Viking continuation mission support
The Deep Space Network (DSN) support Viking spacecraft activities during the period 1 September 1978 through 31 March 1979 is reported. The DSN Viking command and tracking support is included.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
The Deep Space Network (DSN) support Viking spacecraft activities during the period 1 September 1978 through 31 March 1979 is reported. The DSN Viking command and tracking support is included.
The Deep Space Network support of the Pioneer Venus Mission is reported. The orbiter's Venus orbit insertion, multiprobe entry, and orbiter occultation experiment support are included.
To meet the phase stability requirements of certain experiments performed with the Deep Space Network, transmission lines carrying reference signals must be stabilized to reduce changes in their electrical length due to mechanical movement or changes in ambient temperature. A transmission line phase stabilizer being developed at JPL to perform this function is described.
Sample data and cumulative distributions of atmospheric noise temperature increase above the quiescent baseline for the calendar years 1977 and 1978 are presented. Comparison is made with the existing Deep Space Network noise temperature statistics.
A total of 35 days of Faraday rotation data was obtained from the ATS-6 radio beacon experiment operating with the closely spaced network of Elbert, Table Mountain, and Fort Morgan. The 140-MHz Faraday bandpass data are uncorrelated in the transmission range from 8 to 45 minutes. There are distinct, well correlated, and time-displaced maxima and minima that allow the calculation of the speed and direction of horizontal motions of plane fronts of disturbances in the ionosphere. For some selected events, velocities between 88 and 278 m/sec were obtained.
The mission of a tracking station within the NASA/Jet Propulsion Deep Space Network is characterized by a wide diversity of spacecraft types, communications ranges, and data accuracy requirements. In the present paper, the system architecture, communications techniques, and operators interfaces for a utility controller are described. The control equipment as designed and installed is meant to be a tool to study applications of automated control in the dynamic environment of a tracking station. It allows continuous experimenting with new technology without disruption of the tracking activities.
The means by which the data collected by the Voyager 1 mission to Jupiter were returned to earth are presented. Radio links between the earth and the spacecraft are used for the transmission of both imaging and nonimaging telemetry from the spacecraft and commands from the earth and for radiometric observations of the spacecraft and its environment. Features which have lead to vast improvements in the capability of the Voyager telecommunications system over that of previous space probes include the use of X-band rather than S-band telemetry, a dual power X-band traveling wave tube amplifier, a 3.7 m spacecraft antenna and a single channel telemetry system with concatenated coding. Communications equipment at the three ground complexes of the Deep Space Network for telemetry reception includes 64 m steerable antennas, cryogenic maser preamplifiers and a phase-lock loop receiver. Voyager 1 has met or exceeded all of its telecommunications requirements, providing a 98% data return and a total of 2 x 10 to the 11th data bits during the Jupiter encounter.
Results of radio occultation measurements of electron density profiles of the nightside ionosphere of Venus at solar zenith angles from 90 to 164 deg, obtained from the Pioneer Venus Orbiter, are reported. Data were derived from closed-loop S- and X-band signals received by the Deep Space Network upon ionospheric entry and exit of the spacecraft. Nightside electron density profiles are found to be rather uniform in the solar zenith angle range of from 95 to 107 deg, with peak electron densities ranging from 23,000 to 40,000/cu cm, while between 110 and 164 deg, profiles exhibit a high degree of variability and peak electron densities vary from 7,600 to 31,800/cu cm. A possible mechanism for the maintenance of the nightside Venus ionosphere during the long Venus night, which is consistent with the observed spatial and temporal variability of deep ionospheric electron density profiles, is proposed to be impact ionization by precipitating particles, although transport processes from the dayside may also be important.
Instrument is calibrated using back-to-back method. In comparison standard, S-X isolators are opposite from device being tested to permit signal flow in reverse direction. After calibration portable zero-delay assembly (PZDA) is used to set time delays of deep-space network ground-station ranging systems. Approach is also used to calibrate microwave links in other communications systems.
General conceptual requirements and specific application rules and procedures are provided for the production of software specification documents in conformance with deep space network software standards and class B standards. Class B documentation is identified as the appropriate level applicable to implementation, sustaining engineering, and operational uses by qualified personnel. Special characteristics of class B documents are defined.
The current status of the transmitter automation development applicable to all transmitters in the deep space network is described. Interface and software designs are described that improve reliability and reduce the time required for subsystem turn-on and klystron saturation to less than 10 minutes.
An S-band radio frequency interference (RFI) receiver to analyze and identify sources of RFI problems in the Deep Space Network DSN tracking stations is described. The RFI receiver is a constant gain, double conversion, open loop receiver with dual sine/cosine channel outputs, providing a total of 20 MHZ monitoring capability. This receiver is computer controlled using a MODCOMP II miniprocessor. The RFI receiver has been designed to operate at a 150 Kelvin system noise temperature accomplished by cascading two low noise field effect transistor (FET) amplifiers for the receiver front-end. The first stage low noise FET amplifier is mounted at the feed horn to minimize any cable losses to achieve a lower system noise temperature. The receiver is tunable over the frequency range of 2150 to 2450 MHz in both sine/cosine output channels with a resolution of 100 kHz.
The radar astronomy activities supported by the Deep Space Network are reported. The high power S- and X-band radar transmitters at the Goldstone 64 meter station were used for a radar probe of Mars during January, February, and March 1980, which was designed to provide range and Doppler data derived from signals reflected from the Martian surface, taking advantage of the planet's nearness during opposition.
This bibliography includes 1004 technical reports, released during calendar year 1979, that resulted from scientific and engineering work performed, or managed, by the Jet Propulsion Laboratory. Three classes of publications are included: (1) JPL Publications; (2) articles published in the open literature; and (3) articles from the bimonthly Deep Space Network Progress Report. The publications are indexed by: (1) author, (2) subject, and (3) publication type and number. A descriptive entry appears under the name of each author of each publication; an abstract is included with the entry for the primary (first listed) author. Unless designated otherwise, all publications listed are unclassified.
The Project ARIES 9 meter transportable antenna was used as one element of very long baseline interferometer (VLBI) to begin monitoring locations of six sites in California relative to large diameter fixed antennas at the NASA Deep Space Network, Goldstone, California, and at the Caltech Owens Valley Radio Observatory, Big Pine, California. An accuracy of about 6 cm in the horizontal components was demonstrated by comparison with measurements of the National Geodetic Survey. The root of mean square scatter of the lengths of the baselines between any pair of antennas was about 3 cm except for the Goldstone-JPL (Pasadena) baseline. In the period August 1974 to August 1977 the length of this baseline increased by 15 + or - 5 cm as JPL moved westward relative to Goldstone at the rate of 6 + or - 2 cm/year. The baseline lengths were unaffected by the uncertainties of UT1, polar motion, and tropospheric water vapor, which are the limitations to present three dimensional vector accuracies.
The results of approximately 1300 observations of 67 radio sources are presented. Most of the measurements were made at the stations of the Deep Space Network in California, Spain, and Australia at wavelengths of 13.1 and 3.6 cm, between 1971 and 1978. The formal errors in the derived source positions are generally in the neighborhood of 0.01 seconds of arc and the positions agree fairly well with those previously published.
The highlights of 20 years of maser use and development are presented. Masers discussed include cavity, traveling wave, K band, and S band. Noise temperatures measured since 1960 are summarized. Use of masers in the Deep Space Network is presented. Costs associated with the construction of masers systems are given.
Deep Space Network progress in flight project support, tracking and data acquisition research and technology, network engineering, hardware and software implemention, and operations is documented. In addition, developments in Earth based radio technology as applied to geodynamics, astrophysics, and the radio search for extraterrestrial intelligence are reported.