At least 1,369 records · Page 76

Removal of the Plutonium Recycle Test Reactor - 13031

The 309 Facility housed the Plutonium Recycle Test Reactor (PRTR), an operating test reactor in the 300 Area at Hanford, Washington. The reactor first went critical in 1960 and was originally used for experiments under the Hanford Site Plutonium Fuels Utilization Program. The facility was decontaminated and decommissioned in 1988-1989, and the facility was deactivated in 1994. The 309 facility was added to Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) response actions as established in an Interim Record of Decision (IROD) and Action Memorandum (AM). The IROD directs a remedial action for the 309 facility, associated waste sites, associated underground piping and contaminated soils resulting from past unplanned releases. The AM directs a removal action through physical demolition of the facility, including removal of the reactor. Both CERCLA actions are implemented in accordance with U.S. EPA approved Remedial Action Work Plan, and the Remedial Design Report / Remedial Action Report associated with the Hanford 300-FF-2 Operable Unit. The selected method for remedy was to conventionally demolish above grade structures including the easily distinguished containment vessel dome, remove the PRTR and a minimum of 300 mm (12 in) of shielding as a single 560 Ton unit, and conventionally demolish the below grade structure. Initial sample core drilling in the Bio-Shield for radiological surveys showed evidence that the Bio-Shield was of sound structure. Core drills for the separation process of the PRTR from the 309 structure began at the deck level and revealed substantial thermal degradation of at least the top 1.2 m (4LF) of Bio-Shield structure. The degraded structure combined with the original materials used in the Bio-Shield would not allow for a stable structure to be extracted. The water used in the core drilling process proved to erode the sand mixture of the Bio-Shield leaving the steel aggregate to act as ball bearings against the core drill bit. A redesign is being completed to extract the 309 PRTR and entire Bio-Shield structure together as one monolith weighing 1100 Ton by cutting structural concrete supports. In addition, the PRTR has hundreds of contaminated process tubes and pipes that have to be severed to allow for a uniformly flush fit with a lower lifting frame. Thirty-two 50 mm (2 in) core drills must be connected with thirty-two wire saw cuts to allow for lifting columns to be inserted. Then eight primary saw cuts must be completed to severe the PRTR from the 309 Facility. Once the weight of the PRTR is transferred to the lifting frame, then the PRTR may be lifted out of the facility. The critical lift will be executed using four 450 Ton strand jacks mounted on a 9 m (30 LF) tall mobile lifting frame that will allow the PRTR to be transported by eight 600 mm (24 in) Slide Shoes. The PRTR will then be placed on a twenty-four line, double wide, self powered Goldhofer for transfer to the onsite CERCLA Disposal Cell (ERDF Facility), approximately 33 km (20 miles) away. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sensor Network Demonstration for In Situ Decommissioning - 13332

Florida International University's (FIU's) Applied Research Center is currently supporting the Department of Energy's (DOE) Environmental Management Office of D and D and Facility Engineering program. FIU is supporting DOE's initiative to improve safety, reduce technical risks, and limit uncertainty within D and D operations by identifying technologies suitable to meet specific facility D and D requirements, assessing the readiness of those technologies for field deployment, and conducting feasibility studies and large scale demonstrations of promising technologies. During FY11, FIU collaborated with Savannah River National Laboratory in the development of an experimental test site for the demonstration of multiple sensor systems for potential use in the in situ decommissioning process. In situ decommissioning is a process in which the above ground portion of a facility is dismantled and removed, and the underground portion is filled with a cementious material such as grout. In such a scenario, the question remains on how to effectively monitor the structural health of the grout (cracking, flexing, and sinking), as well as track possible migration of contaminants within and out of the grouted monolith. The right types of sensors can aid personnel in better understanding the conditions within the entombed structure. Without sensors embedded in and around the monolith, it will be very difficult to estimate structural integrity and contaminant transport. Yet, to fully utilize the appropriate sensors and the provided data, their performance and reliability must be evaluated outside a laboratory setting. To this end, a large scale experimental setup and demonstration was conducted at FIU. In order to evaluate a large suite of sensor systems, FIU personnel designed and purchased a pre-cast concrete open-top cube, which served as a mock-up of an in situ DOE decommissioned facility. The inside of the cube measures 10 ft x 10 ft x 8 ft. In order to ensure that the individual sensors would be immobilized during the grout pouring activities, a set of nine sensor racks were designed. The 270 sensors provided by Idaho National Laboratory (INL), Mississippi State University (MSU), University of Houston (UH), and University of South Carolina (USC) were secured to these racks based on predetermined locations. Once sensor racks were installed inside the test cube, connected and debugged, approximately 32 cubic yards of special grout material was used to entomb the sensors. MSU provided and demonstrated four types of fiber loop ring-down (FLR) sensors for detection of water, temperature, cracks, and movement of fluids. INL provided and demonstrated time differenced 3D electrical resistivity tomography (ERT), advanced tensiometers for moisture content, and thermocouples for temperature measurements. University of Houston provided smart aggregate (SA) sensors, which detect crack severity and water presence. An additional UH sensor system demonstrated was a Fiber Bragg Grating (FBG) fiber optic system measuring strain, presence of water, and temperature. USC provided a system which measured acoustic emissions during cracking, as well as temperature and pH sensors. All systems were connected to a Sensor Remote Access System (SRAS) data networking and collection system designed, developed and provided by FIU. The purpose of SRAS was to collect and allow download of the raw sensor data from all the sensor system, as well as allow upload of the processed data and any analysis reports and graphs. All this information was made available to the research teams via the Deactivation and Decommissioning Knowledge Management and Information Tool (D and D KM-IT). As a current research effort, FIU is performing an energy analysis, and transferring several sensor systems to a Photovoltaic (PV) System to continuously monitor energy consumption parameters and overall power demands. Also, One final component of this research is focusing on developing an integrated data network to capture, log and analyze sensor system data in near real time from a single interface. FIU personnel and DOE Fellows monitored the progress and condition of the sensors for a period of six months. During this time, the sensors recorded data pertaining to strain, compression, temperature, crack detection, moisture presence, fluid mobility, shock resistance, monolith movement, and electrical resistivity. In addition, FIU regularly observed the curing process of the grout and documented the cube condition via the nine racks of sensors. The sensors held up throughout the curing process, withstood the natural elements for six months, and monitored the integrity of the grout. The large scale experiment and demonstration conducted at FIU was the first of its kind to demonstrate the feasibility of state of the art sensors for in situ decommissioning applications. These efforts successfully measured the durability, performance, and precision of the sensors in question as well as monitored and recorded the curing process of the selected grout material under natural environmental conditions. The current energy analysis work is resulting in data on the constraints placed by some of the sensor systems on a power network that requires high reliability and low losses. In addition, a sensor system demonstration has determined that it is feasible to develop an integrated data network where data can be accessed in near real-time from all systems, thereby allowing for larger-scale integrated system testing to be performed. Information collected during the execution of this research project will aid decision makers in the identification of sensors to be used in nuclear facilities selected for in situ decommissioning. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

D and D Knowledge Management Information Tool - 2012 - 12106

Deactivation and decommissioning (D and D) work is a high priority activity across the Department of Energy (DOE) complex. Subject matter specialists (SMS) associated with the different ALARA (As-Low-As-Reasonably-Achievable) Centers, DOE sites, Energy Facility Contractors Group (EFCOG) and the D and D community have gained extensive knowledge and experience over the years in the cleanup of the legacy waste from the Manhattan Project. To prevent the D and D knowledge and expertise from being lost over time from the evolving and aging workforce, DOE and the Applied Research Center (ARC) at Florida International University (FIU) proposed to capture and maintain this valuable information in a universally available and easily usable system. D and D KM-IT provides single point access to all D and D related activities through its knowledge base. It is a community driven system. D and D KM-IT makes D and D knowledge available to the people who need it at the time they need it and in a readily usable format. It uses the World Wide Web as the primary source for content in addition to information collected from subject matter specialists and the D and D community. It brings information in real time through web based custom search processes and its dynamic knowledge repository. Future developments include developing a document library, providing D and D information access on mobile devices for the Technology module and Hotline, and coordinating multiple subject matter specialists to support the Hotline. The goal is to deploy a high-end sophisticated and secured system to serve as a single large knowledge base for all the D and D activities. The system consolidates a large amount of information available on the web and presents it to users in the simplest way possible. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Successful Characterization Strategies for the Active High Risk Y-12 National Security Complex 9201-5 (Alpha-5) Facility, Oak Ridge, TN - 12164

Building 9201-5 (Alpha 5) was completed in May 1944 and served as a production facility for National Nuclear Security Administration (NNSA) Y-12 Weapons Plant. During the Manhattan Project, it functioned as a uranium enrichment facility. The facility was renovated and altered over the years, converting the calutrons to support other missions. Alpha 5 consists of 4 floors and a basement measuring approximately 600,000 square feet. The facility contains various pieces of equipment remaining from legacy operations. A significant amount (approximately 200,000 kgs) of mercury (Hg) has been spilled in the facility over the operational history of the building. To further complicate matters, beryllium (Be) contamination in 9201-5 is found throughout approximately sixty percent of the facility. Concentrations varying from very low (< 0.2 micrograms (μg)/100 cm{sup 2}) to areas where concentrations are relatively high, approximately 600 μg/100 cm{sup 2}, in regulated beryllium areas. The primary site related contaminants (SRCs) for the waste in this facility are enriched uranium, depleted uranium, beryllium and mercury. This facility represents the highest environmental risk for DOE-ORO EM and NNSA at Y-12 and must be quickly addressed to minimize impacts to future Y-12 missions, as well as human health and the environment. As part of the American Recovery and Reinvestment Act (ARRA), approximately 700,000 cubic feet of legacy material was removed in 2010 and 2011. In addition, characterization of the 9201-5 facility was scheduled in the winter and spring of 2011. This activity was initiated in January 2011 and was completed in July 2011. Heavy schedule pressure was further complicated by the fact that this building has active utility, security and process systems. Given these complex variables, a unique, out of the box characterization strategy was forged in an effort to bound radiological and chemical contaminants, as well as providing the appropriate level of quality to ensure that this data could be used to develop waste profiles when deactivation, decontamination and demolition (D and D) activities are authorized at a future date. The characterization strategy involved a hybrid model of statistically-based and biased sampling events. To achieve the desired results, traditional intrusive sampling and laboratory analysis, as well as a number of field-based characterization methodologies (e.g., X-ray Fluorescence [XRF], Lumex and Non-Destructive Assay [NDA]) were utilized. Results were captured and synthesized into meaningful, usable conclusions in a facility characterization report that will more accurately aid D and D cost estimates for future remedial actions. This massive characterization campaign involved over 1,200 separate sample locations using 4 separate characterization methods and was successfully completed to meet a performance-based milestone within 8 months of initiation. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Simple Waste Solutions for Complex Facilities - 12433

The buildings in the 300 Area, including several Category 3 nuclear facilities are undergoing deactivation, decommissioning, decontamination and demolition (D4) by Washington Closure Hanford (WCH) as part of the River Corridor Closure Contract (RCCC). The D4 process has generated a wide variety of low-level radioactive and low-level radioactive mixed waste as well as TRU. The Hanford Site-wide Transportation Safety Document (TSD) has been successfully utilized to transport waste streams that otherwise would not be able to be shipped. The TSD accomplished this by establishing a comprehensive set of onsite transportation and packaging performance standards and risk-based standards. The requirements and standards presented are equivalent to DOT and NRC standards (10 CFR 71). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

US DOE Office of Technology Innovation and Development - Integration of the EM R and D Program in 2012 and Beyond - 12537

Applied research and technology development has the potential to accelerate environmental cleanup and reduce the cost for cleanup and closure of U.S. Department of Energy (DOE) legacy waste sites throughout the United States. Providing the scientific understanding, knowledge, and technologies to enable successful completion of the DOE Office of Environmental Management (EM) mission, the Technology Innovation and Development program is transforming science and innovation into practical solutions for environmental cleanup. Through integration, collaboration, and communication with DOE partner organization, DOE site managers and contractors, these technologies will reduce human health and environmental risk, cost, and time associated with cleanup and closure. The Office of Technology Innovation and Development (OTID) focused efforts in fiscal year 2011 (FY 2011) to a proactive, visionary program balance with integrated, cross-disciplinary applied research and technology development activities. This transition provides the necessary scientific and technical advancements to address near-term needs. In addition, it fills the critical role in providing scientific approaches and advanced technologies that look beyond today's known needs and requirements to provide innovative technologies to make the necessary long-term changes required to facilitate cleanup and bring sites to closure. The outcomes and impacts of this strategy are summarized in the Impact Plan, which describes potential reduction in life-cycle costs through the development and deployment of advanced technologies supporting EM needs associated with waste processing, groundwater and soil remediation, deactivation and decommissioning, and spent nuclear fuel and materials disposition. Additionally, the OTID International Program Strategic Plan 2010-2015 outlines cooperation and collaboration with the international community that has similar nuclear legacy management experience and expertise to foster transfer of best science practices being used in the field. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Closure End States for Facilities, Waste Sites, and Subsurface Contamination - 12543

The United States (U.S.) Department of Energy (DOE) manages the largest groundwater and soil cleanup effort in the world. DOE's Office of Environmental Management (EM) has made significant progress in its restoration efforts at sites such as Fernald and Rocky Flats. However, remaining sites, such as Savannah River Site, Oak Ridge Site, Hanford Site, Los Alamos, Paducah Gaseous Diffusion Plant, Portsmouth Gaseous Diffusion Plant, and West Valley Demonstration Project possess the most complex challenges ever encountered by the technical community and represent a challenge that will face DOE for the next decade. Closure of the remaining 18 sites in the DOE EM Program requires remediation of 75 million cubic yards of contaminated soil and 1.7 trillion gallons of contaminated groundwater, deactivation and decommissioning (D and D) of over 3000 contaminated facilities and thousands of miles of contaminated piping, removal and disposition of millions of cubic yards of legacy materials, treatment of millions of gallons of high level tank waste and disposition of hundreds of contaminated tanks. The financial obligation required to remediate this volume of contaminated environment is estimated to cost more than 7% of the to-go life-cycle cost. Critical in meeting this goal within the current life-cycle cost projections is defining technically achievable end states that formally acknowledge that remedial goals will not be achieved for a long time and that residual contamination will be managed in the interim in ways that are protective of human health and environment. Formally acknowledging the long timeframe needed for remediation can be a basis for establishing common expectations for remedy performance, thereby minimizing the risk of re-evaluating the selected remedy at a later time. Once the expectations for long-term management are in place, remedial efforts can be directed towards near-term objectives (e.g., reducing the risk of exposure to residual contamination) instead of focusing on long-term cleanup requirements. An acknowledgement of the long timeframe for complete restoration and the need for long-term management can also help a site transition from the process of pilot testing different remedial strategies to selecting a final remedy and establishing a long-term management and monitoring approach. This approach has led to cost savings and the more efficient use of resources across the Department of Defense complex and at numerous industrial sites across the U.S. Defensible end states provide numerous benefits for the DOE environmental remediation programs including cost-effective, sustainable long-term monitoring strategies, remediation and site transition decision support, and long-term management of closure sites. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Application of Robotics Technology to D and D - 17249

The Knowledge Management Information Tool (KM-IT) is a web-based system developed to maintain and preserve the deactivation and decommissioning (D and D) knowledge base across the Department of Energy (DOE) complex. The system was developed by the Applied Research Center (ARC) at Florida International University (FIU) with the support of the D and D community, including the DOE Office of Environmental Management (DOE EM), and with the active collaboration and support of the DOE's Energy Facility Contractors Group (EFCOG). The KM-IT system is a D and D community driven system tailored to serve the technical issues faced by the D and D workforce across the DOE Complex. As part of the D and D KM-IT, FIU has developed a robotics database in collaboration with DOE EM and Nuvision/Cogentus which currently contains over 500 robotics technologies along with information about the robotics technology vendors. This information is aggregated in real time and presented as a robotics technology fact sheet to the end user based on the selected technology. FIU is researching these technologies and studying their capabilities and application to D and D. As part of the research, FIU is categorizing each technology into specific application areas: characterization, decontamination, inspection, and demolition. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Consolidated Nuclear Security, LLC, Excess Facility Disposition Program - 17289

Consolidated Nuclear Security, LLC (CNS), the management and operating contractor for the Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee, and the Pantex Plant (Pantex) in Amarillo, Texas, has developed an integrated strategy to address badly deteriorating excess facilities presenting risks to people, the environment, and the National Nuclear Security Administration (NNSA) mission. The comprehensive, integrated Excess Facilities Disposition Program (EFDP) incorporates NNSA scope for excess facility risk reduction, preparation of facilities to be transferred to the U.S. Department of Energy (DOE) Office of Environmental Management (EM) for demolition, and demolition of non-process contaminated facilities. The Program has been developed using the NNSA Office of Safety, Infrastructure, and Operations (NA-50) Program Management Plan as a guide. The Program has undertaken actions to address the most immediate risks associated with CNS excess facilities. At Y-12, new foam roofs have been installed on Buildings 9201-5 (Alpha 5), 9204-4 (Beta 4), and 9206 to minimize further facility degradation. Tanks and dikes outside of Alpha 5 and Beta 4 are also being disconnected, drained, and filled with concrete. In addition, Beta 4 will be getting a new electrical system as its Manhattan Project-era system will be replaced by a temporary 'construction power' setup that will provide as-needed electricity to the building that is safer, more reliable, and will ease demolition activities in the future. The EFDP is also focusing on the basement of Alpha 5 and is planning to remove the water from the aging facility's flooded basement, which in some areas contains up to 54 inches of water. The EFDP is also planning several efforts to remove excess materials from Alpha 5 and Beta 4, de-inventory the Alpha 5 Mercury House System and numerous transformers, and de-inventory Beta 4 hydraulic pumps and systems. Efforts are also underway to deactivate and decommission non-process-contaminated facilities at Y-12 and at Pantex. The EFDP has prioritized the performance of work to reduce risk while at the same time supporting the preparation of process-contaminated Y-12 facilities for transfer to EM. The Program aligns with the EM goal to have the NNSA scope completed in Alpha 5 and Beta 4 by the end of FY 2020, and Building 9206 completed by the end of FY 2024. These dates and project sequencing will support the Y-12-related DOE EM cleanup initiatives. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Novel Gamma Attenuation Methods Utilized for Waste Characterization of UO{sub 2}F{sub 2}-Bearing Materials at the Paducah GDP - 17327

The Paducah Gaseous Diffusion Plant (PGDP) is currently under deactivation with demolition in the decades to follow. UO{sub 2}F{sub 2}-bearing waste is generated at PGDP by UF{sub 6} hydrolysing to materials such as pipes, valves, PPE, etc. when UF{sub 6} is exposed to humid air. In addition, Al{sub 2}O{sub 3} and NaF trap materials contain significant amounts of Uranium. The UO{sub 2}F{sub 2} deposits within the generated waste can be of sub-gram levels to several hundreds of localized grams and are much denser than the surrounding interfering matrix materials and may be of very complex geometric and chemical forms such as with the Al{sub 2}O{sub 3} and NaF trap materials. The main objective is to characterize the fissile (U-235) content of the UO{sub 2}F{sub 2}-bearing waste so as to meet the Data Quality Objectives (DQO) for proper disposal. If a waste container cannot meet the DQO then it must be subjected to costly remediation, repackaging and re-characterization processes. We have developed, at PGDP, several novel model-based methods and techniques that vastly improve the standard gamma attenuation correction methods and do not require Working Reference Materials (WRM) for calibration. These new methods involve rotating and non-rotating 18.9 liter (5 U.S. gallon) waste containers with and without a transmission modality. A new model-based variant of differential attenuation has been developed that provides a high-quality self-absorption correction that does not require knowledge of the Uranium enrichment or isotopic ratios. For more challenging waste containers, a method using multi-view (non-rotating) 18.9 liter waste containers has been considered using a recently developed Advanced ISOCS{sup C} Uncertainty Estimator (AIUE) package. The new methods suffice to significantly improve accuracy and precision and to lower the Total Measurement Uncertainty (TMU) leading to satisfactory DQO's that were not previously achievable using the standard gamma attenuation correction methods. In this paper we present real 18.9 liter waste container and Working Reference Material (WRM) data subjected to the new methods and compared to standard methods depicting the significant improvement in the DQO that is realized. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Technetium Management Program Plan - 17376

Technetium management is a high-priority activity for the U.S. Department of Energy (DOE) Office of Environmental Management (EM) complex. Waste management and remediation issues involving technetium represent environmental risks and challenges that are unique to DOE. This plan lays out the technology development activities that are underway as well as future technology needs to address technetium issues across DOE EM sites and across programmatic areas of tank waste, groundwater and soils, and facility decommissioning and deactivation in order to be comprehensive and to allow integration of similar activities. The program was developed in close coordination with site representatives and program offices. Activities and needs that were identified share common themes and were grouped into areas of characterization, treatment, and disposition. Characterization includes understanding the inventory at particular locations, the chemical species, and chemical and physical behavior, whether in a treatment process flowsheet or a geological setting that displays periodic contaminant releases. The tools for characterization in these different environments might use the same sensors or protocols. Treatment options include methods to capture technetium such as ion-exchange or manipulation of oxidation states, which also may be applied across program areas. Disposition includes end-points of the processes and environmental risk, including waste form behavior, mobility of technetium once it is treated or remediated, and long-term monitoring. Disposition represents integration of all cleanup actions at a site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The U.S. DOE-EM International Program - 17411

The U.S. Department of Energy (DOE) Office of Environmental Management (EM) has a mission to complete the safe clean-up of the environmental legacy resulting from six decades of weapons production and energy research. This effort is recognized as one of the largest and most diverse and technically complex environmental clean-up operations in the world. The overall strategy to address this challenge includes several components, one of which involves leveraging the expertise within the International community, when applicable. The opportunities related to international collaborations are an important component of the DOE EM strategy for the clean-up mission, providing excellent forums for EM to stay beneficially engaged with the international community and our global partners. EM has been supporting the clean-up mission of the Department through international collaborations for almost 20 years. The EM International Program is sponsored by the DOE EM Office of the Chief of Staff (EM-2.1), which directly supports the DOE-EM Office of Assistant Secretary (EM-1), in coordination with the entire EM organization. The primary objective of the EM International Program is to provide benefit to the Department in successful completion of the EM clean-up mission, through establishing strategic approaches for specific international collaboration initiatives that are focused on appropriate strategic program goals. The EM International Program strategy to support the EM mission includes many facets, but they can generally be grouped into two primary areas. First, the EM International Program maintains, establishes, and/or participates in international agreements such that appropriate mechanisms are available for conducting international collaborations with foreign government organizations, educational institutions and private industry to leverage resources and link international experience and expertise, in support of the EM mission and compliant with US foreign policy. Second, through coordination with the EM Office of Technology Development (EM-3.2), the EM International Program leverages these agreements to identify mutually beneficial opportunities to evaluate, test, and adapt technologies, capabilities, and expertise for application to EM mission needs. These activities directly support goals within the current DOE Strategic Plan 2014 - 2018, issued in April 2014. Working with the Office of Technology Development, the EM International Program is developing a process for identifying and selecting collaborative international technology projects for Fiscal Year 2017 (FY17) that have high potential impact to the EM mission. The technical scope of these activities is expected to span the entire EM mission, including tank waste and nuclear materials management; groundwater and soil remediation; deactivation and decommissioning; and radioactive waste disposal operations. Depending on budget availability, these collaborative activities are expected to be awarded by mid-FY17. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Road to 2020: Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA): Cleanup of the East Tennessee Technology Park - 17425

Uranium enrichment activities at the 890-ha (2,200-acre) East Tennessee Technology Park (ETTP), formerly the Oak Ridge Gaseous Diffusion Plant, date back to the World War II Manhattan Project. The site produced nuclear fuel for weapons and reactors for four decades. Because of these operations, ETTP has a legacy of radiologically and chemically contaminated buildings, soil, sediment, and groundwater that required remedial action to reduce the risk to human health and the environment. Since the early 1990's, the DOE Oak Ridge Office of Environmental Management (OREM) has directed the environmental cleanup of this contaminated site through the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA) process. Cleanup activities have included the demolition of contaminated facilities and structures, including five gaseous diffusion buildings; remediation of contaminated soils; disposal of associated waste; and treatment of contaminated groundwater. In August 2016, DOE realized its Vision 2016, demolition of all five gaseous diffusion buildings at ETTP. This milestone marked the first time that an entire uranium enrichment complex has been demolished. The landmark cleanup included deactivation and demolition of 418,064 m{sup 2} (4.5 million ft{sup 2}) of radiologically and chemically contaminated facilities, and disposal of more than 55,000 truckloads of debris. Fulfillment of Vision 2016 was a major step toward completing ETTP cleanup by 2020. To attain 2020 cleanup, DOE and its cleanup contractor, URS - CH2M Oak Ridge LLC (UCOR), must complete demolition of the following areas: - Poplar Creek Facilities; - K-731 Switch House; - Building K-1037; - Central Neutralization Facility; - K-1200 Complex; - Toxic Substances Control Act Incinerator facilities; - Balance of Site Facilities. In addition, DOE will complete all remedial actions in accordance with current Records of Decision (RODs); as well as cleanup activities involving surface water, sediment, and groundwater that will be addressed in a final site-wide ROD. All waste, including soils, debris, and rubble from demolition and remediation activities, will be dispositioned. Final cleanup of ETTP further advances DOE's goal for re-industrialization of the site as a private sector industrial park. With risks reduced, hazards removed, and the environment restored, DOE can transfer usable ETTP building and land assets to the community for redevelopment and reuse. A history center, equipment building, viewing tower, and wayside exhibits will tell the story of the site, honoring its contributions to the nation's defense and energy needs. Approximately 1,214 ha (3,000 acres) of adjoining lands, now the Black Oak Ridge Conservation Easement (BORCE), will be used for conservation and recreational purposes, including green-ways and trail systems. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Disposition of Chicago Pile 5 (CP-5) Converter Tubes in the 10-160B Cask - 16632

This paper will focus on the unique characterization, packaging, and transportation issues associated with the disposition of the two CP-5 Converter Tube assemblies from Argonne National Laboratory. The converter tubes were constructed of combinations of HEU and alloys of zirconium, and were part of the original research facilities attached to the CP-5 reactor during operating evolutions. These assemblies were heavily irradiated during their operational lifetime, and were segregated from the balance of irradiated test specimens when the reactor was deactivated and slated for Decontamination and Demolition (D and D). In addition, the substantial contribution of fissile material to the assemblies' inventory made the potential disposition pathways extremely challenging. As a result, these items became part of Argonne's legacy 'nuclear footprint', and were added to the Nuclear Footprint Reduction Project scope for disposition. The Project was responsible for the size reduction and characterization of these items, as well as the ultimate disposition. After negotiating a disposal pathway for these tubes, there were significant transportation issues that required a small team to overcome, in order to successfully ship these items to the Nevada National Security Site (NNSS). The Project team at Argonne, technical support from transportation specialists, licensing support from the 10-160B license owner, the Savannah River National Lab (SRNL) Packaging Certification Team (PCT, and the DOE EM-33 staff contributed to license and safety analysis report amendments that eventually authorized the shipment of the material. The paper will identify the organizations, and the specific actions, required to successfully make three 'one of a kind' shipments of irradiated test specimen material. This will include the unique packaging configurations, contents modification for the cask license (via the Amendment process), criticality evaluations, and associated review and approval processes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

System and method for combined heat and electric power generation

A system for combined heat and electric power generation, preferably including a heat reservoir and one or more electric generators, each preferably including a heat source and an energy converter. A method for combined heat and electric power generation, preferably including activating an electric generator, deactivating the electric generator, and/or providing heat from a heat reservoir.

Lorimer, Adam G.↗

Minority Serving Institutions Partnership Program (MSIPP) - 18108

The DOE-EM recognizes that successfully completing its legacy environmental cleanup mission will require maintaining a well-trained, technically skilled, and diverse workforce. Minority representation in critical science and engineering fields is an important part of EM's vision for the future workforce. The Minority Serving Institutions Partnership Program (MSIPP) has been created and designed to increase the numbers of minorities with science and engineering experience in areas important to the success of the DOE-EM mission. MSIPP will provide financial assistance for science, technology, engineering, and mathematics (STEM) activities at Minority Serving Institutions (MSI) engaged in research and related STEM efforts supporting EM's needs. The program offers research internship opportunities at DOE National Laboratories across the DOE complex. MSIPP also encourages research collaborations between MSI Universities and DOE National Laboratories by funding research in areas relevant to DOE-EM needs. Based on current DOE-EM missions, there are two research focus areas: Tank Waste and Site Restoration. Tank Waste includes priority areas of current DOE tank waste and waste processing approaches, alternative DOE tank waste processing options, and tank management and closure. Site Restoration research concentrates in the areas of Soil and Groundwater with priority areas of attenuation-based remedies for the subsurface, deep vadose zone, remediation of mercury and industrial contaminants, and advanced simulation capability for environmental management; and, in the areas of Deactivation and Decommissioning, with priority areas of unique sensor networks for remote monitoring of entombed facilities and tanks, interactions between radiological and chemical contaminants of concern to DOE and facility materials, incombustible fixatives and decontamination agents, acceptability of DeconGel and various contaminant mixtures and robotics, remote systems with plug-and-play interchangeable components, and models for facility decommissioning. This paper gives an overview of the opportunities available to MSI students and universities and outlines the progress this program has made since its inception, and the path forward to further enhance efforts to create a pipeline into the DOE-EM workforce. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Encapsulation and Storage Facility Stabilization and Ventilation Project-18121

Department of Energy contractor CH2M HILL Plateau Remediation Company (CH2M) is responsible for the safe and compliant operation of the Waste Encapsulation and Storage Facility (WESF), a nuclear materials storage facility at Hanford containing 1,936 highly radioactive capsules containing cesium and strontium. The capsules are currently stored under approximately 4 m (13 ft) of water. The water shields workers from radiation and helps cool the capsules. WESF is a large, concrete structure nominally 48 m (160 ft) long, 30 m (98 ft) wide and 12 m (40 ft) high with the pool cells being approximately 4 m (13 ft) below grade level. It is a robust facility with walls ranging from 0.3 m to 1 m (1 ft to 3 ft) thick. While the capsules are currently in a safe configuration, WESF is an aging facility, and DOE and CH2M are modifying the facility to ensure continued safe and compliant operations and to support the eventual transfer of capsules to dry storage. Dry storage would eliminate the possibility of a release of radioactive material in the unlikely event of a major earthquake that might result in loss of pool storage water and overheating and breach of one or more capsules. The project was divided into two major deliverables: 1) Ventilation: replacement of the existing ventilation system which included a below-grade high efficiency particulate air (HEPA) filter pit with an above grade HEPA filter skid and new fans and ducting. 2) Stabilization: grouting deactivated facility hot cells and other void spaces to the maximum extent practical to reduce material at risk from legacy contamination. The aging ventilation system relied on HEPA filters that exceeded their operational life. Due to the high levels of radionuclide contamination, replacing the filters was impractical and highly hazardous. CH2M installed a new ventilation system to provide safe and compliant ventilation for future operations. The project used an existing, unused ventilation skid that was designed for another project. Repurposing the unused skid presented additional technical challenges to modify the system for the project specific requirements. The new system is above ground, easier to maintain and is built to current standards. New connections inside the facility were installed to allow the new ventilation to operate effectively. The stabilization project is unique in that core drilling and grouting was performed in an operating Hazard Category 2 nuclear facility, which brought forth safety basis and environmental regulatory challenges. The hot cells were isolated from all existing support utilities including electrical, process chemicals, manipulator ports, instrument air, etc. to seal the hot cells and prevent highly contaminated supernate or grout from leaking into adjacent galleries. A high flow grout was used to maximize the distance between injection ports. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Closing the Book on the WVDP Vitrification Facility - 18222

Demolition of the West Valley Demonstration Project's Vitrification Facility was initiated on September 11, 2017, approximately 21 years after the facility produced its first canister of vitrified high-level waste. In the center of the structure, the heavily-reinforced concrete Vitrification Cell operated for six years, safely immobilizing about 24 million curies of high-level radioactive waste in borosilicate glass. When the facility was shut down in 2002, it had achieved the highest operational availability of any vitrification facility in the world. It was the first facility in the United States to complete its vitrification mission and is now the first in the nation to undergo demolition. This paper summarizes the selection, design, operation, deactivation and demolition of this facility. (authors)