Search NASA⌕ Search

SEARCH · Search NASA

Results for “Electrical System”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,369 records · Page 76

Human Mars Transportation Applications Using Solar Electric Propulsion

Advanced solar electric power systems and electric propulsion technology constitute viable elements for conducting human Mars transfer missions that are roughly comparable in performance to similar missions utilizing alternative high thrust systems, with the one exception being their inability to achieve short Earth-Mars trip times. A modest solar electric propulsion human Mars scenario is presented that features the use of conjunction class trajectories in concert with pre-emplacement of surface assets that can be used in a series of visits to Mars. Major elements of the Mars solar electric transfer vehicle can be direct derivatives of present state-of-the-art Solar array and electric thruster systems. During the study, several elements affecting system performance were evaluated, including varying Earth orbit altitude for departure, recapturing the transfer stage at Earth for reuse, varying power system mass-to-power ratio, and assessing solar array degradation on performance induced by Van Allen belt passage. Comparisons are made to chemical propulsion and nuclear thermal propulsion Mars vehicles carrying similar payloads.

Donahue, Benjamin B.↗

Design Exploration of a Mild Hybrid Electrified Aircraft Propulsion Concept

NASA has performed in-depth research and analysis into hybrid-electric aircraft concepts featuring high levels of electrification. Many of these concepts were found to be infeasible, whereas feasible designs were significantly heavier and more costly compared to conventional concepts. This study presents the development and analysis of an alternative mild hybrid concept that uses relatively low levels of stored electric energy applied strategically throughout the mission. The team researched several mild hybrid technologies, developed integrated aircraft models, and then evaluated the effects of these technologies on vehicle level performance metrics. Technologies explored in this study include the Turbine Electrified Energy Management system, electric taxi, electric climb assist, and replacing the auxiliary power unit with on-board electric energy storage. Key enabling technologies were energy storage devices that prioritized high power output over energy capacity and integrating electric motors with the shafts of the gas turbine engines. Significant performance improvements were observed when applying multiple technologies separately and in combination, with the most promising configuration incorporating all of them at once. Results for the mild hybrid configuration indicate an 8.2% reduction in block fuel, a 7.7% reduction in equivalent CO2 emissions, and a 3.5% increase in gross takeoff weight compared to a conventional baseline. Results of a cost analysis suggest the mild hybrid slightly reduces direct operating cost plus interest, which demonstrates that aircraft emissions can be significantly reduced without the cost increases associated with highly electrified concepts.

Turbine Electrified Energy Managment↗

Influence of Power System Technology on Electric Propulsion Missions

Electric propulsion (EP) thruster technology, with efficient lightweight power systems can provide substantial reductions in propulsion system wet mass due to the high specific impulse (Isp) of the thrusters. Historically, the space power systems are too massive for many potential orbital missions. The objective of this paper is to show the impact of current power system technology on EP mission performance and determine what technology advancements are needed to make EP beneficial for earth orbital applications. The approach of the paper is to model the electric propulsion system and orbital mission using a partial parametric method. Various missions are analyzed from orbit maintenance to orbit transfer. Results portray the relationship between mission performance and power technology level. Conclusions show which mission applications currently have acceptable power technology, and which mission applications require power technology improvements.

Oleson, Steven R.↗

Comparison of all-electric secondary power systems for civil subsonic transports

Three separate studies have shown operational, weight, and cost advantages for commercial subsonic transport aircraft using an all-electric secondary power system. The first study in 1982 showed that all-electric secondary power systems produced the second largest benefit compared to four other technology upgrades. The second study in 1985 showed a 10 percent weight and fuel savings using an all-electric high frequency (20 kHz) secondary power system. The last study in 1991 showed a 2 percent weight savings using today's technology (400 Hz) in an all-electric secondary power system. This paper will compare the 20 kHz and 400 Hz studies, analyze the 2 to 10 percent difference in weight savings and comment on the common benefits of the all-electric secondary power system.

Renz, David D.↗

NV Energy Large-Scale Photovoltaic Integration Study: Intra-Hour Dispatch and AGC Simulation

The uncertainty and variability with photovoltaic (PV) generation make it very challenging to balance power system generation and load, especially under high penetration cases. Higher reserve requirements and more cycling of conventional generators are generally anticipated for large-scale PV integration. However, whether the existing generation fleet is flexible enough to handle the variations and how well the system can maintain its control performance are difficult to predict. The goal of this project is to develop a software program that can perform intra-hour dispatch and automatic generation control (AGC) simulation, by which the balancing operations of a system can be simulated to answer the questions posed above. The simulator, named Electric System Intra-Hour Operation Simulator (ESIOS), uses the NV Energy southern system as a study case, and models the system’s generator configurations, AGC functions, and operator actions to balance system generation and load. Actual dispatch of AGC generators and control performance under various PV penetration levels can be predicted by running ESIOS. With data about the load, generation, and generator characteristics, ESIOS can perform similar simulations and assess variable generation integration impacts for other systems as well. This report describes the design of the simulator and presents the study results showing the PV impacts on NV Energy real-time operations.

Energy↗

Public policy for solar heating and cooling

Recent analyses indicated that solar heating and cooling systems for residential buildings are nearly economically competitive with conventional fossil fuel or electric systems, the former having higher initial cost but a lower operating cost than the latter. The paper examines obstacles to the widespread acceptance and use of solar space conditioning systems and explores some general policies which could help to overcome them. The discussion covers such institutional barriers limiting the adoption of solar technologies as existing building codes, financing constraints, and organizational structure of the building industry. The potential impact of financial incentives is analyzed. It is noted that a tax incentive of 25% could speed the use of solar energy by 7 to 8 years and produce an 8% reduction in fossil fuel use by 1990. A preliminary incentive package which could be helpful in promoting solar energy both at federal and state levels is proposed, and the necessary incentive level is analysed.

Hirshberg, A. S.↗

Automatic acquisition of domain and procedural knowledge

The design concept and performance of AKAS, an automated knowledge-acquisition system for the development of expert systems, are discussed. AKAS was developed using the FLES knowledge base for the electrical system of the B-737 aircraft and employs a 'learn by being told' strategy. The system comprises four basic modules, a system administration module, a natural-language concept-comprehension module, a knowledge-classification/extraction module, and a knowledge-incorporation module; details of the module architectures are explored.

Ferber, H. J.↗

Standards-Based Wireless Sensor Networking Protocols for Spaceflight Applications

Wireless sensor networks (WSNs) have the capacity to revolutionize data gathering in both spaceflight and terrestrial applications. WSNs provide a huge advantage over traditional, wired instrumentation since they do not require wiring trunks to connect sensors to a central hub. This allows for easy sensor installation in hard to reach locations, easy expansion of the number of sensors or sensing modalities, and reduction in both system cost and weight. While this technology offers unprecedented flexibility and adaptability, implementing it in practice is not without its difficulties. Any practical WSN deployment must contend with a number of difficulties in its radio frequency (RF) environment. Multi-path reflections can distort signals, limit data rates, and cause signal fades that prevent nodes from having clear access to channels, especially in a closed environment such as a spacecraft. Other RF signal sources, such as wireless internet, voice, and data systems may contend with the sensor nodes for bandwidth. Finally, RF noise from electrical systems and periodic scattering from moving objects such as crew members will all combine to give an incredibly unpredictable, time-varying communication environment.

Barton, Richard J.↗

Preventing Accidental Ignition of Upper-Stage Rocket Motors

A report presents a proposal to reduce the risk of accidental ignition of certain upper-stage rocket motors or other high energy hazardous systems. At present, mechanically in-line initiators are used for initiation of many rocket motors and/or other high-energy hazardous systems. Electrical shorts and/or mechanical barriers, which are the basic safety devices in such systems, are typically removed as part of final arming or pad preparations while personnel are present. At this time, static discharge, test equipment malfunction, or incorrect arming techniques can cause premature firing. The proposal calls for a modular out-of-line ignition system incorporating detonating-cord elements, identified as the donor and the acceptor, separated by an air gap. In the safe configuration, the gap would be sealed with two shields, which would prevent an accidental firing of the donor from igniting the system. The shields would be removed to enable normal firing, in which shrapnel generated by the donor would reliably ignite the acceptor to continue the ordnance train. The acceptor would then ignite a through bulkhead initiator (or other similar device), which would ignite the motor or high-energy system. One shield would be remotely operated and would be moved to the armed position when a launch was imminent or conversely returned to the safe position if the launch were postponed. In the event of failure of the remotely operated shield, the other shield could be inserted manually to safe the system.

Hickman, John↗

Partial discharge detector

A partial discharge (PD) detection system includes a PD sensor configured to sense a PD event of an electrical system and to generate a sensor signal in response to the PD event. An envelope generator is coupled to receive the sensor signal from the PD sensor. The envelope generator extracts an envelope signal from the sensor signal. A digitizer is configured to convert the envelope signal to a digital representation of the PD event.

Karin, Todd↗

Improving Efficiency of Off-Road Vehicles by Novel Integration of Electric Machines and Advanced Combustion Engines

Modern off-road equipment will increasingly rely on electrified implements that will deliver precision control with a smaller footprint than hydraulics. The primary energy converter, however, will be an onboard reciprocating internal combustion engine because of the power density of hydrocarbon fuels in comparison to electrical energy storage and the remote locations where much of this equipment is deployed. Adding energy storage and electric machines creates opportunities to improve efficiency while reducing emissions. This program investigated approaches to take advantage of the extra flexibility that an enhanced electrical system to enable high-efficiency, low-emissions combustion technologies. The current program evaluated hybridization of both the torque application and air-handling systems to maximize efficiency while minimizing cost. This program designed, analyzed and tested a hybrid off-road vehicle consisting of a series electric powertrain with energy storage, an electrified air system, and a 33% downsized diesel engine. Detailed comparisons were made between the base powertrain and the developed powertrain using powertrain simulations, engine testing, and vehicle testing. The key results of the study are: • The resulting vehicle reduces fuel consumption by 5% to 15% at equal productivity. The primary improvements were due to recovery of regenerative braking losses for cycles where large transients are encountered. • The electrified air system was an enabler to allow engine downsizing. This was most important for duty-cycles where the engine primarily operated at moderate loads and had few low speed high torque conditions. • Engine level improvements showed re-optimization of the powertrain is possible when electrified air handing is available. Increased exhaust gas recirculation and advanced injection timing allowed up to a 15% reduction in brake specific fuel consumption at equal NOx and transient response. Compared to the larger engine, the downsized engine achieves up to an 18% reduction in brake specific fuel consumption over the non-road transient cycle. • The life cycle analysis and total cost of ownership study showed that the hybrid powertrain has the potential to reduce 5-year CO2 and total cost of ownership by ~6% over the baseline vehicle. The results also indicated that a pure battery electric vehicle is not feasible in this application and is likely to increase the CO2 emissions due to the CO2 from battery production. A hybrid powertrain with low carbon fuels shows the potential to substantially reduce CO2 and total cost of ownership.

02 PETROLEUM↗

Solar/Photovoltaic DC Systems: Information for Electrical Workers and Firefighters

Solar photovoltaic (PV) systems are common and continue to gain popularity. This article helps electrical workers and firefighters understand basic operating principles and hazards of PV dc arrays. The effects of solar radiation and temperature on power output are discussed including; PV-module testing standards; methods for calculating the number of modules in a PV string; some National Electrical Code (NEC) guidelines that are aimed toward improving array safety; dc-array commissioning, periodic maintenance, and testing; arc-flash-hazard potential ways firefighters can work safely around PV arrays; potential risks posed by moonlight and other light sources; some unique dc-system hazards. We also present statistics on PV dc-array electrical incidents and injuries.

14 SOLAR ENERGY↗

Advanced Stirling Convertor Control Unit Testing at NASA Glenn Research Center in the Radioisotope Power Systems System Integration Laboratory

Future NASA missions could include long-duration flyby, orbital, lander, or rover applications where generating power from sunlight may be limited. Radioisotope power systems (RPSs) provide a dependable power source for missions where inadequate sunlight or operational requirements make other power systems impractical. Over the past 16 years, NASA Glenn Research Center has been supporting the development of RPSs. The advanced Stirling radioisotope generator (ASRG) utilized a pair of advanced Stirling convertors (ASCs). Although flight development of the ASRG has been canceled, much of the technology and hardware continued development and testing to guide future activities. Specifically, a controller for the convertor(s) is an integral part of a Stirling-based RPS. For the ASRG design, the controller maintains stable operation of the convertors, regulates the alternating current produced by the linear alternator of the convertor, provides a specified direct-current output voltage for the spacecraft, and synchronizes the piston motion of the two convertors to minimize vibration as well as manage and maintain operation with a stable piston amplitude and hot-end temperature. It not only provides power to the spacecraft but also must regulate convertor operation to avoid damage to internal components and maintain safe thermal conditions after fueling. Lockheed Martin Coherent Technologies, Inc., has designed, developed, and tested an ASC control unit engineering development unit (ACU EDU) to support this effort. GRC used the ACU EDU as part of its nonnuclear representation of a RPS that also consists of a Dual advanced Stirling convertor simulator (DASCS), and associated support equipment to perform a test in the Radioisotope Power Systems System Integration Laboratory (RSIL). The RSIL was designed and built with flexibility to evaluate hardware utilizing RPS technology. The RSIL provides insight into the electrical interactions between as many as three radioisotope power generators, associated control strategies, and typical electric system loads. The first phase of testing included a DASCS that was developed by Johns Hopkins University Applied Physics Laboratory and simulates the operation and electrical behavior of a pair of ASCs in real time via a combination of hardware and software. Testing included the following spacecraft electrical energy storage configurations: capacitor, battery, and supercapacitor. Testing of the DASCS and ACU in each energy storage configuration included simulation of a typical mission profile and transient voltage and current data during load turnon and turnoff. Testing for these devices also included the initiation of several system faults such as short circuits, electrical bus overvoltage, undervoltage, and a "dead bus" recovery to restore normal power operations. The goal of this testing was to verify operation of the ACU(s) when connected to a spacecraft electrical bus. The results of these tests are presented here.

General↗

Simulations of hybrid system varying solar radiation and microturbine response time

Hybrid power systems, such as combinations of renewable power sources with intermittent power production and non-renewable power sources, theoretically increase the reliability and thus integration of renewable sources in the electrical system. However, a recent increase in the number of hybrid installations has sparked interest in the effects of their connection to the grid, especially in remote areas. This paper analyses a photovoltaic-gas microturbine hybrid system dimensioned to be installed in La Paz (Mexico).The research presented in this paper studies and quantifies the effects on the total electric power produced, varying both the solar radiation and the gas microturbine response time. The gas microturbine and the photovoltaic panels are modelled using Matlab/Simulink software, obtaining a platform where different tests to simulate real conditions have been executed. They consist of diverse ramps of irradiance that replicate solar radiation variations, and different microturbine response times reproduced by the time constants of a first order transfer function that models the microturbine dynamic response. The results obtained show that when radiation varies quickly it does not produce significant differences in the power guarantee or the microturbine gas consumption, to any microturbine response time. However, these two parameters are highly variable with smooth radiance variations. The maximum total power variation decreases greatly as the radiation variation gets lower. In addition, by decreasing the microturbine response time, it is possible to appreciably increase the power guarantee although the maximum power variation and gas consumption increase. Only in cases of low radiation variation is there no appreciable difference in the maximum power variation obtained by the different turbine response times.

14 SOLAR ENERGY↗

Modeling and Optimizing Pumped Storage in a Multi-stage Large Scale Electricity Market under Portfolio Evolution

To leverage the fast-ramping capability of resources to provide great value to the grid, electricity system operators such as the Midcontinent Independent System Operator (MISO) continue to evolve their approaches for integrating energy storage resources, including pumpedstorage hydro (PSH), into the electricity markets. However, new challenges arise in modeling and optimizing these energy-limited resources across multiple market clearing processes and planning studies with uncertainties and imperfect information. For instance, current market practices of PSH owners specifying pumping/generating hours can result in sub-optimal generation dispatch. Letting grid operators optimize PSH with the consideration of multiple operating modes and energy limitation constraints can potentially bring economic benefits to both the system and the PSH owners. However, in multi-stage clearing process of electricity markets, utilizing the PSH flexibility to deal with realized uncertainties can cause deviation in the multi-stage scheduling processes. The resulting financial risks from the schedule deviation may not be acceptable to PSH owners. In addition, to effectively utilize this energy limited resource, the state of charge (SOC) constraints of PSH needs to be continuously optimized and the marginal cost of deviation need to reflect the expected cost to purchase or sell energy at future times to compensate for deviations. This project aims to develop a prototype enhanced PSH model and improved price signals in the multi-stage market clearing process with proper consideration of the unique characteristics of PSH, in order to better align underlying PSH capabilities with evolving grid needs, particularly including the needs for more frequent and larger cycling to manage variability and uncertainty from renewables.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Building-Integrated Photovoltaics (BIPV) in the Residential Sector: An Analysis of Installed Rooftop System Prices

For more than 30 years, there have been strong efforts to accelerate the deployment of solar-electric systems by developing photovoltaic (PV) products that are fully integrated with building materials. This report examines the status of building-integrated PV (BIPV), with a focus on the cost drivers of residential rooftop systems, and explores key opportunities and challenges in the marketplace.

14 SOLAR ENERGY↗