Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,351 records · Page 75

Office of Space Flight standard spaceborne Global Positioning System user equipment project

The Global Positioning System (GPS) provides users autonomous, real-time navigation capability. A vehicle equipped with GPS user equipment can receive and process signals transmitted by a constellation of GPS satellites and derive from the resulting measurements the vehicle's position and velocity. Specified accuracies range from 16 to 76 meters and 0.1 to 1.0 meters/second for position and velocity, respectively. In a rendezvous and docking scenario, the use of a technique called relative GPS can provide range and range rate accuracies on the order of 1 meter and 0.01 meters/second, respectively. Relative GPS requires both vehicles to be equipped with GPS user equipment and a data communication link for transmission of GPS data and GPS satellite selection coordination information. Through coordinated satellite selection, GPS measurement errors common to both users are cancelled and improved relative position and velocity accuracies are achieved. The background, the design approach, the expected performance and capabilities, the development plan, and the project status are described. In addition, a description of relative GPS, the possible GPS hardware and software configurations, and its application to automated rendezvous and capture are presented.

Saunders, Penny E.↗

WMU Power Generation Study Task 2.0 Corn Cob Co-Combustion Study: Final Report

Much attention has been focused on renewable energy use in large-scale utilities and very small scale distributed energy systems. However, there is little information available regarding renewable energy options for midscale municipal utilities. The Willmar Municipal Utilities Corn Cob-Coal Co-Combustion Project was initiated to investigate opportunities available for small to midscale municipal utilities to "go green". The overall goal of the Project was to understand the current renewable energy research and energy efficiency projects that are or have been implemented at both larger and smaller scale and determine the applicability to midscale municipal utilities. More specific objectives for Task 2.0 of this project were to determine the technical feasibility of co-combusting com cobs with coal in the existing WMU boiler, and to identify any regulatory issues that might need to be addressed if WMU were to obtain a significant portion of its heat from such co-combustion. This report addresses the issues as laid out in the study proposal. The study investigated the feasibility of and demonstrated the technical effectiveness of co-combusting corn cobs with coal in the Willmar Municipal Utilities stoker boiler steam generation power plant. The results of the WMU Co-Combustion Project will serve as a model for other midscale utilities who wish to use corn cobs to generate renewable electrical energy. As a result of the Co-Combustion Project, the WMU plans to upgrade their stoker boiler to accept whole corn cobs as well as other types of biomass, while still allowing the fuel delivery system to use 100% coal as needed. Benefits of co-combustion will include: energy security, reduced Hg and CO 2 air emissions, improved ash chemistry, potential future carbon credit sales, an immediate positive effect on the local economy, and positive attention focused on the WMU and the City of Willmar. The first step in the study was to complete a feasibility analysis. The feasibility analysis anticipated only positive results from the combustion of corn cobs with coal in the WMU power plant boiler, and therefore recommended that the project proceed. The study proceeded with a review of the existing WMU Power Plant configuration; cob fuel analyses; an application for an Air Quality Permit from the Minnesota Pollution Control Agency to conduct the co-combustion test burns; identification of and a site visit to a similar facility in Iowa; an evaluation of cob grinding machines; and agreements with a corn grower, a cob harvester, and the City of Willmar to procure, harvest, and store cobs. The WMU power plant staff constructed a temporary cob feed system whereby the cobs could be injected into the #3 Boiler firebox, at rates up to 40% of the boiler total heat input. Test burns were conducted, during which air emissions were monitored and fuel and ash samples analyzed. The results of the test burns indicated that the monitored flue gas quality improved slightly during the test burns. The WMU was able to determine that modifications to the #3 Boiler fuel feed system to accept com cobs on a permanent basis would be technically feasible and would enable the WMU to generate electricity from renewable fuels on a dispatchable basis.

09 BIOMASS FUELS↗

ETM: Upper Class E Traffic Management

This is a slide set as part of a meeting series with members of a working group aimed at the development of a concept that addresses needs and gaps in the management of high altitude airspace operations. This concept leverages elements developed through the UAS Traffic Management project with respect to a cooperative, service-based approach that provides services and capabilities in areas (e.g., Upper Class E airspace) that currently receive no or limited service from Air Traffic Control. This concept is meant to provide a safe, fair, and scalable approach to management of Upper Class E operations that reduces the burden on ATC while providing the flexibility and access desired by current and new users of the airspace. This set of slides includes an overview of discussions and industry news covering the time since the previous group meeting, a discussion of questions in response to a proposal document from Aerospace Industries Association (AIA), an update on modeling and simulation work, and announcements of upcoming plans for the project.

Upper E↗

GIS-Based Modeling of Contaminated Soil Volumes at Multiple Sites in the Formerly Utilized Sites Remedial Action Program - 20149

The remediation of hazardous, toxic, and radioactive waste (HTRW) sites produces cost-related risks associated with the estimation of contaminated soil or debris volumes. Historical risk-management techniques include cost contingencies to cover volume uncertainties that affect project budgeting and decision-making. The Buffalo District teamed with project partners to lessen volume uncertainty and reduce project risks at multiple HTRW sites managed under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Historical remedial investigations under FUSRAP commonly identified the presence of radiological material in site media, the associated human health risk, and then areas of remediation. To manage remedial execution and reduce risk, pre-design or remediation-phase sampling essentially 'chased' contamination, which was not conducive to efficient predictive budgeting derived from Feasibility Study (FS) cost analyses. The Buffalo District first optimized their approach to better understand volume uncertainty by utilizing the Argonne National Laboratory's Bayesian Approaches for Adaptive Spatial Sampling (BAASS) software [1]. BAASS processed soft data (e.g., gamma walk-over data) and spatial sampling data to estimate the lateral extent of contaminated soil irrespective of depth (i.e., gross contamination extent) and define areas of contaminant uncertainty. The software performed a binary transformation of contaminant concentrations at all sampling points based upon remedial action goals or a sum of ratios approach (i.e., clean, impacted, or range of impacts in soil). The model produced two-dimensional (horizontal) contaminant probability contours and statistical uncertainty in the sampling coverage and resulting contaminant extents. This method was translated vertically by partitioning the sampling data into depth brackets that produced a stacked representation of contaminant extents and uncertainty in the subsurface (i.e., similar to construction lifts). The results commonly led to a better understanding of project uncertainty and the need for sampling strategies that produce high-confidence soil volumes, which control costs. The BAASS-based delineations were eventually replaced by Empirical Bayesian Kriging (EBK) methods available in ArcGIS Spatial or 3D Analysts [2]. The EBK method calculates contaminant probability zones derived from user-controlled semivariograms of the spatial datasets. The resulting probability zones (e.g., 50% or 80% of contaminant probability) represent the two-dimensional surface delineation of the overall horizontal remedial area, similarly to BAASS. However, unlike BAASS, the vertical sampling data within these probability zones became vertical control points to contour a subterranean surface that connects subsurface points to the land-surface delineations of contamination. The resulting representation of horizontal and vertical impacts within an enclosed envelop (volume) of soil included uncertainty distributions that are used to plan uncertainty-reduction sampling. These data-driven and math-based models of three-dimensional sampling results produced well-bounded remedial volumes for project planning and better uncertainty predictions during project budgeting. The EBK method was applied to several FUSRAP sites managed by the Buffalo District and compared to less rigorously modeled sites previously remediated by the District. The comparison of modeled to actual remediated volumes provide a basis for validating the volume-estimation method. This comparison is important to ensure modeled volumes match physical boundaries of site remediation. FUSRAP sites with denser investigative sampling and lesser volume uncertainty proved useful in remedial planning and contracting. The Buffalo District noted that historical sites with sparser sampling arrays had greater disparity between estimated volumes and final remedial volumes. The benefit achieved over the cost of detailed soil sampling appears positive for FUSRAP projects, especially where impacts vary widely and appear unbounded by investigation-phase sampling. The subsequent Empirical Bayesian Kriging of contamination coupled with vertical contouring for soil estimations reduces uncertainty in soil volumes or indicates where sampling is required to reduce uncertainty, which together optimize remedial planning and budgeting. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lunar Dust Mitigation Technology Development

NASA s plans for implementing the Vision for Space Exploration include returning to the moon as a stepping stone for further exploration of Mars, and beyond. Dust on the lunar surface has a ubiquitous presence which must be explicitly addressed during upcoming human lunar exploration missions. While the operational challenges attributable to dust during the Apollo missions did not prove critical, the comparatively long duration of impending missions presents a different challenge. Near term plans to revisit the moon places a primary emphasis on characterization and mitigation of lunar dust. Comprised of regolith particles ranging in size from tens of nanometers to microns, lunar dust is a manifestation of the complex interaction of the lunar soil with multiple mechanical, electrical, and gravitational effects. The environmental and anthropogenic factors effecting the perturbation, transport, and deposition of lunar dust must be studied in order to mitigate it s potentially harmful effects on exploration systems. This paper presents the current perspective and implementation of dust knowledge management and integration, and mitigation technology development activities within NASA s Exploration Technology Development Program. This work is presented within the context of the Constellation Program s Integrated Lunar Dust Management Strategy. The Lunar Dust Mitigation Technology Development project has been implemented within the ETDP. Project scope and plans will be presented, along with a a perspective on lessons learned from Apollo and forensics engineering studies of Apollo hardware. This paper further outlines the scientific basis for lunar dust behavior, it s characteristics and potential effects, and surveys several potential strategies for its control and mitigation both for lunar surface operations and within the working volumes of a lunar outpost.

Hyatt, Mark J.↗

Digital tomosynthesis (DTS) for verification of target position in early stage lung cancer patients

Purpose: The ability to verify intrafraction tumor position is clinically useful for hypofractionated treatments. Short arc kV digital tomosynthesis (DTS) could facilitate more frequent target verification. The authors used DTS combined with triangulation to determine the mean temporal position of small-volume lung tumor targets treated with stereotactic radiotherapy. DTS registration results were benchmarked against online clinical localization using registration between free-breathing cone-beam computed tomography (CBCT) and the average intensity projection (AvIP) of the planning 4DCT.Methods: In this retrospective study, 76 sets of kV-projection images from online CBCT scans of 13 patients were used to generate DTS image slices (CB-DTS) with nonclinical research software (DTS Toolkit, Varian Medical Systems). Three-dimensional tumor motion was 1.3–4 mm in six patients and 6.1–25.4 mm in seven patients on 4DCT (significant difference in the mean of the groups, P < 0.01). The 4DCT AvIP was used to digitally reconstruct the Reference-DTS. DTS registration and DTS registration combined with triangulation were investigated. Progressive shortening of total DTS arc lengths from 95° to 35° around 0° gantry position was evaluated for different scenarios: DTS registration using the entire arc; DTS registration plus triangulation using two nonoverlapping arcs; and for 55° and 45° total gantry rotation, DTS registration plus triangulation using two overlapping arcs. Finally, DTS registration plus triangulation performed at eight gantry angles, each separated by 45° was evaluated using full fan kV projection data for one patient with an immobile tumor and five patients with mobile tumors.Results: For DTS registration alone, shortening arc length did not influence accuracy in X- and Y-directions, but in Z-direction, mean deviations from online CBCT localization systematically increased for shorter arc length (P < 0.05). For example, using a 95° arc mean DTS-CBCT difference was 0.8 mm (1 SD = 0.6 mm) and for a 35° arc the mean was 2.4 mm (1 SD = 1.7 mm). DTS plus triangulation using nonoverlapping-arcs increased accuracy in Z-direction for tested arc lengths ≤55° (P < 0.01). Overlapping arcs increased accuracy in Y-direction for tumors with motion >4 mm (P < 0.02) but increased Z-direction accuracy was only observed with 55° total gantry rotation. The 95th percentile deviations with this overlapping technique in X-, Y-, and Z-directions were 1.3, 2.0, and 2.5 mm, respectively. For the five patients with mobile tumors where DTS + triangulation was performed with 45° intervals, the pooled deviation from online CBCT correction showed, for X-, Y-, and Z-directions, mean of 1.1 mm, standard deviations (SD) of 0.9, 1.0, and 0.9 mm, respectively. The mean + 2 SD was <3 mm for each direction.Conclusions: Short-arc DTS verification of time averaged lung tumor position is feasible using free-breathing kV projection data and the AvIP of the 4DCT as a reference. Observed differences between DTS and online CBCT registration with AvIP were ≤3 mm (mean + 2 SD), however, the increased temporal resolution of DTS + triangulation also identified short period deviations from the average target position on the CBCT. Short-arc DTS appears promising for intrafraction tumor position monitoring during stereotactic lung radiotherapy delivered with a rotational technique.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Parallel analysis tools and new visualization techniques for ultra-large climate data set

ParVis was a project funded under LAB 10-05: “Earth System Modeling: Advanced Scientific Visualization of Ultra-Large Climate Data Sets”. Argonne was the lead lab with partners at PNNL, SNL, NCAR and UC-Davis. This report covers progress from January 1st, 2013 through Dec 1st, 2014. Two previous reports covered the period from Summer, 2010, through September 2011 and October 2011 through December 2012, respectively. While the project was originally planned to end on April 30, 2013, personnel and priority changes allowed many of the institutions to continue work through FY14 using existing funds. A primary focus of ParVis was introducing parallelism to climate model analysis to greatly reduce the time-to-visualization for ultra-large climate data sets. Work in the first two years was conducted on two tracks with different time horizons: one track to provide immediate help to climate scientists already struggling to apply their analysis to existing large data sets and another focused on building a new data-parallel library and tool for climate analysis and visualization that will give the field a platform for performing analysis and visualization on ultra-large datasets for the foreseeable future. In the final 2 years of the project, we focused mostly on the new data-parallel library and associated tools for climate analysis and visualization.

54 ENVIRONMENTAL SCIENCES↗

Reduction of Nitrogen Oxide Emission for Lean Burn Engine Technology Final Report CRADA No. TC-315-92C

This report is a written version of the technical review presentation which was to be given to the Lean NOx Catalyst CRADA Project Progress Discussions and Planning Meeting, on October 8,1996. The goal objective of this project is to develop aerogel catalysts for catalytic converter systems capable of meeting new and future Clean Air Act requirements.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Precision Local Positioning System

The primary goal of the project is to lay the groundwork for a new system design, meaning that at the end of this project’s effort, a traditional LLNL project could begin. For this goal to be met, the overarching needs of potential sponsors and stakeholders must be analyzed and understood, and a clear statement of work should be able to be drafted from the finding in this report. More specifically, the results from this project should immediately feed into the drafting of requirements, an implementation plan, and a budget plan for a future project. In order to accomplish this goal, the team set a broad framework for work to be completed. First, conduct current market research and select reference technologies to decompose. From the decompositions, analyze shortcomings, possible pain-points and form metrics and architectural decisions. Next, analyze the potential market area by interviewing/researching stakeholders and understanding their needs. As an additional project goal, attempt to capture as large a market area and scope as reasonably possible by incorporating more than the traditional LLNL sponsors. From the information gathered, study stakeholder salience and understand the relationships between stakeholders, mission areas, mission critical functions, and system metrics. Further analyze the relationships to focus on critical system aspects and to group stakeholders and mission together in order to reduce system complexity while maintaining wide marketability. Finally, begin brainstorming concepts from the established architectural decision and use the found metrics to create tradespaces to down select the most viable architectures. This document presents the team’s findings as it progressed through the project’s strategy.

42 ENGINEERING↗

Mission Operations Planning and Scheduling System (MOPSS)

MOPSS is a generic framework that can be configured on the fly to support a wide range of planning and scheduling applications. It is currently used to support seven missions at Goddard Space Flight Center (GSFC) in roles that include science planning, mission planning, and real-time control. Prior to MOPSS, each spacecraft project built its own planning and scheduling capability to plan satellite activities and communications and to create the commands to be uplinked to the spacecraft. This approach required creating a data repository for storing planning and scheduling information, building user interfaces to display data, generating needed scheduling algorithms, and implementing customized external interfaces. Complex scheduling problems that involved reacting to multiple variable situations were analyzed manually. Operators then used the results to add commands to the schedule. Each architecture was unique to specific satellite requirements. MOPSS is an expert system that automates mission operations and frees the flight operations team to concentrate on critical activities. It is easily reconfigured by the flight operations team as the mission evolves. The heart of the system is a custom object-oriented data layer mapped onto an Oracle relational database. The combination of these two technologies allows a user or system engineer to capture any type of scheduling or planning data in the system's generic data storage via a GUI.

Wood, Terri↗

SRR's 'Next Step' in the Lean Journey -Taking Lean to the Workforce - 17247

The Savannah River Site, a U.S. Department of Energy (DOE) facility, contracted Savannah River Remediation (SRR) to manage its liquid waste project, which is a unique, high hazard nuclear waste treatment and disposal facility consisting of 51, one million-gallon underground waste tanks, a solvent extraction processing unit, a vitrification facility for the highest radioactive waste, and a grout solidification and disposal facility for a decontaminated salt solution. Our Project mission is to treat the nuclear waste and close the associated storage and treatment facilities, of which, 8 tanks have been closed to date. At SRR, the Lean business management system has been adopted to address site inefficiencies, aging infrastructure concerns and budget constraints. The Lean philosophy took root decades ago in the manufacturing sector and started with the work of W. Edwards Deming and his contemporaries. In more recent years the process has matured in the Toyota Production System and migrated into fields as diverse as services industries, health-care, and now the DOE complex. The first step of the SRR Lean Journey was to formally identify areas of improvement and initiate Value Stream Analysis (VSAs) and Rapid Improvement Events (RIEs). SRR has achieved improvements in procedure implementation, work planning and control, project schedule compression, and engineering requirements. SRR is now phasing in the next phase of Lean through Managing for Daily Improvement (MDI), Visual Management and 5S (sort, set in order, shine, standardize, and sustain). MDI is a fundamental Lean principle in that we use our most valuable asset, our employees, to drive continuous improvement versus a smaller population through formal events. Part of MDI includes visual management where the workforce can go to a 'dashboard' to see and understand the company mission and status. 5S is a process where a work group improves performance in an area by addressing physical organization, efficiency, uniformity, standardization, and mechanisms to sustain improvements. 5S stands for: Sort, Set in Order, Shine, Standardize, and Sustain. This paper will focus on the 'Next Step' in SRR's Lean journey by address how SRR is implementing MDI and 5S to improve CONOPs, Project efficiencies, and worker engagement in day to day operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Multi-GeV FFA beam transport test at CEBAF

Jefferson National Lab plans an upgrade project to reach 22 GeV high polarization electron beam by using Fixed Field Alternating-gradient (FFA) magnets. The utilization of the FFA magnets for 10-22 GeV beam energy range is unexampled, therefore those magnets need an experimental validation before their full installation to form an arc in the Continuous Electron Beam Accelerator Facility (CEBAF). For this reason, JLAB is also considering the design of an FFA magnet test bench, i.e. a half or full FFA cell, that would be deployed in the current CEBAF in order to serve as the highest energy demonstration for the FFA field uniformity, permanent magnet resiliency with the beam as well as enabling beam optics measurements with the 5-11 GeV range highly polarized beams which closely resembles the full energy range of the 22 GeV upgrade. In this report, we present the status of the planned beamline for the FFA beam transport test at CEBAF.

Accelerator Physics↗

Hanford River Protection Project Life cycle Cost Modeling Tool to Enhance Mission Planning - 13396

The Life cycle Cost Model (LCM) Tool is an overall systems model that incorporates budget, and schedule impacts for the entire life cycle of the River Protection Project (RPP) mission, and is replacing the Hanford Tank Waste Operations Simulator (HTWOS) model as the foundation of the RPP system planning process. Currently, the DOE frequently requests HTWOS simulations of alternative technical and programmatic strategies for completing the RPP mission. Analysis of technical and programmatic changes can be performed with HTWOS; however, life cycle costs and schedules were previously generated by manual transfer of time-based data from HTWOS to Primavera P6. The LCM Tool automates the preparation of life cycle costs and schedules and is needed to provide timely turnaround capability for RPP mission alternative analyses. LCM is the simulation component of the LCM Tool. The simulation component is a replacement of the HTWOS model with new capability to support life cycle cost modeling. It is currently deployed in G22, but has been designed to work in any full object-oriented language with an extensive feature set focused on networking and cross-platform compatibility. The LCM retains existing HTWOS functionality needed to support system planning and alternatives studies going forward. In addition, it incorporates new functionality, coding improvements that streamline programming and model maintenance, and capability to input/export data to/from the LCM using the LCM Database (LCMDB). The LCM Cost/Schedule (LCMCS) contains cost and schedule data and logic. The LCMCS is used to generate life cycle costs and schedules for waste retrieval and processing scenarios. It uses time-based output data from the LCM to produce the logic ties in Primavera P6 necessary for shifting activities. The LCM Tool is evolving to address the needs of decision makers who want to understand the broad spectrum of risks facing complex organizations like DOE-RPP to understand how near-term programmatic decisions affect life cycle costs and commitments. (authors)

54 ENVIRONMENTAL SCIENCES↗

Input Waste Stream Modeling for Trash Management, Recycling, and Manufacturing Processes

Astronaut waste is an important aspect of the planning and execution of long-term crewed missions, especially to the Moon and Mars. However, as new technologies arise and mission planning evolves, the projected composition of the waste similarly evolves. This poses a problem for researchers who are investigating various approaches to mitigating crew waste, since the investigation of each new waste-mitigation technology typically uses a static waste composition that is based on a simulant developed at the time of the research; several such waste simulants have been developed over recent years. To mitigate the ‘moving target’ aspect of crew waste composition and use, researchers at NASA KSC have developed a computational tool wherein researchers can adjust the composition of the crew waste, as well as other important parameters such as crew size, mission duration, and waste mitigation method (e.g., incineration, compaction, jettison, etc.). The computational tool then returns important mission metrics such as waste-related mass reduction, power consumed, water produced or consumed, elemental mass balance, and available feedstock for in-space manufacturing (ISM) applications. This tool can then be used to adjust aspects of a waste model (e.g., removal of metal aluminum (Al) for ISM applications) and determine an associated set of metrics in order to inform mission planning.

Ray Pitts↗

A decision-support system for sustainable urban metabolism in Europe

Urban metabolism components define the energy and material exchanges within a city and, therefore, can provide valuable information on the environmental quality of urban areas. Assessing the potential impact of urban planning alternatives on urban metabolism components (such as energy, water, carbon and pollutants fluxes) can provide a quantitative estimation of their sustainability performance. Urban metabolism impact assessment can, therefore, contribute to the identification of sustainable urban structures with regards, for example, to building types, materials and layout, as well as to location and capacity of transportation and infrastructural developments. In this way, it enables the formulation of planning and policy recommendations to promote efficient use of resources and enhance environmental quality in urban areas. The European FP7 project BRIDGE (sustainaBle uRban plannIng Decision support accountinG for urban mEtabolism) has developed a decision-support system (DSS) that systematically integrates urban metabolism components into impact assessment processes with the aim of accurately quantifying the potential effects of proposed planning interventions. The DSS enables integration of multiple spatial and non-spatial datasets (e.g. physical flows of energy and material with variables of social and economic change) in a systematic manner to obtain spatially defined assessment results and to thus inform planners and decision-makers. This multi-criteria approach also enables incorporation of stakeholders' perceptions in order to prioritise decisive assessment criteria. This paper describes the methodological framework used to develop the DSS and critically examines the results of its practical application in five European cities. - Highlights: Black-Right-Pointing-Pointer Urban metabolism in sustainability assessment of planning alternatives. Black-Right-Pointing-Pointer European FP7 project applied to 5 real life case studies across Europe. Black-Right-Pointing-Pointer Decision support system enables incorporating scientific knowledge into planning. Black-Right-Pointing-Pointer Scale, data availability and stakeholder representativeness limit its application.

54 ENVIRONMENTAL SCIENCES↗

Ammonium Looping with Membrane Absorber and Distributed Stripper for Enhanced Algae Growth

The objective of this project is to conduct a comprehensive investigation to develop and demonstrate a practical, reliable, and cost-effective integrated carbon dioxide (CO 2 ) capture and biofixation process for algae production. This process utilizes a chemical hindered ammonium solution (NH 4 OH) as both a capture reagent and an algae nutrient. The membrane absorber employed in the system ensured minimal ammonia (NH 3 ) emissions in the treated flue gas. Additionally, distributed solar-energy powered strippers located near the bioreactor modules facilitate solvent regeneration and enable just-in-time delivery of CO 2 and NH 3 to the algae, thereby minimizing the pH swing for enhanced productivity. The proposed membrane CO 2 absorber and solar-powered stripper is designed and seamlessly integrated with the existing 0.1 MWth bench-scale CO 2 capture system (CCS) and open raceway ponds (ORPs) at the University of Kentucky Center for Applied Energy (UK CAER) campus. The entire integrated process has undergone construction, operation, testing, and analysis. Furthermore, technology has been evaluated with a techno-economic analysis (TEA), technology gap analysis (TGA), life-cycle analysis (LCA), and a technology maturation plan (TMP). This project was performed within two budget periods, 54 months in duration. There are fourteen Project Tasks, twelve Milestones and four Success Criteria.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Wai'anae Moku Resilience Hub Network ETIPP Deep-Dive Technical Assistance

In 2024, organizations representing communities in the Wai'anae moku, with support from the National Laboratory of the Rockies (NLR) and Hawai'i State Energy Office (HSEO) through an ETIPP Strategic Energy Planning engagement, developed the Wai'anae Moku Community Energy Plan, along with a companion report from NLR. The plan identified five priority focus areas and associated projects to support an energy vision of Wai'anae moku community representatives. The 2026 ETIPP Deep Dive Technical Assistance focuses explicitly on the project identified as highest priority in the plan: support for resilience hub network design and analysis. This fact sheet outlines the scope of technical assistance, benefits of participation the project, and roles and contact information for partners in the project.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The Dresden Felsenkeller shallow-underground accelerator laboratory for nuclear astrophysics - Status and first physics program

Favored by the low background in underground laboratories, low-background accelerator-based experiments are an important tool to study nuclear reactions involving stable charged particles. This technique has been used for many years with great success at the 0.4 MV LUNA accelerator in the Gran Sasso laboratory in Italy, protected from cosmic rays by 1400 m of rock. However, the nuclear reactions of helium and carbon burning and the neutron source reactions for the astrophysical s-process require higher beam energies than those available at LUNA. Also the study of solar fusion reactions necessitates new data at higher energies. As a result, in the present NuPECC long range plan for nuclear physics in Europe, the installation of one or more higher-energy underground accelerators is strongly recommended. An intercomparison exercise using the same High-Purity Ge detector at several sites has shown that, with a combination of 45 m rock overburden, as can be found in the Felsenkeller underground site in Dresden, and an active veto against the remaining muon flux, in a typical nuclear astrophysics setup a background level can be achieved that is similar to the deep underground scenario as in the Gran- Sasso underground laboratory, for instance. Recently, a muon background study and geodetic measurements were carried out by the REGARD group. It was estimated that the rock overburden at the place of the future ion accelerator is equivalent to 130 m of water. The maximum muon flux measured was 2.5 m{sup -2} sr{sup -1} s{sup -1}, in the direction of the tunnel entrance. Based on this finding, a used 5 MV pelletron tandem accelerator with 250 μA up-charge current and external sputter ion source has been obtained and transported to Dresden. Work on an additional radio-frequency ion source on the high voltage terminal is in progress and far advanced. The installation of the accelerator in the Felsenkeller is expected for the near future. The status of the project and the planned access possibilities for external users will be reported, together with the instrumentation to be installed and proposals for the first solar physics measurements to be done at this new low-background facility. (authors)

43 PARTICLE ACCELERATORS↗