEMP’s website at https://www.energy.gov/node/850656. Templates in Microsoft Word can be modified to address each agency’s unique acquisition process.

Federal Energy Management Program↗

AN INTEGRATED BIOLOGICAL CONTROL SYSTEM AT HANFORD

In 1999 an integrated biological control system was instituted at the U.S. Department of Energy's Hanford Site. Successes and changes to the program needed to be communicated to a large and diverse mix of organizations and individuals. Efforts at communication are directed toward the following: Hanford Contractors (Liquid or Tank Waste, Solid Waste, Environmental Restoration, Science and Technology, Site Infrastructure), General Hanford Employees, and Hanford Advisory Board (Native American Tribes, Environmental Groups, Local Citizens, Washington State and Oregon State regulatory agencies). Communication was done through direct interface meetings, individual communication, where appropriate, and broadly sharing program reports. The objectives of the communication efforts was to have the program well coordinated with Hanford contractors, and to have the program understood well enough that all stakeholders would have confidence in the work performed by the program to reduce or elimated spread of radioactive contamination by biotic vectors. Communication of successes and changes to an integrated biological control system instituted in 1999 at the Department of Energy's Hanford Site have required regular interfaces with not only a diverse group of Hanford contractors (i.e., those responsible for liquid or tank waste, solid wastes, environmental restoration, science and technology, and site infrastructure), and general Hanford employees, but also with a consortium of designated stake holders organized as the Hanford Advisory Board (i.e., Native American tribes, various environmental groups, local citizens, Washington state and Oregon regulatory agencies, etc.). Direct interface meetings, individual communication where appropriate, and transparency of the biological control program were the methods and outcome of this effort.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

An air quality index-based multistage type-2-fuzzy interval-stochastic programming model for energy and environmental systems management under multiple uncertainties

Highlights: • A multistage type-2-fuzzy interval-stochastic programming (MTIP) method is developed. • Air quality index (AQI) is introduced to manage energy and environmental systems. • AQI-MTIP model is formulated and results for Tianjin's EES are generated. • Impacts of environmental requirements on energy systems is analyzed. • Results can provide support for making effective pollutant mitigation policy. In this study, a multistage type-2-fuzzy interval-stochastic programming (MTIP) method is developed, which extends upon the existing multistage stochastic programming (MSP) by allowing uncertainties expressed as probabilistic distributions, interval values and type-2 fuzzy sets to be effectively incorporated within the optimization framework. Through coupling air quality index (AQI) with MTIP, an AQI-MTIP model is formulated for energy and environmental systems (EES) management of Tianjin. A number of scenarios based on changed AQIs are examined to analyze the impacts of environmental requirements on the city's energy system. Results indicate that (i) with the improvement of environmental requirement, utilization of clean energies (especially natural gas) is provoked markedly; (ii) PM{sub 2.5} is the primary pollutant, 64.50% of which should be reduced each period to maintain the city's air quality at a health-safe level. These findings can help decision makers adjust energy structure, make effective mitigation strategy, and gain deep insight into the relationship between energy consumption and environmental requirement.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Safety Design Strategy for the Advanced Test Reactor Emergency Firewater Injection System Replacement Project

In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Safety Design Strategy for the Advanced Test Reactor Diesel Bus (E-3) and Switchgear Replacement Project

In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A multi-objective programming model for assessment the GHG emissions in MSW management

Highlights: • The multi-objective multi-period optimization model. • The solution approach for the generation of the Pareto front with mathematical programming. • The very detailed description of the model (decision variables, parameters, equations). • The use of IPCC 2006 guidelines for landfill emissions (first order decay model) in the mathematical programming formulation. - Abstract: In this study a multi-objective mathematical programming model is developed for taking into account GHG emissions for Municipal Solid Waste (MSW) management. Mathematical programming models are often used for structure, design and operational optimization of various systems (energy, supply chain, processes, etc.). The last twenty years they are used all the more often in Municipal Solid Waste (MSW) management in order to provide optimal solutions with the cost objective being the usual driver of the optimization. In our work we consider the GHG emissions as an additional criterion, aiming at a multi-objective approach. The Pareto front (Cost vs. GHG emissions) of the system is generated using an appropriate multi-objective method. This information is essential to the decision maker because he can explore the trade-offs in the Pareto curve and select his most preferred among the Pareto optimal solutions. In the present work a detailed multi-objective, multi-period mathematical programming model is developed in order to describe the waste management problem. Apart from the bi-objective approach, the major innovations of the model are (1) the detailed modeling considering 34 materials and 42 technologies, (2) the detailed calculation of the energy content of the various streams based on the detailed material balances, and (3) the incorporation of the IPCC guidelines for the CH{sub 4} generated in the landfills (first order decay model). The equations of the model are described in full detail. Finally, the whole approach is illustrated with a case study referring to the application of the model in a Greek region.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Safety Design Strategy for the Advanced Test Reactor Primary Coolant Pump and Motor Replacement Project

In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Second Line of Defense Spares Program

During Fiscal Year 2012, a team from the Pacific Northwest National Laboratory (PNNL) conducted an assessment and analysis of the Second Line of Defense (SLD) Sustainability spare parts program. Spare parts management touches many aspects of the SLD Sustainability Program including contracting and integration of Local Maintenance Providers (LMP), equipment vendors, analyses and metrics on program performance, system state of health, and maintenance practices. Standardized spares management will provide better data for decisions during site transition phase and will facilitate transition to host country sustainability ownership. The effort was coordinated with related SLD Sustainability Program initiatives, including a configuration items baselining initiative, a metrics initiative, and a maintenance initiative. The spares study has also led to pilot programs for sourcing alternatives that include regional intermediate inventories and partnering agreements that leverage existing supply chains. Many partners from the SLD Sustainability program contributed to and were consulted in the course of the study. This document provides a description of the findings, recommendations, and implemented solutions that have resulted from the study.

Henderson, Dale L.↗

LAWPS Technology Maturation Program and Scaled Testing - 17408

The Technology Maturation Program for the Low-Activity Waste Pre-Treatment System (LAWPS) had been developed utilizing the guidance of DOE-Order 413.3B 'Program and Project Management for the Acquisition of Capital Assets' for Technology Readiness and Technology Maturation. The technology maturation plan (TMP) for LAWPS established principal technology elements (TE) for the proposed process, designated critical technology elements (CTE), and identified the necessary activities to mature the technologies for successful deployment of the LAWPS. The testing progress for the integrated engineering scale testing and support activities are presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

LAWPS Technology Maturation Program and Scaled Testing - 18488

The Technology Maturation Program for the Low-Activity Waste Pre-Treatment System (LAWPS) had been developed utilizing the guidance of DOE-Order 413.3B 'Program and Project Management for the Acquisition of Capital Assets' for Technology Readiness and Technology Maturation. The technology maturation plan (TMP) for LAWPS established principal technology elements (TE) for the proposed process, designated critical technology elements (CTE), and identified the necessary activities to mature the technologies for successful deployment of the LAWPS. The testing progress for the integrated engineering scale testing and support activities are presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗