On evaluation of assessments of accruals of future dismantling costs

A major prerequisite in order for civilian commercial nuclear energy production to qualify as sustainable energy production is that systems for the management of the nuclear waste legacy are in operation. These waste types are present in a range from very low short lived waste (VLLW) to long lived high level waste (HLW) (including the used nuclear fuel). The second prerequisite is that financial responsibilities or other constraints must not be passed on to coming generations. The first condition for qualification corresponds to the Polluters Pays Principle (PPP) which demands that the responsibility for the waste management rests solely with the polluter. The second qualification corresponds to the principle of fairness between generations and thus concerns the appropriate distribution of responsibilities between the generations. It is important to note that these two conditions must be met simultaneously, and that compliance with both is a necessary prerequisite in order for commercial use of nuclear power to qualify as a semi-sustainable energy source. Financial and technical planning for dismantling and decommissioning of nuclear installations cannot be regarded as successful unless it rests upon a distinctive way to describe and explain the well-founded values of different groups of stakeholders. This cumbersome task can be underpinned by transparent and easy to grasp models for calculation and estimation of future environmental liabilities. It essential that a systematic classification is done of all types of costs and that an effort is done to evaluate the precision level in the cost estimates. In this paper, a systematic and transparent way to develop a parametric approach that rest upon basic accounting standards is combined with data about younger stakeholder's values towards decommissioning and dismantling of nuclear installation. The former entity rests upon theoretical and practical methods from business administration, whilst the latter is based on current survey data retrieved from 667 personal interviews in one town in Poland and one town in Slovakia with a near 100 % response rate. The main conclusions from this field study may be summarised as follows: - Sustainable energy sources are prioritised. - Around one quarter of the respondents regards nuclear power as a future semi-sustainable commercial energy production mode subject to that the waste is managed in a sustainable, environmental friendly and safe way - The values are to a significant degree positioned on health, safety and environmental (HSE) attributes. - The polluter pays principle is honoured. - There are doubts regarding the compliance with these principles due to risks for delays in the implementation phase of repositories for disposal of the nuclear residues. - 1/5. of the respondents expressed an openness to reprocessing (which is linked to the concept of 'new nuclear power'). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sorbent Based Post-Combustion CO 2 Slipstream Testing

TDA Research, Inc. has developed a low-cost sorbent (alkalized alumina) based technology for post-combustion CO 2 capture. The sorbent runs in an isothermal process for adsorption and regeneration. Neither temperature swing nor pressure swing is needed. TDA designed a system which operated 10 fixed beds to simulate a moving bed process. The flow pattern was optimized to minimize the steam usage for regeneration. An excellent sorbent (Batch 1) was also developed with collaboration with our partner. The sorbent degraded after long term operation. We developed a reprocessing procedure, which can be conducted in situ, to restore the sorbent capture capacity as the fresh sorbent after running for about 1250 hours. The reprocessing extended the sorbent longevity significantly. TDA designed a pilot unit (40’ x 32’ x 11.5’), processing flue gas equivalent to 0.5 MW of power generation. It had 10 beds and each bed could hold 1.75 m 3 of sorbent. We worked with Springs Fabrication, Inc. to complete the construction of the pilot unit. It was then shipped and installed at NCCC. The pilot unit was kept running in 24-hour mode when the flue gas and steam were available. It could run automatically without operator on site. Parametric and long-term (2 months) tests were carried out successfully. The results showed that TDA’s process can achieve 90% capture and 95% CO 2 purity for both coal and NG flue gases. For coal flue gas, the system reached performance target when processing up to 0.62 MW flue gas, 24% higher than the design capacity. Thus, capital cost could be saved on the reactors and sorbent. The strip air flow was designed to be 0.25 of that of the flue gas. The test data showed the strip/flue ratio can be reduced to as little as 0.18, which saves the power consumption for the strip air blower. The pressure drop was found to be lower than what the empirical equation calculated. The sorbent still had 91.7% of original capacity after 3-month test. With the data from the pilot test, we updated the TEA. For a 550-MW e supercritical coal fired power plant with CO 2 capture, the capture cost for TDA’s process is $34.9/tonne CO 2 captured, which meets DOE’s goal of $40/tonne and is 17.1% less than the DOE baseline Case 12. Therefore, TDA’s process has a good potential for commercialization.

01 COAL, LIGNITE, AND PEAT↗

Calder Hall Cooling Tower Demolition: Landmark Milestone for Decommissioning at Sellafield

September 2007 saw a very visible change to the Sellafield site following the culmination of a major decommissioning project; the demolition of the four Calder Hall cooling towers. A key part of the UK's nuclear industrial heritage, Calder Hall, the world's first commercial nuclear power station, was opened by Her Majesty Queen Elizabeth II in October 1953 and continued to generate electricity until its closure in 2003. Following the decision to decommission the Calder Hall site, explosive demolition was identified as the safest and most cost effective route for the removal of the towers. The technique, involving the placement of explosive in 60% of the circumference of both shell and legs, is a tried and tested method which had already been used successfully in more than 200 cooling towers in the UK in the last 30 years. The location and composition of the four 88 metre high towers also created additional challenges. Situated only 40 metres away from the UK's only nuclear Fuel Handling Plant, as well as other sensitive structures on the Sellafield site, the project had to address the impact of a number of key areas, including dust, ground vibration and air over pressure, to ensure that the demolition could be carried out safely and without significant impact on other operational areas on the site. At the same time, the towers had to be prepared for demolition in a way that minimised the amounts of radioactive or hazardous waste materials arising. This paper follows the four year journey from the initial decision to demolish the towers right through to the demolition itself as well as the clean up of the site post demolition. It will also consider the massive programme of work necessary not only to carry out the physical work safely but also to gain regulatory confidence and stakeholder support to carry out the project successfully. In summary: The demolition of the four Calder Hall cooling towers was a highly visible symbol of the changes that are occurring on the Sellafield site as it moves forward towards a decommissioning future. Although in itself the demolition was both straightforward and standard, the various complexities posed by the towers situation at Sellafield introduced an entirely new element to the project, with a number of complex challenges which had to be overcome or resolved before the demolition could take place. It is a testament to the skill and dedication of the project team and its associated contractors that the project was delivered safely and successfully without a single accident, injury or event throughout the entire four years, and with minimal impact on both site operations and the local community. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Adaptation of Commercially Available Robots for Conditioning and Packaging ILW at Sellafield - 18282

The Legacy Ponds and Silos at Sellafield site contain some of the most hazardous Intermediate Level Waste (ILW) in the UK. As part of a multi-billion pound decommissioning programme, this waste will be retrieved and transported across the site for conditioning and packaging in the Box Encapsulation Plant (BEP). Current plans are to commence plant active commissioning in 2022, which will represent a major milestone in the UK nuclear decommissioning programme. Within the plant, skips of waste will be transferred from the shielded transport package into standard 3 cubic metre ILW containers. Waste from the Pile Fuel Storage Pond and First Generation Magnox Storage Pond will be immobilised in cementitious grout before being transferred to an adjacent store. Waste from the Magnox Swarf Storage Silo will not be immobilised in grout, but will be packaged, providing multi-barrier containment. During the concept design, the project team selected commercially available robots as the most viable technology for carrying out the numerous dexterous and repetitive tasks involved in characterising, conditioning and packaging the waste within the shielded 'hot' cells. Significant technical challenges had to be overcome during the design to adapt a commercially available robot for use within a high radiation / high contamination environment, where human access is not safe even for short periods of time. These challenges included: - Designing robot assemblies that could be retrofitted into the existing cell structure that was constructed as part of an earlier project but never completed; - Designing robot assemblies that could be recovered to their 'transport' position without requiring manual intervention; - Designing robot assemblies that could be remotely removed and replaced with new ones if they failed part way through the plant operational life; - Designing through-wall service and power connections that allow maintenance and recovery; - Designing control systems and human-machine interfaces that enable both manual and automated operation of the robot, whilst avoiding collisions with the in-cell cranes and other in cell furniture; - Assessing the radiation tolerance of all items. Bespoke computer simulations and full-scale development trials have been carried out, using non-active test materials, in order to demonstrate the Technology Readiness Level (TRL) required by Sellafield Limited (SL) at each stage of the project [1]. The results of these trials have been recorded in both video and written form so that they can form part of the project's Knowledge Management database. Detailed designs and specifications for the robot assemblies have been updated to incorporate the recommendations from the development trials. Procurement and manufacture of robot assemblies has already commenced to deliver two waste handling robots, two waste container lidding / swabbing robots and associated critical spares. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗