Search NASA⌕ Search

SEARCH · Search NASA

Results for “program costs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,351 records · Page 75

Practices for Demonstrating Energy Savings from Commercial PACE Projects

Nearly three-fourths of U.S. states have authorized local governments to use voluntary special assessments on commercial properties to finance energy improvements that boost economic development, create jobs, increase property values and advance energy goals. Commercial Property Assessed Clean Energy (C-PACE) financing allows building owners to repay the borrowed capital — from private or public sources — over time using their property as security. Berkeley Lab is supporting the Department of Energy’s Commercial PACE Working Group by developing a series of C-PACE issue briefs. The second brief in this series, Practices for Demonstrating Energy Savings from Commercial PACE Projects, looks at common practices for demonstrating energy savings to support state and local governments that sponsor C-PACE programs and want to track their energy impacts. This brief reviews: -The value proposition and trade-offs of conducting energy impact assessments for C-PACE programs; -Methods to quantify energy savings impacts from energy efficiency building improvements; and -Available resources and tools to support energy impact assessments. C-PACE programs may benefit from energy impact assessments for many reasons, including: -Validating the public benefits of the programs -Demonstrating that C-PACE can deliver participant benefits -Illustrating program impacts on public policy goals -Generating data to help improve program performance Many C-PACE programs are collecting data on project energy savings impacts, and these data can be leveraged to further support decision making and program implementation. Potential drawbacks to energy impact assessments may include added cost and burdens on property owners (e.g., the need to collect building energy consumption data). Where these burdens are considerable, they might slow program uptake. State and local governments can balance the benefits of energy impact assessments with the range of costs and accuracy inherent to available assessment methodologies. Additionally, depending on the policy context in the state or local government, a C-PACE program may be able to leverage existing efforts (e.g., building energy benchmarking programs) to reduce impact assessment costs, align with building owner practices and expectations, and efficiently assess program impact.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Space Shuttle Program description and status

The main reason for the development of the Space Shuttle is related to the aim to achieve a major reduction in the cost of placing a payload into space. Such a reduction is to be obtained by using a reusable in place of an expendable launch vehicle. Developments concerning launch vehicles show a steady reduction in launching expenses. From a cost of about $500,000 a pound in the late 1950's, launching expenses were reduced to $600 a pound for payloads on the Saturn V. With the Space Shuttle the cost will drop to approximately $150 a pound. The Space Shuttle Program is discussed, taking into account a system description, a typical mission profile, aspects of mission design, launch costs, and Space Shuttle characteristics. The Space Shuttle Program status is also examined, giving attention to orbital flight schedules, flight hardware tests, launch area facilities, the mission control center, and details of flight crew training.

Macleod, J. B.↗

Evaluation of NASA space grant consortia programs

The meaningful evaluation of the NASA Space Grant Consortium and Fellowship Programs must overcome unusual difficulties: (1) the program, in its infancy, is undergoing dynamic change; (2) the several state consortia and universities have widely divergent parochial goals that defy a uniform evaluative process; and (3) the pilot-sized consortium programs require that the evaluative process be economical in human costs less the process of evaluation comprise the effectiveness of the programs they are meant to assess. This paper represents an attempt to assess the context in which evaluation is to be conducted, the goals and limitations inherent to the evaluation, and to recommend appropriate guidelines for evaluation.

Eisenberg, Martin A.↗

Future Concepts for Realtime Data Interfaces for Control Centers

Existing methods of exchanging realtime data between the major control centers in the International Space Station program have resulted in a patchwork of local formats being imposed on each Mission Control Center. This puts the burden on a data customer to comply with the proprietary data formats of each data supplier. This has increased the cost and complexity for each participant, limited access to mission data and hampered the development of efficient and flexible operations concepts. Ideally, a universal format should be promoted in the industry to prevent the unnecessary burden of each center processing a different data format standard for every external interface with another center. With the broad acceptance of XML and other conventions used in other industries, it is now time for the Aerospace industry to fully engage and establish such a standard. This paper will briefly consider the components that would be required by such a standard (XML schema, data dictionaries, etc.) in order to accomplish the goal of a universal low-cost interface, and acquire broad industry acceptance. We will then examine current approaches being developed by standards bodies and other groups. The current state of CCSDS panel work will be reviewed, with a survey of the degree of industry acceptance. Other widely accepted commercial approaches will be considered, sometimes complimentary to the standards work, but sometimes not. The question is whether de facto industry standards are in concert with, or in conflict with the direction of the standards bodies. And given that state of affairs, the author will consider whether a new program establishing its Mission Control Center should implement a data interface based on those standards. The author proposes that broad industry support to unify the various efforts will enable collaboration between control centers and space programs to a wider degree than is currently available. This will reduce the cost for programs to provide realtime access to their data, hence reducing the cost of access to space, and benefiting the industry as a whole.

Kearney, Mike W., III↗

Visibility Studies

Studies conducted by the Environmental Studies Laboratory of the University of Utah embrace investigations of the effects of air pollutants on vegetation; air quality in arid and semi-arid regions surrounding energy developments; and the amount, size and type of particles in the atmosphere. In its visibility studies, the laboratory uses a computer program called RADTMO for Radiative Transfer Models. The program computes the characteristics of scattered radiation in the atmosphere including ozone concentration and aerosol density at various altitudes. Calculations provide information used in determining sky color intensity for visibility modeling under different atmospheric conditions. The laboratory was able to avoid the cost of developing a new computer program by using RADTMO for their calculations.

Source record↗

Test Planning Approach and Lessons

As NASA began technology risk reduction activities and planning for the next generation launch vehicle under the Space Launch Initiative (SLI), now the Next Generation Launch Technology (NGLT) Program, a review of past large liquid rocket engine development programs was performed. The intent of the review was to identify any significant lessons from the development testing programs that could be applied to current and future engine development programs. Because the primary prototype engine in design at the time of this study was the Boeing-Rocketdyne RS-84, the study was slightly biased towards LOX/RP-1 liquid propellant engines. However, the significant lessons identified are universal. It is anticipated that these lessons will serve as a reference for test planning in the Engine Systems Group at Marshall Space Flight Center (MSFC). Towards the end of F-1 and J-2 engine development testing, NASA/MSFC asked Rocketdyne to review those test programs. The result was a document titled, Study to Accelerate Development by Test of a Rocket Engine (R-8099). The "intent (of this study) is to apply this thinking and learning to more efficiently develop rocket engines to high reliability with improved cost effectivenes" Additionally, several other engine programs were reviewed - such as SSME, NSTS, STME, MC-1, and RS-83- to support or refute the R-8099. R-8099 revealed two primary lessons for test planning, which were supported by the other engine development programs. First, engine development programs can benefit from arranging the test program for engine system testing as early as feasible. The best test for determining environments is at the system level, the closest to the operational flight environment. Secondly, the component testing, which tends to be elaborate, should instead be geared towards reducing risk to enable system test. Technical risk can be reduced at the component level, but the design can only be truly verified and validated after engine system testing.

Parkinson, Douglas A.↗

Leading Your Leaders

Even though working on a problem has been your primary effort for the past year, your leadership may have heard about this once in a briefing a decade ago. Now they are basically clueless. Pretend that you are talking to your daughter's fifth-grade class. Explain how your complicated gizmo works. If possible, do not use acronyms. Define your terms. Put your work in context. Assume your leader has no idea what you do, who you work for, or what your gizmo does. That is a good place to start. Remember, taking the next century to study the problem or spending the Gross National Product to invent a new solution are probably not going to be acceptable solutions. Real engineers and technicians build real hardware that works in the real world in a reasonable manner within a reasonable time at a reasonable cost. True, skimping on time or money can cause mistakes, but folks whose gizmos are delayed unreasonably or cost more than is practical get their programs canceled, force the business into bankruptcy, or give the market over to the competition. Real engineers and technicians always consider cost and schedule in their work. Raising questions is important. However, we are in the business of doing things. Engineers and technicians are paid to get things done. Yes, you have to identify the problem, frame the design, identify the tests, perform the analysis, and assemble the hardware. But the goal is to solve the problem. Nobody ever said flying in space was easy. We make it look easy the same way that an Olympic champion makes her sport look easy: by working hard at improving performance every day. Better are the results of a well-defined test. Remember that a test on a laboratory bench is always an approximation of reality, and rules similar to those for good analysis also apply. One should always be mindful of Mechelay's rule: "It is better to be stupid than to run a stupid test." Often we try to overtest. If a piece of hardware passes an unbelievably difficult test, then life is good. More often when an unbelievably difficult test fails, we are left with a very long discussion of why and what was wrong in the design or execution of the test. Make sure that the test is well defined. Even then, it is important to explain to your leaders what inherent accuracy (or error) the test conditions or equipment have and what the assumptions or initial conditions were for the test. Test results without a good understanding of the test's accuracy or the pedigree of the test assumptions are worth very little. Finally, there is flight test data. Always limited, never at the edge of the envelope, it still shows how the real hardware works in a combined environment. Flight experience is dangerous because it typically doesn't show how close to the edge of the cliff the equipment is operating, but it does demonstrate how the hardware really works. A flight test is the ultimate test, again taken with the knowledge that it is probably not the extreme but something more like the middle of the environmental and systems performance. Good understanding of a problem and its solution always relies on a combination of all these methods. Be sure to lead your leaders by using all the tools you have at your disposal. At the end of the day, decisions in space flight always come down to a risk trade. Our business is not remotely safe, not in the sense that the public, the media, or our legislators use the term. Everything we do has a risk, cost, schedule, or performance trade-off. For your leaders to make an appropriate decision, you need to educate them, lead them, talk with them, and engage them in the discussion until full understanding takes place. It's your job. *

Hale, Wayne N.↗

American Recovery and Reinvestment Act of 2009: Final Report on Customer Acceptance, Retention, and Response to Time-Based Rates from Consumer Behavior Studies

Time-based rate programs, enabled by utility investments in advanced metering infrastructure (AMI), are increasingly being considered by utilities as tools to reduce peak demand and enable customers to better manage consumption and costs. Under the Smart Grid Investment Grant Program (SGIG), the U.S. Department of Energy (DOE) partnered with several electric utilities to conduct consumer behavior studies (CBS). The goals involved applying randomized and controlled experimental designs for estimating customer responses more precisely and credibly to advance understanding of time-based rates and customer systems, and provide new information for improving program designs, implementation strategies, and evaluations. The intent was to produce more robust and credible analysis of impacts, costs, benefits, and lessons learned and assist utility and regulatory decision makers in evaluating investment opportunities involving time-based rates.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Oscilloscope Data Push Program

Data acquisition (DAQ) is a complex and costly process. Creating DAQ systems for analyzing a system requires expensive electronics and a dedicated team of engineers for support, posing a challenge for users who readily need data. This project is a proof of concept to create a temporary or one-off DAQ system using equipment commonly available to every team. We aim to automate the data acquisition process from the Rohde \& Schwarz RTO 1044 oscilloscope, convert the acquired binary data into floating point values, and store the results in a CSV file format. By developing a Python program to handle these tasks, we seek to reduce the manual effort involved in data collection, significantly increasing efficiency.

Osei-Tutu, Jason↗

Mission operations and command assurance - Automating an operations TQM task

A long-term program is in progress at JPL to reduce cost and risk of mission operations through defect prevention and error management. A major element of this program, Mission Operations and Command Assurance (MO&CA), provides a system level function on flight projects to instill quality in mission operations. MO&CA embodies the total quality management TQM principle of continuous process improvement (CPI) and uses CPI in applying automation to mission operations to reduce risk and costs. MO&CA has led efforts to apply and has implemented automation in areas that impact the daily flight project work environment including Incident Surprise Anomaly tracking and reporting; command data verification, tracking and reporting; and command support data usage. MO&CA's future work in automation will take into account that future mission operations systems must be designed to avoid increasing error through the introduction of automation, while adapting to the demands of smaller flight teams.

Welz, Linda↗

Mission Operations and Command Assurance: Automating an Operations TQM Task

A long-term program is in progress at JPL to reduce cost and risk of mission operations through defect prevention and error management. A major element of this program, Mission Operations and Command Assurance (MO&QA), provides a system level function on flight projects to instill quality in mission operations. MO&CA embodies the Total Quality Management (TQM) principle of Continuous Process Inprovement (CPI) and uses CPI in applying automation to mission operations to reduce risk and costs. MO&CA has led efforts to apply and has implemented automation in areas that impact the daily flight project environment including Incident Surprise Anomoly tracking and reporting; command data verification, tracking, and reporting; and command support data usage. MO&CA's future work in automation will take into account that future missions systems must be designed to avoid increasing error through the introduction of automation, while adapting to the demands of smaller flight teams.

automation↗

Development of a 13 kW Hall Thruster Propulsion System Performance Model for AEPS

The Advanced Electric Propulsion System (AEPS) program will develop a flight 13kW Hall thruster propulsion system based on NASA's HERMeS thruster. The AEPS system includes the Hall Thruster, the Power Processing Unit (PPU) and the Xenon Flow Controller (XFC). These three primary components must operate together to ensure that the system generates the required combinations of thrust and specific impulse at the required system efficiencies for the desired system lifetime. At the highest level, the AEPS system will be integrated into the spacecraft and will receive power, propellant, and commands from the spacecraft. Power and propellant flow rates will be determined by the throttle set points commanded by the spacecraft. Within the system, the major control loop is between the mass flow rate and thruster current, with time-dependencies required to handle all expected transients, and additional, much slower interactions between the thruster and cathode temperatures, flow controller and PPU. The internal system interactions generally occur on shorter timescales than the spacecraft interactions, though certain failure modes may require rapid responses from the spacecraft. The AEPS system performance model is designed to account for all these interactions in a way that allows evaluation of the sensitivity of the system to expected changes over the planned mission as well as to assess the impacts of normal component and assembly variability during the production phase of the program. This effort describes the plan for the system performance model development, correlation to NASA test data, and how the model will be used to evaluate the critical internal and external interactions. The results will ensure the component requirements do not unnecessarily drive the system cost or overly constrain the development program. Finally, the model will be available to quickly troubleshoot any future unforeseen development challenges.

Stanley, Steven↗

Assessing the benefits of capacity payment, feed‐in‐tariff and time‐of‐use programme on long‐term renewable energy sources integration

Recently, demand response programmes (DRPs) have captured great attention in electric power systems. DRPs such as time‐of‐use (ToU) programme can be efficiently employed in the power system planning to reform the long‐term behaviour of the load demands. The composite generation expansion planning (GEP) and transmission expansion planning (TEP) known as composite GEP–TEP is of high significance in power systems to meet the future load demand of the system and also integrate renewable energy sources (RESs). In this regard, this study presents a dynamic optimisation framework for the composite GEP–TEP problem taking into consideration the ToU programme and also, the incentive‐based and supportive programmes. Accordingly, the performances of the capacity payment and feed‐in tariff mechanisms and the ToU programme in integrating RESs and reducing the total cost have been evaluated in this study. The problem has been formulated and solved as a standard two‐stage mixed‐integer linear programming model aimed at minimising the total costs. In this model, the ToU programme is applied and the results are fed into the expansion planning problem as the input. The proposed framework is simulated on the IEEE Reliability Test System to verify the effectiveness of the model and discuss the results obtained from implementing the mentioned mechanisms to support the RESs integration.

Javadi, Mohammad Sadegh↗

The OpenEfficiency Initiative: Piloting an open source solution to overcome market barriers to commercial energy savings

The OpenEfficiency Initiative supported the deployment of federal energy efficiency tools and data standards into energy efficiency programs operated by utilities and local governments, with the goal of reducing the cost and improving the savings performance of whole buildings programs. Over more than three years, the effort supported a range of pilots testing the integration of these tools into a range of energy efficiency program types. The effort also produced a set of open source tools that can be used to support program management.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Life Cycle Analysis and Life Cycle Costing for Municipal Solid Waste (MSW) Management and Materials Redeployment to Support ARPA-E’s Potential Program on Waste to Energy and Materials

Municipal solid waste infrastructure in the United States contains complex supply chains to transport, sort, and sequester waste. This project developed models to estimate the environmental and economic costs of waste infrastructure in the U.S. using data from several municipalities. Life cycle costing (LCC) models were developed for waste management relevant supply chain steps, including waste collection, sorting, landfilling, waste-to-energy, ash processing, and recycling. A waste-to-materials and energy (WTM&E) life cycle analysis (LCA) and LCC dashboard was developed in collaboration with Argonne National Laboratory (ANL) and an LCC tool was developed for additional analysis.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Bounding the costs of electric vehicle managed charging—supply curves for scenarios from 2025 to 2050

As electric vehicle (EV) adoption increases, the resulting EV battery charging will increase demand on the electric power grid. Through EV managed charging (EVMC) programs, charging can be shifted in time to support electric grid reliability and reduce electricity costs. EVMC can offer an alternative to additional supply-side generation, but the costs of EVMC implementation must be understood to evaluate the cost-benefits of EVMC. This paper presents bottom-up, forward-looking (from 2025 through 2050) estimates of the incremental costs associated with different EVMC dispatch mechanisms available to electric utilities. The costs of enabling EVMC for a range of customer participation levels are presented in the form of supply curves, which provide per-EV costs for a targeted level of participation. The largest drivers of cost variation are assumptions about future charging flexibility paradigms described in four scenarios. These supply curves can be used to quantify the expected costs of EVMC programs and enable comparison with supply-side or other demand flexibility alternatives.

25 ENERGY STORAGE↗

Scale Model Experiments on Sound Propagation From a Mach 2.5 Cold Nitrogen Jet Flowing Through a Rigid-Walled Duct With a J-Deflector

The Launch Systems Testbed (LST) represents the evolution of vibroacoustics research and development work performed at NASA John F. Kennedy Space Center (KSC) over the last 15 years. The LST is located at the Launch Equipment Test Facility (LETF) in the KSC industrial complex. The LETF is operated by Sierra Lobo, Inc., as a member of University-Affiliated Technology Development Contract (USTDC) to KSC Spaceport and Engineering and Technology Directorate (YA), with ASRC Aerospace Corporation as a the prime contractor. Trajectory Simulation Mechanism (TSM) is a major component of the LST, developed specifically to simulate nonstationary acoustic loads on launch pad structures, vehicles, and payloads. TSM enhances the capabilities within LST for simulating launch environments of future vehicles. The scaled launch environments will be used to predict the full-scale launch environment via an appropriate scaling procedure. Air Force Research Laboratory (AFRL) has tasked NASA KSC to perform a basic technology test program in support of developing a low-cost clean pad (incorporating passive mitigation techniques) for future launch vehicles. The overall goal of the program is to develop innovative launch exhaust management systems, which effectively reduce launch acoustic environment with innovative duct designs, while eliminating traditional sound suppression water systems. Passive techniques, such as nontraditional duct geometries, resonators, and diffusers, etc., will be investigated. The overall goals are to advance innovative concepts for a clean pad while developing ideas to reduce transmitted sound via investigation and modeling of jet exhaust acoustic and flow field characteristics. The series of tests outlined in this report represent baseline tests and are geared towards defining the acoustic load environment on the TSM pad for open and closed duct configurations. This report summarizes the cold jet acoustic testing for Mach 2.5 supersonic nitrogen jet issuing from a nozzle with 1-inch exit diameter. Acoustic data, including spectral sound power and Overall Sound Pressure Level (OASPL), are obtained both for a free jet and with the jet flowing through a rigid-walled duct with a J-deflector. The relative performance of closed duct and open duct is evaluated. The results show that the closed duct is superior to the partially open duct, and results in about 3-decibel (dB) noise reduction (near the duct axis) relative to the free jet. The location of the nozzle exit plane (NEP) relative to the duct inlet plane (DIP) has a significant effect on the acoustic field. The results suggest that the location of NEP at 10 inches above the DIP results in reduced acoustic loads relative to 5 inches above the duct inlet and 1 inch into the duct inlet.

Kandula, Max↗

NPP Clouds and the Earth's Radiant Energy System (CERES) Predicted Sensor Performance Calibration and Preliminary Data Product Performance

Continuation of the Earth Radiation Budget (ERB) Climate Data Record (CDR) has been identified as critical in the 2007 NRC Decadal Survey, the Global Climate Observing System WCRP report, and in an assessment titled Impacts of NPOESS Nunn-McCurdy Certification on Joint NASA-NOAA Climate Goals. In response, NASA, NOAA and NPOESS agreed in early 2008 to fly the final existing CERES Flight Model (FM-5) on the NPP spacecraft for launch in 2010. Future opportunities for ERB CDR continuity consist of procuring an additional CERES Sensor with modest performance upgrades for flight on the NPOESS C1 spacecraft in 2013, followed by a new CERES follow-on sensor for flight in 2018 on the NPOESS C3 spacecraft. While science goals remain unchanged for the long-term ERB Climate Data Record, it is now understood that the task of achieving these goals is more difficult for two reasons. The first is an increased understanding of the dynamics of the Earth/atmosphere system which demonstrates that rigorous separation of natural variability from anthropogenic change on decadal time scales requires higher accuracy and stability than originally envisioned. Secondly, future implementation scenarios involve less redundancy in flight hardware (1 vs. 2 orbits and operational sensors) resulting in higher risk of loss of continuity and reduced number of independent observations to characterize performance of individual sensors. Although EOS CERES CDR's realize a factor of 2 to 4 improvement in accuracy and stability over previous ERBE CDR's, future sensors will require an additional factor of 2 improvement to answer rigorously the science questions moving forward. Modest investments, defined through the CERES Science Team s 30-year operational history of the EOS CERES sensors, in onboard calibration hardware and pre-flight calibration and test program will ensure meeting these goals while reducing costs in re-processing scientific datasets. The CERES FM-5 pre-flight radiometric characterization program benefited from the 30-year operational experience of the CERES EOS sensors, as well as a stronger emphasis of radiometric characterization in the Statement of Work with the sensor provider. Improvements to the pre-flight program included increased spectral, spatial, and temporal sampling under vacuum conditions as well as additional tests to characterize the primary and transfer standards in the calibration facility. Future work will include collaboration with NIST to further enhance the understanding of the radiometric performance of this equipment prior to flight. The current effort summarizes these improvements to the CERES FM-5 pre-flight sensor characterization program, as well as modifications to inflight calibration procedures and operational tasking. In addition, an estimate of the impacts to the system level accuracy and traceability is presented.

Priestly, Kory↗