Search NASA⌕ Search

SEARCH · Search NASA

Results for “test system test”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,351 records · Page 75

Oklo Sponsored Testing using PELICAN: System, Subchannel, and High-Fidelity Software Validation (Final CRADA Report)

Argonne National Laboratory (the Contractor), located in Lemont IL, and Oklo, Inc., (the Participant), headquartered in Santa Clara, CA, propose to enter into a Cooperative Research and Development Agreement (CRADA) to perform a gap analysis of thermal hydraulic data, perform prototypical fuel assembly pressure drop and cavitation model validation, generate the experimental data as well as the corresponding uncertainties for this matrix and, finally, develop the validation models with the Argonne system level code SAS4A/SASSYS-1, the Argonne subchannel analysis code DASSH, the Argonne high fidelity code Nek5000, and/or the Idaho National Laboratory code Pronghorn Subchannel. The work outlined below will significantly improve the experimental and validation database currently available for liquid metal fast reactors, thus making it a viable part of a comprehensive reactor design and licensing suite to be used by the participant.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

OEDI—Solar Grid Integration Data and Analytics Library

As a part of the Open Energy Data Initiative, this effort aims to develop and demonstrate novel distribution state estimation, control optimization, and transient analysis as well as provide access to data, data integration, and mapping information. More specifically, the focus of the effort will be on physics-based distribution system state estimation, hybrid (physics-based and machine learning) distribution optimal power flow, and event detection/analysis for solar integration and analytics. This work will enable reproducible, robust, replicable, and generalizable R&D in simulation and emulation of solar system integration. These test models and datasets will provide an integrated library for developing and testing power system operation technologies. To make the library user-friendly, this project will provide data curation tools such as data translators, mapping scripts and APIs, database schemas and metadata, interfaces and user dashboard, source code for the reference algorithms, description of the use-cases/scenarios, and comprehensive information on all the assumptions.

14 SOLAR ENERGY↗

Wind Turbinie Generator System Power Performance Test Report for the Mariah Windspire 1-kW Wind Turbine

This report summarizes the results of a power performance test that NREL conducted on the Mariah Windspire 1-kW wind turbine. During this test, two configurations were tested on the same turbine. In the first configuration, the turbine inverter was optimized for power production. In the second configuration, the turbine inverter was set for normal power production. In both configurations, the inverter experienced failures and the tests were not finished.

1-KW WIND TURBINE↗

Wind Turbine Generator System Acoustic Noise Test Report for the ARE 442 Wind Turbine

This test was conducted on the ARE 442 as part of the U.S. Department of Energy's (DOE's) Independent Testing project. This project was established to help reduce the barriers of wind energy expansion by providing independent testing results for small turbines. In total, five turbines are being tested at the National Wind Technology Center (NWTC) as a part of this project. Acoustic noise testingis one of up to five tests that may be performed on the turbines, including duration, safety and function, power performance, and power quality tests. The acoustic noise test was conducted to the IEC 61400-11 Edition 2.1.

17 WIND ENERGY↗

Ripple-Type Voltage Control for Extreme-Event Contingencies: Preprint

Frequent and intense extreme events make grid operation unprecedentedly challenging. Disruptive events could lead to dangerous voltage drops and even voltage collapse if corrective actions are not quickly taken. In this paper, we present a real-time algorithm for voltage control suitable for mitigating electric grid damage scenarios. In our strategy, when agents (generators, substations) experience a dangerous undervoltage, they first respond locally. When the local control resources are depleted, agents seek assistance from peer nodes over a communication network. The algorithm is simulated on a realistic test transmission system. Using fragility curve methodology, we simulate hurricane damages to the components of the synthetic 2000-bus grid representing the ERCOT system. Although being tested over a damaged grid after a hurricane event, our algorithm can be equally successfully applied to any other emergency low-voltage situation.

extreme weather events↗

Virtual tour: INL's space battery facility

This virtual tour shows how INL fuels and tests nuclear power systems for deep space missions. To learn more about INL's contribution to the Mars Science Laboratory, visit http://www.inl.gov/marsrover.

33 ADVANCED PROPULSION SYSTEMS↗

Status and Plans for a Superconducting RF Accelerator Test Facility at Fermilab

The Advanced Superconducting Test Accelerator (ASTA) is being constructed at Fermilab. The existing New Muon Lab (NML) building is being converted for this facility. The accelerator will consist of an electron gun, injector, beam acceleration section consisting of 3 TTF-type or ILC-type cryomodules, multiple downstream beam lines for testing diagnostics and conducting various beam tests, and a high power beam dump. When completed, it is envisioned that this facility will initially be capable of generating a 750 MeV electron beam with ILC beam intensity. An expansion of this facility was recently completed that will provide the capability to upgrade the accelerator to a total beam energy of 1.5 GeV. Two new buildings were also constructed adjacent to the ASTA facility to house a new cryogenic plant and multiple superconducting RF (SRF) cryomodule test stands. In addition to testing accelerator components, this facility will be used to test RF power systems, instrumentation, and control systems for future SRF accelerators such as the ILC and Project-X. This paper describes the current status and overall plans for this facility.

43 PARTICLE ACCELERATORS↗