Search NASA⌕ Search

SEARCH · Search NASA

Results for “Reliability & Maintainability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

1,345 records · Page 75

Cost Comparison in 2015 Dollars for Radioisotope Power Systems -- Cassini and Mars Science Laboratory

Radioisotope power systems (RPSs) have enabled missions requiring reliable, long-lasting power in remote, harsh environments such as space since the early 1960s. Costs for RPSs are high, but are often misrepresented due to the complexity of space missions and inconsistent charging practices among the many and changing participant organizations over the years. This paper examines historical documentation associated with two past successful flight missions, each with a different RPS design, to provide a realistic cost basis for RPS production and deployment. The missions and their respective RPSs are Cassini, launched in 1997, that uses the general purpose heat source (GPHS) radioisotope thermoelectric generator (RTG), and Mars Science Laboratory (MSL), launched in 2011, that uses the multi-mission RTG (MMRTG). Actual costs in their respective years are discussed for each of the two RTG designs and the missions they enabled, and then present day values to 2015 are computed to compare the costs. Costs for this analysis were categorized into two areas: development of the specific RTG technology, and production and deployment of an RTG. This latter category includes material costs for the flight components (including Pu-238 and fine weave pierced fabric (FWPF)); manufacturing of flight components; assembly, testing, and transport of the flight RTG(s); ground operations involving the RTG(s) through launch; nuclear safety analyses for the launch and for the facilities housing the RTG(s) during all phases of ground operations; DOE’s support for NEPA analyses; and radiological contingency planning. This analysis results in a fairly similar 2015 normalized cost for the production and deployment of an RTG—approximately $118M for the GPHS-RTG and $109M for the MMRTG. In addition to these two successful flight missions, the costs for development of the MMRTG are included to serve as a future reference. Note that development costs included herein for the MMRTG do not include costs from NASA staff or facilities for their development efforts—they only include the amounts costed by DOE and DOE contractors. The 2015 value for MMRTG development is $83M. Both of the RPS types analyzed herein use the general purpose heat source (GPHS) module as the “heart of the RPS.” The estimates presented herein do not include development costs for the GPHS. These estimates also do not include the RPS infrastructure cost to maintain the facilities, equipment, and personnel necessary to enable the production of RPSs, except to the extent that the infrastructure is utilized during the production campaigns to provide RPSs for missions. It was not until after the Cassini mission that an RPS infrastructure funding structure was defined and funded separately from mission-specific elements. The information presented herein could allow for more accurate budget planning estimates for space missions being considered over the next decade and beyond.

07 ISOTOPE AND RADIATION SOURCES↗

Role of small lead-cooled fast reactors for international deployment in worldwide sustainable nuclear energy supply.

Most recently, the global nuclear energy partnership (GNEP) has identified, as one of its key objectives, the development and demonstration of concepts for small and medium-sized reactors (SMRs) that can be globally deployed while assuring a high level of proliferation resistance. Lead-cooled systems offer several key advantages in meeting these goals. The small lead-cooled fast reactor concept known as the small secure transportable autonomous reactor (SSTAR) has been under ongoing development as part of the US advanced nuclear energy systems programs. Meeting future worldwide projected energy demands during this century (e.g., 1000 to 2000 GWe by 2050) in a sustainable manner while maintaining CO2 emissions at or below today's level will require massive deployments of nuclear reactors in non-fuel cycle states as well as fuel cycle states. The projected energy demands of non-fuel cycle states will not be met solely through the deployment of Light Water Reactors (LWRs) in those states without using up the world's resources of fissile material (e.g., known plus speculative virgin uranium resources = 15 million tonnes). The present U.S. policy is focused upon domestic deployment of large-scale LWRs and sodium-cooled fast spectrum Advanced Burner Reactors (ABRs) working in a symbiotic relationship that burns existing fissile material while destroying the actinides which are generated. Other major nuclear nations are carrying out the development and deployment of SFR breeders as witness the planning for SFR breeder deployments in France, Japan, China, India, and Russia. Small (less that 300 MWe) and medium (300 to 700 MWe) size reactors are better suited to the growing economies and infrastructures of many non-fuel cycle states and developing nations. For those deployments, fast reactor converters which are fissile self-sufficient by creating as much fissile material as they consume are preferred to breeders that create more fissile material than they consume. Thus, there is a need for small and medium size fast reactors in non-fuel cycle states operating in a converter mode as well as large sodium-cooled fast breeders in fuel cycle states. Desired attributes for exportable small fast reactors include: proliferation resistance features such as restricted access to fuel; long core life further restricting access by reducing or eliminating the need for refueling; restricted potential to be misused in a breeding mode; fuel form that is unattractive in the safeguards sense; and a conversion ratio of unity to self-generate as much fissile material as is consumed. Desired attributes for exportable small reactor deployments in developing nations and remote sites also include: a small power level to match the smaller demand of towns or sites that are off-grid or on immature local grids; low enough cost to be economically competitive with alternative energy sources available to developing nation customers (e.g. diesel generators in remote locations); readily transported and assembled from transportable modules; simple to operate and highly reliable reducing plant operating staff requirements; as well as high reliability and passive safety reducing the number of accident initiators and need for safety systems as well as reducing the size of the exclusion and emergency planning zones. The Lead-Cooled Fast Reactor (LFR) has the desired attributes. An example of a small exportable LFR concept is the 20 MWe (45 MWt) Small Secure Transportable Autonomous Reactor (SSTAR) incorporating proliferation resistance, fissile selfsufficiency, autonomous load following, a high degree of passive safety, and supercritical carbon dioxide Brayton cycle energy conversion for high plant efficiency and improved economic competitiveness.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Luminescence properties of Ce{sup 3+} and Tb{sup 3+} co-doped SiO{sub x}N{sub y} thin films: Prospects for color tunability in silicon-based hosts

In this work, the role of the nitrogen content, the annealing temperature, and the sample morphology on the luminescence properties of Ce{sup 3+} and Tb{sup 3+} co-doped SiO{sub x}N{sub y} thin films has been investigated. An increasing nitrogen atomic percentage has been incorporated in the host matrix by gradually replacing oxygen with nitrogen during fabrication while maintaining the Si content unaltered, obtaining a sequential variation in the film composition from nearly stoichiometric SiO{sub 2} to SiO{sub x}N{sub y}. The study of rare earth doped single layers has allowed us to identify the parameters that yield an optimum optical performance from Ce{sup 3+} and Tb{sup 3+} ions. Ce{sup 3+} ions proved to be highly sensitive to the annealing temperature and the nitrogen content, showing strong PL emission for relatively low nitrogen contents (from 0 to 20%) and moderate annealing temperatures (800–1000 °C) or under high temperature annealing (1180 °C). Tb{sup 3+} ions, on the other hand, displayed a mild dependence on those film parameters. Rare earth co-doping has also been investigated by comparing the luminescence properties of three different approaches: (i) a Ce{sup 3+} and Tb{sup 3+} co-doped SiO{sub x}N{sub y} single layer, (ii) a bilayer composed of two SiO{sub x}N{sub y} single layers doped with either Ce{sup 3+} or Tb{sup 3+} ions, and (iii) a multilayer composed of a series of either Tb{sup 3+} or Ce{sup 3+}-doped SiO{sub x}N{sub y} thin films with interleaved SiO{sub 2} spacers. Bright green emission and efficient energy transfer from either Ce{sup 3+} ions or Ce silicates to Tb{sup 3+} ions has been observed in the co-doped single layer as a consequence of the strong ion-ion interaction. On the other hand, independent luminescence from Ce{sup 3+} and Tb{sup 3+} ions has been observed in the Ce{sup 3+} and Tb{sup 3+} co-doped bilayer and multilayer, providing a good scenario to develop light emitting devices with wide color tunability by varying the number of deposited films that contain each rare earth dopant. Moreover, the optoelectronic properties of Ce{sup 3+}- and/or Tb{sup 3+}-doped thin films have been studied by depositing transparent conductive electrodes over selected samples. An electroluminescence signal according to the rare earth transitions is obtained in all cases, validating the excitation of Ce{sup 3+} and Tb{sup 3+} ions upon electron injection. Also, the main charge transport of injected electrons has been evaluated and correlated with the layer stoichiometry. Finally, a simple reliability test has allowed disclosing the origin of the early breakdown of test devices, attributed to the excessive joule heating at filament currents that occur around a region close to the polarization point.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

srlife : A software tool for estimating the life of high temperature concentrating solar receivers. Part II – Ceramic receivers

As Concentrating Solar Power (CSP) technologies aim for higher operating temperatures to enhance efficiency and meet industrial process heat demands, high-temperature metallic materials, including nickel-based superalloys, face challenges in maintaining structural integrity. Advanced ceramics offer a promising alternative due to their superior high-temperature strength. However, accurately assessing the performance of ceramic components requires a fundamentally different approach from that used for metallic components. This Part II of a two-part paper describes the integration of ceramic statistical failure models within srlife – an open-source tool for predicting the life of high-temperature CSP receivers. These models account for the inherent variability in ceramic strength, as well as the effects of subcritical crack growth (SCG) under high temperature cyclic loads. Here, the paper includes an example problem that demonstrate the process of evaluating ceramic receivers using srlife. Part I details the life estimation process for metallic receivers (i.e. creep-fatigue life) along with input and output data structure, thermohydraulic analysis, and structural analysis. The complete tool is available as open-source software at https://github.com/srlife-project/srlife and can be installed via the PyPi package manager (https://pypi.org). By supporting both ceramic and metallic receiver analyses, srlife facilitates fair comparisons between competing metallic and ceramic designs, enabling accurate evaluations of plant efficiency and the economic benefits of ceramic solar receivers and other components.

High temperature ceramic receivers↗

Going from Closed to Open and Then Back Again: How to Keep a Level Head

Nuclear Energy is a mature, reliable low carbon technology with a secure and abundant fuel source and is an essential contributor to the energy mix. The UK has a long history of using nuclear energy and has a long standing world class expertise in the recycling of used nuclear fuel with three generations of industrial scale reprocessing plant operating on the Sellafield site, as well as the Thorp Miniature Pilot Plant in the 1980's, and a vibrant, internationally recognised R and D capability at the National Nuclear Laboratory (NNL). However, the reprocessing plants at Sellafield are both scheduled to finish around 2020 with Thorp and Magnox plants moving to post operational clean out (POCO). This will move the UK from a closed fuel cycle to an open one. Within the UK a decision has been made to refresh the current nuclear energy plants to at least replacement of the existing nuclear fleet. This will mean the building of new nuclear power plant to ensure energy production of 16 GWe per annum. With the closure of the UK's reprocessing plants, these new nuclear power plants will operate on an open fuel cycle with long term storage of used fuel followed by disposal. However it is also recognised that this may not be enough and as such expansion scenarios ranging from 16 to 75 GWe nuclear energy production are being considered through the development of a UK Road map. Within these energy scenarios, a variety of options are being evaluated including electricity generation only, electricity generation plus heat, open versus closed fuel cycles, Generation III versus Generation IV systems and combinations of the above. What is clear is that the deciding factor on the type and mix of any energy programme will not be on technology choice alone. Instead a complex mix of Government policy, relative cost of nuclear power, market decisions and public opinion will influence the rate and direction of growth of any future energy programme. At the ANS Winter Meeting 2013 a number of these techniques were presented. What was clear from the fuel cycle scenario modelling was the requirement for the utilisation of a closed fuel cycle to enable the expansion beyond 16 GWe. It is therefore a necessity for the UK to keep options open for a potential return to a closed fuel cycle in the future. The requirement to maintain the skills and capabilities to do so will be an essential part of any future nuclear strategy. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Dynamic Building Load Control to Facilitate High Penetration of Solar Photovoltaic Generation (Final Technical Report)

Solar photovoltaic (PV) resources are the most common form of distributed generation in residential and commercial customer premises within electric distribution networks. A higher penetration of PV generation in distribution circuits will impose challenges on maintaining service voltages within the range of industry standards, power quality, and power flow. Buildings consume 74% of the electricity produced in the United States, and a significant portion of the building load is dispatchable, making them responsive to electrical grid needs. Oak Ridge National Laboratory—in collaboration with Southern Company; the University of Tennessee, Knoxville; and the Georgia Institute of Technology—is examining the PV integration issues in distribution-level electrical grids and developing integrated demand-side control and communication systems to enable responsive loads. The proposed responsive loads mechanism performs renewable generation following to increase the penetration of solar PV within each feeder. The specific objectives of this project are to (1) examine distribution-level PV integration scenarios to understand requirements, (2) undertake an end-to-end simulation-based design of a distributed control strategy of loads geographically near the PV generation asset to minimize the effect on the distribution feeder, (3) deploy and demonstrate the control technology developed in partnership with utilities, and (4) perform a scalability analysis at the utility scale. This 3-year integrated project aims to develop, demonstrate, and validate demand-side control technology to enable increased the penetration of renewables while mitigating challenges that arise due to their intermittency. Activities in Budget Period (BP) 1 focused on a literature review and the formal design of a control system for integrating local distribution with generation and loads. The team used modeling and simulation to evaluate the impact of varying buildings loads, variable PV generation, and power flow dynamics on the distribution circuit. The dynamic models developed in BP 1 were used in BP 2 to develop a model-based control design and a test bed. The test bed has enabled the simulation-based testing and comparison of different control designs and formulations applied to different configurations of the distribution grid, PVs, and building loads. The control approaches developed in BP 2 were implemented in BP 3 in the form of hardware deployed at the Central Baptist Church (CBC) in Knoxville, Tennessee, for testing and evaluation. The outcome of this project was the development and demonstration of open-source, low-cost, low-touch sensing and control retrofits to distributed PV generation and building loads that, in a coordinated fashion, provide the load-shaping response needed to integrate high levels of renewable penetration. This research addresses the target metrics by dynamically controlling a load with solar generation variability to minimize the extent of two-way power flow, enhance reliability, facilitate high PV penetration (>100% of peak load in a line segment), and generate scalable software and hardware solutions adaptable to any penetration levels. The research and development activities are focused and designed to be impactful within the relevant 2020 targets time frame.An accurate open-source integration simulation framework for end-to-end control design was developed and deployed at the CBC facility for testing and evaluation. This final report provides a detailed review of the technical results achieved during this 3-year integrated project. A novel spectral analysis of PV data is demonstrated to derive the requirements of the control design. A detailed simulation-based analysis of PV integration at increasing penetration levels is presented using 1 year of PV data to demonstrate the impact on the distribution circuits. Two different control strategies were developed and demonstrated via simulation to track variable PV generation with adaptive load dispatch. The report concludes with a summary of accomplishments and recommendations for a path forward.

14 SOLAR ENERGY↗

Determining the Effects of Neutron Irradiation on the Structural Integrity of Additively Manufactured Heat Exchangers for Very Small Modular Reactor Applications, DOE Final Report (Project # 19-16980)

Auburn University (AU) teamed with the University of Missouri Research Reactor (MURR) and Kansas State University (KSU) to determine how to best use laser-powder bed fusion (L-PBF) additive manufacturing (AM) methods for generating radiation resistant nickel-based superalloys, Inconel alloy 625 and 718, for special purpose reactor (SPR) or very small modular reactor (vSMR) heat-exchangers (HeXs). Compact, conformal, and durable HeXs that are tolerant of extreme environments are needed for supporting the technical maturity of next-generation, portable compact reactors. AM is an enabler for realizing this new wave of HeXs – providing a means to make customizable hot and cold stream architectures with novel flow path geometries (e.g., tortuous channels with non-uniform, asymmetric cross-sections) and reduced layer-to-layer contact resistance (i.e., no separate bonding procedure required). AM further enables a more time/cost efficient means for fabricating SPRs by reducing the number of suppliers required for HeX assembly and allowing for on-site HeX fabrication. The project aim has been to better understand how neutron irradiation affects the microstructure and properties of additively manufactured nickel-based superalloys, to accelerate their safe, reliable use in the modular reactor industry. The major objective was to qualify/quantify the microstructure and microhardness of nickel-based superalloys (including Inconel 718 and 625) additively manufactured via the L-PBF process in the neutron-dosed (irradiated) and non-irradiated states over a course of 3 years. Effects of build orientation during L-PBF and post-AM heat treatments on neutron resistance, microstructure and mechanical properties were also investigated. Neutron damage mechanisms via hardening were characterized. This project combined subject-matter experts in AM, mechanical/microstructure metallic part characterization, and neutron irradiation, as well as unique assets and capabilities at AU and MURR at MU, to ensure project results translated to effectively addressing known gaps in nuclear science and engineering. Parts were fabricated using L-PBF systems readily available at AU. Specimens were then irradiated using MURR facilities; a manipulator equipped hot cell was also used to measure material hardness after dosing. MURR, a 10 MW, light-water nuclear reactor, is the largest, highest powered, highest-flux university owned research reactor in the U.S. The major findings in this project provide evidence that AM can serve as an alternative way to build structural components for future advanced small modular reactors using advanced materials like Inconel 625 (IN625) or Inconel 718 (IN718). After full spectrum neutron irradiation, vertically as-built AM IN625 samples were observed to display better resistance towards radiation-induced-hardening defects relative to traditionally machined metals. A Vickers microhardness tester, using settings of 1 kgf and dwell time of 15 seconds per indentation, was used to measure hardness in this study. The as-built, vertically printed samples experienced 1.2% of radiation hardening vs. 5.25% radiation hardening observed in wrought IN625. Another set of IN625 and IN718 samples were exposed to fast neutron irradiation. It was observed that IN718 showed more resistance towards radiation hardening compared to IN625 samples indicating IN718 had a better performance. Results showed that the IN718 samples experienced less change (-2.5 to 3.24 %) in microhardness. On the other hand, IN625 samples underwent more (0.9 to 7.21%) change in microhardness after fast neutron irradiation. AM IN625 samples were irradiated using an ion (proton) beam in cyclotron. The mechanical properties of AM samples post irradiation were compared with wrought samples. The irradiated region on the samples were tested using nano-hardness indention. It was observed that the beam current and time used in this study generated an annealing effect and thus reduced the hardness of the samples. The sum of the project results provide precious insight into how one may minimize radiation hardening in AM materials while maintaining material property constraints. Results should assist engineers in selecting an appropriate heat treatment for AM nickel-based superalloys for increased radiation resistance. Results should increase confidence levels for adopting AM for building nuclear reactor components which perform the same or better than conventionally manufactured components. Fast neutron irradiation testing provided an accelerated means of obtaining radiation effects without making materials radioactive and difficult to handle.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A Balanced Approach to Molded Case Circuit Breaker Maintenance

Abstract – NFPA 70E mandates that "overcurrent devices shall be maintained in accordance with the manufacturer's instructions or industry consensus standards". At our laboratory this mandate is law, because 10 CFR 851 requires adherence to NFPA 70 and 70E. This begs the question, exactly what are those manufacturer's instructions, and what do the industry consensus standards require? In particular with Molded Case Circuit Breakers (MCCB's), how does one meet these requirements and still apply a balanced approach in a maintenance program when the facilities range from brand new construction to over fifty years old, and where circuit breakers exist that have been made by virtually every major manufacturer? This paper examines the instructions given by the various manufacturers, and examines the standards that exist, along with major guides and white paper recommendations. Both the consistencies and the inconsistencies are examined, recommendations are compared, and a general consensus of recommendations emerges. The various maintenance particulars are examined, from cycling of breakers and thermography to inverse thermal and instantaneous primary injection trip testing. The results of an FMEA (Failure Modes and Effects Analysis) was conducted at our facility; the results of that FMEA and the recommendations of that FMEA for maintenance of MCCB’s are presented. In this paper, we have examined the recommendations of manufacturers, standards, and guides that provide the guidelines for maintenance of molded case circuit breakers. Although many conflicts exist, a consensus of nearly universal recommendations emerges. A balanced approach to maintenance that provides the maximum safety benefit within the bounds of economic feasibility can be developed. We provide a condensation of the existing literature with references, a visual summary of that literature and propose a recommended maintenance approach.

42 ENGINEERING↗

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗

Attack-resilient algorithms and testbed federation for wide-area protection and control in smart grid

Today’s energy infrastructure is undergoing a massive transformation across all generation, transmission, and distribution systems to provide reliability, efficiency, and sustainability to the power system network. During the past 10 years, there has been a remarkable enhancement in developing close-loop wide-area protection and control (WAPAC) applications, such as automatic generation control (AGC), wide-area protection scheme (WAPS), synchrophasor-based wide-area voltage control system (WAVCS), etc., in the energy management system (EMS) to provide an adequate situational awareness to control center operators during physical disturbances and natural events. The rapid digitalization, unencrypted communication, and numerous data-sharing devices have increased digital access points that have exposed the grid network to countless cyberattacks pertinent to the WAPAC cybersecurity. Given the amount of complex grid network coupled with legacy infrastructures, it is untrustworthy to completely rely on information technology (IT)-based conventional security measures to defend against evolving cyberattacks. Hence, there is a compelling need to go beyond the traditional paradigm of ‘security by obscurity’ and ‘bolt-on’ security measures, and develop a suite of innovative security solutions at multiple layers to transform the current “fault-resilient” grid into “fault and attack-resilient” grid of the future. This dissertation specifically focuses on developing application-specific attack-resilient solutions for critical WAPAC applications in the smart grid. The first part of the study, Attack-Resilient Wide-Area Protection Scheme, presents a cyber-physical attack-resilient system (CPARS) for WAPS, where two anomaly detection methods are proposed to detect multi-level cyberattacks followed by the rules-based intrusion mitigation system (RIMS) to initiate effective mitigation strategies, tailored to these attacks, to restore the normal grid operation after disturbances. The first anomaly detection component, Machine learning-based Anomaly Detection for Centralized WAPS, discusses a novel architecture and methodology for developing a machine-learning-based anomaly detection system (ADS) for the centralized wide-area protection system (CWAPS) by applying the variational mode decomposition (VMD) technique and decision tree (DT) algorithms using cyber logs and synchrophasor measurements. The second component, Multi-Agent-based Anomaly Detection for Decentralized WAPS, presents a two-level hierarchical multi-agent-based decentralized WAPS against the system-aware stealthy cyber-attacks. Finally, for the RIMS, the state transition diagram-based mitigation measures are defined based on the grid operation states and experimental testing and evaluation are presented in a cyber-physical testbed environment. The second part of the study, Attack-Resilient Wide-Area Voltage Control System, addresses the existing vulnerabilities in the wide-area voltage control system (WAVCS), presents the methodology for performing an impact analysis during data integrity attacks, and proposes a data-driven attackresilient system (DARS) by incorporating machine learning-based ADS and rules-based anomaly mitigation system (RAMS) to detect these attacks and provide necessary mitigation actions to maintain the transient voltage stability after disturbances. Finally, the third part, Networked Federation Testbed (NEFTSec) for Smart Grid Cybersecurity, focuses on developing an interconnected federated testbed through a common network like the internet, describes its conceptual architectures, and also presents its design components for experimental testing, validation, and evaluation. Further, it presents the co-simulation interface algorithm (CIA) to facilitate the geographically-dispersed real-time distributed simulation (GD-RTDS) during the cyber-physical federation. In general, this dissertation presents innovative attack-resilient solutions for WAPAC applications that are experimentally tested and evaluated using the PowerCyber testbed and NEFTSec platform to accelerate the transition of state-of-the-art research works to the real-field deployments.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Crickets{sup TM} and Curies: Lessons Learned from the Steel Industry - 18221

The global nuclear power industry, and to a lesser extent, the decommissioning and demolition of old nuclear weapons plants, obviously present challenges to those in the radioactive waste management field. Some if not many of these challenges have already been dealt with, and resolved, in the steel industry, including its recycling component. This paper presents proven state-of-the-art radiation detection systems used in steel and related recycling facilities, emphasizing current, reliable and flexible technologies for characterization, volume reduction, and remote handling of recyclable solid wastes contaminated and, just as important, not contaminated, with a wide range of radioactive isotopes. It will also cover features of remotely operated waste handling equipment effective in reducing or eliminating exposure of workers engaged in decontamination and demolition work on active and/or inactive nuclear installations. The industry group identified above has a long-standing policy regarding any radioactivity in potentially recyclable as well as waste materials it receives: if it is detected, it is rejected. The US Steel Manufacturers Association (SMA) put it this way in one of their Public Policy Statements: 'SMA members have not, and will not, accept scrap that is known to be radioactively contaminated' (emphasis included in the original) (1). This policy, adopted around the globe, obviously has major implications for decommissioning and demolition projects. To put it bluntly, if rad-contaminated metal, concrete, or other materials are sent to a facility for possible recycling, reuse or even disposal, they may well be rejected. If so, the materials will be returned to the generator--at the generator's cost-and a new solution will have to be found. This also results in additional costs for the generator. Facilities in the steel making and metal recycling industries have access to, and routinely count on, a wide range of proven detection technologies and techniques for monitoring incoming shipments and sorting the materials in them. The approaches range from using sensitive handheld instruments for pinpointing and isolating small devices such as isotope-containing gauges and radium dials all the way up to technologies effective for large volumes and weights of contaminated construction and demolition material. In this latter realm, the most suitable, robust, and field-proven system for decommissioning and demolition work is a radiation detection system fitted to a grappling and/or magnetic device, known as the Crickets{sup TM} technology, which automatically scans bulk material with no added effort or time in material handling operations. Highly versatile, a Crickets{sup TM} system can be put to work on any material-handling system, including grapples handling volumes ranging from 1 up to 18 cubic yards, while detecting radioactivity in real-time over a very wide dose range, from nSv to Sv levels. Other field-proven real-time measuring radiation detection devices can be fixed to conveyor belts with traverse speeds up 3 meters/second, also measuring in real time and over the same dose range, allowing both recyclable and waste materials with a pre-set level of radioactivity to be diverted off the belt. Finally, there are highly sensitive radiation portal installations for detecting radiation from materials being transported by vehicles, including those with roll-offs, dump trailers, and other containers, again in real-time and for the same dose ranges. For vehicles, the speed must be carefully controlled-the vehicles need to travel from 5 to 10 km/h through the scanning zone to ensure that maximum detection capability is maintained. When radiation detection systems at recycling and steel making facilities detect radioactive material in an incoming shipment, these facilities have a zero tolerance for accepting the cargo. Therefore, it is imperative that material from a demolition operation that is slated to be sent for recycling or other reuse be checked at the point of demolition at similar detection levels to avoid possible rejection later of a shipment because of its radioactivity. In addition to measuring overall radiation levels (for example, total gamma), when necessary, combinations of different radiation detection media can be used to detect the presence and intensities of specific isotopes such as U-235, Cs-137, Co-60, Am-241, etc., again in real-time and over a similar dose range. These detection technologies can be fixed or transportable. More important for the rad-waste management profession, this overall systems approach can be tailored and adapted during use on-site in any dismantling, demolition or remediation project, to allow materials to be thoroughly scanned before being released to the recycling stream for reuse, or to appropriate long-term storage and disposal facilities. Potentially recyclable materials with contamination such as steel beams and rebar will set off alarms at recycling facilities, resulting in unnecessary added expenses to the generator, primarily due to increased transportation costs, time delays and additional rad-waste handling and disposal charges. Additionally, there are situations where relatively lightly contaminated materials, once identified and appropriately characterized, can be reused in new construction applications, such as concrete from demolition being used in the base layer for roads or recycled steel used for repair or construction of bridges. In other cases, specific smaller volumes can be sent to specialized rad-waste disposal sites. These radiation detection systems can also be custom tailored to ensure proper handling and disposition of contaminated materials destined for reuse in specific applications where, for example, acceptable levels of radioactivity in NORM or TENORM can be reused or safely disposed of. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Simulation-Based Recovery Action Analysis Using the EMRALD Dynamic Risk Assessment Tool

A recovery action is defined as the action that prevents deviant conditions from producing unwanted effects. It generally indicates a kind of countermeasure performed in response to a failure of human action. The recovery actions especially play an important role in complex systems like nuclear power plants (NPPs), which consist of highly sophisticated controllers to ensure that desired performance and safety must be achieved and maintained. This is because a combination of human error and its recovery failure may be able to cause a catastrophic effect on a system. Analyzing recovery actions has been a critical part of HRA, which is a technique to evaluate human errors and provide human error probabilities (HEPs) for application in probabilistic safety assessment (PSA). If recovery actions are not adequately analyzed and applied to PSA models, the PSA results may be under-estimated or be not able to reasonably account for the failure of human actions in the context of PSA. For this reason, some regulatory documents such as ASME/ANS RA-Sb-2013 by the American Society for Mechanical Engineers and the American Nuclear Society and NUREG-1792 by U.S. Nuclear Regulatory Commission have emphasized the importance of recovery analysis within the HRA. A couple of existing HRA methods, such as the Technique for Human Error-Rate Prediction (THERP), the Cause-Based Decision Tree (CBDT), and the Korean Standard HRA (K-HRA), have respectively suggested their own approaches to the HRA recovery analysis. However, there are a couple of limitations to treating recovery actions using only the current HRA methods available. The biggest limitation is that the existing recovery analysis does not explicitly consider a variety of recovery action types and recovery sequences as they occur in actual NPPs. To handle the limitations of existing recovery analysis, this study proposes a simulation-based recovery analysis method using the Event Modeling Risk Assessment Using Linked Diagram (EMRALD) software. The EMRALD software is a dynamic simulation tool for PSA. It supports realistic and dynamic modeling of human actions as they would be performed at NPPs. It is also favorable to simultaneously model the specific moment at which an action is performed, the time it takes to perform the action, and the failure probability of that action. In this paper, a detailed methodology for modeling recovery actions in the simulation platform is proposed with a couple of examples. Then, outputs from the simulation are discussed as reviewing if this novel approach can complement the challenges of existing recovery analyses.

99 GENERAL AND MISCELLANEOUS↗

Innovating the next generation of commercial smart building software

Nearly 30% of commercial building energy use is wasted due to equipment faults and HVAC controls problems. The result is increased emissions, compromised comfort and productivity, and less reliable coordination of building power needs with a clean grid. The energy impact alone represents $17 billion in potential savings. Today’s smart building software provides a robust solution to address these operational deficiencies. Energy management and information systems (EMIS) are saving up to 9% on average, with two-year paybacks. They are being incorporated into energy management processes, commissioning services, and utility programs. As effective as they are, two barriers prevent even deeper benefits; limited personnel to fix problems once they are identified, and the expense and time to manually implement changes in control systems. In partnership with the research community, the EMIS industry is developing new capabilities to overcome these barriers. Moving beyond siloed products for either fault detection and diagnostics, or optimal control, these new capabilities empower users to not only automatically identify faults, but also to push corrective action, and control improvements to their buildings. In this paper, several areas for enhancements are documented: ‘one-time’ correction of faults such as setpoints, schedules, and economizer lockouts; short-term active testing for automated proportional integral derivative (PID) loop tuning and functional testing; and continuous supervisory control for demand flexibility and year-round efficiency. Results are presented from a pair of partner implementations out of a dozen providers integrating these enhancements into their products, including field tests from across the country, and insights into operator acceptance and integration into operations and maintenance practices.

Casillas, Armando↗