Application of TOS/AMS to TDRS E and F

The development of the Transfer Orbit Stage (TOS) and the study of an Apogee and Maneuvering Stage (AMS) to be used in conjunction with the TOS are presented. A definition of the TOS/AMS configuration is provided along with a detailed design analysis including layout drawings, component definition, performance, sts and spacecraft interface definition, schedules, cost estimates, and specifications documents.

Source record↗

AFB/open cycle gas turbine conceptual design study

Applications of coal fired atmospheric fluidized bed gas turbine systems in industrial cogeneration are identified. Based on site-specific conceptual designs, the potential benefits of the AFB/gas turbine system were compared with an atmospheric fluidized design steam boiler/steam turbine system. The application of these cogeneration systems at four industrial plant sites is reviewed. A performance and benefit analysis was made along with a study of the representativeness of the sites both in regard to their own industry and compared to industry as a whole. A site was selected for the conceptual design, which included detailed site definition, AFB/gas turbine and AFB/steam turbine cogeneration system designs, detailed cost estimates, and comparative performance and benefit analysis. Market and benefit analyses identified the potential market penetration for the cogeneration technologies and quantified the potential benefits.

Dickinson, T. W.↗

Preliminary analysis of space mission applications for electromagnetic launchers

The technical and economic feasibility of using electromagnetically launched EML payloads propelled from the Earth's surface to LEO, GEO, lunar orbit, or to interplanetary space was assessed. Analyses of the designs of rail accelerators and coaxial magnetic accelerators show that each is capable of launching to space payloads of 800 KG or more. A hybrid launcher in which EML is used for the first 2 KM/sec followed by chemical rocket stages was also tested. A cost estimates study shows that one to two EML launches per day are needed to break even, compared to a four-stage rocket. Development models are discussed for: (1) Earth orbital missions; (2) lunar base supply mission; (3) solar system escape mission; (4) Earth escape missions; (5) suborbital missions; (6) electromagnetic boost missions; and (7) space-based missions. Safety factors, environmental impacts, and EML systems analysis are discussed. Alternate systems examined include electrothermal thrustors, an EML rocket gun; an EML theta gun, and Soviet electromagnetic accelerators.

Miller, L. A.↗

Salton Sea Solar Pond Power Plant Design Study and Regional Applicability

Ormat collected and organized the data base and conducted conceptual plant design, performance, and cost analysis. JPL conducted site-specific studies related to solar pond chemistry, soil biological activity, and dike design and construction. WESTEC conducted environmental investigation studies and performed an environmental assessment. SCE provided planning support for licensing and permitting and technical evaluations of the system design and cost estimate.

R. L. French↗

In situ orbital debris experiment concepts

Implementation of the radar, lidar and passive optical remote sensing concepts for measuring space debris from an Earth orbiting platform was investigated. Each system was compared for their requirements on the host platform, their performance relative to the space debris measurement program and the estimated cost of developing each concept into a flight instrument. It is found that the radar and lidar systems offer the greatest versatility and accuracy since they control the direction, intensity and duration of the energy incident on the target object. The performance of the passive optical system is determined by the capability of the detector and by the baseline separation of the telescopes, which requires the use of an on-orbit deployment mechanism. The passive optical concept provides the largest total event rae, and includes significant detections of particle sizes greater than 10 cm to allow correlation with ground based observations of the larger particles. The event rate for the radar system is relatively constant with particle while the lidar system is slightly biased toward the smaller sizes. These event rate differences result from a combination of the debris flux size distribution and the variation of sensitive detection area with particle size for the three concepts.

Neste, S. L.↗

Space Station

The official start of a bold new space program, essential to maintain the United States' leadership in space was signaled by a Presidential directive to move aggressively again into space by proceeding with the development of a space station. Development concepts for a permanently manned space station are discussed. Reasons for establishing an inhabited space station are given. Cost estimates and timetables are also cited.

Anderton, D. A.↗

Concepts and cost trade-offs for land vehicle antennas in satellite mobile communications

Several antenna design concepts, operating at UHF (821 to 825 MHz transmit and 866 to 870 MHz receive bands), with gain ranging between 6 and 12 dBic, that are suitable for land mobile vehicles are presented. The antennas may be used within CONUS and ALASKA to communicate to and from a geosynchronous satellite. Depending on the type of steering mechanism, the antennas are broken down into three categories; (1) electronically scanned arrays with phase shifters, (2) electronically switched arrays with switchable power dividers/combiners, and (3) mechanically steered arrays. The operating characteristics of two of these design concepts, one a conformal antenna with electronic beam steering and the other a nonconformal design with mechanical steering, were evaluated with regard to two and three satellite system. Cost estimates of various antenna concepts were made and plotted against their overall gain performance.

Haddad, H. A.↗

Land vehicle antennas for satellite mobile communications

The RF performance, size, pointing system, and cost were investigated concepts are: for a mechanically steered 1 x 4 tilted microstrip array, a mechanically steered fixed-beam conformal array, and an electronically steered conformal phased array. Emphasis is on the RF performance of the tilted 1 x 4 antenna array and methods for pointing the various antennas studied to a geosynchronous satellite. An updated version of satellite isolations in a two-satellite system is presented. Cost estimates for the antennas in quantities of 10,000 and 100,000 unites are summarized.

Haddad, H. A.↗

Shuttle-tethered satellite system definition study. Volume 1: Executive study

The Tethered Satellite System has great prospects for extending orbital operations capability of the Space Transportation System to science, applications, and technology projects not otherwise attainable. The system will installed in the Shuttle Orbiter and will have the capability to deploy a captive satellite up to 100 km away from the Orbiter. Control and retrieval of the satellite are accomplished by means of a tether line connecting the satellite and the cargo bay mounted equipment in the Orbiter. At low satellite altitudes, the system will permit investigations of a duration that could not be pursued with sounding rockets of free-flying spacecraft. The propose of the Shuttle/Tethered Satellite System Definition Study was to produce the preliminary design, preliminary specifications, gross program plans, and program cost estimate for a 1982 operational verification flight. This was accomplished during a fifteen month effort under by the NASA George C. Marshall Space Flight Center (MSFC). The MSFC Phase 1 and related studies demonstrated the feasibility of the system and served as a starting point for the Phase 2 definition study.

Source record↗

Planetary sample rapid recovery and handling

Methods for recovering and cost effectively handling planetary samples following return to the vicinity of Earth were designed for planetary mission planners. Three topics are addressed: (1) a rough cost estimate was produced for each of a series of options for the handling of planetary samples following their return to the vicinity of Earth; (2) the difficulty of quickly retrieving planetary samples from low circular and high elliptical Earth orbit is assessed; and (3) a conceptual design for a biological isolation and thermal control system for the returned sample and spacecraft is developed.

Source record↗

A comparison of 8.415-, 32.0- and 565646-GHz deep space telemetry links

An economic and performance comparison is made of spacecraft telecommunication links at 8.415, 32.0, and 565646 GHz (0.53-micron wavelength) for the return of 3.43 x 10 to the 11th power bits from a Saturn Orbiter/Titan Probe mission in year 2000. Technical performance and costs for both ends of the links are included. Spacecraft antenna or telescope efficiencies, pointing losses, ground-based or Earth-orbiting relay terminals efficiencies, noise temperatures, recurring and nonrecurring engineering, and maintenance and operations costs are modeled. Weather effects, dc-to-RF or laser power conversion efficiencies, gravity and other environment distortions gain reductions, and the cost of pointing and tracking are analyzed. The effort is focused primarily on the microwave frequency links. There are large uncertainties in the cost results, but conclusions indicate that for a mid-1990's launch, the Ka-band system is as cost effective as X-band. The Ka-band system has a data rate advantage as compared to the X-band system for the same dc power input to the spacecraft. The magnitude of the advantage is a complex function of the weather at the DSN stations and the elevation angle of the ground antenna. A simple numerical comparison of the advantage is difficult and curves are provided. The optical frequency link is more costly based on the launch-to-orbit costs for the orbiting terminal. A more detailed study of the optical system is recommended to quantify astrometric tracking benefits and improve the accuracy of the cost estimate.

Dickinson, R. M.↗

Space station data system analysis/architecture study. Task 5: Program plan

Cost estimates for both the on-board and ground segments of the Space Station Data System (SSDS) are presented along with summary program schedules. Advanced technology development recommendations are provided in the areas of distributed data base management, end-to-end protocols, command/resource management, and flight qualified artificial intelligence machines.

Source record↗

Conceptual design study: Forest Fire Advanced System Technology (FFAST)

An integrated forest fire detection and mapping system that will be based upon technology available in the 1990s was defined. Uncertainties in emerging and advanced technologies related to the conceptual design were identified and recommended for inclusion as preferred system components. System component technologies identified for an end-to-end system include thermal infrared, linear array detectors, automatic georeferencing and signal processing, geosynchronous satellite communication links, and advanced data integration and display. Potential system configuration options were developed and examined for possible inclusion in the preferred system configuration. The preferred system configuration will provide increased performance and be cost effective over the system currently in use. Forest fire management user requirements and the system component emerging technologies were the basis for the system configuration design. A preferred system configuration was defined that warrants continued refinement and development, examined economic aspects of the current and preferred system, and provided preliminary cost estimates for follow-on system prototype development.

Nichols, J. D.↗

Software management tools: Lessons learned from use

Experience in inserting software project planning tools into more than 100 projects producing mission critical software are discussed. The problems the software project manager faces are listed along with methods and tools available to handle them. Experience is reported with the Project Manager's Workstation (PMW) and the SoftCost-R cost estimating package. Finally, the results of a survey, which looked at what could be done in the future to overcome the problems experienced and build a set of truly useful tools, are presented.

Reifer, D. J.↗

A Mars sample return mission using a rover for sample acquisition

Mission and vehicle concepts are discussed for obtaining surface and subsurface samples of Mars, acquired by a roving vehicle, and returning those samples to earth for detailed analyses in scientific laboratories. Mission options that were traded off in order to arrive at a baseline mission considered most worthy of further study comprised the following: (1) direct entry vs entry out of Mars orbit; (2) direct return from the Mars surface vs rendezvous in Mars orbit and return to earth from there; and (3) propulsive orbit injection and aeroballistic entry (similar to Viking) vs aerocapture into Mars orbit and aeromaneuvering entry. After a comparison of relative merits - based primarily on mass and cost estimates and secondarily on configurational constraints - a baseline mission was selected: out-of-orbit entry, return after Mars orbit rendezvous, and aerocapture/aeromaneuvering. Trajectory design is based on the 1996 launch opportunity. Launch mass requirements for eight mission options, a mission and vehicle description for the baseline mission, and the outline of a mission sequence of events are presented.

De Vries, J. P.↗

High-Strength Glass for Solar Applications

Technology for strengthening thin sections reviewed. Report reviews technology of high-strength glass for such solar applications as heat collectors, reflectors, and photovoltaic arrays. Discusses most feasible methods - heat strengthening and chemical strengthening of increasing strength of glass for solar-energy use. Also estimates cost and availability of high-strength glass and considers physical characteristics, amenability to back-silvering, and effects of atmospheric contamination.

Bouquet, F. L.↗

A space station Structures and Assembly Verification Experiment, SAVE

The Space Station structure has been baselined to be a 5 M (16.4 ft) erectable truss. This structure will provide the overall framework to attach laboratory modules and other systems, subsystems and utilities. The assembly of this structure represents a formidable EVA challenge. To validate this capability the Space Station Structures/Dynamics Technical Integration Panel (TIP) met to develop the necessary data for an integrated STS structures flight experiment. As a result of this meeting, the Langley Research Center initiated a joint Langley/Boeing Aerospace Company study which supported the structures/dynamics TIP in developing the preliminary definition and design of a 5 M erectable space station truss and the resources required for a proposed flight experiment. The purpose of the study was to: (1) devise methods of truss assembly by astronauts; (2) define a specific test matrix for dynamic characterization; (3) identify instrumentation and data system requirements; (4) determine the power, propulsion and control requirements for the truss on-orbit for 3 years; (5) study the packaging of the experiment in the orbiter cargo bay; (6) prepare a preliminary cost estimate and schedule for the experiment; and (7) provide a list of potential follow-on experiments using the structure as a free flyer. The results of this three month study are presented.

Russell, R. A.↗